CN101649606A - 岩溶洼地无负压堵漏成湖方法 - Google Patents
岩溶洼地无负压堵漏成湖方法 Download PDFInfo
- Publication number
- CN101649606A CN101649606A CN200910115670A CN200910115670A CN101649606A CN 101649606 A CN101649606 A CN 101649606A CN 200910115670 A CN200910115670 A CN 200910115670A CN 200910115670 A CN200910115670 A CN 200910115670A CN 101649606 A CN101649606 A CN 101649606A
- Authority
- CN
- China
- Prior art keywords
- underground
- hole
- river
- lake
- underground river
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000007789 sealing Methods 0.000 claims abstract description 9
- 238000005553 drilling Methods 0.000 claims abstract 3
- 239000011435 rock Substances 0.000 claims description 11
- 230000006837 decompression Effects 0.000 claims description 7
- 238000005266 casting Methods 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 14
- 239000004575 stone Substances 0.000 abstract 4
- 239000002689 soil Substances 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 238000004162 soil erosion Methods 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
- 239000003643 water by type Substances 0.000 description 1
Images
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
一种岩溶洼地无负压堵漏成湖方法是:在落水洞众多的岩溶洼地通过物探仪探测地下暗河位置,从基岩表面垂直钻通孔与地下暗河相通,并浇铸混凝土形成防渗墙,将地下暗河堵塞,在防渗墙的前端及后端的基岩上钻减压通孔与地下暗河相通。另一种方法,在岩溶洼地与地下暗河相通的落水洞的基岩洞口浇铸带通孔的混凝土密封座,混凝土密封座与涵管一端相接,涵管的另一端高出成湖后的水平面。本发明采用科学的工程措施,确保了水域范围内地下基岩的稳定,使地表与地下暗河空气相通或水体相连,保持了地表与地下的应力场平衡,工程造价低,简单实用,而且没有任何安全隐患。
Description
技术领域
本发明涉及一种岩溶洼地无负压堵漏成湖方法。
背景技术
岩溶洼地是岩溶地区,特别是石漠化地区一种数量庞大、生态脆弱的构造单元,它的面积大的有成千上万亩,小的也有几十亩,位于小溪、河流的终端,是水土流失的出口及通道。它四面环山,谷底平坦,河水只能通过有限的落水洞经地下暗河汇入下游水系。这种地质结构造成在雨季水量大时无法及时排涝而受淹,旱季因落水洞的地下暗河的巨大吸力,带走大量水土而干旱。且随着岩溶洼地内的落水洞、地下暗河、溶洞的不断发展,岩石崩塌和地面塌陷等地质灾害频发,泥土逐年加快流失,最终岩石裸露而荒漠化。我国这种严重石漠化地区集中分布在珠江流域源头和长江流域上游地带,面积近百万平方公里,是我国四大生态脆弱带之一,该区域年降雨量充沛,并不缺水,但均以地下径流,快速流走的方式消失,致使地表干涸而严重缺水,是典型的工程性缺水区域。
目前,人们采取的办法是在相关区域对落水洞进行简单的密封,这种密封破坏了地表与地下的应力场平衡。由于地下暗河随着地下水位的变化,对密封处及相邻地域产生巨大的张力或吸力,使落水洞口根本无法堵牢,还会形成新的落水洞,水资源顺着落水洞流入地下暗河,白白浪费掉。
发明内容
本发明的目的就是提供一种工程造价低,能蓄水保土,并改善生态环境的岩溶洼地无负压堵漏成湖方法。
本发明的岩溶洼地无负压堵漏成湖方法是:枯水季节,在落水洞众多的岩溶洼地通过物探仪探测地下暗河位置,从基岩表面垂直钻通孔与地下暗河相通,并浇铸混凝土形成防渗墙,将地下暗河堵塞,在防渗墙的前端及后端的基岩上钻减压通孔与地下暗河相通。
本发明的岩溶洼地无负压堵漏成湖的另一种方法是:枯水季节,在岩溶洼地与地下暗河相通的落水洞的基岩洞口浇铸带通孔的混凝土密封座,混凝土密封座与涵管一端相接,涵管的另一端高出成湖后的水平面。
本发明的岩溶洼地无负压堵漏成湖方法,在地表和地下堵漏的时候,采用科学的工程措施,确保了水域范围内地下基岩的稳定、牢固,使地表与地下暗河空气相通或水体相连,保持了地表与地下的应力场平衡,化解了地下暗河随地下水位的变化形成巨大的张力或吸力,工程造价低,简单实用,一般情况下,建同等规模的水库或水面所需工程费用要比传流的筑坝工程的费用低很多,而且没有任何安全隐患。
附图说明
图1为本发明岩溶洼地无负压堵漏成湖方法的示意图;
图2为本发明岩溶洼地无负压堵漏成湖方法另一实施例的示意图。
具体实施方式
实施例1:(如图1)
一种岩溶洼地无负压堵漏成湖方法是:枯水季节,在落水洞4众多的岩溶洼地通过物探仪探测地下暗河2的位置,从基岩1表面垂直钻通孔6与地下暗河2相通,并浇铸混凝土形成防渗墙8,将地下暗河2堵塞,在防渗墙8的前端及后端的基岩1上钻前减压通孔5、后减压通孔7,前减压通孔5和后减压通孔7均与地下暗河2相通。基岩1上为土壤层3。
实施例2:(如图2)
一种岩溶洼地无负压堵漏成湖方法是:枯水季节,在岩溶洼地与地下暗河2相通的落水洞4的基岩洞口浇铸带通孔的混凝土密封座9,混凝土密封座9与涵管10一端相接,涵管10的另一端高出成湖后的水平面。
Claims (2)
1、一种岩溶洼地无负压堵漏成湖方法,其特征在于:枯水季节,在岩溶洼地通过物探仪探测地下暗河(2)的位置,从基岩(1)表面垂直钻通孔(6)与地下暗河(2)相通,并浇铸混凝土形成防渗墙(8),将地下暗河(2)堵塞,在防渗墙(8)的前端及后端的基岩(1)上钻前减压通孔(5)、后减压通孔(7),前减压通孔(5)和后减压通孔(7)均与地下暗河2相通。
2、一种岩溶洼地无负压堵漏成湖方法,其特征在于:枯水季节,在岩溶洼地与地下暗河(2)相通的落水洞(4)的基岩洞口浇铸带通孔的混凝土密封座(9),混凝土密封座(9)与涵管(10)一端相接,涵管(10)的另一端高出成湖后的水平面。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009101156707A CN101649606B (zh) | 2009-07-13 | 2009-07-13 | 岩溶洼地无负压堵漏成湖方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009101156707A CN101649606B (zh) | 2009-07-13 | 2009-07-13 | 岩溶洼地无负压堵漏成湖方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101649606A true CN101649606A (zh) | 2010-02-17 |
CN101649606B CN101649606B (zh) | 2011-07-06 |
Family
ID=41671923
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009101156707A Expired - Fee Related CN101649606B (zh) | 2009-07-13 | 2009-07-13 | 岩溶洼地无负压堵漏成湖方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101649606B (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101881015A (zh) * | 2010-05-31 | 2010-11-10 | 长江水利委员会长江勘测规划设计研究院 | 气动抛投散粒体地洞堵水的方法 |
CN106013049A (zh) * | 2016-06-13 | 2016-10-12 | 黄泽普 | 岩溶地区基桩工程施工方法 |
CN109403451A (zh) * | 2018-12-19 | 2019-03-01 | 中国科学院地球化学研究所 | 一种溶丘洼地人畜饮用水的大型蓄水系统及其实施方法 |
CN113187081A (zh) * | 2021-05-27 | 2021-07-30 | 贵阳市水利水电勘测设计研究院 | 一种喀斯特洼地封堵成库的方法 |
CN113944223A (zh) * | 2021-12-06 | 2022-01-18 | 中国地质科学院岩溶地质研究所 | 基于岩溶峰丛洼地群水流联合调控的旱涝灾害治理方法 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH01210580A (ja) | 1988-02-17 | 1989-08-24 | Central Res Inst Of Electric Power Ind | 覆工地中空間の築造工法 |
RU2152483C1 (ru) * | 1998-07-27 | 2000-07-10 | Читинский государственный технический университет | Способ предотвращения наледеобразования на склонах в малоснежных районах распространения вечной мерзлоты |
CN1173097C (zh) * | 2001-04-13 | 2004-10-27 | 河北省水利工程局 | 防渗墙施工防塌堵漏新工艺 |
CN1276157C (zh) * | 2004-09-17 | 2006-09-20 | 云南省地质调查院水文工程环境地质调查研究所 | 一种岩溶大泉束流调压壅水技术方案 |
CN100570077C (zh) * | 2006-01-18 | 2009-12-16 | 贵阳铝镁设计研究院 | 用于岩溶地区赤泥堆场的水平防渗结构 |
CN101270582B (zh) * | 2007-06-01 | 2010-09-01 | 中铁西北科学研究院有限公司 | 地下洞室内设置支撑柱的方法 |
CN100458018C (zh) * | 2007-10-24 | 2009-02-04 | 吴仲科 | 地下梯级水库及其建造方法 |
-
2009
- 2009-07-13 CN CN2009101156707A patent/CN101649606B/zh not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101881015A (zh) * | 2010-05-31 | 2010-11-10 | 长江水利委员会长江勘测规划设计研究院 | 气动抛投散粒体地洞堵水的方法 |
CN101881015B (zh) * | 2010-05-31 | 2011-06-15 | 长江水利委员会长江勘测规划设计研究院 | 气动抛投散粒体地洞堵水的方法 |
CN106013049A (zh) * | 2016-06-13 | 2016-10-12 | 黄泽普 | 岩溶地区基桩工程施工方法 |
CN106013049B (zh) * | 2016-06-13 | 2018-09-21 | 广东鹏祥建设有限公司 | 岩溶地区基桩工程施工方法 |
CN109403451A (zh) * | 2018-12-19 | 2019-03-01 | 中国科学院地球化学研究所 | 一种溶丘洼地人畜饮用水的大型蓄水系统及其实施方法 |
CN109403451B (zh) * | 2018-12-19 | 2024-08-20 | 中国科学院地球化学研究所 | 一种溶丘洼地人畜饮用水的大型蓄水系统及其实施方法 |
CN113187081A (zh) * | 2021-05-27 | 2021-07-30 | 贵阳市水利水电勘测设计研究院 | 一种喀斯特洼地封堵成库的方法 |
CN113944223A (zh) * | 2021-12-06 | 2022-01-18 | 中国地质科学院岩溶地质研究所 | 基于岩溶峰丛洼地群水流联合调控的旱涝灾害治理方法 |
CN113944223B (zh) * | 2021-12-06 | 2022-07-26 | 中国地质科学院岩溶地质研究所 | 基于岩溶峰丛洼地群水流联合调控的旱涝灾害治理方法 |
Also Published As
Publication number | Publication date |
---|---|
CN101649606B (zh) | 2011-07-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Li et al. | Protection against water or mud inrush in tunnels by grouting: a review | |
CN103967507B (zh) | 一种适于富水矿山井下开采堵水用的帷幕注浆工艺 | |
CN103091214A (zh) | 坝下渗流实验装置 | |
CN203824876U (zh) | 一种用于模拟地下水渗流的实验装置 | |
CN101649606A (zh) | 岩溶洼地无负压堵漏成湖方法 | |
Sun et al. | An improved siphon drainage method for slope stabilization | |
CN105137488A (zh) | 基于人工注液的地下水流场描述方法 | |
CN204662463U (zh) | 膨胀土路堑边坡深浅层排水结构 | |
CN210180872U (zh) | 一种模拟岩溶裂隙-管道水流及溶质运移规律的试验装置 | |
CN108918823B (zh) | 隧道突水突泥洞内涌泥淤积长度的预测方法 | |
CN101713185B (zh) | 地面沉降控制施工方法 | |
CN105297739B (zh) | 止水帷幕下基坑内定水位抽水时承压水位的确定方法 | |
Lei et al. | Experimental study of physical models for sinkhole collapses in Wuhan, China | |
CN106149734A (zh) | 一种岩土护坡结构及其施工方法 | |
CN202693189U (zh) | 一种测量超高压大流量岩溶裂隙水压力的封堵结构 | |
CN201802363U (zh) | 原地浸取注液系统 | |
Aliewi et al. | Design of dewatering schemes using analytical and numerical methods at residential areas in Kuwait | |
Li et al. | Determination method of water gushing runoff zones in the open pit mining area | |
CN201144706Y (zh) | 一种抗水压衬砌结构体系 | |
CN204825934U (zh) | 一种边坡排水系统 | |
Ouyang et al. | Seepage effects of groundwater and its make-up water on triggering ground subsidence | |
CN202767091U (zh) | 一种用于底板抗浮的盲沟结构 | |
CN101182999A (zh) | 一种确定围岩注浆堵水圈的厚度的方法 | |
CN111577385A (zh) | 一种限量排水方法及其优化隧道注浆圈厚度的方法 | |
CN110439614B (zh) | 一种煤炭开采底板疏放水模拟装置及使用方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110706 |
|
CF01 | Termination of patent right due to non-payment of annual fee |