- CN101588067A CN101588067A CNA2009100317044A CN200910031704A CN101588067A CN 101588067 A CN101588067 A CN 101588067A CN A2009100317044 A CNA2009100317044 A CN A2009100317044A CN 200910031704 A CN200910031704 A CN 200910031704A CN 101588067 A CN101588067 A CN 101588067A
- Authority
- CN
- China
- Prior art keywords
- accident
- data
- retrospection
- time
- accidents
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention discloses a safety accident retrospection and review method of an electrical power system. The method comprises the following steps: configuring retrospection points and retrospection data of accidents needing to be retrospected; reading accident retrospection point information according to configured information, and obtaining relevant data values from a real-time database; tracking the accident points in real time, recording the retrospection data, forming complete accident retrospection data pieces after the finish of the accidents and storing the complete accident retrospection data pieces into a historical database; and selecting items needing to be analyzed and viewed from happened accidents, inquiring relevant historical data, and displaying data change values and curves before and after the accidents and lists of all switching value displacement and analog value out-of-limit accidents. The method overcomes the defects of the prior art and organically combines the record and analysis of the accidents and monitoring and control of the industrial production process, and because the real-time database has flexible configuration means and high expansibility and maintainability, the maintenance of accident retrospection is simpler.
Description
Technical field
The present invention relates in automatic control, accident analysis and the diagnostic techniques security incident and recollect back method, especially relate to a kind of safety accident retrospection and review method of electrical power system.
Background technology
In power plant produced, safety in production was the most important thing.When industry spot has accident to take place,, must come out to carry out comprehensive analysis and judgement to each parameter relevant data extract in a period of time before and after accident with accident for the reason that the analysis accident takes place.This just requires to follow the tracks of the series of parameters relevant with accident, and under when accident takes place the historical data of this section in the time being preserved, i.e. emergency review.The realization of emergency review can have following several method:
(1) instrument record
This method uses special instrument to carry out emergency review, and cost is higher, and all needs cable for each measuring point and measurement point is linked to each other the wiring complexity with instrument.Because this type of instrument often can't adopt the instrument communication of various communications protocol and other manufacturers flexibly, so autgmentability and maintainability are all poor.But owing to be to adopt special hardware device, independently wiring is so stability better.
(2) special-purpose software record
This method has overcome the most of not enough of instrumentation record.Can use various means of communications to take the instrument communication of various communications protocol and multiple manufacturer, it is all higher to expand maintainability.But because this type of software only is used for the record accident, data show means and rich data analytical method so it lacks flexibly, also lack control device effectively.It often needs to cooperate the monitoring of finishing jointly production process with other software.
Summary of the invention
For the accident occurrence cause in the analytical industry production, must note the related data in this accident surrounding time, a series of data variation trend during accident analysis in the dynamically demonstration accident generation surrounding time are carried out comprehensive analysis and judgement thereby be convenient to the user, obtain correct conclusion.The purpose of emergency review and playback promptly is this.It provides the means of a kind of effective analysis accident and diagnosis accident.
To achieve these goals, the present invention adopts following technical scheme, comprises the steps:
The emergency review point of recollecting for needs and recollect data and be configured.These emergency review points and recollect data and all be taken from the computer supervisory control system real-time data base are responsible for the collection of data and are refreshed by supervisory control system.
Read the emergency review dot information according to configuration information, from real-time data base, obtain relevant data value.And the real-time tracking accident point, data recollected in record, and accident finishes the back and forms complete emergency review data slice, stores historical data base into.
Selection needs to analyze the clauses and subclauses of checking in the accident that has taken place, and the relevant historical data of inquiry demonstrates the tabulation of accident front and back data variation value and curve and all switching value displacements and the out-of-limit incident of analog quantity then.If adopt play mode to check, then the result that slowly will inquire according to playing progress rate shows, and is omnidistance thereby simulated accident takes place.
By the emergency review function is embedded in the real-time data base, can save cost and enhancement function to greatest extent.The present invention has overcome the deficiencies in the prior art, combines controlling to the record analysis of accident with to the supervision of industrial processes.Because real-time data base has configuration means and the higher maintainability expanded flexibly, so the maintenance of emergency review is also become simple.The real-time data base of supervisory control system just well provides the support to emergency review.
Description of drawings
Fig. 1 is a flow chart of the present invention
Embodiment
Below in conjunction with accompanying drawing the present invention is further described.
The emergency review configuration
The emergency review that need start for each bar need define emergency review and start time after time before source, emergency review data, the accident, the accident, sweep time.
Emergency review startup source is meant the entry condition of emergency review, comprise switching value change (by 0 become 1 or become 0 by 1), analog quantity is out-of-limit, gradient etc. more.
The emergency review data are meant the analog quantity relevant with accident point of needs record etc.After accident took place, the data message of accident point surrounding time was by input database.
Before the accident time be meant from the accident before opening entry data how long.
After the accident time be meant from the accident after end record data how long.
Be meant the time interval of emergency review data record sweep time.
The online processing of accident
The online processing of accident is as the resident affairs of a core of emergency review and playback, and it carries out real-time tracking to the startup source of the emergency review that defined, is that accident takes place in case satisfy entry condition, will preserve the emergency review data of definition.
Because the scope of emergency review record is a time period, the back time took place to accident in the time before promptly the accident of definition took place.So when the online processing of accident operation, track record emergency review data always just.The data of these records are according to the rolling forward that the time does not stop when accident does not take place, and the legacy data before the accident that is rolled to takes place beyond the time is rejected.When accident took place, the data of time were fixed before these accidents took place.Continue track record emergency review data simultaneously, take place the back time up to the arrival accident.At this moment recollecting data to this section of accident generation back time before accident takes place is saved.The switching value displacement of other in the online processing of accident also will be preserved down during this period of time simultaneously, the multiple more limit information of analog quantity.
The definition of emergency review data sheet field:
Field name | Type | Meaning |
year | smallint | Time of origin (year) |
month | smallint | Time of origin (moon) |
day | smallint | Time of origin (day) |
hour | smallint | Time of origin (time) |
minute | smallint | Time of origin (branch) |
second | smallint | Time of origin (second) |
ms | smallint | Time of origin (millisecond) |
srctag | varchar | Startup source tag name |
srcdes | varchar | Start Source Description |
preset | smallint | Time before the accident |
sumset | smallint | Time after the accident |
tracepoint | smallint | Recollect and count |
tracedata | Image | Recollect data |
Recollecting data tracedata is binary storage, and form is " [recollect and count]+remembrance point data [recollect and count] [recollecting total time length] are described in the remembrance point ".
Other switching value displacements of emergency review and the out-of-limit information of analog quantity are stored in other tables of data by " the online processing transactions of historical events " of supervisory control system, the online processing of historical events is in online wait state always in the supervisory control system running process, activate by incident and to store, and no matter whether there is accident to take place.
The inquiry of emergency review and playback.
Emergency review and playback query facility are the direct windows of accident analysis and diagnosis.At first query facility is retrieved time and startup Source Description that all accidents take place to come out from database, and the user can select wherein any one accident point that has taken place, and at this moment query facility retrieves the remembrance point data of this accident point once more and shows.
The data display of accident inquiry has several modes: data form, list of thing, curve are showed.Analog value is showed with the form of data form, is also showed with curve simultaneously.Other switching value displacements in accident process (accident, fault, shape become) and the multiple more limit information of analog quantity are showed with the form of list of thing.
Accident is play the accident overall process according to being divided into several minor time slices second, and the time schedule bar is at initial position, all data dumps.When the time progress moves forward, inquiry is satisfied the data of current time and is shown, and the time schedule bar is covered by the time, and all data show also and finish that the accident playing process finishes.
Claims (2)
1, a kind of safety accident retrospection and review method of electrical power system is characterized in that, may further comprise the steps:
The emergency review point of recollecting for needs and recollect data and be configured;
Read the emergency review dot information according to configuration information, from real-time data base, obtain relevant data value;
The real-time tracking accident point, data recollected in record, and accident finishes the back and forms complete emergency review data slice, stores historical data base into;
Demonstrate the tabulation of accident front and back data variation value and curve and all switching value displacements and the out-of-limit incident of analog quantity.
2, a kind of safety accident retrospection and review method of electrical power system according to claim 1 is characterized in that, described emergency review point and recollect data and all be taken from the computer supervisory control system real-time data base is responsible for the collection of data and is refreshed by supervisory control system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2009100317044A CN101588067A (en) | 2009-07-10 | 2009-07-10 | Safety accident retrospection and review method of electrical power system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2009100317044A CN101588067A (en) | 2009-07-10 | 2009-07-10 | Safety accident retrospection and review method of electrical power system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101588067A true CN101588067A (en) | 2009-11-25 |
Family
ID=41372185
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2009100317044A Pending CN101588067A (en) | 2009-07-10 | 2009-07-10 | Safety accident retrospection and review method of electrical power system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101588067A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101968829A (en) * | 2010-09-21 | 2011-02-09 | 深圳市华力特电气股份有限公司 | Electrical fire accident review method and device |
CN103646348A (en) * | 2013-09-26 | 2014-03-19 | 国家电网公司 | Method for saving factory station wiring diagram panoramic inversion context |
CN104049578A (en) * | 2013-03-12 | 2014-09-17 | 阿斯科动力科技公司 | Methods And Systems For Infrastructure-monitoring Control |
CN105761164A (en) * | 2016-02-25 | 2016-07-13 | 南京信息工程大学 | Hadoop-based electric power system accident recall method |
CN107193264A (en) * | 2017-06-07 | 2017-09-22 | 四川谊田集群科技有限公司 | The method and system that a kind of industrial automation event is traced to the source |
CN110996066A (en) * | 2019-12-19 | 2020-04-10 | 浙江中控技术股份有限公司 | Accident backtracking method and device |
-
2009
- 2009-07-10 CN CNA2009100317044A patent/CN101588067A/en active Pending
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101968829A (en) * | 2010-09-21 | 2011-02-09 | 深圳市华力特电气股份有限公司 | Electrical fire accident review method and device |
CN104049578A (en) * | 2013-03-12 | 2014-09-17 | 阿斯科动力科技公司 | Methods And Systems For Infrastructure-monitoring Control |
US10712735B2 (en) | 2013-03-12 | 2020-07-14 | Asco Power Technologies, L.P. | Methods and systems for infrastructure-monitoring control |
CN103646348A (en) * | 2013-09-26 | 2014-03-19 | 国家电网公司 | Method for saving factory station wiring diagram panoramic inversion context |
CN103646348B (en) * | 2013-09-26 | 2017-01-11 | 国家电网公司 | Method for saving factory station wiring diagram panoramic inversion context |
CN105761164A (en) * | 2016-02-25 | 2016-07-13 | 南京信息工程大学 | Hadoop-based electric power system accident recall method |
CN107193264A (en) * | 2017-06-07 | 2017-09-22 | 四川谊田集群科技有限公司 | The method and system that a kind of industrial automation event is traced to the source |
CN107193264B (en) * | 2017-06-07 | 2019-05-10 | 四川谊田集群科技有限公司 | A kind of method and system that industrial automation event is traced to the source |
CN110996066A (en) * | 2019-12-19 | 2020-04-10 | 浙江中控技术股份有限公司 | Accident backtracking method and device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101588067A (en) | Safety accident retrospection and review method of electrical power system | |
CN104407589B (en) | Workshop manufacturing process-oriented active sensing and anomaly analysis method of real-time production performance | |
CN108038553B (en) | Rolling mill equipment state on-line monitoring and diagnosing system and monitoring and diagnosing method | |
CN101673421B (en) | Automatic recording system for running time of production line device | |
CN106779592A (en) | A kind of improving production management banner system and application process | |
WO2008033231A3 (en) | Process data collection for process plant diagnostics development | |
WO2008033228A3 (en) | Process data collection system configuration for process plant diagnostics development | |
WO2008033235A9 (en) | Process data storage for process plant diagnostics development | |
DE102016108197A1 (en) | Method and device for determining the causes of failure of alarm patterns in process control systems | |
CN102915478A (en) | Production execution management system and method thereof | |
CN105573892B (en) | Business datum runs batch method and system | |
CN105739462A (en) | Intelligent real-time dynamic factory automation management system | |
CN103500163B (en) | The method and apparatus of identification event key development | |
EP3948831A1 (en) | System for displaying prices by means of a display panel | |
Dyreyes et al. | Tests of the direction of causation between money and income in six countries | |
CN106054832B (en) | Multivariable-based dynamic online monitoring method and device for intermittent chemical production process | |
CN111159487A (en) | Predictive maintenance intelligent system for automobile engine spindle | |
CN115796845A (en) | Intelligent electric power plant equipment regular inspection auxiliary decision-making method and system | |
CN101430688A (en) | Database automatic detection system and its operation method | |
CN116340312A (en) | Data storage method and system of GIS equipment partial discharge on-line monitoring system | |
DE102008005119A1 (en) | Resource planning system for service stakes on objects, comprises multiple identification carrier, which is assigned to object and has identification, which identifies object | |
CN111539686B (en) | Transportation management monitoring method based on vehicle running record visualization | |
AU2000245419A1 (en) | Method and system for recording and saving data from a production plant | |
CN112633704A (en) | Engineering construction site quality management system and method | |
CN111026792A (en) | Message-driven key process holographic tracing method and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Open date: 20091125 |