CN101552433A - Tower end bearing fixture for live-wire operation of tangent tower of high voltage transmission line - Google Patents
Tower end bearing fixture for live-wire operation of tangent tower of high voltage transmission line Download PDFInfo
- Publication number
- CN101552433A CN101552433A CNA2008100800660A CN200810080066A CN101552433A CN 101552433 A CN101552433 A CN 101552433A CN A2008100800660 A CNA2008100800660 A CN A2008100800660A CN 200810080066 A CN200810080066 A CN 200810080066A CN 101552433 A CN101552433 A CN 101552433A
- Authority
- CN
- China
- Prior art keywords
- jig
- tower
- transmission line
- live
- fixture
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000005540 biological transmission Effects 0.000 title claims abstract description 13
- 238000000034 method Methods 0.000 abstract description 3
- 239000000725 suspension Substances 0.000 abstract 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 20
- 239000000463 material Substances 0.000 description 17
- 229910052742 iron Inorganic materials 0.000 description 10
- 238000009434 installation Methods 0.000 description 2
- 239000012212 insulator Substances 0.000 description 2
- 238000011017 operating method Methods 0.000 description 2
- 230000000149 penetrating effect Effects 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 229910000746 Structural steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 description 1
- 239000010931 gold Substances 0.000 description 1
- 229910052737 gold Inorganic materials 0.000 description 1
- 238000011068 loading method Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000003252 repetitive effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000002834 transmittance Methods 0.000 description 1
Landscapes
- Electric Cable Installation (AREA)
Abstract
The invention relates to a tower end bearing fixture for the live-wire operation of a tangent tower of a high voltage transmission line of an electric power system. The tower end bearing fixture comprises a fixture, a screw rod of the fixture, a screw rod lifting device and an insulating suspension wire rod, wherein the screw rod lifting device can drive the screw rod of the fixture to move up and down, and the insulating suspension wire rod is arranged on the lower end of the screw rod of the fixture. The invention is convenient for operation, has obvious practical effects, can be applied to the live-wire operation of a tangent tower of a 110-500kV transmission line, and is especially suitable for skill competitions of the live-wire operation. With simplified operation steps, the invention can reduce the probability of hazard events comprising falling objects from high altitude, and the like in the process of transferring tools so that the safety is ensured.
Description
Technical field
The present invention relates to a kind of tower end load jig that is used for the live line working of power system high tension power line tangent tower.
Background technology
Traditional ultra-high-tension power transmission line tangent tower live line working tower end load jig adopts that the version structure of insulated hanger bar and cross-arm support is complicated, overall dimension is bigger.When being used for charged work high above the ground, for jig cross-arm support and insulated hanger bar are realized being connected, the operating personnel must penetrate the cross-arm support earlier from top to bottom on the tower in the two main material two angle-iron frame slits of lead hanging point, the cross-arm support is connected with insulated hanger bar bolt, personnel must be stretched in body part (hand) cross-arm master material below on the tower, finish a complete set of lead load device assembles, traditional power tool and operating type make the air gap between human body short circuit earth electrode and the electrified body, shortened the live line working safe distance, bring certain hazards for the safe operation of live line working operating personnel personal safety and transmission line charging equipment, and increased (high-altitude) work operations amount on the tower, the input manpower is more, operating time is longer, and efficiency descends thereupon.
Summary of the invention
Technical problem to be solved by this invention provide a kind of quick and easy for installation, safe and reliable can effectively increase work efficiency entirely be used for ultra-high-tension power transmission line tangent tower live line working tower end load jig.
The present invention adopts following technical scheme:
The present invention includes jig, jig leading screw, can drive leading screw lowering or hoisting gear that the jig leading screw moves up and down and the insulated hanger bar that is arranged on jig leading screw lower end.
Jig of the present invention both sides are provided with the jig wing plate, and the jig wing plate is provided with the reinforcement gusset.
The width of jig wing plate of the present invention is 40-60mm, and the optimum width of jig wing plate is 45-59mm.
The invention has the beneficial effects as follows: use the transmission of a complete set of load instrument of the present invention once to finish, avoid repeating work, reduce workload, reduce manpower, time input, increase work efficiency, method of operation of the present invention is easy, and practical function is obvious, can be applied to 110kV~500kV transmission line tangent tower live line working work.
The present invention is particularly useful for the contest of live line working technical ability.
Use the simplification of operating procedure of the present invention, can reduce the probability that the hazard events such as falling object from high altitude of instrument in transmittance process takes place, guarantee safety.Personnel need not be stretched in body part (hand) cross-arm master material below on the tower.The person and shielding clothing can the short circuit electrified body and earth electrode between the air gap.Guarantee charging equipment and personal safety, improve the job safety level.
Description of drawings
Accompanying drawing is a structural representation of the present invention.
In the accompanying drawings: 1 jig, 2 jig leading screws, 3 jig wing plates, 4 are strengthened gusset, 5 leading screw lowering or hoisting gears, 6 iron tower main materials, 7 insulated hanger bars, 8 insulator strings, 9 leads, 10 hooks, 11 operating grips.
Concrete real examination mode
As shown in drawings, the present invention includes jig 1, jig leading screw 2, can drive leading screw lowering or hoisting gear 5 that jig leading screw 2 moves up and down and the insulated hanger bar 7 that is arranged on jig leading screw 2 lower ends.Jig of the present invention 1 both sides are provided with jig wing plate 3, and jig wing plate 3 is provided with strengthens gusset 4.The width of jig wing plate 3 of the present invention is 40-60mm, and the optimum width of jig wing plate 3 is 45-59mm.
Jig 1 of the present invention, jig leading screw 2 and insulated hanger bar 7 connect as one, be passed on the tower jig leading screw 2 bottom-up penetrating in hanging point iron tower main material 6 slits, treat that jig rises to hanging point iron tower main material 6 tops, personnel's rotary fixture 1 on the tower, make it evenly stressed on iron tower main material 6 leading role's steel, can tighten up leading screw lifting lead 9 and carry out operation.The width of jig wing plate 3 of the present invention is 40-60mm, and the optimum width of jig wing plate 3 is 45-59mm, and the spacing between the iron tower main material 6 is 60mm, can penetrate in the slit between the two main materials of 500kV ultra-high-tension power transmission line tangent tower lead hanging point like this.As shown in drawings, jig 1 of the present invention is of a size of 58 * 58 * 45mm.
Adopt the operating procedure of jig of the present invention as follows:
1, jig 1 of the present invention, jig leading screw 2 and insulated hanger bar 3 are connected on ground.
2, use jig 1, jig leading screw 2 and insulated hanger bar 3 integral body transmitted after rope will connect to be delivered on the tower.After adopting jig of the present invention, a complete set of stressed equipment can the disposable installation on ground, and stressed equipment can once be passed on the tower.
3, the width of jig wing plate 3 of the present invention is 40-60mm, the optimum width of jig wing plate 3 is 45-59mm, can make on the tower personnel auxiliary like this is bottom-up penetrating iron tower main material 6 slits (two main materials are that the spacing between the iron tower main material 6 is 60mm) with jig 1 and jig leading screw 2 from lead 9 hanging wire points pair main materials, when treating that jig 1 rises to iron tower main material 6 tops, jig wing plate 3 revolved turn 90 degrees, make it evenly stressed on iron tower main material 6.After adopting jig of the present invention, on the tower personnel hand need not to be extended cross-arm master material be iron tower main material 6 belows.Avoid the air gap between the person and shielding clothing short circuit electrified body and the earth electrode.Guarantee charging equipment and personal safety.Avoid required workload of repetitive operation and time.Jig of the present invention 1 both sides are provided with jig wing plate 3, and jig wing plate 3 is provided with strengthens gusset 4, can improve the bearing capacity of jig 1 greatly, makes jig 1 more sturdy and durable.
4, personnel utilize leading screw lowering or hoisting gear 5 that jig leading screw 2 is moved up by turn operating grip 11 on the tower, promote lead 9, and lead 9 loadings are transferred on the stressed equipment that jig 1, jig leading screw 2 and insulated hanger bar 7 be formed by connecting from the substring 8 that insulate.
5, personnel carry out the lead gold utensil on the tower, the defective operation is changed or eliminated to insulator string 8.
Claims (3)
1, a kind of ultra-high-tension power transmission line tangent tower live line working tower end load jig that is used for is characterized in that it comprises jig (1), jig leading screw (2), can drive leading screw lowering or hoisting gear (5) that jig leading screw (2) moves up and down and the insulated hanger bar (7) that is arranged on jig leading screw (2) lower end.
2, a kind of ultra-high-tension power transmission line tangent tower live line working tower end load jig that is used for according to claim 1 is characterized in that described jig (1) both sides are provided with jig wing plate (3), and jig wing plate (3) is provided with strengthens gusset (4).
3, a kind of ultra-high-tension power transmission line tangent tower live line working tower end load jig that is used for according to claim 1 and 2, the width that it is characterized in that described jig wing plate (3) is 40-60mm, the optimum width of jig wing plate (3) is 45-59mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2008100800660A CN101552433A (en) | 2008-12-11 | 2008-12-11 | Tower end bearing fixture for live-wire operation of tangent tower of high voltage transmission line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2008100800660A CN101552433A (en) | 2008-12-11 | 2008-12-11 | Tower end bearing fixture for live-wire operation of tangent tower of high voltage transmission line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101552433A true CN101552433A (en) | 2009-10-07 |
Family
ID=41156482
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2008100800660A Pending CN101552433A (en) | 2008-12-11 | 2008-12-11 | Tower end bearing fixture for live-wire operation of tangent tower of high voltage transmission line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101552433A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103594968A (en) * | 2013-11-21 | 2014-02-19 | 国网上海市电力公司 | Lifting device of multiple divided conductors of transmission tower |
CN107658785A (en) * | 2017-10-16 | 2018-02-02 | 国网浙江嵊州市供电有限公司 | The pillar insulator quick replacement device of leading screw driving |
-
2008
- 2008-12-11 CN CNA2008100800660A patent/CN101552433A/en active Pending
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103594968A (en) * | 2013-11-21 | 2014-02-19 | 国网上海市电力公司 | Lifting device of multiple divided conductors of transmission tower |
CN103594968B (en) * | 2013-11-21 | 2016-03-30 | 国网上海市电力公司 | A kind of transmission tower multiple fission conductor lifting device |
CN107658785A (en) * | 2017-10-16 | 2018-02-02 | 国网浙江嵊州市供电有限公司 | The pillar insulator quick replacement device of leading screw driving |
CN107658785B (en) * | 2017-10-16 | 2023-12-15 | 国网浙江嵊州市供电有限公司 | Screw driven post insulator quick change device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2012088987A1 (en) | Maintenance tool for insulator of direct current transmission line | |
CN103618251A (en) | Technology for electrified overhaul of +-800kV ultrahigh voltage direct-current transmission line | |
CN102136695B (en) | Overhauling tool used for +/-660kV direct-current transmission line | |
CN101022212A (en) | Live line replacing method high voltage transmission line strain insulator-string and device | |
CN203352051U (en) | Insulation protective umbrella | |
CN201838934U (en) | Novel portable adjustable rod upper platform | |
CN101552433A (en) | Tower end bearing fixture for live-wire operation of tangent tower of high voltage transmission line | |
CN201360116Y (en) | Tower end bearing force fixture for tangent tower live-line work of high voltage power transmission line | |
CN206233852U (en) | A kind of Portable lifting transmission platform | |
CN206379675U (en) | Yoke plate card for live-line replacement of V-string insulator wire of tangent tower | |
CN114172078A (en) | Transmission line overhauls supports with automatically regulated and turns to coaster device | |
CN202308909U (en) | Clamping device for live line insulator string replacement | |
CN201946912U (en) | Universal clamp apparatus for cross arm of electric transmission line tangent tower | |
CN104836149A (en) | A tool and method for removing foreign matter from a split conductor of a high-voltage line | |
CN101567529B (en) | Lifting ladder hook for insulated pulling materials | |
CN206794455U (en) | Copper Bending Device | |
CN206099152U (en) | Middle multi -disc insulator specialized tool of direct current strain insulator tower is changed in segmentation | |
CN102290738B (en) | Construction method for replacing 35kV line tension pole cross arm | |
CN206349693U (en) | Four-bundle conductor splitting type wire lifting device and application structure thereof | |
CN204884916U (en) | Special joystick for distribution line intelligent switch controller | |
CN203632045U (en) | Transformer station electrical equipment grounding short-circuiting device with anti-falling function | |
CN204230763U (en) | A kind of 10kV overhead distribution electrical verification operation insulating bar | |
CN203931680U (en) | A kind of composite insulator one-shot forming compression bonding apparatus | |
CN205195138U (en) | A sharp shoulder pole card for changing sharp insulator chain that singly goes here and there | |
CN204886008U (en) | Wire lifting device for replacing insulator strings of large-tonnage wires with power on |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Open date: 20091007 |