CN101552433A - Tower end bearing fixture for live-wire operation of tangent tower of high voltage transmission line - Google Patents

Tower end bearing fixture for live-wire operation of tangent tower of high voltage transmission line Download PDF

Info

Publication number
CN101552433A
CN101552433A CNA2008100800660A CN200810080066A CN101552433A CN 101552433 A CN101552433 A CN 101552433A CN A2008100800660 A CNA2008100800660 A CN A2008100800660A CN 200810080066 A CN200810080066 A CN 200810080066A CN 101552433 A CN101552433 A CN 101552433A
Authority
CN
China
Prior art keywords
jig
tower
transmission line
live
fixture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008100800660A
Other languages
Chinese (zh)
Inventor
焦巨轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Power Co Ultra-Hv Transmission & Distribution Co
Original Assignee
Hebei Power Co Ultra-Hv Transmission & Distribution Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Power Co Ultra-Hv Transmission & Distribution Co filed Critical Hebei Power Co Ultra-Hv Transmission & Distribution Co
Priority to CNA2008100800660A priority Critical patent/CN101552433A/en
Publication of CN101552433A publication Critical patent/CN101552433A/en
Pending legal-status Critical Current

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention relates to a tower end bearing fixture for the live-wire operation of a tangent tower of a high voltage transmission line of an electric power system. The tower end bearing fixture comprises a fixture, a screw rod of the fixture, a screw rod lifting device and an insulating suspension wire rod, wherein the screw rod lifting device can drive the screw rod of the fixture to move up and down, and the insulating suspension wire rod is arranged on the lower end of the screw rod of the fixture. The invention is convenient for operation, has obvious practical effects, can be applied to the live-wire operation of a tangent tower of a 110-500kV transmission line, and is especially suitable for skill competitions of the live-wire operation. With simplified operation steps, the invention can reduce the probability of hazard events comprising falling objects from high altitude, and the like in the process of transferring tools so that the safety is ensured.

Description

A kind of ultra-high-tension power transmission line tangent tower live line working tower end load jig that is used for
Technical field
The present invention relates to a kind of tower end load jig that is used for the live line working of power system high tension power line tangent tower.
Background technology
Traditional ultra-high-tension power transmission line tangent tower live line working tower end load jig adopts that the version structure of insulated hanger bar and cross-arm support is complicated, overall dimension is bigger.When being used for charged work high above the ground, for jig cross-arm support and insulated hanger bar are realized being connected, the operating personnel must penetrate the cross-arm support earlier from top to bottom on the tower in the two main material two angle-iron frame slits of lead hanging point, the cross-arm support is connected with insulated hanger bar bolt, personnel must be stretched in body part (hand) cross-arm master material below on the tower, finish a complete set of lead load device assembles, traditional power tool and operating type make the air gap between human body short circuit earth electrode and the electrified body, shortened the live line working safe distance, bring certain hazards for the safe operation of live line working operating personnel personal safety and transmission line charging equipment, and increased (high-altitude) work operations amount on the tower, the input manpower is more, operating time is longer, and efficiency descends thereupon.
Summary of the invention
Technical problem to be solved by this invention provide a kind of quick and easy for installation, safe and reliable can effectively increase work efficiency entirely be used for ultra-high-tension power transmission line tangent tower live line working tower end load jig.
The present invention adopts following technical scheme:
The present invention includes jig, jig leading screw, can drive leading screw lowering or hoisting gear that the jig leading screw moves up and down and the insulated hanger bar that is arranged on jig leading screw lower end.
Jig of the present invention both sides are provided with the jig wing plate, and the jig wing plate is provided with the reinforcement gusset.
The width of jig wing plate of the present invention is 40-60mm, and the optimum width of jig wing plate is 45-59mm.
The invention has the beneficial effects as follows: use the transmission of a complete set of load instrument of the present invention once to finish, avoid repeating work, reduce workload, reduce manpower, time input, increase work efficiency, method of operation of the present invention is easy, and practical function is obvious, can be applied to 110kV~500kV transmission line tangent tower live line working work.
The present invention is particularly useful for the contest of live line working technical ability.
Use the simplification of operating procedure of the present invention, can reduce the probability that the hazard events such as falling object from high altitude of instrument in transmittance process takes place, guarantee safety.Personnel need not be stretched in body part (hand) cross-arm master material below on the tower.The person and shielding clothing can the short circuit electrified body and earth electrode between the air gap.Guarantee charging equipment and personal safety, improve the job safety level.
Description of drawings
Accompanying drawing is a structural representation of the present invention.
In the accompanying drawings: 1 jig, 2 jig leading screws, 3 jig wing plates, 4 are strengthened gusset, 5 leading screw lowering or hoisting gears, 6 iron tower main materials, 7 insulated hanger bars, 8 insulator strings, 9 leads, 10 hooks, 11 operating grips.
Concrete real examination mode
As shown in drawings, the present invention includes jig 1, jig leading screw 2, can drive leading screw lowering or hoisting gear 5 that jig leading screw 2 moves up and down and the insulated hanger bar 7 that is arranged on jig leading screw 2 lower ends.Jig of the present invention 1 both sides are provided with jig wing plate 3, and jig wing plate 3 is provided with strengthens gusset 4.The width of jig wing plate 3 of the present invention is 40-60mm, and the optimum width of jig wing plate 3 is 45-59mm.
Jig 1 of the present invention, jig leading screw 2 and insulated hanger bar 7 connect as one, be passed on the tower jig leading screw 2 bottom-up penetrating in hanging point iron tower main material 6 slits, treat that jig rises to hanging point iron tower main material 6 tops, personnel's rotary fixture 1 on the tower, make it evenly stressed on iron tower main material 6 leading role's steel, can tighten up leading screw lifting lead 9 and carry out operation.The width of jig wing plate 3 of the present invention is 40-60mm, and the optimum width of jig wing plate 3 is 45-59mm, and the spacing between the iron tower main material 6 is 60mm, can penetrate in the slit between the two main materials of 500kV ultra-high-tension power transmission line tangent tower lead hanging point like this.As shown in drawings, jig 1 of the present invention is of a size of 58 * 58 * 45mm.
Adopt the operating procedure of jig of the present invention as follows:
1, jig 1 of the present invention, jig leading screw 2 and insulated hanger bar 3 are connected on ground.
2, use jig 1, jig leading screw 2 and insulated hanger bar 3 integral body transmitted after rope will connect to be delivered on the tower.After adopting jig of the present invention, a complete set of stressed equipment can the disposable installation on ground, and stressed equipment can once be passed on the tower.
3, the width of jig wing plate 3 of the present invention is 40-60mm, the optimum width of jig wing plate 3 is 45-59mm, can make on the tower personnel auxiliary like this is bottom-up penetrating iron tower main material 6 slits (two main materials are that the spacing between the iron tower main material 6 is 60mm) with jig 1 and jig leading screw 2 from lead 9 hanging wire points pair main materials, when treating that jig 1 rises to iron tower main material 6 tops, jig wing plate 3 revolved turn 90 degrees, make it evenly stressed on iron tower main material 6.After adopting jig of the present invention, on the tower personnel hand need not to be extended cross-arm master material be iron tower main material 6 belows.Avoid the air gap between the person and shielding clothing short circuit electrified body and the earth electrode.Guarantee charging equipment and personal safety.Avoid required workload of repetitive operation and time.Jig of the present invention 1 both sides are provided with jig wing plate 3, and jig wing plate 3 is provided with strengthens gusset 4, can improve the bearing capacity of jig 1 greatly, makes jig 1 more sturdy and durable.
4, personnel utilize leading screw lowering or hoisting gear 5 that jig leading screw 2 is moved up by turn operating grip 11 on the tower, promote lead 9, and lead 9 loadings are transferred on the stressed equipment that jig 1, jig leading screw 2 and insulated hanger bar 7 be formed by connecting from the substring 8 that insulate.
5, personnel carry out the lead gold utensil on the tower, the defective operation is changed or eliminated to insulator string 8.

Claims (3)

1, a kind of ultra-high-tension power transmission line tangent tower live line working tower end load jig that is used for is characterized in that it comprises jig (1), jig leading screw (2), can drive leading screw lowering or hoisting gear (5) that jig leading screw (2) moves up and down and the insulated hanger bar (7) that is arranged on jig leading screw (2) lower end.
2, a kind of ultra-high-tension power transmission line tangent tower live line working tower end load jig that is used for according to claim 1 is characterized in that described jig (1) both sides are provided with jig wing plate (3), and jig wing plate (3) is provided with strengthens gusset (4).
3, a kind of ultra-high-tension power transmission line tangent tower live line working tower end load jig that is used for according to claim 1 and 2, the width that it is characterized in that described jig wing plate (3) is 40-60mm, the optimum width of jig wing plate (3) is 45-59mm.
CNA2008100800660A 2008-12-11 2008-12-11 Tower end bearing fixture for live-wire operation of tangent tower of high voltage transmission line Pending CN101552433A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008100800660A CN101552433A (en) 2008-12-11 2008-12-11 Tower end bearing fixture for live-wire operation of tangent tower of high voltage transmission line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008100800660A CN101552433A (en) 2008-12-11 2008-12-11 Tower end bearing fixture for live-wire operation of tangent tower of high voltage transmission line

Publications (1)

Publication Number Publication Date
CN101552433A true CN101552433A (en) 2009-10-07

Family

ID=41156482

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008100800660A Pending CN101552433A (en) 2008-12-11 2008-12-11 Tower end bearing fixture for live-wire operation of tangent tower of high voltage transmission line

Country Status (1)

Country Link
CN (1) CN101552433A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103594968A (en) * 2013-11-21 2014-02-19 国网上海市电力公司 Lifting device of multiple divided conductors of transmission tower
CN107658785A (en) * 2017-10-16 2018-02-02 国网浙江嵊州市供电有限公司 The pillar insulator quick replacement device of leading screw driving

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103594968A (en) * 2013-11-21 2014-02-19 国网上海市电力公司 Lifting device of multiple divided conductors of transmission tower
CN103594968B (en) * 2013-11-21 2016-03-30 国网上海市电力公司 A kind of transmission tower multiple fission conductor lifting device
CN107658785A (en) * 2017-10-16 2018-02-02 国网浙江嵊州市供电有限公司 The pillar insulator quick replacement device of leading screw driving
CN107658785B (en) * 2017-10-16 2023-12-15 国网浙江嵊州市供电有限公司 Screw driven post insulator quick change device

Similar Documents

Publication Publication Date Title
WO2012088987A1 (en) Maintenance tool for insulator of direct current transmission line
CN103618251A (en) Technology for electrified overhaul of +-800kV ultrahigh voltage direct-current transmission line
CN102136695B (en) Overhauling tool used for +/-660kV direct-current transmission line
CN101022212A (en) Live line replacing method high voltage transmission line strain insulator-string and device
CN203352051U (en) Insulation protective umbrella
CN201838934U (en) Novel portable adjustable rod upper platform
CN101552433A (en) Tower end bearing fixture for live-wire operation of tangent tower of high voltage transmission line
CN201360116Y (en) Tower end bearing force fixture for tangent tower live-line work of high voltage power transmission line
CN206233852U (en) A kind of Portable lifting transmission platform
CN206379675U (en) Yoke plate card for live-line replacement of V-string insulator wire of tangent tower
CN114172078A (en) Transmission line overhauls supports with automatically regulated and turns to coaster device
CN202308909U (en) Clamping device for live line insulator string replacement
CN201946912U (en) Universal clamp apparatus for cross arm of electric transmission line tangent tower
CN104836149A (en) A tool and method for removing foreign matter from a split conductor of a high-voltage line
CN101567529B (en) Lifting ladder hook for insulated pulling materials
CN206794455U (en) Copper Bending Device
CN206099152U (en) Middle multi -disc insulator specialized tool of direct current strain insulator tower is changed in segmentation
CN102290738B (en) Construction method for replacing 35kV line tension pole cross arm
CN206349693U (en) Four-bundle conductor splitting type wire lifting device and application structure thereof
CN204884916U (en) Special joystick for distribution line intelligent switch controller
CN203632045U (en) Transformer station electrical equipment grounding short-circuiting device with anti-falling function
CN204230763U (en) A kind of 10kV overhead distribution electrical verification operation insulating bar
CN203931680U (en) A kind of composite insulator one-shot forming compression bonding apparatus
CN205195138U (en) A sharp shoulder pole card for changing sharp insulator chain that singly goes here and there
CN204886008U (en) Wire lifting device for replacing insulator strings of large-tonnage wires with power on

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20091007