CN101550692A - Constructing method for reinforcing mixing stake around built shield tunnel - Google Patents

Constructing method for reinforcing mixing stake around built shield tunnel Download PDF

Info

Publication number
CN101550692A
CN101550692A CNA2009100506296A CN200910050629A CN101550692A CN 101550692 A CN101550692 A CN 101550692A CN A2009100506296 A CNA2009100506296 A CN A2009100506296A CN 200910050629 A CN200910050629 A CN 200910050629A CN 101550692 A CN101550692 A CN 101550692A
Authority
CN
China
Prior art keywords
agitation pile
pile
tunnel
stake
reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2009100506296A
Other languages
Chinese (zh)
Other versions
CN101550692B (en
Inventor
陈思慧
温锁林
普德荣
杨永平
王建华
张俊峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Tunnel Engineering Co Ltd
Original Assignee
Shanghai Tunnel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tunnel Engineering Co Ltd filed Critical Shanghai Tunnel Engineering Co Ltd
Priority to CN2009100506296A priority Critical patent/CN101550692B/en
Publication of CN101550692A publication Critical patent/CN101550692A/en
Application granted granted Critical
Publication of CN101550692B publication Critical patent/CN101550692B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention provides a constructing method for reinforcing mixing stake around a built shield tunnel. The method mainly comprises the following steps: stake position sampling; digging groove and making the slurry pool; digging the guiding groove; placing the positioning steel; positing the stake machine and rectifying the verticality for the stake machine; controlling the mark of the stake of the machine; sinking and improving the drilling rod of the stake machine and filing the slurry; the characteristic is mixing the slurry to the stake by different types of the mixing stake to control the sinking and improving speed, reducing the influence if the built shield tunnel for the construction and forming the protection of the tunnel to reduce the pumping quantity of the tunnel.

Description

Carrying out the job practices that agitation pile is reinforced around the built shield tunnel
Technical field
The present invention relates to a kind of job practices that agitation pile is reinforced, relate in particular to and a kind ofly carrying out the job practices that agitation pile is reinforced around the built shield tunnel.
Background technology
Along with the development of China's urban construction and public transport, must carry out mixing pile construction by the built shield tunnel sometimes; The mixing pile construction method is constructed routinely, can produce greatly influence to the shield tunnel of having built, thereby might influence the normal use of built shield tunnel; Conventional mixing pile construction can destroy soil structures, when replacing a part of soil body with cement paste at short notice, cement paste before not solidifying its weight less than the weight of undisturbed soil, therefore should the routine mixing pile construction can cause built shield tunnel produces local unloading effect in a period of time, shield tunnel around the agitation pile can produce very big come-up protuberance, can cause shield tunnel normally not use like this, bring inconvenience for people's living trip.And, in order to satisfy the normal operation of shield tunnel, when around shield tunnel, carrying out mixing pile construction, require the final absolute displacement of shield tunnel construction can not surpass 20mm, the radius of curvature of deformation curve is not less than 15000m, and bending is not more than 1/2500 relatively.
Application number 200610029159.1, publication number CN1900466A, the Chinese invention patent that name is called " isolation pile construction method that is used for important building protection " discloses a kind of isolation pile construction method that is used for the key protection point building.The divider wall that is formed by isolation pile has effectively prevented peripheral because of the influence of constructions such as continuous wall trench underground construction and excavation of foundation pit to the focused protection building, reduces and controlled the soil deformation of focused protection building below.Yet the shielded building distance of the divider wall distance that the technical scheme of this patent disclosure is formed by isolation pile is 2-2.8m at least; In addition, this job practices is not considered the adverse effect that partition wall construction causes the surrounding buildings thing.
Yet, in actual engineering construction, for around shield tunnel, carrying out mixing pile construction, isolate agitation pile apart from the nearest distance of shield tunnel at least in 1 meter, when in this distance range, carrying out mixing pile construction, can cause adverse effect to built shield tunnel, and mixing pile construction method of the prior art can not solve all and isolates mixing pile construction can the shield tunnel of having built not exerted an influence in 1 meter distance range; Above shortcoming at prior art, when built shield tunnel carries out mixing pile construction on every side, in order to guarantee the normal use of built shield tunnel, satisfy the requirement of built shield tunnel structure, and when shield tunnel carries out mixing pile construction on every side, shield tunnel is not exerted an influence, be necessary to propose carrying out the job practices that agitation pile is reinforced around the built shield tunnel.
Summary of the invention
In order to solve above technical problem; the invention provides and carrying out the job practices that agitation pile is reinforced around the built shield tunnel; agitation pile around the tunnel is divided into different types; the water/binder ratio of the agitation pile by controlling variant type and the sinking and the hoisting velocity of stirring-head; thereby be reduced in when carrying out mixing pile construction the influence that shield tunnel is on every side caused; and to around shield tunnel form protection, reduce the protuberance amount of shield tunnel.
Of the present inventionly around built shield tunnel, carrying out the job practices that agitation pile is reinforced, the agitation pile of reinforcing around the built shield tunnel is divided into the isolation agitation pile of both sides, tunnel, the reinforcing agitation pile of tunnel upper and the reinforcing agitation pile of isolating the agitation pile outside, and this method mainly may further comprise the steps:
Carry out stake position setting-out in each position that need beat agitation pile;
Excavate groove in each position, position, make at least one mud pit on construction ground;
With the agitation pile pile-forming machine perching, and the stake machine carried out rectify perpendicular;
On the drilling rod of stake machine, do the long control mark of stake;
Sink and promote the mixing pile machine drilling rod, carry out slip casting simultaneously;
It is characterized in that: both sides, described tunnel are provided with at least two rows and isolate agitation pile, and adopt the jumping play to isolate the piling of agitation pile; Adopt the jumping play that the reinforcing agitation pile of tunnel upper is driven piles; Utilize the method for piling continuously that the reinforcing agitation pile in the isolation pile outside is driven piles.
The further improvement of this method is: described jumping play of driving piles used to the isolation agitation pile of both sides, tunnel adopts the mode of plaing a jumping two.
The further improvement of this method is: described jumping play of driving piles used to the reinforcing agitation pile of tunnel upper adopts the mode of plaing a jumping two.
The further improvement of this method is: during slip casting, the water/binder ratio of the cement grout of described isolation agitation pile is 1.5~1.8 in stake machine piling process.
The further improvement of this method is: during slip casting, the water/binder ratio that described tunnel upper stirs the cement grout of reinforcing stake is 1.2~1.4 in stake machine piling process.
The further improvement of this method is: in stake machine piling process during slip casting, the water/binder ratio of cement grout that described tunnel isolates the reinforcing agitation pile in the agitation pile outside is 1.4~1.6.
The further improvement of this method is: to the tunnel lateral septal when agitation pile is driven piles, the stirring-head of stake machine is whitewashed in the sinking process, and the stirring-head subsidence velocity is less than 0.4m/min; Do not whitewash during lifting, and the stirring-head hoisting velocity is less than 0.6m/min.
The further improvement of this method is: when the reinforcing stake of tunnel upper is driven piles, whitewash in the stirring-head sinking process of stake machine, do not whitewash during lifting; And the stirring-head subsidence velocity is less than 0.4m/min, and the stirring-head hoisting velocity is less than 0.6m/min.
The further improvement of this method is: when the reinforcing agitation pile of the tunnel being isolated the agitation pile outside is driven piles, whitewash in the stirring-head sinking process of stake machine, do not whitewash during lifting; And the stirring-head subsidence velocity is less than 0.4m/min, and the stirring-head hoisting velocity is less than 0.6m/min.
By above-described technical scheme; of the present inventionly around built shield tunnel, carrying out the job practices that agitation pile is reinforced; the isolation agitation pile that agitation pile around the tunnel is divided into the outside, tunnel; the reinforcing agitation pile of tunnel upper and three kinds of dissimilar agitation piles of reinforcing agitation pile of isolating the agitation pile outside; the water/binder ratio of the agitation pile by controlling variant type and the sinking and the hoisting velocity of stirring-head; thereby be reduced in when carrying out mixing pile construction the influence that shield tunnel is on every side caused; and to around shield tunnel form protection; reduce the protuberance amount of shield tunnel, and can make isolate agitation pile apart from the minimum distance of shield tunnel in 1 meter scope.
Description of drawings
Fig. 1 is the reinforcing sectional plan of the present invention's one preferred embodiment;
Fig. 2 is in the present invention's one preferred embodiment, the sequence of construction and the bridging method schematic diagram of the isolation agitation pile in the outside, tunnel and the reinforcing agitation pile of tunnel upper;
Fig. 3 isolates sequence of construction and bridging method schematic diagram that the agitation pile outside reinforces agitation pile in the present invention's one preferred embodiment; And
Fig. 4 is in the present invention's one preferred embodiment the testing result schematic diagram of the shield tunnel protuberance that mixing pile construction causes.
The specific embodiment
In conjunction with a specific embodiment the specific embodiment of the present invention is described in detail.Constructed by the built shield tunnel one, in order not influence this normal operation of built shield tunnel, protect this built shield tunnel, need carry out mixing pile construction around the built shield tunnel at this, around shield tunnel, form stabilization zone, with reference to figure 1, the stabilization zone 30 in the stabilization zone 20 of shield tunnel 10 both sides, stabilization zone 20 outsides and the stabilization zone (not shown) of shield tunnel 10 tops; And when carrying out mixing pile construction, in order to reduce the shield tunnel protuberance that mixing pile construction causes, reach the structural requirement of shield tunnel, guarantee the normal operation of shield tunnel, agitation pile in the stabilization zone around the built shield tunnel is divided three classes: nearly shield tunnel and be parallel to the isolation agitation pile that shield tunnel is provided with, and in this specific embodiment, isolation pile is 700mm apart from shield tunnel, in order to guarantee enough good isolation effect, isolation agitation pile that three rows are parallel to shield tunnel is set (certainly, also can be according to concrete construction needs, the isolation agitation pile of required row's number is set), the degree of depth of this isolation agitation pile will run through whole tunnel, and extend to the certain degree of depth in below, tunnel, the degree of depth of this extension is relevant with concrete soil layer, according to different soil layers, the degree of depth difference of this extension, and should the full hall reinforcing of isolation agitation pile form stabilization zone 20; The reinforcing agitation pile of shield tunnel top, the distance at the top of the distance from bottom shield tunnel of this reinforcing agitation pile is generally more than 1m, the height of this reinforcing agitation pile will be determined according to the requirement of different soil layer constructions and engineering, and should reinforce the full hall of agitation pile and reinforce the stabilization zone (not shown) that forms 10 tops, tunnel; And the reinforcing agitation pile in the isolation pile outside, the length of this reinforcing agitation pile generally is identical with the length of isolation agitation pile, and should the full hall reinforcing of reinforcing agitation pile form stabilization zone 30.
When carrying out mixing pile construction, the sequence of construction of three types agitation pile can be according to the demand of concrete engineering, select corresponding sequence of construction, we adopt the isolation agitation pile of first construction tunnel both sides in this specific embodiment, and then the reinforcing agitation pile in the reinforcing agitation pile of construction tunnel top and the isolation pile outside, adopting specification in this specific embodiment is the agitation pile of Ф 850, and the stake footpath is 850mm, and wherein the mixing pile construction step mainly comprises:
A) stake position setting-out:
Control point direct-axis line direction is extended to outside the construction area both sides five meters local and bury underground along axis direction with steel nail; Emit the stake position by site technology person according to design drawing and measurement control point, a stake bit plane deviation is not more than 5cm.
B) excavation groove and make mud pit:
Clean and tidy for the safety displacement that guarantees a machine and job site uses digging machine to excavate groove in advance on agitation pile stake position, in order to deposit the mud that cements out in the piling process, the about 1.2m of ditch groove width, dark 0.7~1m; Also need make a big mud pit in addition at the construction field (site), place in it, treat the dried slightly back outward transport of soil body mud in order to the soil body mud that will on each position, cement out in three mixing pile construction processes.
C) excavation guide groove:
According to bracing of foundation pit inner edge control line, adopt digging machine excavation guide groove, and remove underground obstacle, the surplus soil of excavation groove should in time be handled.
D) placement positioning shaped steel:
The vertical trench direction is placed two location shaped steel, and specification is 200mm * 200mm, is about 2.5m, places two location shaped steel specification 300mm * 300mm in the parallel groove direction again, is about 8~20m.
E) stake in place machine and carry out the rectify perpendicular of a machine:
Perform at the beam worker of carrying out above each step, with pile-forming machine perching; Pile-forming machine perching ground is not only smooth, solid, lays some 2m * 7m roadbed steel plate casees simultaneously under creeper tread; When pile-forming machine perching, leg oil pressure stent support can be guaranteed vertically construction firmly of a machine like this before and after it on the road headblock in addition.
Behind pile-forming machine perching, the stake machine is carried out rectify perpendicular: on the pile frame of stake machine, be welded with the iron ring that a radius is 5cm, hang a plummet, utilize transit to proofread and correct the drilling rod verticality, make plummet just in time by the iron ring center from the eminence of iron ring 10m.Must suitably regulate drilling rod before each piling construction, make plummet probably be positioned at the center of iron ring, promptly the drilling rod error of perpendicularity is controlled in 0.5%, can guarantee that like this each agitation pile is in vertical direction substantially.
F) the long control mark of stake:
Because the long variation of this engineering agitation pile stake is more, therefore before carrying out the agitation pile piling construction, the stake that all should determine this agitation pile is long, on stake machine drill bar, carry out respective markers according to the stake of this agitation pile is long, can control a machine like this and carry out agitation pile when piling, making that stake is long must not be less than designing pile length; When playing new stake,, wipe old mark, according to the long mark newly of on drilling rod, carrying out accordingly of new stake if during changing of stake long hair.
G) begin piling:
Behind the long mark of the good stake of drilling rod subscript, start a stake machine and drive piles, should put up before the construction and mix the slurry platform, all workmans are carried out the work of telling somebody what one's real intentions are of detailed construction technology; Begin piling, drilling rod sinks and promotes slip casting, stirring, lifting.To dissimilar agitation piles, volume used when it is driven piles is distinguished to some extent according to the difference of its type.
When the isolation agitation pile in the shield tunnel outside was driven piles, the volume that its whitewashing is adopted was 20% Portland cement, and the water/binder ratio scope of cement grout is 1.5~1.8, available in this embodiment 1.6 water/binder ratio; Whitewash in the stirring-head sinking process, and its subsidence velocity can adopt 0.25m/min in this embodiment less than 0.4m/min, do not whitewash during lifting, and its hoisting velocity can adopt 0.4m/min in this embodiment less than 0.6m/min.
When the reinforcing agitation pile above the shield tunnel was driven piles, the volume that its whitewashing is adopted was 20% Portland cement, and the water/binder ratio scope of cement grout is 1.2~1.4, available in this embodiment 1.3 water/binder ratio; Whitewash in the stirring-head sinking process, the stirring-head subsidence velocity can adopt 0.25m/min in this embodiment less than 0.4m/min, does not whitewash during lifting, and the stirring-head hoisting velocity can adopt 0.4m/min in this embodiment less than 0.6m/min.
For the reinforcing agitation pile that shield tunnel is isolated the agitation pile outside, its construction technology is identical substantially with the reinforcing agitation pile of shield tunnel top; But, two kinds of water/binder ratio differences of reinforcing the cement grout that agitation pile adopted, the water/binder ratio of the reinforcing agitation pile cement grout of shield tunnel top is prepared according to 1.2~1.4 scope, shield tunnel is isolated the water/binder ratio of the reinforcing agitation pile cement grout in the agitation pile outside and is prepared available in this embodiment 1.5 water/binder ratio according to 1.4~1.6 scope.
And when carrying out mixing pile construction, according to the mixing pile construction technological requirement, drilling rod all need inject cement grout when sinking and promote.In addition, drilling rod subsidence velocity and hoisting velocity will be carried out in strict accordance with the construction parameter table, require even, continuous injection to mix the cement grout that makes, and drilling rod promotes when finishing, and the design cement grout has all been annotated, and this moment, mixing pile construction finished.
For dissimilar agitation piles, its sequence of construction and bridging method difference: with reference to figure 2 is the isolation agitation pile in the shield tunnel outside and the sequence of construction and the bridging method figure of the reinforcing agitation pile above the shield tunnel.When the agitation pile of this two class is constructed, adopt the jumping play to construct, adopt in this embodiment and make a call to one and jump two mode (can certainly adopt different jumping play), each agitation pile is numbered according to different requirement of engineering, when the first round constructs to being numbered 3n+1 (n=0,1,2, agitation pile 3...) is driven piles, and takes turns when construction to being numbered 3n+2 (n=0 second, 1,2, agitation pile 3...) is driven piles, and overlaps with the agitation pile that is numbered 3n+1, carry out the third round construction then, to being numbered 3n+3 (n=0,1,2,3...) agitation pile carry out piling construction, it overlaps with the agitation pile that is numbered 3n+2; In this specific embodiment, at first construct and isolate agitation pile from the nearest row of shield tunnel, behind the isolation agitation pile of finishing first row, and then carry out second row and isolate the construction of agitation pile, and second row's isolation agitation pile will overlap with first row's isolation, construct then the 3rd row's isolation agitation pile, and the 3rd row's isolation agitation pile will overlap (simultaneously with reference to figure 1) with second row's isolation agitation pile; The sequence of construction of the reinforcing agitation pile of shield tunnel top and method are identical with this sequence of construction and method of isolating agitation pile; The above is a kind of sequence of construction method of comparison standard, certainly in concrete work progress, can determine to jump according to concrete construction environment and beat sequence of construction.
With reference to figure 3 is the sequence of construction and the bridging method schematic diagram of the reinforcing agitation pile in the isolation pile outside.Reinforcing agitation pile to the isolation pile outside, order by continuous construction is constructed, and each is reinforced between the agitation pile and overlaps (simultaneously with reference to figure 1) mutually, and on having constructed after the construction of an agitation pile, the engineering time of itself and next agitation pile can be determined according to the requirement of concrete engineering at interval, what adopt in this project is continuous construction, on having constructed one reinforce agitation pile after, can carry out next mixing pile construction with that; Reinforcing agitation pile between each row overlaps (simultaneously with reference to figure 1) mutually in addition.
With reference to figure 4 in the specific embodiment of the invention when finishing all mixing pile constructions, the testing result schematic diagram of the protuberance amount of shield tunnel and deflection at a time, its abscissa is represented the position coordinates of each test point, the m of its unit, ordinate is represented the protuberance amount of each test point, its unit is mm, is adopting job practices of the present invention to carry out in the work progress, has arranged several protuberance observation points and monitor in real time on the shield tunnel axis; In this concrete enforcement, finish to a last agitation pile since first mixing pile construction, last 3 months, from Fig. 4, can learn, point sometime after the construction of finishing all agitation piles, the total protuberance amount of actual shield tunnel is no more than 5mm, and deflection is no more than 1mm.Table 1 has provided since first mixing pile construction and has finished to a last agitation pile, lasted 3 months and after finishing two months of constructing in, the protuberance amount of shield tunnel every month, the data of being given from form can learn that the protuberance amount of the every month of shield tunnel also all is no more than 5mm, and the deflection of every month also all is no more than 1mm.And, according to protuberance variable quantity and builder's diary at construction period shield tunnel each monitoring location every day, can find the nearest local shield tunnel protuberance maximum in agitation pile position that distance has just been constructed, can swell the back and sink finishing near the agitation pile position of construction shield tunnel, adopt job practices construction of the present invention, vertical protuberance can take place or sink in shield tunnel, monitored data after finishing according to whole stabilization zone mixing pile construction, contrast finds that the shield tunnel protuberance amount that each odd-numbered day mixing pile construction causes is no more than 0.5mm, and deflection is no more than 0.36mm; This shows, according to each monitoring point monitoring result of every day, and after all mixing pile constructions finish, protuberance amount that shield tunnel is final and deflection all satisfy the structural requirement of built shield tunnel, guarantee the normal operation of shield tunnel, produce good effect.
Table 1
Survey period Y0 Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 Y11 Y12 Y13 Y14 Y15
September 0 00 0.00 0 02 0 09 0 18 0 20 0 19 0 20 0.19 0.21 0 26 0.24 0 16 0.09 0 05 0 01
October 0 00 0 01 0 09 0.17 0 31 0.34 0.37 0.43 0 46 0 58 0 69 0 56 0 51 0 45 0 43 0 42
November 0 00 0 11 0 31 0 43 0 63 0 64 0.64 0 62 0 79 1 09 1.50 1 68 1 83 1 96 2.12 2.31
December 0 00 0 29 0 73 0 99 1 38 1 35 1 24 1 03 1.15 1 47 2 14 2.38 2 73 2 82 3 04 3.48
01 month 0.00 0.75 1.68 2.02 2.25 1.47 0 62 -0 31 -0.57 -0.51 0 08 0 22 0 56 0.69 0.89 1.57
Survey period Y16 Y17 Y18 Y19 Y20 Y21 Y22 Y23 Y24 Y25 Y26 Y27 Y28 Y29 Y30 Y31
September -0 01 -0.11 -0.10 -0 13 -0 13 -0 18 -0 25 -0.30 -0.29 -0.29 -0.28 -0 27 -0 29 -0.22 -0.27 -0.29
October 0 46 0 40 0.58 0 54 0.54 0 46 0 24 0.15 0 12 0.08 0.00 -0 10 -0.21 -0.19 -0 29 -0.37
November 2.45 2.37 2.69 2.89 3 19 3 39 3.21 3 10 2 99 2.83 2 44 2.02 1.42 1.09 0.81 0.56
December 3 83 3 56 3 85 3 90 4.04 4.13 3 90 4 00 3.90 3.57 2.84 2 09 1.37 1.20 0 49 0.05
01 month 2.23 2 02 2.55 2.81 3 10 3 43 3.49 3.84 3.86 3.52 2.67 1.73 0.94 0.64 -0.28 -0.73
Survey period Y31 Y32 Y33 Y34 Y35 Y36 Y37 Y38 Y39 Y40 Y41 Y42 Y43 Y44 Y45
September -0.29 -0.28 -0.24 -0.19 -0.18 -0.17 -0.18 -0.16 -0.13 -0.05 -0.03 -0.01 0.04 0.05 0.00
October -0.37 -0.40 -0.39 -0.37 -0.41 -0.41 -0.38 -0.42 -0.34 -0.22 -0.15 -0.11 0.04 0.04 0.00
November 0.56 0.35 0.16 0.11 -0.04 -0.13 -0.11 -0.19 -0.14 0.00 0.03 0.05 0.21 0.16 0.00
December 0.05 0.04 0.22 0.51 0.61 0.45 0.26 0.02 -0.04 0.12 0.12 0.22 0.45 0.33 0.00
01 month -0.73 -0.63 -0.32 -0.05 0.06 0.03 -0.29 -0.52 -0.44 -0.10 -0.15 0.06 0.45 0.34 0.00
Be understandable that the detailed description of the foregoing description is in order to set forth and explain principle of the present invention rather than to the qualification of protection scope of the present invention.Under the prerequisite that does not break away from purport of the present invention, one of ordinary skill in the art can be made modification by the understanding to the principle of being instructed of technique scheme on these embodiment bases, changes and changes.Therefore protection scope of the present invention by appended claim with and be equal to and limit.

Claims (10)

1, carrying out the job practices that agitation pile is reinforced around the built shield tunnel, the agitation pile of constructing around the built shield tunnel is divided into the isolation agitation pile of both sides, tunnel, the reinforcing agitation pile of tunnel upper and the reinforcing agitation pile of isolating the agitation pile outside, and this method mainly may further comprise the steps:
Carry out stake position setting-out in each position that need beat agitation pile;
Excavate groove in each position, position, make at least one mud pit on construction ground;
With pile-forming machine perching, and the stake machine carried out rectify perpendicular;
On the drilling rod of stake machine, do the long control mark of stake;
Begin piling, sink and promote the mixing pile machine drilling rod, carry out slip casting simultaneously;
It is characterized in that: both sides, described tunnel are provided with at least two rows and isolate agitation pile, and adopt the jumping play to isolate the piling of agitation pile; Adopt the jumping play that the reinforcing agitation pile of tunnel upper is driven piles.
2, method according to claim 1 is characterized in that: utilize the method for piling continuously that the reinforcing agitation pile in the isolation pile outside is driven piles.
3, method according to claim 1 is characterized in that: described jumping play of driving piles used to the isolation agitation pile of both sides, tunnel adopts the mode of plaing a jumping two.
4, method according to claim 3 is characterized in that: described jumping play of driving piles used to the reinforcing agitation pile of tunnel upper adopts the mode of plaing a jumping two.
5, according to the arbitrary described method of claim 1~4, it is characterized in that: during slip casting, the water/binder ratio of the cement grout of described isolation agitation pile is 1.5~1.8 in stake machine piling process.
6, according to the arbitrary described method of claim 1~4, it is characterized in that: during slip casting, the water/binder ratio that described tunnel upper stirs the cement grout of reinforcing stake is 1.2~1.4 in stake machine piling process.
7, according to the arbitrary described method of claim 1~4, it is characterized in that: in stake machine piling process during slip casting, the water/binder ratio of cement grout that described tunnel isolates the reinforcing agitation pile in the agitation pile outside is 1.4~1.6.
8, method according to claim 5 is characterized in that: to the tunnel lateral septal when agitation pile is driven piles, the stirring-head of stake machine is whitewashed in the sinking process, and the stirring-head subsidence velocity is less than 0.4m/min; Do not whitewash during lifting, and the stirring-head hoisting velocity is less than 0.6m/min.
9, method according to claim 6 is characterized in that: when the reinforcing stake of tunnel upper is driven piles, whitewash in the stirring-head sinking process of stake machine, do not whitewash during lifting; And the stirring-head subsidence velocity is less than 0.4m/min, and the stirring-head hoisting velocity is less than 0.6m/min.
10, method according to claim 7 is characterized in that: when the reinforcing agitation pile of the tunnel being isolated the agitation pile outside is driven piles, whitewash in the stirring-head sinking process of stake machine, do not whitewash during lifting; And the stirring-head subsidence velocity is less than 0.4m/min, and the stirring-head hoisting velocity is less than 0.6m/min.
CN2009100506296A 2009-05-05 2009-05-05 Constructing method for reinforcing mixing stake around built shield tunnel Active CN101550692B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100506296A CN101550692B (en) 2009-05-05 2009-05-05 Constructing method for reinforcing mixing stake around built shield tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100506296A CN101550692B (en) 2009-05-05 2009-05-05 Constructing method for reinforcing mixing stake around built shield tunnel

Publications (2)

Publication Number Publication Date
CN101550692A true CN101550692A (en) 2009-10-07
CN101550692B CN101550692B (en) 2011-05-04

Family

ID=41155163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100506296A Active CN101550692B (en) 2009-05-05 2009-05-05 Constructing method for reinforcing mixing stake around built shield tunnel

Country Status (1)

Country Link
CN (1) CN101550692B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101768961A (en) * 2010-01-22 2010-07-07 中铁二十二局集团第六工程有限公司 Construction method of section-steel triaxial soil-cement mixing pile
CN102677662A (en) * 2012-05-22 2012-09-19 天津二十冶建设有限公司 Construction method of cement-mixed pile for treating coastal soft soil foundation
CN102758443A (en) * 2012-07-25 2012-10-31 上海隧道工程股份有限公司 Novel enclosing structure applicable to connection change between new pipes and old pipes and construction method thereof
CN103321230A (en) * 2013-07-12 2013-09-25 上海隧道工程股份有限公司 Excavation method for deep and big foundation pit in long-distance crossing field for shallow-buried subway
CN105317039A (en) * 2014-06-26 2016-02-10 中国二十冶集团有限公司 Pile sinking method for controlling pile group floating
CN108005682A (en) * 2017-10-16 2018-05-08 广州地铁设计研究院有限公司 A kind of shield tunnel reinforcement means
CN109083157A (en) * 2018-09-28 2018-12-25 浙江工业大学 A kind of slip-crack surface bracing means and its construction method
CN109989398A (en) * 2017-12-30 2019-07-09 山东大学 One kind being suitable for city underground proximity engineering construction tunnel displacement control method
CN111058454A (en) * 2019-11-29 2020-04-24 天津建岩岩土工程有限公司 Construction protection method on one side of existing building
CN113221233A (en) * 2021-06-18 2021-08-06 华东交通大学 Composite soil layer shield tunnel cross section design method and shield tunnel

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3626619B2 (en) * 1999-03-19 2005-03-09 不動建設株式会社 Construction method of reinforced mixed solidified pile
CN101250885A (en) * 2008-04-03 2008-08-27 上海市第一建筑有限公司 Construction method for reinforcing subway station side soil body

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101768961B (en) * 2010-01-22 2013-10-30 中铁二十二局集团第六工程有限公司 Construction method of section-steel triaxial soil-cement mixing pile
CN101768961A (en) * 2010-01-22 2010-07-07 中铁二十二局集团第六工程有限公司 Construction method of section-steel triaxial soil-cement mixing pile
CN102677662A (en) * 2012-05-22 2012-09-19 天津二十冶建设有限公司 Construction method of cement-mixed pile for treating coastal soft soil foundation
CN102758443A (en) * 2012-07-25 2012-10-31 上海隧道工程股份有限公司 Novel enclosing structure applicable to connection change between new pipes and old pipes and construction method thereof
CN102758443B (en) * 2012-07-25 2015-04-01 上海隧道工程股份有限公司 Novel enclosing structure applicable to connection change between new pipes and old pipes and construction method thereof
CN103321230B (en) * 2013-07-12 2016-03-09 上海隧道工程有限公司 The deep big foundation pit excavation method in place is passed through in the long distance of operation shallow embedding subway
CN103321230A (en) * 2013-07-12 2013-09-25 上海隧道工程股份有限公司 Excavation method for deep and big foundation pit in long-distance crossing field for shallow-buried subway
CN105317039A (en) * 2014-06-26 2016-02-10 中国二十冶集团有限公司 Pile sinking method for controlling pile group floating
CN108005682A (en) * 2017-10-16 2018-05-08 广州地铁设计研究院有限公司 A kind of shield tunnel reinforcement means
CN109989398A (en) * 2017-12-30 2019-07-09 山东大学 One kind being suitable for city underground proximity engineering construction tunnel displacement control method
CN109083157A (en) * 2018-09-28 2018-12-25 浙江工业大学 A kind of slip-crack surface bracing means and its construction method
CN111058454A (en) * 2019-11-29 2020-04-24 天津建岩岩土工程有限公司 Construction protection method on one side of existing building
CN113221233A (en) * 2021-06-18 2021-08-06 华东交通大学 Composite soil layer shield tunnel cross section design method and shield tunnel
CN113221233B (en) * 2021-06-18 2023-03-14 华东交通大学 Composite soil layer shield tunnel cross section design method and shield tunnel

Also Published As

Publication number Publication date
CN101550692B (en) 2011-05-04

Similar Documents

Publication Publication Date Title
CN101550692B (en) Constructing method for reinforcing mixing stake around built shield tunnel
CN101768961B (en) Construction method of section-steel triaxial soil-cement mixing pile
CN106958256A (en) A kind of placement layer by layer, the open caisson construction technique repeatedly sunk
CN113614315A (en) Method of constructing a structure
RU2414563C1 (en) Method to erect multistory subsurface structure
CN103195076A (en) Method for constructing silt deep foundation pit tower crane foundation
CN107447778A (en) The heightening and consolidation structure and method of a kind of in-service reinforced concrete retaining wall
CN108842819A (en) A kind of urban track traffic cable run method for tunnel construction
CN112127900A (en) Construction method for hidden half-wall and half-arch protection structure of exposed arch of shallow-buried bias tunnel penetrating through accumulation body
CN104264683B (en) Building concave shape ultra-deep foundation pit subregion supporting method is protected for three around literary composition
CN207331740U (en) A kind of heightening and consolidation structure of in-service reinforced concrete retaining wall
Tan et al. Practical solutions for concurrent excavation of neighboring mega basements closely surrounded by utility tunnels in Shanghai Hongqiao CBD
JP2000008394A (en) Construction method for underground structure such as underground pit for installation of parking lot
CN110424372A (en) Along road interval method in a row remove obstacles after construct diaphram wall construction method
CN107740425A (en) Revolve cast anchor rope foundation pit supporting construction and its construction method
CN104963348A (en) Soft soil area tower crane foundation construction supporting structure and construction method thereof
CN105484270B (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit
JP2000352296A (en) Method o constructing passage just under underground structure
CN108457303B (en) Method for newly adding underground parking lot under existing building
JP4226954B2 (en) Underpinning method and viaduct
CN207469262U (en) The supporting construction that a kind of foundation pit is combined with side slope
CN116044437A (en) Tunnel supporting isolation system and construction method thereof
CN108571010A (en) A kind of cut and cover method engineering prefabricated bodies structure and the integrated method of supporting construction
CN207582473U (en) Foundation pit supporting construction
CN112065433A (en) Pipe jacking working well supporting and water stopping assembly and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANGHAI TUNNEL ENGINEERING CO., LTD.

Free format text: FORMER OWNER: SHANGHAI TUNNEL ENGINEERING CO LTD

Effective date: 20150130

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 200082 HONGKOU, SHANGHAI TO: 200232 XUHUI, SHANGHAI

TR01 Transfer of patent right

Effective date of registration: 20150130

Address after: 200232 Shanghai Wanping Road No. 1099

Patentee after: SHANGHAI TUNNEL ENGINEERING CO., LTD.

Address before: 210 room 118, 200082 Dalian Road, Shanghai

Patentee before: Shanghai Tunnel Engineering Co., Ltd.