CN101532917B - 一种桥梁承载能力快速荷载试验方法 - Google Patents

一种桥梁承载能力快速荷载试验方法 Download PDF

Info

Publication number
CN101532917B
CN101532917B CN2009100307610A CN200910030761A CN101532917B CN 101532917 B CN101532917 B CN 101532917B CN 2009100307610 A CN2009100307610 A CN 2009100307610A CN 200910030761 A CN200910030761 A CN 200910030761A CN 101532917 B CN101532917 B CN 101532917B
Authority
CN
China
Prior art keywords
bridge
correction
strain
load test
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2009100307610A
Other languages
English (en)
Other versions
CN101532917A (zh
Inventor
张宇峰
马志国
段鸿杰
徐剑
徐文平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JSTI Group Co Ltd
Original Assignee
Jiangsu Transportation Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Transportation Research Institute Co Ltd filed Critical Jiangsu Transportation Research Institute Co Ltd
Priority to CN2009100307610A priority Critical patent/CN101532917B/zh
Publication of CN101532917A publication Critical patent/CN101532917A/zh
Application granted granted Critical
Publication of CN101532917B publication Critical patent/CN101532917B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及一种桥梁承载能力快速荷载试验方法,目的是提出一种快速、准确的桥梁承载能力评定方法,该方法包括以下步骤:进行桥梁准静态荷载试验;建立初始有限元分析模型;根据准静态荷载试验实测得到的控制测点应变影响线对模型进行校准;分别在校准前后模型上按荷载试验要求进行布载,计算得到控制测点挠度值f修正前和f修正后;定义η’=1.1×f修正后/f修正前,通过效率系数η′得到结构的检算系数Z2,通过Z2对结构进行检算。

Description

一种桥梁承载能力快速荷载试验方法
技术领域
本发明属于桥梁建筑领域,具体涉及种桥梁承载能力快速荷载试验方法。
背景技术
目前我国的桥梁承载能力评定方法主要分为结构检算法和常规荷载试验方法两种:
结构检算法是依据对桥梁结构或者构件进行检测的结果,进行结构检算系数、截面折减系数等一系列系数的合理取值,然后依据设计图纸或者竣工资料进行有限元分析进而评定桥梁承载能力的一种方法;
荷载试验法是通过直接在桥梁结构上进行加载的一项科学试验研究,通过实桥加载试验了解桥梁的整体受力性能,评估桥梁承载能力的一种方法。
以上两种方法尽管被广泛应用,但是每个方法均存在其固有的局限性,对于结构检算法而言,首先,由于承载能力检算系数是依据现场检测结果进行人为判断,受主观影响较大,其次,由于初始桥梁有限元模型一般不考虑桥面铺装、人行道和护栏对结构刚度的影响,因此结构检算法一般很难准确的模拟实际结构,这难免会给评估工作带来一定误差。对于荷载试验而言,尽管能较准确的评估桥梁的承载能力,但这种试验方法不仅费时费力、费用昂贵,且应用于旧桥承载力评估时可能会对其正常交通造成长时间干扰,加之由于实测荷载作用响应为单点数据,信息量少,很难判断和确保实测数据的正确性和可靠性。因此,研究一种快速而准确的评估方法是目前的当务之急。
发明内容
本发明的目的针对目前桥梁结构承载能力评定方法中,结构检算法受人为因素影响较大,而荷载试验法则对交通干扰较大的缺陷,提出一种快速、准确的桥梁承载能力评定方法。
实现本发明目的的技术方案是:一种桥梁承载能力快速荷载试验方法,该方法包括以下步骤:
(1)进行桥梁现场准静态荷载试验;
(2)建立初始有限元分析模型;
(3)进行应变时程曲线的采集;
(4)根据准静态荷载试验实测得到的控制测点应变影响线对模型进行校准;
(5)分别在校准前后模型上按荷载试验要求进行布载,计算得到控制测点挠度值f修正前和f修正后;
(6)定义η’=1.1×f修正后/f修正前,通过效率系数η′得到结构的检算系数Z2,通过Z2对结构进行检算。
本发明的有益效果在于:
(1)与结构检算法相比,准静态荷载试验通过对实际桥梁进行加载,根据实测结构响应数据,通过遗传算法对有限元模型进行参数修正,使得有限元模型能够逼近实际结构,和结构检算法相比,避免了结构检算系数选取中的人为因素影响,该方法是根据实际结构响应的一种线形外推,在结构弹性工作状态下,具有较高的精度,因此使用性较大。
(2)与常规荷载试验方法相比,准静态荷载试验是诊断性荷载试验,一般采用1~2辆车在桥面上缓慢移动同时记录各测点的应力时程曲线,故加载量一般较轻,因此一般不需要进行分级加载,同时,整个加载过程也是一个准静态的过程,因此大大提高了整个试验的时间,对交通的干扰大大降低,由于封闭交通的时间大大降低,因此不仅将带来极大的经济效益,以沪宁高速公路为例,高速公路一天的收费额为1000万左右,如果对高速上桥梁进行常规的荷载试验,则需要中断交通8小时左右,所产生的直接经济损失大约为333万元,即使是半幅封闭,每天收费也将有160万元的损失,这还不考虑由于许多车辆被迫绕行所增加的路程成本、时间成本等间接经济损失和由此带来的巨大社会成本。而如果对高速上的桥梁进行准静态荷载试验则仅需要封闭交通1~2小时,那么直接经济损失约为传统荷载试验所带来的损失的1/8~1/4,而且这样封闭交通所引起的附加损失将会大大降低。
附图说明
图1是运用本发明的桥梁评估流程示意图
图2是本发明快速荷载试验的流程图
图3是本发明实施例1的截面布置图
图4是本发明实施例1的测点布置图
图5是本发明实施例1的实测的应变时程曲线
具体实施方式
下面结合实施例做进一步说明。
实施例1
如图3所示,某跨径组合为58.96m+100m+76.96m的三跨连续梁桥,采用三跨预应力混凝土变截面单箱单室连续箱梁,箱梁高度从跨中为2.97m,至距主墩中心2m处按二次抛物线变化为5.77m。
如图1所示为整个桥梁评估流程,本发明桥梁承载能力快速荷载试验方法运用于桥梁评估流程中,可在常规荷载试验步骤前进行。
如图2所示,桥梁承载能力快速荷载试验评估方法采用如下步骤:
(1)进行桥梁现场准静态荷载试验步骤
准静态荷载试验采用两辆20吨载重车并行缓速在不同车道上通过该桥,不同车道组合作为不同工况,共计2个工况;以美国桥梁诊断公司最新开发的BDI桥梁结构测试系统的自动测距装置完成车辆位置记录,每隔4米为一个记录点,每两点间的速度被认为匀速;以BDI系统自带的应变传感器记录应变时程,测点选取主桥中跨跨中位置作为控制断面,底板等距布置4个测点,为了了解截面中性轴的变化情况,在底板向上15cm、上翼缘板向下15cm高的腹板位置各对称布置两个应变测点,具体测点1、2、3、4、5、6、7、8布置如下图4所示。
(2)有限元模型建立步骤
采用Ansys参数化语言进行整个模型的建立,主桥采用梁单元来模拟,为了加载方便,设置虚拟梁进行主梁移动荷载的加载,支座的转动刚度通过建立弹簧单元来模拟。
(3)进行应变时程曲线的采集步骤;
(4)根据准静态荷载试验实测得到的控制测点应变影响线对模型进行校准步骤
通过参数敏感性分析,最终选定以梁的抗弯刚度(EI)、支座转动刚度(Kr)和截面中和轴高度y作为主要修正参数变量。根据施工期块段的划分把跨中悬臂段划分为15个块段,两边现浇段划分为9个块段,每个块段把EI综合一起考虑,包括四个支座的转动刚度,全桥共分为28个优化参数。实测的应变时程曲线如图5所示。
以桥梁结构在准静态荷载试验下的结构应变相应作为约束条件和目标函数,将有限元计算得到的控制断面的应变响应与实际测试的应变相对误差平方和作为目标函数,采用加速遗传算法对上述参数进行优化。
(5)分别在校准前后模型上按荷载试验要求进行布载,计算得到控制测点挠度值f修正 和f修正后
(6)利用修正后的模型进行桥梁状态评估步骤
利用修正后的模型模拟常规荷载试验对结构进行加载计算,利用公式:η′=1.1×f修正后/f修正前计算效率系数,查《公路旧桥承载能力鉴定方法》(试行)或《公路桥梁承载能力检测评定规程》(报批稿)中结构的检算系数Z2计算表单,得到修正后的结构的检算系数Z2’。下面可以利用现行常规荷载试验的评定方法再进行承载能力评定。

Claims (3)

1.一种桥梁承载能力快速荷载试验方法,其特征是,该方法包括以下步骤:
(1)进行桥梁准静态荷载试验;
(2)建立初始有限元分析模型;
(3)进行应变时程曲线的采集;
(4)根据准静态荷载试验实测得到的控制测点应变影响线对模型进行校准:通过参数敏感性分析,选定主要修正参数变量;根据施工期块段的划分把桥梁分成若干块段;并把每个块段的修正参数变量综合考虑,获得全桥的优化参数;以桥梁结构在准静态荷载试验下的结构应变相应作为约束条件和目标函数,将有限元计算得到的控制断面的应变响应与实际测试的应变相对误差平方和作为目标函数,采用加速遗传算法对上述参数进行优化;
(5)分别在校准前后模型上按荷载试验要求进行布载,计算得到控制测点挠度值f修正前和f修正后
(6)定义η’=1.1×f修正后/f修正前,通过效率系数η′得到结构的检算系数Z2,通过Z2对结构进行检算。
2.根据权利要求1所述的方法,其特征是,所述步骤(2)中采用ansys参数化语言进行整个模型的建立,主桥采用梁单元来模拟,设置虚拟梁进行主梁移动荷载的加载,支座的转动刚度通过建立弹簧单元来模拟。
3.根据权利要求1所述的方法,其特征是,所述步骤(4)中的主要修正参数变量包括梁的抗弯刚度、支座转动刚度和截面中和轴高度。
CN2009100307610A 2009-04-15 2009-04-15 一种桥梁承载能力快速荷载试验方法 Active CN101532917B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100307610A CN101532917B (zh) 2009-04-15 2009-04-15 一种桥梁承载能力快速荷载试验方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100307610A CN101532917B (zh) 2009-04-15 2009-04-15 一种桥梁承载能力快速荷载试验方法

Publications (2)

Publication Number Publication Date
CN101532917A CN101532917A (zh) 2009-09-16
CN101532917B true CN101532917B (zh) 2011-08-03

Family

ID=41103649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100307610A Active CN101532917B (zh) 2009-04-15 2009-04-15 一种桥梁承载能力快速荷载试验方法

Country Status (1)

Country Link
CN (1) CN101532917B (zh)

Families Citing this family (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102288401B (zh) * 2011-06-30 2013-04-24 甘肃蓝科石化高新装备股份有限公司 一种石油井架承载能力的测试方法
CN102509005B (zh) * 2011-10-27 2015-02-25 招商局重庆交通科研设计院有限公司 基于准静态广义影响线的桥梁承载力评定方法
CN102721562A (zh) * 2012-01-12 2012-10-10 长安大学 一种基于裂缝指标的rc梁桥承载能力检算评定方法
CN102628708B (zh) * 2012-04-11 2014-01-08 中铁大桥局集团武汉桥梁科学研究院有限公司 用于正交异性桥面板钢箱梁桥的车辆荷载动态称重方法
CN102635071B (zh) * 2012-05-15 2015-07-22 中铁五局(集团)有限公司 预应力混凝土连续梁悬臂浇筑施工挠度处理系统
CN102721714B (zh) * 2012-06-06 2014-09-03 广东省粮食科学研究所 一种预测食物粉制成食物条后的断条率的方法
CN102750412B (zh) * 2012-06-19 2016-01-20 招商局重庆交通科研设计院有限公司 一种桥梁荷载试验智能布载系统及其方法
CN103528775B (zh) * 2012-07-06 2015-08-19 中山大学深圳研究院 一种基于响应灵敏度的结构健康检测方法
CN102866031B (zh) * 2012-09-28 2015-08-12 中国人民解放军63983部队 一种荷载位置与桥梁响应关系的测试方法
CN103792053A (zh) * 2012-10-29 2014-05-14 同济大学 用于隧道结构多点振动台试验的模型箱转动式接头装置
CN103048102B (zh) * 2012-11-30 2016-08-17 江苏省交通科学研究院股份有限公司 一种梁式桥的状态评估方法
CN103268371B (zh) * 2013-04-26 2016-09-14 重庆交通大学 一种基于影响矩阵的桥梁实时荷载识别方法
CN103323276B (zh) * 2013-05-28 2015-07-15 山西省交通科学研究院 混凝土桥梁截面特性快速检测评定方法
CN103399978B (zh) * 2013-07-02 2014-10-29 袁红茵 一种桥梁抗弯刚度识别方法
CN103344395B (zh) * 2013-07-08 2016-01-20 清华大学 一种桥梁加固目标承载力的确认方法及装置
CN104133959A (zh) * 2014-07-28 2014-11-05 东北大学 桥梁有限元模型的修正方法
CN104713740B (zh) * 2015-03-17 2017-07-14 天津市市政工程研究院 一种基于移动荷载试验的桥梁承载能力快速评定方法
CN104819813B (zh) * 2015-04-29 2017-04-26 中南大学 一种桥梁影响线动态测试方法
CN105203310B (zh) * 2015-09-17 2018-04-13 中国飞机强度研究所 一种航空发动机的轴类部件载荷标定方法及系统
CN105865819B (zh) * 2016-04-18 2019-05-31 湖南联智桥隧技术有限公司 一种单片梁荷载试验方法
CN105973627A (zh) * 2016-05-26 2016-09-28 东南大学 一种基于长标距应变影响包络线的桥梁损伤识别方法
CN106706239B (zh) * 2016-11-30 2020-02-07 山西省交通建设工程质量检测中心(有限公司) 一种桥梁快速荷载试验测试方法
CN106813828A (zh) * 2016-12-29 2017-06-09 江西飞尚科技有限公司 一种现场绕制式磁通量传感器标定方法
CN106932160A (zh) * 2017-03-15 2017-07-07 上海建为历保科技股份有限公司 古建筑受荷分析方法
CN108844821A (zh) * 2018-06-13 2018-11-20 中国神华能源股份有限公司 桥梁静载试验方法及系统
CN108982030B (zh) * 2018-07-26 2020-06-16 云南大学 一种既有桥梁短期监测与承载力评定方法
CN109341989B (zh) * 2018-09-03 2020-06-12 大连理工大学 一种能够剔除车辆动力效应的桥梁影响线识别方法
CN110926735A (zh) * 2019-11-29 2020-03-27 邢台市交通运输局 基于多维动态参数的桥梁结构快速诊断方法
CN111400794A (zh) * 2020-03-10 2020-07-10 上海城建城市运营(集团)有限公司 一种城市高架桥梁总挠度快速智能化监测算法
CN111553104B (zh) * 2020-05-08 2023-12-05 东南大学 一种桥面铺装结构仿真分析方法
CN111879626B (zh) * 2020-07-31 2022-05-31 广西交科集团有限公司 桥梁橡胶支座实际刚度静力测试方法
CN113627060A (zh) * 2021-08-09 2021-11-09 苏交科集团股份有限公司 一种基于实测挠度影响线的公路梁式桥承载能力评定方法
CN113884258B (zh) * 2021-11-18 2023-04-18 郑州大学 一种考虑温度对桥梁刚度影响的检验系数修正方法

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101145045A (zh) * 2007-10-25 2008-03-19 上海电机成套联合有限公司 桥梁限载自动监控系统

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101145045A (zh) * 2007-10-25 2008-03-19 上海电机成套联合有限公司 桥梁限载自动监控系统

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
席广恒,等.体外预应力桥梁现场荷载试验研究.中外公路.2008,第28卷(第4期), *
肖红菊,等.基于ANSYS 的预应力混凝土桥梁受力有限元分析.铜陵学院学报.2007,(第6期), *

Also Published As

Publication number Publication date
CN101532917A (zh) 2009-09-16

Similar Documents

Publication Publication Date Title
CN101532917B (zh) 一种桥梁承载能力快速荷载试验方法
CN110377943B (zh) 一种基于移动荷载试验的桥梁承载能力评估方法
CN104713740B (zh) 一种基于移动荷载试验的桥梁承载能力快速评定方法
Sanayei et al. Instrumentation, nondestructive testing, and finite-element model updating for bridge evaluation using strain measurements
Karoumi et al. Monitoring traffic loads and dynamic effects using an instrumented railway bridge
CN103048102B (zh) 一种梁式桥的状态评估方法
CN105956216A (zh) 大跨钢桥基于均匀温度响应监测值的有限元模型修正方法
CN101865683A (zh) 基于应变计的梁式桥位移动态测量系统及测量方法
Xu Making good use of structural health monitoring systems of long-span cable-supported bridges
CN105930571A (zh) 基于单位温度响应监测值的大跨钢桥有限元模型修正方法
CN105956218A (zh) 基于非均匀温度响应监测值的钢桥有限元模型修正方法
CN106257541A (zh) 一种桥梁有限元模型的修正方法
CN113239481B (zh) 一种32米高铁标准简支梁的动挠度监测方法
CN115470677A (zh) 一种面向整体式箱梁桥承载能力的快速测试评定方法
CN103344395B (zh) 一种桥梁加固目标承载力的确认方法及装置
CN112989660A (zh) 基于偏最小二乘法的地铁杂散电流下管道腐蚀预测方法
CN114065358A (zh) 基于变形监测的大跨公轨同层斜拉桥运行舒适性评价方法
Nassif et al. Model validation for bridge-road-vehicle dynamic interaction system
Islam et al. Bridge condition assessment and load rating using dynamic response.
Li et al. Safety Evaluation of Steel Temporary Beam Service Status Based on the Combination Weighting‐Fuzzy Model of Game Theory
Zhuang et al. Fatigue performance analysis and evaluation for steel box girder based on structural health monitoring system
Zhao et al. Fatigue assessment of highway bridges under traffic loading using microscopic traffic simulation
Marques et al. Evaluation of dynamic effects and fatigue assessment of a railway bridge supported by temporary monitoring
Xiao et al. Multi-direction bridge model updating using static and dynamic measurement
Zhu et al. Research on bridge structure SAM based on real-time monitoring

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 211112 No. 223 Simon Street, Jiangsu, Nanjing

Patentee after: JSTI GROUP Co.,Ltd.

Address before: 211112 No. 223 Simon Street, Jiangsu, Nanjing

Patentee before: JIANGSU TRANSPORTATION RESEARCH INSTITUTE Co.,Ltd.