CN101519977B CN2009100296175A CN200910029617A CN101519977B CN 101519977 B CN101519977 B CN 101519977B CN 2009100296175 A CN2009100296175 A CN 2009100296175A CN 200910029617 A CN200910029617 A CN 200910029617A CN 101519977 B CN101519977 B CN 101519977B
Authority
CN
China
Prior art keywords
gob
roadside packing
entry retaining
fixing
packing
Prior art date
Application number
CN2009100296175A
Other languages
Chinese (zh)
Other versions
CN101519977A (en
Inventor
冯光明
丁玉
Original Assignee
中国矿业大学
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中国矿业大学 filed Critical 中国矿业大学
Priority to CN2009100296175A priority Critical patent/CN101519977B/en
Publication of CN101519977A publication Critical patent/CN101519977A/en
Application granted granted Critical
Publication of CN101519977B publication Critical patent/CN101519977B/en

Links

Abstract

The invention provides a method for fixing a gob-side entry retaining roadside packing body on a coal seam with a big declined angle, which is applicable to fixing the gob-side entry retaining roadside packing body under the condition of big declined angle(the declined angle(alfa) of the coal seam is more than 15 degrees). Fixing pull rods are fixed in the roadside packing body which is constructed in sections at intervals and simultaneously fixed on a groundsill on the side of the gob-side entry retaining, and anchoring heads of the fixing pull rods are closely fixed on bottom plates on the side of a goal area by an anchoring agent; and along with the advance of a coal face, the construction of the roadside packing body and the fixing pull rods is orderly and cyclically performed until the whole gob-side entry retaining operation is completed. By the method, the gob-side entry retaining bottom plates of the coal seam with a big declined angle are unnecessarily flattened, and the fixing pull rods only need to be arranged at intervals along the direction of constructing the packing body on the declined surface, by the combined action of the fixing pull rods and front baffle boards, the packing body is effectively restricted or blocked from slipping down; moreover, the method also has the advantages of simplicity, easy construction, time and labor conservation, good effect and wide practicability.

Description

The fixing method of gob-side entry retaining of large-inclination coal seam roadside packing body
Technical field
The present invention relates to edge air gallery technology, especially a kind of fixing method of gob-side entry retaining of large-inclination coal seam roadside packing body.
Background technology
Under the situation of seam inclination big (α>15 °), gob side entry retaining roadside packing body just is difficult to stablize.Subject matter is, obturation places on the inclined-plane, and under the multifactor actings in conjunction such as extruding of obturation self gravitation, overburden pressure and the spoil that collapses, obturation causes the obturation unstability just to lower slider.Aspect the control of existing gob side entry retaining roadside packing body stability, also there is not solution well at present.In order under high inclination-angle (α>15 °) situation, to implement the gob side entry retaining roadside packing, adopt and will carry out filling again after the inclined-plane leveling, the amount of working is quite big like this, has not only had a strong impact on the progress of filling operation, and has influenced the production of work plane.
Summary of the invention
The objective of the invention is at the problem that exists in the prior art, provide a kind of method simple, easily construction, workload is little, can directly carry out the fixing method of gob-side entry retaining of large-inclination coal seam roadside packing body.
Technical scheme of the present invention is:
A, adopt the sky side in tunnel, work plane rear the gob-side entry retaining of large-inclination coal seam piecemeal is constructed the roadside packing body;
B, whenever finish a roadside packing body, along boring an anchor hole on the base plate of goaf one side at least downwards, and in anchor hole, put into the anchoring agent at the roadside packing body;
C, the firm pull bar of corresponding hole count is inserted in the anchor hole, be fixed in the anchor hole after fully stirring with the anchoring agent;
D, carry out constructing of next piece roadside packing body, firm pull bar is fixed between two sections roadside packing bodies, with front baffle board and nut that the afterbody of firm pull bar is fastening;
E, along with the propelling of coal-face, constructing of circulation construction roadside packing body and firm pull bar successively is until finishing whole gob-side entry retaining work.
Described firm pull bar is 1~3.
Beneficial effect: no longer need the gob-side entry retaining of large-inclination coal seam base plate is flattened, only need on the inclined-plane, fixed interval has the firm pull bar that is fixed in simultaneously along on the one side base plate of goaf in the roadside packing body that piecemeal is constructed, the anchorage head of firm pull bar is anchored on the ground of goaf one side by the anchoring agent, acting in conjunction by anchoring rod and front baffle board, effectively suppress and stop that obturation is in the inclined-plane slide down, obturation is stable on the inclined-plane, promptly under the effect of anchoring rod, obturation and inclined-plane are become one, can improve the stability of obturation greatly, the assurance gob side entry retaining is unimpeded, and this technology is applicable to implements gob side entry retaining roadside packing technology under high inclination-angle (seam inclination α>15 °) condition.This technology can alleviate labor strength greatly, has improved efficiency, makes gob side entry retaining work not influence the work plane coal mining activity.Its method is simple, and easily construction is time saving and energy saving, effective, has practicality widely.
Description of drawings
Fig. 1 is a construction schematic diagram of the present invention.
Fig. 2 is the A-A generalized section of Fig. 1.
Among the figure: the firm pull bar of 1-; The 2-front apron; The 3-anchor hole; 4-anchoring agent; The 5-anchorage zone; 6-roadside packing body; The 7-spoil that falls that collapses; The 8-goaf; The 9-force piece; 10-file leader's frame; Former tunnel, 11-work plane the place ahead; The 12-gob side entry retaining; The 13-roof; The 14-seat earth; 15-coal seam or coal group.
The specific embodiment
Below in conjunction with accompanying drawing embodiments of the invention are further described:
Shown in the accompanying drawing, propelling along with work plane, force piece 9 moves forward with file leader's frame 10 thereupon, the filling space is reserved at rear at file leader's frame 10, at this moment adopt the sky side in the tunnel and 13 construct roadside packing body 6, with top board 13, base plate 14 and coal seam or the coal group 15 common gob side entries 12 that form from seat earth 14 to roof.Whenever finish a roadside packing body 6, at roadside packing body 6 along boring a hole on the base plate 14 of 8 one side anchorage zones 5, goaf at least downwards, according to on-site actual situations, firm pull bar 1 can be 1, it also can be 2 or 3, improve the stability of obturation on the inclined-plane with this, satisfy the requirement of gob side entry retaining.In boring, put into anchoring agent 4, firm pull bar 1 is inserted in the anchor hole 3, fully be fixed in the anchor hole 3 after the stirring with anchoring agent 4, carry out constructing of next piece roadside packing body 6, firm pull bar 1 is fixed between two sections roadside packing bodies 6, with front baffle board 2 and nut that the afterbody of firm pull bar 1 is fastening; Obturation is stable on the inclined-plane, promptly under the effect of anchoring rod, obturation and inclined-plane are become one, propelling (work plane the place ahead former tunnel 11 shortenings along with coal-face, gob side entry retaining 12 lengthenings), circulation construction roadside packing body 6 and firmly constructing of pull bar 1 successively are until the operation of constructing of finishing whole roadside packing body.When the spoil 7 that falls when collapsing was squeezed in roadside packing body 6 inboards, the firm pull bar 1 that is anchored on the one side base plate of goaf, inclined-plane was combined closely with roadside packing body 6, and roadside packing body overall structure stability is improved greatly.

Claims (2)

1. the fixing method of a gob-side entry retaining of large-inclination coal seam roadside packing body is characterized in that:
A, adopt the sky side in tunnel, work plane rear the gob-side entry retaining of large-inclination coal seam piecemeal of α>15 ° is constructed roadside packing body (6);
B, whenever finish a roadside packing body (6), along boring an anchor hole (3) at least downwards on the base plate (14) of goaf (8) one sides, put into anchoring agent (4) at roadside packing body (6);
In c, firm pull bar (1) the insertion anchor hole (3), fully be fixed in the anchor hole (3) after the stirring with anchoring agent (4) with corresponding hole count;
D, carry out constructing of next piece roadside packing body (6), firm pull bar (1) is fixed between two sections roadside packing bodies (6), with front baffle board (2) and nut that the afterbody of firm pull bar (1) is fastening;
E, along with the propelling of coal-face, constructing of circulation construction roadside packing body (6) and firm pull bar (1) successively is until finishing whole gob-side entry retaining work.
2. the fixing method of a kind of gob-side entry retaining of large-inclination coal seam roadside packing body according to claim 1 is characterized in that: described firm pull bar (1) is 1~3.
CN2009100296175A 2009-03-28 2009-03-28 Method for fixing gob-side entry retaining roadside packing body on coal seam with big inclined angle CN101519977B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100296175A CN101519977B (en) 2009-03-28 2009-03-28 Method for fixing gob-side entry retaining roadside packing body on coal seam with big inclined angle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100296175A CN101519977B (en) 2009-03-28 2009-03-28 Method for fixing gob-side entry retaining roadside packing body on coal seam with big inclined angle

Publications (2)

Publication Number Publication Date
CN101519977A CN101519977A (en) 2009-09-02
CN101519977B true CN101519977B (en) 2011-05-11

Family

ID=41080754

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100296175A CN101519977B (en) 2009-03-28 2009-03-28 Method for fixing gob-side entry retaining roadside packing body on coal seam with big inclined angle

Country Status (1)

Country Link
CN (1) CN101519977B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101864987B (en) * 2010-06-13 2011-11-02 中国矿业大学 Building method of filled wall body for gob-side entry retaining of large-inclination coal seam
CN101949301B (en) * 2010-08-30 2012-05-23 山东新矿赵官能源有限责任公司 Different-strength bearing roadway-beside filling body of gob-side entry under coal mine
CN102852550B (en) * 2012-04-01 2015-03-04 中国矿业大学 Coal-pillar-free semi-normal-position goaf-side entry retaining method
CN103982237A (en) * 2014-04-09 2014-08-13 中国矿业大学 Method for preventing slippage of filling mass under large-dip-angle coal bed condition and structural form
CN104314612A (en) * 2014-08-15 2015-01-28 中国矿业大学 Method for preventing large-dip-angle coal bed filler next to gob-side entry retaining gateway from slipping
CN108049896B (en) * 2017-12-19 2019-04-02 河南力行科创矿山技术开发有限公司 A kind of fully mechanized coal face gob-side entry retaining method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1067477A (en) * 1991-06-03 1992-12-30 北京矿冶研究总院 Mining method by filling coarse wet sand on slope wall
CN2443146Y (en) * 2000-08-16 2001-08-15 中国矿业大学 Space reinforcing net of high-water material filler for gallery side
RU2177546C1 (en) * 2000-05-24 2001-12-27 Санкт-Петербургский государственный горный институт им. Г.В. Плеханова (Технический университет) Method of controlling difficult-to-cave roof
CN101117890A (en) * 2007-08-17 2008-02-06 淮南矿业(集团)有限责任公司 Method of support along spatially keeping lane

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1067477A (en) * 1991-06-03 1992-12-30 北京矿冶研究总院 Mining method by filling coarse wet sand on slope wall
RU2177546C1 (en) * 2000-05-24 2001-12-27 Санкт-Петербургский государственный горный институт им. Г.В. Плеханова (Технический университет) Method of controlling difficult-to-cave roof
CN2443146Y (en) * 2000-08-16 2001-08-15 中国矿业大学 Space reinforcing net of high-water material filler for gallery side
CN101117890A (en) * 2007-08-17 2008-02-06 淮南矿业(集团)有限责任公司 Method of support along spatially keeping lane

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
张东升等.综放沿空留巷充填体稳定性控制.《中国矿业大学学报》.2003,(第03期), *
王同贞等.大倾角工作面前进式开采沿空留巷技术.《能源技术与管理》.2008,(第03期), *
路启荣等.充填体空间锚栓加固网及其应用.《中国煤炭》.2003,(第01期), *
马立强等.综放巷内充填原位沿空留巷充填体支护阻力研究.《岩石力学与工程学报》.2007,(第03期), *

Also Published As

Publication number Publication date
CN101519977A (en) 2009-09-02

Similar Documents

Publication Publication Date Title
CN100577986C (en) Goaf surrounding rock around gob-side supporting method under three soft geological condition
CN203669865U (en) Constant-support alpine bolter miner
CN107905790B (en) Broadwall N00 engineering method
CN101749018B (en) Coal mining method with direct coal pillar recovery
CN101775840B (en) Beam column node suitable for quadrate steel pipe column
CN102296976B (en) Asymmetrical bolt-net-cable combined supporting method for special-shaped recovery tunnel of large inclination angle coal bed
CN204162991U (en) Combined anti-fall girder apparatus
CN103410515B (en) It is a kind of that three-soft seam is reciprocating combines mining method without coal column
CN103133003B (en) Opencut steep end-slope mining method
CN104533482B (en) A kind of reinforcement means improving gob side entry driving fender stability
CN103075165B (en) Vertical beam of coal road combined type supporting method
CN102661169B (en) Gob-side entry retaining method for anchor bolt network gangue bag wall body for coal mining without pillars
CN103306714B (en) Coal seam group with near interval Di Chou holes in lane the mash gas harnessing method in a hole three
CN101864987B (en) Building method of filled wall body for gob-side entry retaining of large-inclination coal seam
CN102691302B (en) Concrete structure for supporting deep foundation pit
CN102011589A (en) Stope bottom structure suitable for underground two-step mining and production process thereof
CN102182483A (en) Semi-rigid abnormal beam anchor cable truss roadway supporting system
CN103775084B (en) High inclination-angle, mining height workface equipment cross geological structure crushed zone construction technology
CN101725352A (en) Method for filling solid and fully mechanizing and recovering room type coal pillar
WO2010066180A1 (en) Filling and supporting hudraulic support with tamping mechanism
CN101864956B (en) Sectional coal pillar-free exploitation method
CN104234749B (en) A kind of fully-mechanized mining working big cross section return channel surrounding rock control method
CN104018837B (en) A kind of interval filling gob-side entry retaining method processing planted agent's spoil
CN204511478U (en) A kind of self-feeding anchor pile structure
CN101915101B (en) Method of mining coal from heavy pitch thick coal seam

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
GR01 Patent grant
C14 Grant of patent or utility model