CN101494428A - Apparatus for mounting high-voltage transmission line pole tower equipment - Google Patents
Apparatus for mounting high-voltage transmission line pole tower equipment Download PDFInfo
- Publication number
- CN101494428A CN101494428A CNA2008102247179A CN200810224717A CN101494428A CN 101494428 A CN101494428 A CN 101494428A CN A2008102247179 A CNA2008102247179 A CN A2008102247179A CN 200810224717 A CN200810224717 A CN 200810224717A CN 101494428 A CN101494428 A CN 101494428A
- Authority
- CN
- China
- Prior art keywords
- hoop
- tower
- angle steel
- bottom plate
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
Description
技术领域 technical field
本发明涉及机械技术领域,特别涉及一种高压输电线路杆塔设备安装装置。The invention relates to the field of mechanical technology, in particular to a high-voltage transmission line tower equipment installation device.
背景技术 Background technique
全国各地分布着大量的输电线路,每条输电线路间隔200-500米即设置一座杆塔。随着智能电网和可视化电网的发展,需要在杆塔上安装相应设备,例如太阳能极板、摄像机、数据采集设备或无线通信设备等。利用这些设备实现输电电路的监视和数据采集。上述这些设备在常规场所安装比较方便,但是由于杆塔的地理位置和自身特点的限制,例如各个杆塔的尺寸和方向都不相同,并且杆塔表面的防腐镀锌层不能被损坏。因此,常规安装方式并不适用于输电线路的杆塔上。There are a large number of transmission lines distributed all over the country, and a pole tower is set up for each transmission line at an interval of 200-500 meters. With the development of smart grid and visualized grid, it is necessary to install corresponding equipment on the tower, such as solar panels, cameras, data acquisition equipment or wireless communication equipment. Use these devices to realize the monitoring and data collection of power transmission circuits. The above-mentioned devices are relatively easy to install in conventional places, but due to the limitations of the geographical location of the towers and their own characteristics, for example, the size and direction of each tower are different, and the anti-corrosion galvanized layer on the surface of the towers cannot be damaged. Therefore, the conventional installation method is not suitable for the tower of the transmission line.
目前在杆塔上安装相应设备大部分是在杆塔上打孔安装。由于杆塔表面都有防腐镀锌层,打孔时造成镀锌层破坏。并且,目前的高压输电线路杆塔上缺少大型太阳能极板的安装装置。At present, most of the corresponding equipment installed on the tower is perforated and installed on the tower. Since there is an anti-corrosion galvanized layer on the surface of the tower, the galvanized layer will be damaged when drilling. Moreover, there is a lack of installation devices for large-scale solar panels on the current high-voltage transmission line towers.
发明内容 Contents of the invention
本发明要解决的问题是提供一种高压输电线路杆塔设备安装装置,能够保证杆塔不受任何损坏。The problem to be solved by the present invention is to provide a high-voltage transmission line tower equipment installation device, which can ensure that the tower is not damaged in any way.
本发明提供一种高压输电线路杆塔设备安装装置,包括:立柱、太阳能极板支架、抱箍、底板和槽钢;The invention provides a high-voltage transmission line tower equipment installation device, including: a column, a solar plate bracket, a hoop, a bottom plate and a channel steel;
所述抱箍包括第一小抱箍、第二小抱箍、第一大抱箍和第二大抱箍;所述抱箍由弧形区和两条固定支腿组成;所述两条固定支腿的两条中线平行;所述弧形区连接所述两条固定支腿;The hoop includes a first small hoop, a second small hoop, a first large hoop and a second large hoop; the hoop is composed of an arc-shaped area and two fixed legs; the two fixed The two midlines of the legs are parallel; the arc zone connects the two fixed legs;
所述第一小抱箍和第二小抱箍将所述太阳能极板支架固定在所述立柱上;所述第一小抱箍和第二小抱箍的弧形区与所述立柱的外围面相接触,所述第一小抱箍和第二小抱箍的两条固定支腿分别插入所述太阳能极板支架的上横梁和下横梁的孔中,通过螺母将所述固定支腿与所述太阳能极板支架紧固;The first small hoop and the second small hoop fix the solar plate support on the column; The two fixed legs of the first small hoop and the second small hoop are respectively inserted into the holes of the upper beam and the lower beam of the solar plate bracket, and the fixed legs are connected with the fixed legs by nuts. Fasten the solar plate support;
所述第一大抱箍和第二大抱箍通过所述槽钢和底板将所述立柱与杆塔角钢固定在一起;所述槽钢开口的两边与所述立柱焊接固定;所述槽钢的外底面与杆塔角钢的第一平面相接触;所述第一大抱箍和第二大抱箍的弧形区与所述立柱的外围面相接触;所述第一大抱箍和第二大抱箍分别位于杆塔角钢的上下侧;所述第一大抱箍和第二大抱箍的固定支腿与所述杆塔角钢的第二平面相平行,并且插入所述底板的四个孔中,通过螺母将所述第一大抱箍和第二大抱箍与底板紧固。The first large hoop and the second large hoop fix the column and the tower angle steel together through the channel steel and the bottom plate; the two sides of the channel steel opening are welded and fixed to the column; the channel steel The outer bottom surface is in contact with the first plane of the tower angle steel; the arc-shaped area of the first large hoop and the second large hoop is in contact with the peripheral surface of the column; the first large hoop and the second large hoop The hoops are respectively located on the upper and lower sides of the tower angle steel; the fixed legs of the first large hoop and the second large hoop are parallel to the second plane of the tower angle steel, and are inserted into the four holes of the bottom plate, through The nut fastens the first large hoop and the second large hoop to the bottom plate.
优选地,所述装置还包括两个套管;所述套管的长度加上所述杆塔角钢第一平面的厚度与所述杆塔角钢的第二平面宽度相等;所述两个套管分别套在所述第二大抱箍的两条固定支腿上,并且所述两个套管位于所述底板与立柱之间。Preferably, the device further includes two sleeves; the length of the sleeve plus the thickness of the first plane of the tower angle steel is equal to the width of the second plane of the tower angle steel; On the two fixed legs of the second large hoop, and the two sleeves are located between the bottom plate and the column.
优选地,所述两个套管为圆形,所述套管的外径大于所述底板上的孔径。Preferably, the two sleeves are circular, and the outer diameter of the sleeves is larger than the diameter of the hole on the bottom plate.
优选地,所述装置还包括横担螺栓,所述横担螺栓的一端焊接固定在所述槽钢的外底面上,另一头插入所述底板的孔中,通过螺母与所述底板固定;且所述横担螺栓与槽钢的外底面垂直;所述横担螺栓担于所述杆塔角钢的第二平面上。Preferably, the device further includes a cross-arm bolt, one end of the cross-arm bolt is welded and fixed on the outer bottom surface of the channel steel, the other end is inserted into the hole of the bottom plate, and fixed to the bottom plate by a nut; and The cross-arm bolts are perpendicular to the outer bottom surface of the channel steel; the cross-arm bolts are supported on the second plane of the tower angle steel.
优选地,所述太阳能极板支架由两个相同的直角三角形侧面架和一个矩形背面架组成;Preferably, the solar plate support is composed of two identical right-angled triangle side frames and a rectangular back frame;
所述两个相同的直角三角侧面架分别焊接在所述矩形背面架的两侧边上;The two identical right-angled triangular side frames are respectively welded on the two sides of the rectangular back frame;
所述两个相同的直角三角侧面架之间用角钢焊接在一起;The two identical right-angled triangular side frames are welded together with angle steel;
所述两个相同的直角三角形侧面架的斜边和所述角钢组成的平面构成太阳能极板的支撑面。The plane formed by the hypotenuses of the two identical right-angled triangle side frames and the angle steel constitutes the supporting surface of the solar plate.
优选地,所述太阳能极板支架的矩形背面架的两侧边上有孔,用于通过钢丝与杆塔的角钢加固。Preferably, there are holes on both sides of the rectangular back frame of the solar plate support for reinforcement with steel wires and angle steel of the tower.
优选地,所述太阳能极板支架位于所述杆塔的角钢上端。Preferably, the solar panel support is located at the upper end of the angle steel of the tower.
与现有技术相比,本发明具有以下优点:Compared with the prior art, the present invention has the following advantages:
本发明提供的高压输电线路杆塔设备安装装置,第一小抱箍和第二小抱箍将太阳能极板支架固定在立柱上。通过所述第一小抱箍和第二小抱箍与立柱的安装方向,可以随意调整太阳能极板的方向。无论杆塔的方向如何,均可以将太阳能极板支架的方向朝南。第一大抱箍和第二大抱箍通过槽钢和底板将所述立柱固定在杆塔的角钢上,从而实现了将太阳能极板支架固定在所述杆塔上。本发明提供的装置采用抱箍和底板将立柱与杆塔的角钢固定,对杆塔的角钢没有任何损坏,从而保护了角钢外表面的防腐镀锌涂层。由于本发明的安装装置不需要在杆塔上打孔或直接焊接,安装调试方便。In the installation device for pole and tower equipment of a high-voltage transmission line provided by the present invention, the first small hoop and the second small hoop fix the solar plate support on the column. Through the installation direction of the first small hoop, the second small hoop and the column, the direction of the solar plate can be adjusted at will. Regardless of the orientation of the tower, the orientation of the solar panel support can be directed south. The first large hoop and the second large hoop fix the column on the angle steel of the tower through the channel steel and the bottom plate, thereby realizing the fixing of the solar plate support on the tower. The device provided by the invention adopts the hoop and the bottom plate to fix the column and the angle steel of the pole tower without any damage to the angle steel of the pole tower, thereby protecting the anti-corrosion galvanized coating on the outer surface of the angle steel. Since the installation device of the invention does not need to drill holes or directly weld on the tower, the installation and debugging are convenient.
附图说明 Description of drawings
图1是本发明高压输电线路杆塔设备安装装置的第一实施例的主视图;Fig. 1 is the front view of the first embodiment of the high-voltage transmission line tower equipment installation device of the present invention;
图2是本发明所述抱箍示意图;Fig. 2 is a schematic diagram of the hoop of the present invention;
图3是本发明高压输电线路杆塔设备安装装置的第二实施例的主视图;Fig. 3 is the front view of the second embodiment of the high-voltage transmission line tower equipment installation device of the present invention;
图4是本发明底板的侧视图;Fig. 4 is the side view of base plate of the present invention;
图5是本发明高压输电线路杆塔设备安装装置的第二实施例的侧视图;Fig. 5 is a side view of the second embodiment of the installation device for high-voltage transmission line tower equipment of the present invention;
图6是本发明高压输电线路杆塔设备安装装置的第三实施例的主视图。Fig. 6 is a front view of a third embodiment of the installation device for pole and tower equipment of a high-voltage transmission line of the present invention.
具体实施方式 Detailed ways
为使本发明的上述目的、特征和优点能够更加明显易懂,下面结合附图对本发明的具体实施方式做详细的说明。In order to make the above objects, features and advantages of the present invention more comprehensible, specific implementations of the present invention will be described in detail below in conjunction with the accompanying drawings.
参见图1,该图为高压输电线路杆塔设备安装装置的第一实施例的主视图。Referring to FIG. 1 , this figure is a front view of the first embodiment of the installation device for pole and tower equipment of high-voltage transmission lines.
本发明提供的高压输电线路杆塔设备安装装置包括:立柱1、太阳能极板支架2、抱箍、底板8和槽钢9。The installation device for high-voltage transmission line tower equipment provided by the present invention includes: a
所述抱箍包括第一小抱箍3、第二小抱箍4、第一大抱箍6和第二大抱箍7。The hoop includes a first
所述抱箍由弧形区和两条固定支腿组成;所述两条固定支腿的两条中线平行;所述弧形区连接所述两条固定支腿;The hoop is composed of an arc-shaped area and two fixed legs; the two midlines of the two fixed legs are parallel; the arc-shaped area connects the two fixed legs;
所述第一小抱箍3和第二小抱箍4将所述太阳能极板支架2固定在所述立柱1上。The first
所述第一小抱箍3和第二小抱箍4的弧形区与所述立柱1的外围面相接触。The arc-shaped areas of the first
所述第一小抱箍3和第二小抱箍4的两条固定支腿分别插入所述太阳能极板支架2的上横梁和下横梁的孔中,通过螺母5将所述固定支腿与所述太阳能极板支架2紧固。The two fixed legs of the first
所述第一大抱箍6和第二大抱箍7通过所述槽钢9和底板8将所述立柱1与杆塔角钢10固定在一起。The first
所述槽钢9开口的两边与所述立柱1焊接固定。The two sides of the opening of the channel steel 9 are welded and fixed to the
所述槽钢9的外底面与杆塔角钢10的第一平面11相接触。The outer bottom surface of the channel steel 9 is in contact with the
由于杆塔角钢10为平面,立柱1的圆面。因此,为了提高稳定性,增大摩擦力。将立柱1首先与槽钢9焊接在一起。槽钢9的外底面与杆塔角钢10的第一平面11相接触。这样,槽钢9与杆塔角钢10的接触面为平面,增加了摩擦面和固定面。Because the pole and
所述第一大抱箍6和第二大抱箍7的弧形区与所述立柱1的外围面相接触。The arc-shaped areas of the first
所述第一大抱箍6和第二大抱箍7分别位于杆塔角钢10的上下侧。The first
所述第一大抱箍6和第二大抱箍7的固定支腿与所述杆塔角钢10的第二平面12相平行,并且插入所述底板8的四个孔中,通过螺母5将所述第一大抱箍6和第二大抱箍7与底板8紧固。The fixed legs of the first
本发明提供的高压输电线路杆塔设备安装装置,第一小抱箍3和第二小抱箍4将太阳能极板支架2固定在立柱1上。通过所述第一小抱箍3和第二小抱箍4与立柱1的安装方向,可以随意调整太阳能极板支架2的方向。无论杆塔的方向如何,均可以将太阳能极板支架2的方向朝南。第一大抱箍6和第二大抱箍7通过槽钢9和底板8将所述立柱1固定在杆塔的角钢10上,从而实现了将太阳能极板支架2固定在所述高压输电线的杆塔上。由于本发明提供的装置采用抱箍和底板将立柱与杆塔的角钢固定,对杆塔的角钢没有任何损坏,从而保护了角钢外表面的防腐镀锌涂层。由于本发明的安装装置不需要在杆塔上打孔或直接焊接,安装调试方便。In the installation device for pole and tower equipment of a high-voltage transmission line provided by the present invention, the first
参见图2,该图为本发明所述抱箍示意图。Referring to Fig. 2, this figure is a schematic diagram of the hoop of the present invention.
所述抱箍由弧形区B和两条固定支腿A组成。The hoop is composed of an arc-shaped area B and two fixed legs A.
所述两条固定支腿A的两条中线平行。The two midlines of the two fixed legs A are parallel.
所述弧形区B连接所述两条固定支腿A。The arc region B connects the two fixed legs A.
所述两条固定支腿A的长度可以较长,以便于适应各种杆塔角钢的型号。The length of the two fixed legs A can be longer, so as to adapt to various types of pole and tower angle steel.
参见图3,该图为高压输电线路杆塔设备安装装置的第二实施例的主视图。Referring to FIG. 3 , this figure is a front view of a second embodiment of the installation device for pole and tower equipment of high-voltage transmission lines.
本发明装置第二实施例与装置第一实施例的区别是增加了横担螺栓15。The difference between the second embodiment of the device of the present invention and the first embodiment of the device is that a cross arm bolt 15 is added.
其他部件与实施例一中的相同,图中未画出。Other components are the same as those in
所述横担螺栓15的一端安装在所述槽钢9的外底面上,另一头插入所述底板8的孔中。通过螺母5与所述底板8固定。并且所述横担螺栓15与槽钢9的外底面垂直。One end of the cross-arm bolt 15 is installed on the outer bottom surface of the channel steel 9 , and the other end is inserted into the hole of the
所述横担螺栓15担于所述杆塔角钢10的第二平面12上。The cross arm bolts 15 bear on the second plane 12 of the
在槽钢9上安装所述横担螺栓15是为了减小安装装置的重力对杆塔角钢10摩擦面(即第一平面11)的压力,并提高对所述太阳能极板支架2的轴向支撑力。The cross arm bolt 15 is installed on the channel steel 9 in order to reduce the pressure of the gravity of the installation device on the friction surface of the pole tower angle steel 10 (i.e. the first plane 11), and improve the axial support to the solar plate support 2 force.
参见图4,该图为本发明底板的侧视图。Referring to Fig. 4, this figure is a side view of the bottom plate of the present invention.
所述底板8上有5个孔。上边有三个孔。其中两个孔6A是第一大抱箍6的两条固定支腿插入的孔。孔15A是所述横担螺栓15插入的孔。两个孔7A是第二大抱箍7的两条固定支腿插入的孔。There are 5 holes on the
参见图5,该图为高压输电线路杆塔设备安装装置的第二实施例的侧视图。Referring to FIG. 5 , this figure is a side view of the second embodiment of the installation device for the pole and tower equipment of the high-voltage transmission line.
所述太阳能极板支架2位于所述杆塔角钢10的上端。这样,便于调整调整太阳能极板的角度。The solar plate support 2 is located at the upper end of the pole and
所述太阳能极板支架2的矩形背面架的两侧边上有孔16,用于通过钢丝与杆塔角钢10固定在一起。由于一般的高压输电线路杆塔较高,这样可以提高太阳能极板支架2的稳定性,从而增强太阳能极板的抗风能力。There are
参见图6,该图为高压输电线路杆塔设备安装装置的第三实施例的主视图。Referring to FIG. 6 , this figure is a front view of a third embodiment of the installation device for pole and tower equipment of high-voltage transmission lines.
本发明第三实施例与第二实施例的区别是增加了两个套管17。The difference between the third embodiment of the present invention and the second embodiment is that two
所述两个套管17的长度与杆塔角钢10的第二平面12宽度相等。The length of the two
所述两个套管17分别套在所述第二大抱箍7的两条固定支腿上,并且所述两个套管位于所述底板8与立柱之间。The two
所述两个套管17为圆形,所述套管17的外径大于所述底板8上的孔径,避免所述套管17通过所述底板8上的孔串到底板8的另一侧。The two
由于杆塔角钢10只有第一平面11和第二平面12这两个支撑面,立柱与杆塔角钢10固定时,在无支撑面部分添加两个套管14,起到支撑作用。这样,底板8与立柱保持平行,避免底板8倾斜。Since the
需要说明的是,本发明提供的太阳能极板支架由两个相同的直角三角形侧面架和一个矩形背面架组成。It should be noted that the solar plate support provided by the present invention is composed of two identical right-angled triangle side frames and a rectangular back frame.
所述两个相同的直角三角侧面架分别焊接在所述矩形背面架的两侧边上。The two identical right-angled triangular side frames are respectively welded on the two sides of the rectangular back frame.
所述两个相同的直角三角侧面架之间用角钢焊接在一起。The two identical right-angled triangular side frames are welded together with angle steel.
所述两个相同的直角三角形侧面架的斜边和所述角钢组成的平面构成太阳能极板的支撑面。The plane formed by the hypotenuses of the two identical right-angled triangle side frames and the angle steel constitutes the supporting surface of the solar plate.
需要说明的是,本发明实施例所述的太阳能极板支架优选上述形状。可以根据实际需要采用其他形状的太阳能极板支架。It should be noted that the solar plate support described in the embodiment of the present invention preferably has the above-mentioned shape. Solar plate supports of other shapes can be used according to actual needs.
由于一般区域的太阳能极板支架的仰角相对固定或偏差较小,为了提高其稳固定,太阳能极板可固定焊接在所述太阳能极板支架上。Since the elevation angle of the solar plate support in the general area is relatively fixed or the deviation is small, in order to improve its stability, the solar plate can be fixedly welded on the solar plate support.
以上所述,仅是本发明的较佳实施例而已,并非对本发明作任何形式上的限制。虽然本发明已以较佳实施例揭露如上,然而并非用以限定本发明。任何熟悉本领域的技术人员,在不脱离本发明技术方案范围情况下,都可利用上述揭示的方法和技术内容对本发明技术方案做出许多可能的变动和修饰,或修改为等同变化的等效实施例。因此,凡是未脱离本发明技术方案的内容,依据本发明的技术实质对以上实施例所做的任何简单修改、等同变化及修饰,均仍属于本发明技术方案保护的范围内。The above descriptions are only preferred embodiments of the present invention, and do not limit the present invention in any form. Although the present invention has been disclosed above with preferred embodiments, it is not intended to limit the present invention. Any person familiar with the art, without departing from the scope of the technical solution of the present invention, can use the methods and technical content disclosed above to make many possible changes and modifications to the technical solution of the present invention, or modify it to be equivalent to equivalent changes Example. Therefore, any simple modifications, equivalent changes and modifications made to the above embodiments according to the technical essence of the present invention, which do not deviate from the technical solution of the present invention, still fall within the protection scope of the technical solution of the present invention.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2008102247179A CN101494428B (en) | 2008-12-09 | 2008-12-09 | A high-voltage transmission line tower equipment installation device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2008102247179A CN101494428B (en) | 2008-12-09 | 2008-12-09 | A high-voltage transmission line tower equipment installation device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN101494428A true CN101494428A (en) | 2009-07-29 |
| CN101494428B CN101494428B (en) | 2011-01-12 |
Family
ID=40924873
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2008102247179A Active CN101494428B (en) | 2008-12-09 | 2008-12-09 | A high-voltage transmission line tower equipment installation device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN101494428B (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101857166A (en) * | 2010-06-04 | 2010-10-13 | 江苏省电力公司溧阳市供电公司 | Lifting and installation tools for high-voltage bushings and high-voltage leads |
| CN102158133A (en) * | 2011-05-25 | 2011-08-17 | 宁波市镇海华泰电器厂 | Solar power generating and combining device of iron tower for power transmission |
| CN103306382A (en) * | 2013-07-01 | 2013-09-18 | 北京玻钢院复合材料有限公司 | Connection device for composite nodes and assembly method of connection device |
| CN103979206A (en) * | 2014-05-14 | 2014-08-13 | 国家电网公司 | Protection device for tower material plating layer of high-voltage line iron tower |
| CN106836943A (en) * | 2017-01-23 | 2017-06-13 | 中国能源建设集团江苏省电力设计院有限公司 | A kind of equipment for photovoltaic system circle pillar installs fixed structure |
| CN108506697A (en) * | 2018-01-24 | 2018-09-07 | 中国水产科学研究院南海水产研究所 | A kind of video monitoring fixing device based on deep water mesh cage |
| CN113726278A (en) * | 2021-09-28 | 2021-11-30 | 福建永福电力设计股份有限公司 | Novel method for installing umbrella-opening type solar panel for steel pipe pole |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN87205930U (en) * | 1987-03-31 | 1988-03-02 | 赵健平 | Hinged lamp bracket |
| CN2259457Y (en) * | 1994-04-01 | 1997-08-13 | 陶威 | Power-line tower |
| CN1048309C (en) * | 1995-02-16 | 2000-01-12 | 汪友忠 | High-voltage transmission tower |
| CN2377415Y (en) * | 1998-12-01 | 2000-05-10 | 上海电力物资公司电力线路器材厂 | Hoop for electric pole |
| CN2544289Y (en) * | 2002-04-15 | 2003-04-09 | 毛凤麟 | Flashover indicator for isolator of high-voltage power line |
-
2008
- 2008-12-09 CN CN2008102247179A patent/CN101494428B/en active Active
Cited By (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101857166A (en) * | 2010-06-04 | 2010-10-13 | 江苏省电力公司溧阳市供电公司 | Lifting and installation tools for high-voltage bushings and high-voltage leads |
| CN101857166B (en) * | 2010-06-04 | 2012-07-04 | 江苏省电力公司溧阳市供电公司 | Lifting installation tool of high pressure bushings and high pressure leads |
| CN102158133A (en) * | 2011-05-25 | 2011-08-17 | 宁波市镇海华泰电器厂 | Solar power generating and combining device of iron tower for power transmission |
| CN102158133B (en) * | 2011-05-25 | 2013-02-27 | 宁波市镇海华泰电器厂 | Solar power generating and combining device of iron tower for power transmission |
| CN103306382A (en) * | 2013-07-01 | 2013-09-18 | 北京玻钢院复合材料有限公司 | Connection device for composite nodes and assembly method of connection device |
| CN103306382B (en) * | 2013-07-01 | 2016-03-09 | 北京玻钢院复合材料有限公司 | A kind of linkage of composite material node and assemble method thereof |
| CN103979206A (en) * | 2014-05-14 | 2014-08-13 | 国家电网公司 | Protection device for tower material plating layer of high-voltage line iron tower |
| CN103979206B (en) * | 2014-05-14 | 2016-05-18 | 国家电网公司 | The protector of high voltage line iron tower tower material coating |
| CN106836943A (en) * | 2017-01-23 | 2017-06-13 | 中国能源建设集团江苏省电力设计院有限公司 | A kind of equipment for photovoltaic system circle pillar installs fixed structure |
| CN108506697A (en) * | 2018-01-24 | 2018-09-07 | 中国水产科学研究院南海水产研究所 | A kind of video monitoring fixing device based on deep water mesh cage |
| CN108506697B (en) * | 2018-01-24 | 2019-12-10 | 中国水产科学研究院南海水产研究所 | A video monitoring fixture based on deep water cage |
| CN113726278A (en) * | 2021-09-28 | 2021-11-30 | 福建永福电力设计股份有限公司 | Novel method for installing umbrella-opening type solar panel for steel pipe pole |
Also Published As
| Publication number | Publication date |
|---|---|
| CN101494428B (en) | 2011-01-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101494428B (en) | A high-voltage transmission line tower equipment installation device | |
| CN205653036U (en) | Structure of wireless communication device integration installation | |
| CN103474939A (en) | Universal support for mounting controllable discharge lightning arrester on high-voltage transmission line iron tower | |
| CN206117579U (en) | A connection structure for photovoltaic assembly system | |
| CN206503677U (en) | A kind of outer annular video monitoring holder device of wind generator tower | |
| CN203276732U (en) | Portable mounting device for tower signboard | |
| CN109538903B (en) | A fixture for monitoring equipment on transmission towers | |
| CN202810345U (en) | Fence upright and fence unit and detection alarm fence | |
| CN204334433U (en) | A kind of solar panels mounting bracket being fixed on high-tension cable steel tower inside | |
| CN204805722U (en) | Separate cold pipeline bracket | |
| CN218449425U (en) | Lightning rod installation component | |
| CN204886799U (en) | Solar cell panel fixing device suitable for transmission line shaft tower | |
| CN203323743U (en) | Fixed device for inclinometer | |
| CN203230107U (en) | Mounting support for roof solar component | |
| CN221633392U (en) | Lightning rod installing support of electric power iron tower | |
| CN211878900U (en) | Adjustable signboard fixing device for electric power angle steel tower | |
| CN209200573U (en) | Movably connected cable fixed mount | |
| CN208137577U (en) | A kind of iron tower of power transmission line advertising device | |
| CN103387101B (en) | Equipment for supporting wind turbine towers | |
| CN214790341U (en) | Equipment mounting bracket for frame type glass curtain wall | |
| CN107587773A (en) | A mounting frame for monitoring equipment on a power transmission tower and a power transmission tower | |
| CN209513848U (en) | A lightning detection substation iron tower support installation device | |
| CN218564730U (en) | Air pipe support under air truss | |
| CN205480072U (en) | Laboratory is with camera, cell -phone support frame | |
| CN205260506U (en) | Super extra -high voltage defeated substation equipment equalizer ring fixed knot construct |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C53 | Correction of patent for invention or patent application | ||
| CB03 | Change of inventor or designer information |
Inventor after: Wang Jiye Inventor after: Yang Hong Inventor before: Yang Hong |
|
| COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: YANG HONG TO: WANG JIYE YANG HONG |
|
| ASS | Succession or assignment of patent right |
Owner name: BEIJING GUODIANTONG NETWORK TECHNOLOGY CO., LTD. Free format text: FORMER OWNER: BEIJING FIBRLINK COMMUNICATIONS CO., LTD. Effective date: 20120730 Owner name: STATE ELECTRIC NET CROP. BEIJING FIBRLINK COMMUNIC Effective date: 20120730 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20120730 Address after: 100070, Beijing, Fengtai District, Feng Feng Road, 1 times fortune world 28 Co-patentee after: State Grid Corporation of China Patentee after: Beijing Guodiantong Network Technology Co., Ltd. Co-patentee after: Fibrlink Networks Co., Ltd. Address before: 100070 Fengtai District, Feng Feng Road, No. 1, the era of fortune World Building, floor, layer 28, Beijing Patentee before: Fibrlink Networks Co., Ltd. |