CN101492147A - 行车梁标高调整方法 - Google Patents
行车梁标高调整方法 Download PDFInfo
- Publication number
- CN101492147A CN101492147A CNA2008100328970A CN200810032897A CN101492147A CN 101492147 A CN101492147 A CN 101492147A CN A2008100328970 A CNA2008100328970 A CN A2008100328970A CN 200810032897 A CN200810032897 A CN 200810032897A CN 101492147 A CN101492147 A CN 101492147A
- Authority
- CN
- China
- Prior art keywords
- crane beam
- jacking
- jack
- crane
- regulation method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 19
- 229910000831 Steel Inorganic materials 0.000 claims description 4
- 239000010959 steel Substances 0.000 claims description 4
- 230000009286 beneficial effect Effects 0.000 claims description 3
- 239000000725 suspension Substances 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 238000005259 measurement Methods 0.000 abstract 3
- 230000007812 deficiency Effects 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明涉及行车,尤其涉及厂房的行车梁标高调整方法。一种行车梁标高调整方法,它包括:架设在柱子上的行车梁,相邻的行车梁端头有弹簧板并以螺栓连接;它包括下列步骤:步骤一,对行车梁进行全面测量,测量内容主要包括行车梁直线度、跨距、顶面标高。测量资料必须在行车梁调整前整理出来,计算并复核行车梁调整偏差值;步骤二,松开连接行车梁与弹簧板的螺栓;步骤三,架设行车顶升标高调整装置;所述调整装置主要包括千斤顶;步骤四,利用所述千斤顶顶升行车梁直至达到规定的顶升调整值。本发明能精确调行车梁的标高,使之符合使用要求,保证工厂安全生产。
Description
技术领域
本发明涉及行车,尤其涉及厂房的行车梁标高调整装置。
背景技术
在工厂厂房中,行车作为主要的吊运重型设备有十分重要的作用,它沿着架设在砼柱牛腿之间的行车梁来回运动,由于其需要吊运的设备重量大,运输过程中因为刹车启动等原因发生的振动,对于行车梁影响很大,在使用一定期限后,会产生行车梁高度不足的安全隐患,因此需要进行检查,发现需要及时解决,但是由于行车梁位于厂房的高空,重量又大,无法使用吊车等设备,调整高度比较困难,无法满足使用要求。
发明内容
本发明旨在克服现有技术的缺陷,提供一种钢柱标高调整方法。本发明能精确调行车梁的标高,使之符合使用要求,保证工厂安全生产。
一种行车梁标高调整方法,它包括:架设在柱子上的行车梁,相邻的行车梁端头有弹簧板并以螺栓连接;其特征在于,它包括下列步骤
步骤一,对行车梁进行全面测量,测量内容主要包括行车梁直线度、跨距、顶面标高。测量资料必须在行车梁调整前整理出来,计算并复核行车梁调整偏差值;
步骤二,松开连接行车梁与弹簧板的螺栓;
步骤三,架设行车顶升标高调整装置;所述调整装置主要包括千斤顶;
步骤四,利用所述千斤顶顶升行车梁直至达到规定的顶升调整值。
所述的行车梁标高调整方法,,所述标高调整装置包括两个顶升反力架,它们为Z形挂件,分别以其上端固定挂接在行车梁的柱子上,并间隔设置;
一个横梁,它架设在两个顶升反力架之间,并和顶升反力架下端固定连接;
至少一个千斤顶,它设置在所述横梁上,并以其顶杆顶升行车梁。
所述的行车梁标高调整方法,顶升反力架的竖直边后背紧靠所述行车梁的柱子。
所述的行车梁标高调整方法,所述步骤四中,架设千斤顶进行行车梁顶升,若行车梁的标高调整值小于或等于千斤顶的一次行程,就直接利于千斤顶一次性顶升就位;
若行车梁的标高调整值大于千斤顶的一次行程,则在行车梁端头配置垫板,将行车梁临时固定,然后卸载,待垫高千斤顶后继续顶升,以此反复循环顶升直至达到规定的顶升调整值。
所述的行车梁标高调整方法,顶升就位后,根据行车梁端头距柱顶板的实际尺寸配置垫板,垫板的放置数量不多于三块,且相互点焊固定牢固。
所述的行车梁标高调整方法,所述垫板为H型钢。
本发明利用两块“Z”字板挂在混凝土柱顶部预埋件上做受力点,再在两块“Z”字板上增设横梁做顶升支座,架设千斤顶进行行车梁顶升,从而实现行车梁高度的调整,保证行车的安全运行。
附图说明
下面,结合附图进一步说明本发明:
图1为本发明示意图;
图2为图1中A-A剖视图。
具体实施方式
如图1和图2所示,一种行车梁标高调整方法,它包括:架设在柱子11上的行车梁1,相邻的行车梁11端头有弹簧板并以螺栓连接;它包括下列步骤
步骤一,对行车梁1进行全面测量,测量内容主要包括行车梁直线度、跨距、顶面标高。测量资料必须在行车梁调整前整理出来,计算并复核行车梁调整偏差值;
步骤二,松开连接行车梁与弹簧板的螺栓;
步骤三,架设行车顶升标高调整装置;所述调整装置主要包括千斤顶4;
步骤四,利用所述千斤顶4顶升行车梁1直至达到规定的顶升调整值。
所述行车梁标高调整顶升装置,它设置架设行车梁1的柱子11上,它包括;
两个顶升反力架2,它们为Z形挂件,分别以其上端固定挂接在行车梁1的柱子2上,并间隔设置;顶升反力架2的竖直边后背紧靠所述行车梁1的柱子11。
一个横梁3,它架设在两个顶升反力架2之间,并和顶升反力架2下端固定连接;
至少一个千斤顶4,它设置在所述横梁3上,并以其顶杆顶升行车梁1。
若行车梁1的标高调整值小于或等于千斤顶4的一次行程,就直接利于千斤顶4一次性顶升就位;若行车梁1的标高调整值大于千斤顶4的一次行程,须在行车梁1端头配置垫板5,将行车梁1临时固定,然后卸载,待垫高千斤顶4后继续顶升,以此反复循环顶升直至达到规定的顶升调整值。
顶升就位后,根据行车梁端头距柱顶板的实际尺寸配置垫板,垫板的放置数量不多于三块,且相互点焊固定牢固。所述垫板为H型钢。
Claims (6)
1.一种行车梁标高调整方法,它包括:架设在柱子上的行车梁,相邻的行车梁端头有弹簧板并以螺栓连接;其特征在于,它包括下列步骤
步骤一,对行车梁进行全面测量,测量内容主要包括行车梁直线度、跨距、顶面标高。测量资料必须在行车梁调整前整理出来,计算并复核行车梁调整偏差值;
步骤二,松开连接行车梁与弹簧板的螺栓;
步骤三,架设行车顶升标高调整装置;所述调整装置主要包括千斤顶;
步骤四,利用所述千斤顶顶升行车梁直至达到规定的顶升调整值。
2.根据权利要求1所述的行车梁标高调整方法,其特征在与,所述标高调整装置包括两个顶升反力架,它们为Z形挂件,分别以其上端固定挂接在行车梁的柱子上,并间隔设置;
一个横梁,它架设在两个顶升反力架之间,并和顶升反力架下端固定连接;
至少一个千斤顶,它设置在所述横梁上,并以其顶杆顶升行车梁。
3.根据权利要求1或2所述的行车梁标高调整方法,其特征在于,顶升反力架的竖直边后背紧靠所述行车梁的柱子。
4.根据权利要求1所述的行车梁标高调整方法,其特征在于,所述步骤四中,架设千斤顶进行行车梁顶升,若行车梁的标高调整值小于或等于千斤顶的一次行程,就直接利于千斤顶一次性顶升就位;
若行车梁的标高调整值大于千斤顶的一次行程,则在行车梁端头配置垫板,将行车梁临时固定,然后卸载,待垫高千斤顶后继续顶升,以此反复循环顶升直至达到规定的顶升调整值。
5.根据权利要求1所述的行车梁标高调整方法,其特征在于,顶升就位后,根据行车梁端头距柱顶板的实际尺寸配置垫板,垫板的放置数量不多于三块,且相互点焊固定牢固。
6.根据权利要求1所述的行车梁标高调整方法,其特征在于,所述垫板为H型钢。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNA2008100328970A CN101492147A (zh) | 2008-01-22 | 2008-01-22 | 行车梁标高调整方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNA2008100328970A CN101492147A (zh) | 2008-01-22 | 2008-01-22 | 行车梁标高调整方法 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN101492147A true CN101492147A (zh) | 2009-07-29 |
Family
ID=40922965
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNA2008100328970A Pending CN101492147A (zh) | 2008-01-22 | 2008-01-22 | 行车梁标高调整方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN101492147A (zh) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102079480A (zh) * | 2011-01-28 | 2011-06-01 | 西安热工研究院有限公司 | 一种大载荷刚性吊架受力调整装置 |
| CN102358576A (zh) * | 2011-11-04 | 2012-02-22 | 吉林建龙钢铁有限责任公司 | 一种冶金桥式起重机的调整装置 |
| CN102519673A (zh) * | 2011-11-30 | 2012-06-27 | 中国北车集团大连机车车辆有限公司 | 曲轴动平衡试验传动中心高的调整方法 |
| CN109780969A (zh) * | 2019-01-29 | 2019-05-21 | 中国五冶集团有限公司 | 行车梁调整时的测量方法 |
| CN110281004A (zh) * | 2019-07-29 | 2019-09-27 | 广西玉柴机器股份有限公司 | 一种调整导轨直线度的方法及调整装置 |
| CN113998590A (zh) * | 2021-11-24 | 2022-02-01 | 中国十九冶集团有限公司 | 行车梁制动板顶升结构以及顶升方法 |
-
2008
- 2008-01-22 CN CNA2008100328970A patent/CN101492147A/zh active Pending
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102079480A (zh) * | 2011-01-28 | 2011-06-01 | 西安热工研究院有限公司 | 一种大载荷刚性吊架受力调整装置 |
| CN102079480B (zh) * | 2011-01-28 | 2013-01-09 | 西安热工研究院有限公司 | 一种大载荷刚性吊架受力调整装置 |
| CN102358576A (zh) * | 2011-11-04 | 2012-02-22 | 吉林建龙钢铁有限责任公司 | 一种冶金桥式起重机的调整装置 |
| CN102519673A (zh) * | 2011-11-30 | 2012-06-27 | 中国北车集团大连机车车辆有限公司 | 曲轴动平衡试验传动中心高的调整方法 |
| CN109780969A (zh) * | 2019-01-29 | 2019-05-21 | 中国五冶集团有限公司 | 行车梁调整时的测量方法 |
| CN110281004A (zh) * | 2019-07-29 | 2019-09-27 | 广西玉柴机器股份有限公司 | 一种调整导轨直线度的方法及调整装置 |
| CN110281004B (zh) * | 2019-07-29 | 2024-02-09 | 广西玉柴机器股份有限公司 | 一种调整导轨直线度的方法及调整装置 |
| CN113998590A (zh) * | 2021-11-24 | 2022-02-01 | 中国十九冶集团有限公司 | 行车梁制动板顶升结构以及顶升方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109269896B (zh) | 一种多角度荷载施加装置及方法 | |
| CN101307605B (zh) | 高精度设备底座安装方法 | |
| CN101266011B (zh) | 用于预埋高精度大直径地脚螺栓的安装装置及使用该装置的安装方法 | |
| CN111851565B (zh) | 一种带杯口型基础钢结构立柱找正结构及其施工方法 | |
| CN101492147A (zh) | 行车梁标高调整方法 | |
| CN105971294A (zh) | 一种采用通用标准节组成的立体支撑胎架及安装方法 | |
| CN211034860U (zh) | 钢结构网架液压提升施工作业装置 | |
| CN106087765A (zh) | 高墩墩顶现浇砼托架预压加载装置 | |
| CN105421792A (zh) | 一种模块式钢结构构件的吊装施工工艺 | |
| CN104278843B (zh) | 一种钢结构梁吊装对接的纠偏装置及使用方法 | |
| CN202482772U (zh) | 铁路桥梁防落梁挡块安装系统 | |
| CN205941201U (zh) | 一种三方向的拉力试验机 | |
| CN205777401U (zh) | 一种胎架用通用标准节 | |
| CN205576749U (zh) | 桥体梁架提升及调位装置 | |
| CN216272860U (zh) | 一种系梁盖梁施工可调铰式千斤顶 | |
| CN113235433B (zh) | 一种矮塔斜拉桥分丝管索鞍精确快速定位方法及装置 | |
| CN106978904A (zh) | 一种格构柱定位导向装置及应用定位导向装置进行施工的工艺 | |
| CN207259974U (zh) | 一种铁路桥墩模板安装的手持调模工具 | |
| CN106041825B (zh) | 一种轿架调整工装 | |
| CN205818149U (zh) | 预制箱梁用预应力张拉千斤顶现场校验装置 | |
| CN109577995B (zh) | 一种自动整平基座系统及其使用方法 | |
| CN201186852Y (zh) | 行车梁顶升装置 | |
| CN204401646U (zh) | 通用型五点支撑压重式塔机基础 | |
| CN106988542B (zh) | 一种预制构件拼接专用设备 | |
| CN217230001U (zh) | 一种用于塔器安装的组合式支撑调整装置 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20090729 |