CN101457558A - Steel truss-steel plate combined shear wall and method for producing the same - Google Patents

Steel truss-steel plate combined shear wall and method for producing the same Download PDF

Info

Publication number
CN101457558A
CN101457558A CNA2008102405172A CN200810240517A CN101457558A CN 101457558 A CN101457558 A CN 101457558A CN A2008102405172 A CNA2008102405172 A CN A2008102405172A CN 200810240517 A CN200810240517 A CN 200810240517A CN 101457558 A CN101457558 A CN 101457558A
Authority
CN
China
Prior art keywords
steel
profiled
frame
concrete column
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008102405172A
Other languages
Chinese (zh)
Inventor
曹万林
彭斌
张建伟
张文江
周中一
董宏英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Technology
Original Assignee
Beijing University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Technology filed Critical Beijing University of Technology
Priority to CNA2008102405172A priority Critical patent/CN101457558A/en
Publication of CN101457558A publication Critical patent/CN101457558A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

本发明是一种剪力墙,特别涉及钢桁架-钢板组合剪力墙及其制作方法。包括边框梁、与边框梁固结的边框柱和布置在边框梁和边框柱之间的钢板。边框梁包括型钢梁和浇注在型钢梁外的混凝土构成型钢-混凝土组合梁。边框柱为由型钢和浇注在型钢外的混凝土构成的型钢混凝土柱,型钢混凝土柱中的型钢与钢板及边框梁中的型钢梁固连,在钢板平面上斜向固结型钢斜支撑,型钢斜支撑可呈人字形、X形或八字形布置。型钢梁、型钢混凝土柱、型钢斜支撑和钢板组合,形成钢桁架-钢板组合结构。本发明的剪力墙比现有剪力墙的初始刚度大、承载能力高、承载力和刚度衰减慢、整体抗震耗能性能好,后期抗震性能相对稳定,可有效减轻底部剪切滑移破坏。

Figure 200810240517

The invention relates to a shear wall, in particular to a steel truss-steel plate composite shear wall and a manufacturing method thereof. It includes a frame beam, a frame column consolidated with the frame beam and a steel plate arranged between the frame beam and the frame column. The frame beam includes a shaped steel beam and concrete poured outside the shaped steel beam to form a shaped steel-concrete composite beam. The frame column is a steel concrete column composed of profiled steel and concrete poured outside the profiled steel. The profiled steel in the profiled steel concrete column is connected with the steel plate and the profiled steel beam in the frame beam. The oblique supports can be arranged in a herringbone, X or splayed shape. Steel beams, steel concrete columns, steel diagonal supports and steel plates are combined to form a steel truss-steel plate composite structure. Compared with the existing shear walls, the shear wall of the present invention has higher initial stiffness, higher bearing capacity, slower decay of bearing capacity and stiffness, better overall seismic energy dissipation performance, relatively stable later seismic performance, and can effectively reduce bottom shear slip damage .

Figure 200810240517

Description

钢桁架-钢板组合剪力墙及其制作方法 Steel truss-steel plate composite shear wall and its manufacturing method

技术领域 technical field

本发明是一种剪力墙,特别涉及钢桁架-钢板组合剪力墙及其制作方法。The invention relates to a shear wall, in particular to a steel truss-steel plate composite shear wall and a manufacturing method thereof.

技术背景 technical background

随着社会生产的发展和人们生活的需要,高层建筑越来越多。量大面广的钢筋混凝土高层建筑通常由梁、柱、楼板和剪力墙及筒体构成。剪力墙和由剪力墙组成的筒体是高层建筑抗震的核心部分,剪力墙结构的抗震性能对于高层建筑的安全可靠有着至关重要的作用。With the development of social production and the needs of people's lives, there are more and more high-rise buildings. Reinforced concrete high-rise buildings with large volume and wide area are usually composed of beams, columns, floors, shear walls and cylinders. The shear wall and the cylinder composed of the shear wall are the core parts of the high-rise building's seismic resistance, and the seismic performance of the shear wall structure plays a vital role in the safety and reliability of the high-rise building.

由于高层建筑需要有较大的侧向刚度,因此剪力墙的设计,必须考虑抗侧力的设计。此外,剪力墙还要求有较大的弹性初始刚度、大变形能力和良好的塑性性能、稳定的滞回特性等。钢板剪力墙的出现不但很好地满足了上述要求,而且能够有效地克服钢筋混凝土剪力墙自重大、角部混凝土易开裂、易碎等缺点,已成为一种非常具有发展前景的高层抗侧力体系。然而钢板剪力墙中的钢板在受力时,其对角线方向上的应力最大,破坏也大多发生在对角线上,降低了整个剪力墙的承载力,使得整个结构的抗震能力受到很大的影响。Because high-rise buildings need to have greater lateral stiffness, the design of shear walls must consider the design of lateral force resistance. In addition, shear walls also require large elastic initial stiffness, large deformation capacity, good plastic properties, and stable hysteretic properties. The emergence of steel plate shear walls not only satisfies the above requirements well, but also can effectively overcome the shortcomings of reinforced concrete shear walls, such as heavy weight, easy cracking and brittleness of corner concrete, and has become a very promising high-rise anti-corrosion structure. side force system. However, when the steel plate in the steel plate shear wall is stressed, the stress on the diagonal direction is the largest, and most of the damage occurs on the diagonal line, which reduces the bearing capacity of the entire shear wall and limits the seismic capacity of the entire structure. big impact.

发明内容 Contents of the invention

本发明的目的在于克服了现有剪力墙的上述缺陷,提供了一种钢桁架-钢板组合剪力墙及其制作方法,本发明能够显著提高型钢混凝土柱边框剪力墙延性、抗震耗能能力。The purpose of the present invention is to overcome the above-mentioned defects of the existing shear walls, and provide a steel truss-steel plate composite shear wall and its manufacturing method. The present invention can significantly improve the ductility and seismic energy consumption of the steel concrete column frame shear wall ability.

为了实现上述目的,本发明采取了如下技术方案。本发明中的钢桁架-钢板组合剪力墙包括上下边框梁、与边框梁固结的边框柱和布置在边框梁和边框柱之间的钢板。所述边框梁为由型钢梁和浇注在型钢梁外围的混凝土构成的型钢-混凝土组合梁。所述边框柱为由型钢和浇注在型钢外的混凝土构成的型钢混凝土柱,型钢混凝土柱中的型钢与钢板及边框梁中的型钢梁固连,在钢板平面上斜向固结型钢斜支撑。In order to achieve the above object, the present invention adopts the following technical solutions. The steel truss-steel plate composite shear wall in the present invention includes upper and lower frame beams, frame columns consolidated with the frame beams, and steel plates arranged between the frame beams and the frame columns. The frame beam is a steel-concrete composite beam composed of a steel beam and concrete poured on the periphery of the steel beam. The frame column is a steel concrete column composed of profiled steel and concrete poured outside the profiled steel. The profiled steel in the profiled steel concrete column is fixedly connected with the steel plate and the profiled steel beam in the frame beam. .

钢桁架-钢板组合剪力墙的制作方法,该方法是按以下顺序进行的:The manufacturing method of steel truss-steel plate composite shear wall is carried out in the following order:

1)配置型钢混凝土柱中的型钢;1) Configure the steel in the steel concrete column;

2)配置钢板,并在钢板上预留孔洞或切割槽;2) Configure the steel plate, and reserve holes or cutting grooves on the steel plate;

3)配置型钢斜支撑,将型钢斜支撑斜向布置在钢板平面内并与钢板固连;再将钢板、型钢斜支撑与型钢混凝土柱中的型钢固连;3) Configure the inclined support of shaped steel, arrange the inclined support of shaped steel obliquely in the plane of the steel plate and fix it with the steel plate; then connect the steel plate, the inclined support of shaped steel with the shaped steel in the steel concrete column;

4)配置上下边框梁中的型钢梁,将型钢梁与钢板、型钢斜支撑及型钢混凝土柱中的型钢进行刚性连接,构成钢桁架-钢板组合结构;4) Configure the shaped steel beams in the upper and lower frame beams, and rigidly connect the shaped steel beams with steel plates, shaped steel oblique supports and shaped steel in steel concrete columns to form a steel truss-steel plate composite structure;

5)在型钢梁和型钢混凝土柱中的型钢外配置钢筋,并在钢筋外绑扎箍筋,组成钢筋网;箍筋穿过钢板上预留的孔洞或切割槽;5) Arrange reinforcing bars outside the shaped steel in the shaped steel beams and shaped reinforced concrete columns, and bind the stirrups outside the steel bars to form a reinforcement mesh; the stirrups pass through the reserved holes or cutting grooves on the steel plate;

6)在型钢混凝土柱和型钢梁布筋外侧预留保护层厚度,支模板;6) Reserve the thickness of the protective layer on the outer side of the reinforced concrete columns and steel beams, and support the formwork;

7)浇筑型钢混凝土柱和边框梁的混凝土,成型后即为钢桁架-钢板组合剪力墙。7) Concrete is poured for steel-steel concrete columns and frame beams, and after forming, it becomes a steel truss-steel plate composite shear wall.

所述的型钢斜支撑呈人字形或八字形布置,其上端伸入上边框梁中与型钢梁固结,下端伸入下边框梁与型钢混凝土柱的节点中,同时与下边框梁中的型钢梁和型钢混凝土柱中的型钢固连。The profiled steel oblique supports are arranged in a herringbone or splayed shape, the upper end of which extends into the upper frame beam and is consolidated with the profiled steel beam, and the lower end extends into the joint between the lower frame beam and the steel concrete column, and simultaneously connects with the lower frame beam Steel beams and steel concrete columns are fixedly connected.

所述的型钢斜支撑呈X形布置,其上端伸入上边框梁与型钢混凝土柱的节点中,同时与上边框梁中的型钢梁及型钢混凝土柱中的型钢固连;下端伸入下边框梁与型钢混凝土柱的节点中,同时与下边框梁中的型钢梁和型钢混凝土柱中的型钢固连。The profiled steel diagonal support is arranged in an X shape, and its upper end extends into the joint between the upper frame beam and the steel concrete column, and is fixedly connected with the profiled steel beam in the upper frame beam and the profiled steel in the steel concrete column; the lower end extends into the lower In the joint between the frame beam and the steel concrete column, it is fixedly connected with the steel beam in the lower frame beam and the steel in the steel concrete column at the same time.

本发明钢桁架-钢板组合部分有利于提高剪力墙作为抗震第一道防线的抗剪承载力,延性以及耗能能力,也利于减轻结构的自重,并使剪力墙和边框柱二者承受的荷载重分布,将剪力墙承担的一部分压力转移到型钢混凝土柱中,减少剪力墙中的轴压比,使得墙体部分可以采取较少的材料,从而增加建筑的使用面积。当墙板在抗震中破坏后,型钢斜支撑与上、下边框梁、型钢混凝土柱形成门架结构,从而保持结构的整体稳定性。型钢混凝土柱边框与普通混凝土边框柱的剪力墙相比,可以提高承载能力,减慢承载力和刚度的衰减速度,使得墙体的后期抗震性能相对稳定,而且减轻了底部剪切滑移破坏。The steel truss-steel plate combination part of the present invention is beneficial to improve the shear bearing capacity, ductility and energy dissipation capacity of the shear wall as the first line of defense against earthquakes, and is also beneficial to reduce the self-weight of the structure, and make both the shear wall and the frame column bear The load distribution of the shear wall transfers part of the pressure borne by the shear wall to the steel concrete column, reducing the axial compression ratio in the shear wall, so that the wall part can use less material, thereby increasing the usable area of the building. When the wall panel is damaged in the earthquake resistance, the slanted steel support, the upper and lower frame beams, and the steel concrete column form a portal frame structure, thereby maintaining the overall stability of the structure. Compared with the shear wall of ordinary concrete frame column frame, steel reinforced concrete column frame can improve the bearing capacity, slow down the attenuation speed of bearing capacity and stiffness, make the later seismic performance of the wall relatively stable, and reduce the shear slip damage at the bottom .

由于剪力墙是建筑结构的核心抗侧力部件,提高了剪力墙的抗震能力,也就提高了结构的整体抗震能力,当建筑物遭遇强烈地震时,可减轻其震害,防止其倒塌。Since the shear wall is the core anti-lateral force component of the building structure, the seismic capacity of the shear wall is improved, and the overall seismic capacity of the structure is also improved. When the building encounters a strong earthquake, its earthquake damage can be reduced and its collapse can be prevented. .

附图说明 Description of drawings

图1是本发明钢桁架-钢板组合剪力墙中型钢斜支撑呈人字形时剪力墙一个结构单元的结构配筋示意图;Fig. 1 is the structural reinforcement schematic diagram of a structural unit of the shear wall when the steel truss-steel plate composite shear wall medium-sized steel oblique support of the present invention is herringbone;

图2是图1中A-A剖面放大示意图;Fig. 2 is the enlarged schematic view of A-A section in Fig. 1;

图3是图1中B-B剖面放大示意图;Fig. 3 is the enlarged schematic view of B-B section in Fig. 1;

图4是本发明钢桁架-钢板组合剪力墙中型钢斜支撑呈X形时剪力墙一个结构单元的结构配筋示意图;Fig. 4 is the structural reinforcement schematic diagram of a structural unit of the shear wall when the steel truss-steel plate composite shear wall medium-sized steel oblique support of the present invention is X-shaped;

图5是本发明钢桁架-钢板组合剪力墙中型钢斜支撑呈八字形时剪力墙一个结构单元的结构配筋示意图;Fig. 5 is the structural reinforcement schematic diagram of a structural unit of the shear wall when the steel truss-steel plate composite shear wall medium-sized steel oblique support of the present invention is in a figure-eight shape;

图6是本发明钢桁架-钢板组合剪力墙中型钢斜支撑呈人字形网状布置时剪力墙一个结构单元的结构配筋示意图;Fig. 6 is a schematic diagram of structural reinforcement of a structural unit of the shear wall when the steel truss-steel plate composite shear wall medium-sized steel oblique supports of the present invention are arranged in a herringbone shape;

图7是本发明钢桁架-钢板组合剪力墙中型钢斜支撑呈X形网状布置时剪力墙一个结构单元的结构配筋示意图;Fig. 7 is a schematic diagram of structural reinforcement of a structural unit of the shear wall when the steel truss-steel plate composite shear wall medium-sized steel oblique supports of the present invention are arranged in an X-shaped network;

图8是本发明钢桁架-钢板组合剪力墙中型钢斜支撑呈八字形网状布置时剪力墙一个结构单元的结构配筋示意图;Fig. 8 is a schematic diagram of the structural reinforcement of a structural unit of the shear wall when the steel truss-steel plate composite shear wall medium-sized steel oblique supports of the present invention are arranged in a figure-eight network;

图中:1、钢板,2、型钢斜支撑,3、型钢混凝土柱,4、型钢梁,5、型钢混凝土柱纵筋,6、型钢混凝土柱矩形箍筋,7、边框梁纵筋,8、边框梁的矩形箍筋。In the figure: 1. Steel plate, 2. Diagonal steel support, 3. Steel concrete column, 4. Steel beam, 5. Longitudinal reinforcement of steel concrete column, 6. Rectangular stirrup of steel concrete column, 7. Longitudinal reinforcement of frame beam, 8 , Rectangular stirrups for frame beams.

具体实施方式 Detailed ways

下面结合附图1~图8对本发明作进一步说明:Below in conjunction with accompanying drawing 1~Fig. 8, the present invention will be further described:

实施例1Example 1

钢桁架-钢板组合剪力墙一个结构单元的结构配筋示意图如图1~图3所示。本实施例包括边框梁、型钢混凝土柱3、钢板和型钢斜支撑组合而成。剪力墙两端设置型钢混凝土柱3,型钢混凝土柱3与边框梁固结,在边框梁和边框柱之间设置有钢板1,钢板1上预留孔洞或切割出槽。剪力墙边框梁中设置有型钢梁4,在型钢梁4的外围布置边框梁纵筋7,沿边框梁纵筋7均匀地绑扎着矩形箍筋8,边框梁的矩形箍筋8穿过钢板上的预留孔洞或切割槽均匀分布至梁端,在由纵筋7和矩形箍筋8组成的钢筋网上浇注混凝土,形成型钢-混凝土组合梁。型钢混凝土柱3内设置有为型钢,该型钢与边框梁中的型钢梁4固结,在型钢梁4外布置型钢混凝土柱纵筋5,沿纵筋5均匀地绑扎着矩形箍筋6,型钢混凝土柱的矩形箍筋6也穿过钢板上的预留空洞或切割槽,在由纵筋5和箍筋6组成的钢筋网上浇注混凝土,构成型钢混凝土柱3。The schematic diagrams of the structural reinforcement of a structural unit of the steel truss-steel plate composite shear wall are shown in Figures 1 to 3. This embodiment is composed of frame beams, shaped steel concrete columns 3, steel plates and shaped steel oblique supports. The two ends of the shear wall are provided with steel concrete columns 3, and the steel concrete columns 3 are consolidated with the frame beams, and a steel plate 1 is arranged between the frame beams and the frame columns, and holes or grooves are reserved on the steel plate 1. The frame beam of the shear wall is provided with a shaped steel beam 4, and the frame beam longitudinal reinforcement 7 is arranged on the periphery of the shaped steel beam 4, and the rectangular stirrup 8 is evenly bound along the frame beam longitudinal reinforcement 7, and the rectangular stirrup 8 of the frame beam passes through The reserved holes or cutting grooves on the steel plate are evenly distributed to the beam ends, and concrete is poured on the steel mesh composed of longitudinal bars 7 and rectangular stirrups 8 to form a steel-concrete composite beam. The shaped steel concrete column 3 is provided with a shaped steel, which is consolidated with the shaped steel beam 4 in the frame beam, and the shaped steel concrete column longitudinal reinforcement 5 is arranged outside the shaped steel beam 4, and the rectangular stirrups 6 are evenly bound along the longitudinal reinforcement 5 The rectangular stirrup 6 of the steel concrete column also passes through the reserved cavity or cutting groove on the steel plate, and concrete is poured on the steel mesh composed of the longitudinal bar 5 and the stirrup 6 to form the steel concrete column 3 .

在钢板平面上斜向固结型钢斜支撑2,型钢斜支撑2在钢板平面内呈人字形布置,其上端伸入上边框梁中与型钢梁4固结,下端伸入下边框梁与型钢混凝土柱的节点中,与下边框梁中型钢梁4和型钢混凝土柱3中的型钢同时固结1。On the plane of the steel plate, the obliquely consolidated profiled steel support 2 is arranged in a herringbone shape in the plane of the steel plate, and its upper end extends into the upper frame beam to be consolidated with the profiled steel beam 4, and its lower end extends into the lower frame beam and the profiled steel In the node of the concrete column, the profile steel in the medium steel beam 4 of the lower frame beam and the profile steel in the profile steel concrete column 3 are simultaneously consolidated 1 .

钢板1、型钢斜支撑2、边框梁中的型钢梁4和剪力墙两端的型钢混凝土柱3组合,形成钢桁架-钢板组合结构。The combination of steel plate 1, shaped steel diagonal support 2, shaped steel beam 4 in the frame beam and shaped steel concrete column 3 at both ends of the shear wall forms a steel truss-steel plate composite structure.

钢桁架-钢板组合剪力墙的制作方法,该方法包括以下步骤:A method for manufacturing a steel truss-steel plate composite shear wall, the method comprising the following steps:

1)制作型钢混凝土柱3中的型钢,在梁柱节点处的型钢上焊短钢梁;1) Make the shaped steel in the steel reinforced concrete column 3, and weld the short steel beam on the shaped steel at the beam-column node;

2)制作钢板1,并在钢板上预留孔洞或切割出槽,以便于型钢混凝土柱和边框梁的箍筋的绑扎;2) Make the steel plate 1, and reserve a hole or cut a groove on the steel plate, so as to facilitate the binding of the stirrups of the steel concrete column and the frame beam;

3)配置型钢斜支撑2,型钢斜支撑2呈人字形布置布置在钢板平面上,并与钢板焊接或利用螺栓连接。再将钢板与型钢斜支撑2与型钢混凝土柱3中的型钢焊接。3) The profiled steel oblique supports 2 are configured, and the profiled steel oblique supports 2 are arranged in a herringbone shape on the plane of the steel plate, and are welded to the steel plate or connected with bolts. Then the steel plate and the profiled steel oblique support 2 are welded with the profiled steel in the profiled steel concrete column 3 .

4)制作边框梁中的型钢梁4,型钢梁的缘与柱边预设短钢梁的翼缘焊接,钢梁的腹板与短钢梁的腹板用双夹板高强度螺栓摩擦型连接。型钢梁与型钢混凝土柱3及钢板1与斜支撑11进行可靠刚性连接,构成钢桁架-钢板组合结构。其中,型钢斜支撑的上端伸入边框梁中,与上边框梁中的型钢梁4焊接。下端伸入型钢混凝土柱和下边框梁的节点中,与型钢混凝土柱3、下边框梁中型钢梁4焊接;4) Make the shaped steel beam 4 in the frame beam, the edge of the shaped steel beam is welded to the flange of the pre-set short steel beam at the column edge, and the web of the steel beam and the web of the short steel beam are friction-type with double splint high-strength bolts connect. Reliable and rigid connections are made between the shaped steel beam and the shaped steel concrete column 3 and the steel plate 1 and the diagonal support 11 to form a steel truss-steel plate composite structure. Wherein, the upper end of the shaped steel oblique support extends into the frame beam, and is welded with the shaped steel beam 4 in the upper frame beam. The lower end extends into the node of the steel concrete column and the lower frame beam, and is welded with the steel concrete column 3 and the middle steel beam 4 of the lower frame beam;

5)配置型钢混凝土柱3和边框梁中的钢筋,其中箍筋穿过钢板的预留孔洞或槽;5) Configure steel bars in the steel concrete columns 3 and frame beams, wherein the stirrups pass through the reserved holes or grooves of the steel plates;

6)在型钢混凝土柱和边框梁布筋外侧保留一定保护层厚度,支模板;6) A certain protective layer thickness is reserved on the outer side of the reinforced concrete column and frame beam reinforcement, and the formwork is supported;

7)浇筑型钢混凝土柱和边框梁的混凝土,成型后即为钢桁架-钢板组合剪力墙。7) Concrete is poured for steel-steel concrete columns and frame beams, and after forming, it becomes a steel truss-steel plate composite shear wall.

实施例2Example 2

本实施例的结构形式如图4所示,与实施例1基本相同,不同之处仅在于:型钢斜支撑2在钢板平面内呈X形布置,其上端伸入型钢混凝土柱3与上边框梁的节点中,与型钢混凝土柱3中的型钢、上边框梁中的型钢梁4同时连接。下端伸入型钢混凝土柱和下边框梁的节点中,与型钢混凝土柱3中的型钢、下边框梁中的型钢梁4同时连接。The structural form of this embodiment is shown in Figure 4, which is basically the same as that of Embodiment 1, the only difference being that the inclined steel support 2 is arranged in an X shape in the steel plate plane, and its upper end extends into the steel concrete column 3 and the upper frame beam In the nodes of , it is simultaneously connected with the steel beam in the steel concrete column 3 and the steel beam 4 in the upper frame beam. The lower end extends into the node of the shaped steel concrete column and the lower frame beam, and is simultaneously connected with the shaped steel in the shaped steel concrete column 3 and the shaped steel beam 4 in the lower frame beam.

实施例3Example 3

本实施例的结构形式如图5所示,与实施例1基本相同,不同之处仅在于:型钢斜支撑2在钢板平面内呈八字形布置,其上端伸入上边框梁与梁中的型钢梁4固连,其下端伸入型钢混凝土柱3和下边框梁的节点中,与型钢混凝土柱3、下边框梁中的型钢梁4同时连接。The structural form of this embodiment is shown in Figure 5, which is basically the same as that of Embodiment 1, the only difference being that the profile steel oblique support 2 is arranged in a figure-eight shape in the plane of the steel plate, and its upper end extends into the profile of the upper frame beam and the beam. The steel beam 4 is fixedly connected, and its lower end extends into the joint between the shaped steel concrete column 3 and the lower frame beam, and is simultaneously connected with the shaped steel beam 4 in the shaped steel concrete column 3 and the lower frame beam.

实施例4Example 4

当剪力墙高宽比值小于1时,采用多个复合斜支撑网状布置效果较好。其结构形式如图6、图7、图8所示,型钢斜支撑在钢板平面内的布置形式可以为人字形、八字形或X形布置,其它结构与实施例1相同。When the ratio of height to width of the shear wall is less than 1, the effect of using multiple composite diagonal braces in a network arrangement is better. Its structure is shown in Fig. 6, Fig. 7 and Fig. 8. The arrangement of the oblique steel supports in the plane of the steel plate can be herringbone, splayed or X-shaped, and other structures are the same as in Embodiment 1.

Claims (6)

1、钢桁架-钢板组合剪力墙,包括上下边框梁、与边框梁固结的边框柱和布置在边框梁和边框柱之间的钢板(1);所述边框梁为由型钢梁(4)和浇注在型钢梁(4)外围的混凝土构成的型钢-混凝土组合梁;其特征在于:所述边框柱为由型钢和浇注在型钢外围的混凝土构成的型钢混凝土柱(3),型钢混凝土柱(3)中的型钢与钢板及边框梁中的型钢梁(4)固连,在钢板平面上斜向固结型钢斜支撑(2)。1. Steel truss-steel plate composite shear wall, including upper and lower frame beams, frame columns consolidated with the frame beams, and steel plates (1) arranged between the frame beams and frame columns; the frame beams are shaped steel beams ( 4) a steel-concrete composite beam made of concrete poured on the periphery of the steel beam (4); it is characterized in that: the frame column is a steel concrete column (3) made of steel and concrete poured on the periphery of the steel beam; The profiled steel in the concrete column (3) is fixedly connected with the steel plate and the profiled steel beam (4) in the frame beam, and obliquely consolidates the profiled steel oblique support (2) on the plane of the steel plate. 2、根据权利要求1所述的钢桁架-钢板组合剪力墙,其特征在于:所述的型钢斜支撑(2)呈人字形或八字形布置,其上端伸入上边框梁中与型钢梁(4)固结,下端伸入下边框梁与型钢混凝土柱(3)的节点中,同时与下边框梁中的型钢梁(4)和型钢混凝土柱(3)中的型钢固连。2. The steel truss-steel composite shear wall according to claim 1, characterized in that: the profiled steel diagonal support (2) is arranged in a herringbone or splayed shape, and its upper end extends into the upper frame beam to meet with the profiled steel The beam (4) is consolidated, and the lower end extends into the joint between the lower frame beam and the steel concrete column (3), and is simultaneously connected with the steel beam (4) in the lower frame beam and the steel in the steel concrete column (3). 3、根据权利要求1所述的钢桁架-钢板组合剪力墙,其特征在于:所述的型钢斜支撑(2)呈X形布置,其上端伸入上边框梁与型钢混凝土柱(3)的节点中,同时与上边框梁中的型钢梁(4)及型钢混凝土柱(3)中的型钢固连;下端伸入下边框梁与型钢混凝土柱(3)的节点中,同时与下边框梁中的型钢梁(4)和型钢混凝土柱(3)中的型钢固连。3. The steel truss-steel composite shear wall according to claim 1, characterized in that: the profiled steel diagonal support (2) is arranged in an X shape, and its upper end extends into the upper frame beam and the profiled steel concrete column (3) In the node of the frame beam, it is fixedly connected with the steel beam (4) in the upper frame beam and the steel concrete column (3) at the same time; the lower end extends into the node of the lower frame beam and the steel concrete column (3) The shaped steel beams (4) in the frame beams and the shaped steels in the shaped steel concrete columns (3) are fixedly connected. 4、如权利要求1所述的钢桁架-钢板组合剪力墙的制作方法,其特征在于,该方法是按以下顺序进行的:4. The manufacturing method of steel truss-steel plate composite shear wall as claimed in claim 1, characterized in that, the method is carried out in the following order: 1)配置型钢混凝土柱(3)中的型钢;1) configure the profile steel in the steel concrete column (3); 2)配置钢板(1),并在钢板(1)上预留孔洞或切割槽;2) Configure the steel plate (1), and reserve holes or cutting grooves on the steel plate (1); 3)配置型钢斜支撑(2),将型钢斜支撑(2)斜向布置在钢板平面内并与钢板固连;再将钢板(1)、型钢斜支撑(2)与型钢混凝土柱(3)中的型钢固连;3) Configure the inclined steel support (2), arrange the inclined steel support (2) obliquely in the plane of the steel plate and fix it with the steel plate; then install the steel plate (1), inclined steel support (2) and the steel concrete column (3) The section steel in the middle is fixed; 4)配置上下边框梁中的型钢梁(4),将型钢梁(4)与钢板、型钢斜支撑(2)及型钢混凝土柱(3)中的型钢进行刚性连接,构成钢桁架-钢板组合结构;4) Configure the shaped steel beams (4) in the upper and lower frame beams, and rigidly connect the shaped steel beams (4) with the steel plates, shaped steel diagonal supports (2) and shaped steel in the shaped steel concrete columns (3) to form a steel truss-steel plate Composite Structure; 5)在型钢梁4)和型钢混凝土柱(3)中的型钢外配置钢筋,并在钢筋外绑扎箍筋,组成钢筋网;箍筋穿过钢板(1)上预留的孔洞或切割槽;5) Arrange reinforcing bars outside the profiled steel in the profiled steel beam 4) and the profiled steel concrete column (3), and tie the stirrups outside the reinforcements to form a reinforcement mesh; the stirrups pass through the reserved holes or cutting grooves on the steel plate (1) ; 6)在型钢混凝土柱(3)和型钢梁(4)布筋外侧预留保护层厚度,支模板;6) Reserve the thickness of the protective layer on the outer side of the reinforced concrete column (3) and the steel beam (4) to support the formwork; 7)浇筑型钢混凝土柱和边框梁的混凝土,成型后即为钢桁架-钢板组合剪力墙。7) Concrete is poured for steel-steel concrete columns and frame beams, and after forming, it becomes a steel truss-steel plate composite shear wall. 5、根据权利要求4所述的钢桁架-钢板组合剪力墙的制作方法,其特征在于:步骤3)、步骤4)中所述的型钢斜支撑(2)呈人字形或八字形,其上端伸入上边框梁中与型钢梁(4)固结,下端伸入下边框梁与型钢混凝土柱(3)的节点中,同时与下边框梁中的型钢梁(4)和型钢混凝土柱(3)中的型钢固连。5. The manufacturing method of steel truss-steel plate combined shear wall according to claim 4, characterized in that: the profile steel diagonal support (2) described in step 3) and step 4) is in the shape of a herringbone or a figure-eight, which The upper end extends into the upper frame beam to be consolidated with the shaped steel beam (4), the lower end extends into the joint between the lower frame beam and the steel concrete column (3), and at the same time connects with the shaped steel beam (4) and the steel concrete column in the lower frame beam The shaped steel in the column (3) is fixedly connected. 6、根据权利要求4所述的钢桁架-钢板组合剪力墙的制作方法,其特征在于:步骤3)、步骤4)中所述的型钢斜支撑(2)呈X形布置,其上端伸入上边框梁与型钢混凝土柱(3)的节点中,同时与上边框梁中的型钢梁(4)及型钢混凝土柱(3)中的型钢固连;下端伸入下边框梁与型钢混凝土柱(3)的节点中,同时与下边框梁中的型钢梁(4)和型钢混凝土柱(3)中的型钢固连。6. The manufacturing method of steel truss-steel plate composite shear wall according to claim 4, characterized in that: the profile steel diagonal supports (2) described in step 3) and step 4) are arranged in an X shape, and the upper end extends into the joint between the upper frame beam and the steel concrete column (3), and at the same time, it is fixedly connected with the steel beam (4) in the upper frame beam and the steel in the steel concrete column (3); the lower end extends into the lower frame beam and the steel concrete column In the node of the column (3), it is fixedly connected with the profiled steel beam (4) in the lower frame beam and the profiled steel in the profiled steel concrete column (3) at the same time.
CNA2008102405172A 2008-12-19 2008-12-19 Steel truss-steel plate combined shear wall and method for producing the same Pending CN101457558A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008102405172A CN101457558A (en) 2008-12-19 2008-12-19 Steel truss-steel plate combined shear wall and method for producing the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008102405172A CN101457558A (en) 2008-12-19 2008-12-19 Steel truss-steel plate combined shear wall and method for producing the same

Publications (1)

Publication Number Publication Date
CN101457558A true CN101457558A (en) 2009-06-17

Family

ID=40768661

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008102405172A Pending CN101457558A (en) 2008-12-19 2008-12-19 Steel truss-steel plate combined shear wall and method for producing the same

Country Status (1)

Country Link
CN (1) CN101457558A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101914959A (en) * 2010-08-24 2010-12-15 张吉华 Precast concrete inside heat insulation wall body
CN103615054A (en) * 2013-11-29 2014-03-05 同济大学建筑设计研究院(集团)有限公司 A buckling-constrained bracing layout method based on cell shear deformation
CN107542191A (en) * 2017-09-29 2018-01-05 青岛腾远设计事务所有限公司 The construction method of combined concrete shear wall is filled in a kind of bilateral plate fixation bracing members
CN108487496A (en) * 2016-07-08 2018-09-04 张玉强 Damping wall device and resilient element number of species determine method
CN109933838A (en) * 2019-01-11 2019-06-25 重庆交通大学 A whole-process slip calculation method for prefabricated shear connectors
CN110374229A (en) * 2019-08-21 2019-10-25 广州大学 A kind of assembled energy-consuming shear wall of replaceable built-in profile steel diagonal brace
CN111088860A (en) * 2020-01-20 2020-05-01 南京工业大学 Three-dimensional shear-resistant reinforced concrete shear wall
CN111749332A (en) * 2020-07-28 2020-10-09 西安建筑科技大学 A gantry type double anti-side force grid support frame

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101914959A (en) * 2010-08-24 2010-12-15 张吉华 Precast concrete inside heat insulation wall body
CN103615054A (en) * 2013-11-29 2014-03-05 同济大学建筑设计研究院(集团)有限公司 A buckling-constrained bracing layout method based on cell shear deformation
CN108487496A (en) * 2016-07-08 2018-09-04 张玉强 Damping wall device and resilient element number of species determine method
CN108487496B (en) * 2016-07-08 2019-11-26 江苏来德福汽车部件有限公司 Damping wall device and resilient element number of species determine method
CN107542191A (en) * 2017-09-29 2018-01-05 青岛腾远设计事务所有限公司 The construction method of combined concrete shear wall is filled in a kind of bilateral plate fixation bracing members
CN109933838A (en) * 2019-01-11 2019-06-25 重庆交通大学 A whole-process slip calculation method for prefabricated shear connectors
CN110374229A (en) * 2019-08-21 2019-10-25 广州大学 A kind of assembled energy-consuming shear wall of replaceable built-in profile steel diagonal brace
CN111088860A (en) * 2020-01-20 2020-05-01 南京工业大学 Three-dimensional shear-resistant reinforced concrete shear wall
CN111749332A (en) * 2020-07-28 2020-10-09 西安建筑科技大学 A gantry type double anti-side force grid support frame

Similar Documents

Publication Publication Date Title
CN101457560B (en) Section steel concrete- punched steel plate-concrete combined shear wall and method for producing the same
CN101761154B (en) Shear wall with inbuilt continuous-row steel tube concrete core column and soft steel energy consumption bond and manufacturing method thereof
CN101435231B (en) Folding frame - steel support - concrete combined shear wall and manufacturing method thereof
CN102704595B (en) Shear wall with 'profile steel column-steel beam-steel support' embedded between steel tube concrete columns and manufacturing method
CN202124961U (en) Profile steel concrete shear wall
CN102704593B (en) Steel tube reinforced concrete composite column-steel beam-lattice steel support shear wall and manufacturing method
CN102995789B (en) Built-in section steel column-lattice steel beam-mesh steel support concrete wall body and manufacturing method
CN103726594B (en) Built-in multi-cavity double steel plate and steel tube concrete column composite shear wall and its method
CN101748828B (en) Concrete filled steel tube laminated column frame inbuilt steel plate and steel truss interconnected space shear wall
CN102409783B (en) Manufacturing method of bottom double composite section steel shear wall with reinforced concrete frame and inside-hidden steel plate
CN201358528Y (en) Steel-truss-steel-plate combination shear wall
CN103485443B (en) A kind of window shape steel plate concrete shear wall and preparation method thereof
CN101748829B (en) Combined shear wall with concealed strip multi-cavity core plate of steel pipes and concrete
CN101672071A (en) Vertical reinforced concrete component-connection node of buckling-restrained brace
CN102704598A (en) Composite shear wall with concrete-filled steel tube frames and double steel plates with concealed bracings and construction method thereof
CN101435235A (en) Steel tube concrete - steel support - steel plate external wrapping concrete shear force wall and manufacturing method thereof
CN201358530Y (en) Profiled-steel-concrete-punched-steel-plate-concrete combination shear wall
CN201367654Y (en) Combined shear wall of steel tube concrete, steel plate with holes and concrete
CN101435233B (en) Steel tube concrete-opened steel plate-concrete composite shear wall and its manufacturing method
CN102704594A (en) Combined shear wall with 'multi-steel plate-support' hidden in profile steel overlapped side frame column and manufacturing method of combined shear wall
CN116084587A (en) Steel wire mesh shear wall and construction method thereof
CN1995579A (en) Steel pipe concrete frame-steel truss-concrete combined shear wall and its manufacture method
CN101435234A (en) Steel tube concrete - steel support - concrete combined shear wall and manufacturing method thereof
CN201358529Y (en) Steel-truss-steel-plate-concrete combination shear wall
CN101424105B (en) Oblique steel support concrete shear wall composite coupling beams and production method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20090617