CN101392650A - Sublevelling raise method - Google Patents

Sublevelling raise method Download PDF

Info

Publication number
CN101392650A
CN101392650A CNA2007101130110A CN200710113011A CN101392650A CN 101392650 A CN101392650 A CN 101392650A CN A2007101130110 A CNA2007101130110 A CN A2007101130110A CN 200710113011 A CN200710113011 A CN 200710113011A CN 101392650 A CN101392650 A CN 101392650A
Authority
CN
China
Prior art keywords
section
driving
stope
raise
courtyard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007101130110A
Other languages
Chinese (zh)
Inventor
穆太升
徐国良
杨承锟
高志强
朱悦荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DAYINGEZHUANG GOLD MINE ZHAOJIN MINING INDUSTRY Co Ltd
Original Assignee
DAYINGEZHUANG GOLD MINE ZHAOJIN MINING INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DAYINGEZHUANG GOLD MINE ZHAOJIN MINING INDUSTRY Co Ltd filed Critical DAYINGEZHUANG GOLD MINE ZHAOJIN MINING INDUSTRY Co Ltd
Priority to CNA2007101130110A priority Critical patent/CN101392650A/en
Publication of CN101392650A publication Critical patent/CN101392650A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a method for sectionally driving a raise. The difference of the method is as follows: a long raise is divided into a plurality of sections of short raises for driving, upper and lower sections of stope communication passages are mutually staggered in the horizontal position and are arranged at both sides of the raise respectively, the stoping of a first section of ore body can be performed after the raise is communicated with the second section of stope communication passage, the driving of a third section of lane is performed after the first section of mining, the raise is upward driven from the second section and is communicated with a third section of stope communication passage, the construction of other sections of raises is performed according to the method until the uppermost section is communicated with upper and middle sections of ventilating laneway. Therefore, the method has good ventilation effect, safe operating environment, small labor intensity and high driving efficiency, greatly reduces production cost, and is particularly suitable for raise driving in high and middle sections of gently inclined medium thick ore bodies.

Description

A kind of sublevel drive courtyard method
Technical field:
The present invention relates to a kind of method of tunneling courtyard, the method for sublevel drive courtyard in particularly a kind of high stage casing, the gently inclined medium thick orebody.
Background technology:
At present both at home and abroad when the courtyard of the high stage casing of driving, main adopt suspended bulkhead raising method, climb pot process, deep hole blasting method and machinery and creep into method, wherein suspended bulkhead raising method, deep hole blasting method only adapt to the inclined orebody more than 60 °, but climb pot process and machinery and creep into the slow courtyard of method appropriate angle, but these two kinds of methods all have equipment investment big, the maintenance of equipment complexity, the shortcoming of cost height and driving preparatory construction maximum, middle-size and small-size mine is difficult to adopt.
Summary of the invention:
Purpose of the present invention will provide a kind of ventilation effect good exactly, operating environment safety, and labour intensity is little, drivage efficiency height, a kind of sublevel drive courtyard method that reduces production costs.
The object of the present invention is achieved like this:
A kind of sublevel drive courtyard method is characterized in that may further comprise the steps:
1, suitable position driving courtyard as the initial scope of freedom of stope connecting taxiway, prospecting drift and the first floor back production of first layering, is chosen, to the two-section level in the vertical ore body driving tunnel that undercuts from a segmentation lane.
2, driving two-section stope connecting taxiway, the stope connecting taxiway of two segmentations staggers on horizontal level mutually up and down, is arranged in the both sides of courtyard, and the stope connecting taxiway of courtyard and two-section just can carry out the back production of a segmentation ore body after connecting.
3, behind one fen section mining, carry out three segmentation lanes driving, the stope connecting taxiway that drives up courtyard and three segmentations from two-section connects, and other each segmentation sky well construction all carries out according to above method, connects up to the airway in a segmentation of going up most and a last stage casing.
The present invention compared with prior art has following advantage:
Since adopted above step, thereby ventilation effect is good, operating environment safety, labour intensity is little, and the drivage efficiency height greatly reduces cost of production.
The specific embodiment:
1, suitable position driving courtyard as the initial scope of freedom of stope connecting taxiway, prospecting drift and the first floor back production of first layering, is chosen, to the two-section level in the vertical ore body driving tunnel that undercuts from a segmentation lane.
2, driving two-section stope connecting taxiway, the stope connecting taxiway of two segmentations staggers on horizontal level mutually up and down, is arranged in the both sides of courtyard, and the stope connecting taxiway of courtyard and two-section just can carry out the back production of a segmentation ore body after connecting.
3, behind one fen section mining, carry out three segmentation lanes driving, the stope connecting taxiway that drives up courtyard and three segmentations from two-section connects, and other each segmentation sky well construction all carries out according to above method, connects up to the airway in a segmentation of going up most and a last stage casing.

Claims (4)

  1. A kind of sublevel drive courtyard method is characterized in that may further comprise the steps:
  2. 1, suitable position driving courtyard as the initial scope of freedom of stope field connecting taxiway, prospecting drift and the first floor back production of first layering, is chosen, to the two-section level in the vertical ore body driving tunnel that undercuts from a segmentation lane.
  3. 2, driving two-section stope connecting taxiway, the stope connecting taxiway of two segmentations staggers on horizontal level mutually up and down, is arranged in the both sides of courtyard, and the stope connecting taxiway of courtyard and two-section just can carry out the back production of a segmentation ore body after connecting.
  4. 3, behind one fen section mining, carry out three segmentation lanes driving, the stope connecting taxiway that drives up courtyard and three segmentations from two-section connects, and other each segmentation sky well construction all carries out according to above method, connects up to the airway in a segmentation of going up most and a last stage casing.
CNA2007101130110A 2007-09-18 2007-09-18 Sublevelling raise method Pending CN101392650A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007101130110A CN101392650A (en) 2007-09-18 2007-09-18 Sublevelling raise method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007101130110A CN101392650A (en) 2007-09-18 2007-09-18 Sublevelling raise method

Publications (1)

Publication Number Publication Date
CN101392650A true CN101392650A (en) 2009-03-25

Family

ID=40493140

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007101130110A Pending CN101392650A (en) 2007-09-18 2007-09-18 Sublevelling raise method

Country Status (1)

Country Link
CN (1) CN101392650A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105781550A (en) * 2016-04-01 2016-07-20 北京科技大学 Shoring-free mining method for footwall space of weak broken rock ore
CN112066829A (en) * 2020-08-14 2020-12-11 首钢集团有限公司 Air shaft communication channel communicating method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105781550A (en) * 2016-04-01 2016-07-20 北京科技大学 Shoring-free mining method for footwall space of weak broken rock ore
CN105781550B (en) * 2016-04-01 2017-12-08 北京科技大学 Blanking method is adopted suitable for the pulling end space non-support of Weak-break ore body
CN112066829A (en) * 2020-08-14 2020-12-11 首钢集团有限公司 Air shaft communication channel communicating method
CN112066829B (en) * 2020-08-14 2022-03-18 首钢集团有限公司 Air shaft communication channel communicating method

Similar Documents

Publication Publication Date Title
CN107869349B (en) A kind of mechanized mining method of gently inclined medium thick orebody
CN104373125B (en) In two steps to the packed method of mining by the way of filling of high stratification
CN104806244B (en) Filling mining method for slant middle-thick ore body
CN102644476B (en) Method for pumping gas of protected layer by layer penetration and hole drilling on high-position drilling fields of protecting layer machinery tunnel
CN104100270B (en) A kind of low-angle dip mineral ore Truckless mining method
CN101025086B (en) Explosion coal-falling, coal-loading, coal-conveying and anchor-rod supporting mechanism integration operation method and apparatus
CN101956556B (en) Roof and bottom pillar-free stage upward continuous filling and mining method
CN101302931B (en) Method for extracting rim angle coal and re-extracting after warehouse coal extracting
CN111828007B (en) Stoping method for residual studs in underground mine goaf
CN102392678A (en) Gas drainage method combining surface and underground fracturing and permeability improvement
CN102168579A (en) Rib-pillar-free continuous sublevel filling method for mining preparation in medium-thickness slope crushed ore body vein
CN104481578B (en) A kind of high gas layer large-mining-height working surface mash gas harnessing method
CN104712358A (en) Coal seam group with high gas content pressure relief and co-mining method based on gob-side entry retaining of working face of first mining total rock pressure relief
CN103924977A (en) Center-pillared full-face shaft drilling machine
CN107060795B (en) A kind of underground mine TBM assembly construction methods
CN105422102B (en) A kind of vertical medium-length hole ore blast subsection access back-filling method
CN105927226A (en) Medium-length hole ore-breaking continuous sectional horizontal filling mining method
CN104251139A (en) Filling mining method for caving zone on coal face
CN102661167A (en) Protected seam bottom plate upward comb-shaped drilled hole gas extraction method
CN105041317A (en) Medium-length hole shrinkage stoping method
CN104453900A (en) Filling mining method of near-horizontal ore body
CN102031972B (en) L-shaped mining method under open-underground mining
CN101824986B (en) Coal mining process of drilling, loading, conveying and anchoring integral machine
CN103147759B (en) Prospecting and short-hole shrinkage mining method of small inclined ore body
CN103557003A (en) Iron ore body safety pillar mining method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20090325