CN101324117A CNA2008103032329A CN200810303232A CN101324117A CN 101324117 A CN101324117 A CN 101324117A CN A2008103032329 A CNA2008103032329 A CN A2008103032329A CN 200810303232 A CN200810303232 A CN 200810303232A CN 101324117 A CN101324117 A CN 101324117A
Authority
CN
China
Prior art keywords
positioning
reinforcing bar
stirrup
block tongue
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008103032329A
Other languages
English (en)
Other versions
CN101324117B (zh
Inventor
曹新明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 4 Construction Engineering Co Ltd of Guizhou Construction and Engineering Group
Original Assignee
Guizhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou University filed Critical Guizhou University
Priority to CN2008103032329A priority Critical patent/CN101324117B/zh
Publication of CN101324117A publication Critical patent/CN101324117A/zh
Application granted granted Critical
Publication of CN101324117B publication Critical patent/CN101324117B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种用于钢筋混凝土施工中钢筋或箍筋的定位方法及定位器,在进行制作板、梁或柱的钢筋施工时,按本发明的方法进行制作,即预先制作一个具有长度刻度尺寸的定位尺,并在定位尺上设置上扣环和定位卡舌,然后利用扣环将该定位尺与钢筋卡固在一起,将该卡固有定位尺的钢筋作为基准钢筋,这样即可将其后的钢筋或箍筋放置在该定位尺上的定位卡舌上进行定位,从而实现对其后钢筋或箍筋的定位及绑扎或焊接固定,定位尺上的定位卡舌作为其后钢筋或箍筋的定位和托架使用。本发明不仅具有施工方便、不易偏离设计位置并且劳动强度低的优点,而且还具有定位准确、工作效率高的优点。

Description

用于钢筋混凝土施工中钢筋或箍筋的定位方法及定位器
技术领域
本发明涉及一种用于钢筋混凝土施工中钢筋或箍筋的定位方法及定位器,属于钢筋混凝土施工技术领域。
背景技术
目前,在混凝土施工中板的钢筋及梁、柱的箍筋定位通常是钢筋工先在模板或钢筋上用石笔标出预设钢筋或箍筋位置,然后将钢筋或箍筋放置(其中,柱箍筋还需先用手将箍筋托住,用扎丝将箍筋规定在纵筋上),然后施与绑扎或固定。因此,在现有的钢筋混凝土施工中所采用的钢筋或箍筋的定位方法主要存在着钢筋位置容易偏离设计位置和劳动强度大的问题。
发明内容
本发明的目的在于:提供一种施工方便、不易偏离设计位置并且劳动强度底的用于钢筋混凝土施工中钢筋或箍筋的定位方法及定位器,以克服现有技术的不足。
本发明是这样实现的:本发明的用于钢筋混凝土施工中钢筋或箍筋的定位方法为:在进行梁或柱的钢筋施工时,预先制作一个具有长度刻度尺寸的定位尺,并在定位尺上设有扣环和定位卡舌,然后利用扣环将该定位尺与钢筋卡固在一起,将该卡固有定位尺的钢筋作为基准钢筋,这样即可将其后的钢筋或箍筋放置在该定位尺上的定位卡舌上进行定位,从而实现对其后钢筋或箍筋的定位及绑扎或焊接固定,定位尺上的定位卡舌作为其后钢筋或箍筋的定位和托架使用。
本发明的用于钢筋混凝土施工中钢筋或箍筋的定位器为:它由定位尺和装在定位尺上的定位卡舌组成,并且在定位尺上设有用于与钢筋或箍筋连接的扣环。
在上述的定位尺上设有长度刻度。
在定位尺上设有卡舌槽和轴孔,在轴孔中装有转轴,定位卡舌设置在卡舌槽中并且安装在转轴上。
在定位卡舌上设有卡固凸轮。
安装在定位尺上的定位卡舌的数量等于或大于1个。
每两个相邻安装定位卡舌的转轴的轴孔之间的中心距离为20mm或50mm。
每两个相邻转轴轴孔之间的中心距离为20mm或50mm的整数倍数。
由于采用了上述技术方案,本发明将卡固有定位尺的钢筋作为基准钢筋,将基准钢筋固定在需要的位置,再以基准钢筋作为标准或支承点进行其后钢筋或箍筋的定位及绑扎(或焊接),其中的定位卡舌同时还起到钢筋或箍筋托架的作用。因此,本发明与现有技术相比,本发明不仅具有施工方便、不易偏离设计位置并且劳动强度底的优点,而且还具有定位准确、工作效率高的优点。
附图说明
图1是本发明的结构示意图;
图2是附图1的俯视结构示意图;
图3是本发明的定位卡舌结构示意图;
图4是本发明的定位卡舌工作状态时的示意图。
具体实施方式
本发明的实施例:在进行制作板、梁或柱的钢筋施工时,按本发明的方法进行制作,即预先制作一个具有长度刻度尺寸的定位尺,并在定位尺上设置上扣环和定位卡舌,然后利用扣环将该定位尺与钢筋卡固在一起,将该卡固有定位尺的钢筋作为基准钢筋,这样即可将其后的钢筋或箍筋放置在该定位尺上的定位卡舌上进行定位,从而实现对其后钢筋或箍筋的定位及绑扎或焊接固定,定位尺上的定位卡舌作为其后钢筋或箍筋的定位和托架使用。
实施时,最好采用本发明的用于钢筋混凝土施工中钢筋或箍筋的定位器进行实施,制作时,将本发明的定位器制作成由定位尺1和装在定位尺1上的定位卡舌2组成,同时在定位尺1上制作出两个用于与钢筋或箍筋连接的扣环3,并在定位尺1上制作出长度刻度(长度刻度尺的尺长最好在2m以上),以方便定位;制作时,最好在定位尺1上制作一个卡舌槽4和根据使用数量的需要制作出轴孔,并在轴孔中装上转轴5,将定位卡舌2设置在卡舌槽4中并且安装在转轴5上;在制作定位卡舌2时,在定位卡舌2上同时制作出用于将定位卡舌2卡固在定位尺1上的卡固凸轮6;安装在定位尺1上的定位卡舌2的数量可以等于或大于1个,其定位卡舌2的数量可根据施工图确定;当定位卡舌2的数量大于等于2时,将每两个相邻安装定位卡舌2的转轴5的轴孔之间的中心距离控制在20mm或50mm,或者将每两个相邻转轴5轴孔之间的中心距离控制在20mm或50mm的整数倍数上,并将轴孔制作在定位尺1的长度刻度尺的20mm或50mm的整数倍数处即成。
使用本发明的定位器时,通过扣环3将定位尺1连接在所进行的混凝土施工中的纵筋上,般动定位卡舌2(如附图4的箭头所示),使其与定位尺1成90度即进入工作状态(如附图4的虚线位置所示),这样定位卡舌2通过其凸轮6的作用就与定位尺1成90度卡固在定位尺1上,然后将要绑扎(或焊接)的箍筋放置在定位卡舌2的支撑圆弧口上即可。每两个定位卡舌2之间的距离由设计或使用需要确定。当箍筋绑扎完后,本发明的限位器可以回收使用,如果不回收,此限位器还可以兼作混凝土板、梁、柱中的保护层定位器使用;当将本发明的定位器中的扣环3取消时,该定位器可用于板钢筋定位。

Claims (8)

1.一种用于钢筋混凝土施工中钢筋或箍筋的定位方法,其特征在于:在进行梁或柱的钢筋施工时,预先制作一个具有长度刻度尺寸的定位尺,并在定位尺上设有扣环和定位卡舌,然后利用扣环将该定位尺与钢筋卡固在一起,将该卡固有定位尺的钢筋作为基准钢筋,这样即可将其后的钢筋或箍筋放置在该定位尺上的定位卡舌上进行定位,从而实现对其后钢筋或箍筋的定位及绑扎或焊接固定,定位尺上的定位卡舌作为其后钢筋或箍筋的定位和托架使用。
2.一种用于钢筋混凝土施工中钢筋或箍筋的定位器,其特征在于:它由定位尺(1)和装在定位尺(1)上的定位卡舌(2)组成,并且在定位尺(1)上设有用于与钢筋或箍筋连接的扣环(3)。
3.根据权利要求2所述的用于钢筋混凝土施工中钢筋或箍筋的定位器,其特征在于:在定位尺(1)上设有长度刻度。
4.根据权利要求2所述的用于钢筋混凝土施工中钢筋或箍筋的定位器,其特征在于:在定位尺(1)上设有卡舌槽(4)和轴孔,在轴孔中装有转轴(5),定位卡舌(2)设置在卡舌槽(4)中并且安装在转轴(5)上。
5.根据权利要求4所述的用于钢筋混凝土施工中钢筋或箍筋的定位器,其特征在于:在定位卡舌(2)上设有卡固凸轮(6)。
6.根据权利要求4所述的用于钢筋混凝土施工中钢筋或箍筋的定位器,其特征在于:安装在定位尺(1)上的定位卡舌(2)的数量等于或大于1个。
7.根据权利要求6所述的用于钢筋混凝土施工中钢筋或箍筋的定位器,其特征在于:每两个相邻安装定位卡舌(2)的转轴(5)的轴孔之间的中心距离为20mm或50mm。
8.根据权利要求7所述的用于钢筋混凝土施工中钢筋或箍筋的定位器,其特征在于:每两个相邻转轴(5)轴孔之间的中心距离为20mm或50mm的整数倍数。
CN2008103032329A 2008-07-30 2008-07-30 用于钢筋混凝土施工中钢筋的定位方法及定位器 Expired - Fee Related CN101324117B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008103032329A CN101324117B (zh) 2008-07-30 2008-07-30 用于钢筋混凝土施工中钢筋的定位方法及定位器

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008103032329A CN101324117B (zh) 2008-07-30 2008-07-30 用于钢筋混凝土施工中钢筋的定位方法及定位器

Publications (2)

Publication Number Publication Date
CN101324117A true CN101324117A (zh) 2008-12-17
CN101324117B CN101324117B (zh) 2011-02-02

Family

ID=40187797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008103032329A Expired - Fee Related CN101324117B (zh) 2008-07-30 2008-07-30 用于钢筋混凝土施工中钢筋的定位方法及定位器

Country Status (1)

Country Link
CN (1) CN101324117B (zh)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101845896A (zh) * 2010-05-31 2010-09-29 中建钢构有限公司 定位器及钢构件的定位方法
CN101845872B (zh) * 2009-12-24 2012-02-08 上海市第七建筑有限公司 劲性梁钢筋保护层的控制方法
CN102359279A (zh) * 2011-09-11 2012-02-22 威海建设集团股份有限公司 钢筋混凝土框架结构梁柱节点区钢筋骨架安装改进方法
CN103216043A (zh) * 2013-04-25 2013-07-24 云南建工第五建设有限公司 组装式钢筋定位器
CN103452322A (zh) * 2013-09-06 2013-12-18 青岛林川工程技术咨询有限公司 一种保证水平钢筋间距的装置及其使用方法
CN105507499A (zh) * 2015-11-16 2016-04-20 重庆市合川区盐井建筑工程有限公司 一种建筑钢筋连接装置
CN107700753A (zh) * 2017-09-26 2018-02-16 陈先海 钢筋混凝土梁及建筑物
CN109184083A (zh) * 2018-09-30 2019-01-11 中国五冶集团有限公司 一种钢筋连接定位装置
CN109437010A (zh) * 2018-12-12 2019-03-08 上海市安装工程集团有限公司 用于管线组装的管道夹具、安装系统及其操作方法
CN109443328A (zh) * 2018-11-30 2019-03-08 宁夏路桥工程股份有限公司 一种预应力管道坐标定位尺及其使用方法
CN109736579A (zh) * 2019-01-30 2019-05-10 重庆工程职业技术学院 装配式建筑施工定位安装结构
CN112324149A (zh) * 2020-09-16 2021-02-05 国网山东省电力公司建设公司 一种构造柱箍筋固定自锁装置

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201241427Y (zh) * 2008-07-30 2009-05-20 贵州大学 用于钢筋混凝土施工中钢筋或箍筋的定位器

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101845872B (zh) * 2009-12-24 2012-02-08 上海市第七建筑有限公司 劲性梁钢筋保护层的控制方法
CN101845896A (zh) * 2010-05-31 2010-09-29 中建钢构有限公司 定位器及钢构件的定位方法
CN102359279A (zh) * 2011-09-11 2012-02-22 威海建设集团股份有限公司 钢筋混凝土框架结构梁柱节点区钢筋骨架安装改进方法
CN102359279B (zh) * 2011-09-11 2013-01-09 威海建设集团股份有限公司 钢筋混凝土框架结构梁柱节点区钢筋骨架安装改进方法
CN103216043A (zh) * 2013-04-25 2013-07-24 云南建工第五建设有限公司 组装式钢筋定位器
CN103452322A (zh) * 2013-09-06 2013-12-18 青岛林川工程技术咨询有限公司 一种保证水平钢筋间距的装置及其使用方法
CN105507499A (zh) * 2015-11-16 2016-04-20 重庆市合川区盐井建筑工程有限公司 一种建筑钢筋连接装置
CN105507499B (zh) * 2015-11-16 2017-11-07 重庆市合川区盐井建筑工程有限公司 一种建筑钢筋连接装置
CN107700753A (zh) * 2017-09-26 2018-02-16 陈先海 钢筋混凝土梁及建筑物
CN109184083A (zh) * 2018-09-30 2019-01-11 中国五冶集团有限公司 一种钢筋连接定位装置
CN109443328A (zh) * 2018-11-30 2019-03-08 宁夏路桥工程股份有限公司 一种预应力管道坐标定位尺及其使用方法
CN109443328B (zh) * 2018-11-30 2024-03-22 宁夏公路桥梁建设有限公司 一种预应力管道坐标定位尺及其使用方法
CN109437010A (zh) * 2018-12-12 2019-03-08 上海市安装工程集团有限公司 用于管线组装的管道夹具、安装系统及其操作方法
CN109736579A (zh) * 2019-01-30 2019-05-10 重庆工程职业技术学院 装配式建筑施工定位安装结构
CN112324149A (zh) * 2020-09-16 2021-02-05 国网山东省电力公司建设公司 一种构造柱箍筋固定自锁装置

Also Published As

Publication number Publication date
CN101324117B (zh) 2011-02-02

Similar Documents

Publication Publication Date Title
CN101324117B (zh) 用于钢筋混凝土施工中钢筋的定位方法及定位器
CN202225295U (zh) 一种钢筋骨架整体成型模架
CN102003071A (zh) 后张法预应力梁的预应力孔道制孔定位施工工艺
CN201241427Y (zh) 用于钢筋混凝土施工中钢筋或箍筋的定位器
CN214996081U (zh) 一种用于不同标号混凝土浇筑的拦截工具
CN102441625B (zh) 一种全自动钢筋捆扎机的切丝机构
CN207260599U (zh) 一种可调节式框架柱钢筋定位卡
CN201873988U (zh) 钻孔桩钢筋笼模具
CN202055414U (zh) 预应力箱梁中波纹管快速定位装置
CN218061511U (zh) 一种梁筋定位装置
CN206982069U (zh) 一种钢筋笼主筋定位小卡具
CN203383835U (zh) 隧道格栅拱架胎膜
CN201172787Y (zh) 板式无碴轨道底座板钢筋骨架纵向钢筋装夹胎具
CN201981706U (zh) 预应力波纹管定位装置
CN209429552U (zh) 一种直立式混凝土构件钢筋笼胎具
CN201214217Y (zh) 汤道砖打箍夹具
CN210589877U (zh) 一种箱梁钢筋骨架的定型模架
CN202356549U (zh) 一种钢筋废料制作的螺旋箍筋加工工具
CN204276763U (zh) 环形箍筋成型模具
CN202461336U (zh) 折弯机激光对点器
CN210547240U (zh) 一种钢筋网片简易折弯装置
CN207327275U (zh) 一种预制t梁钢筋模架定位制安系统
CN209308432U (zh) 一种框架柱可调节定位箍
CN205324556U (zh) 一种用于弯折线材的多向变位弯曲机构
CN206702444U (zh) 路灯基础钢筋笼制作台架

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GUIZHOU CONSTRUCTION GROUP NO.FOUR CONSTRUCTION EN

Free format text: FORMER OWNER: GUIZHOU UNIVERSITY

Effective date: 20140409

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 550003 GUIYANG, GUIZHOU PROVINCE TO: 550000 GUIYANG, GUIZHOU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20140409

Address after: 550000 No. 4, Wangcheng Road, Guiyang, Guizhou

Patentee after: Guizhou Construction Engineering Group No.4 Construction Engineering Co., Ltd.

Address before: 550003 Cai Jia Guan, Guizhou City, Guiyang Province

Patentee before: Guizhou University

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110202

Termination date: 20170730

CF01 Termination of patent right due to non-payment of annual fee