CN101324063A - 一种特软地基固结方法 - Google Patents

一种特软地基固结方法 Download PDF

Info

Publication number
CN101324063A
CN101324063A CNA2008100414317A CN200810041431A CN101324063A CN 101324063 A CN101324063 A CN 101324063A CN A2008100414317 A CNA2008100414317 A CN A2008100414317A CN 200810041431 A CN200810041431 A CN 200810041431A CN 101324063 A CN101324063 A CN 101324063A
Authority
CN
China
Prior art keywords
construction
horizontal water
permeable pipe
soft foundation
geotextiles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008100414317A
Other languages
English (en)
Other versions
CN101324063B (zh
Inventor
徐士龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Bay infrastructure construction (Group) Limited by Share Ltd
Original Assignee
SHANGHAI GANGWAN SOFT FOUNDATION TREATMENT ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI GANGWAN SOFT FOUNDATION TREATMENT ENGINEERING Co Ltd filed Critical SHANGHAI GANGWAN SOFT FOUNDATION TREATMENT ENGINEERING Co Ltd
Priority to CN2008100414317A priority Critical patent/CN101324063B/zh
Publication of CN101324063A publication Critical patent/CN101324063A/zh
Application granted granted Critical
Publication of CN101324063B publication Critical patent/CN101324063B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明提供了一种特软地基固结方法,本发明提供的方法包括以下步骤:在软土地基上铺设土工布;在土工布上铺设毛竹竿网格;插入塑料排水板;铺设水平透水管;塑料排水板紧贴环绕水平透水管,并连接至抽真空设备;覆真空膜,并在真空膜上覆压,抽真空。采用本发明提供的方法施工,与采用目前国内外常用方式(如真空预压法或堆载预压法)进行施工相比,由于不使用砂垫层,因此,节约的造价约为35-70元/m2,且施工工期可缩短20%以上,并且操作轻便安全。

Description

一种特软地基固结方法
技术领域
本发明属于地基处理领域,具体的说,涉及一种特软地基固结方法。
背景技术
由于耕地使用的限制,目前沿海的工业区一般采用围海吹填淤泥以形成陆地的方式获得足够的用地,而吹填淤泥必然会形成大面积的人机无法进入的特软地基。目前,针对特软地基的处理,一般采用真空预压法或堆载预压法等方法,其中:
真空预压法的施工工艺为:在特软地基上铺1~2层土工布,然后铺竹片板1~2层,接着铺大于80cm的砂垫层,并机械插塑料排水板,然后布水平软管后,再铺1~2层真空膜,最后抽真空3~8个月。
堆载预压法的施工工艺为:在特软地基上铺1~2层土工布,然后铺竹片板1~2层,接着铺大于80cm的砂垫层,并堆载土方4~6m后,堆载预压3~8个月。
采用上述方法,均需要在特软地基上铺1~2层土工布及竹片板,并回填大于80cm的粗砂垫层(粗砂层又作为透气作用)方能确保施工机械安全施工。由于需要使用大批量砂石资源,而且竹片板需使用毛竹竿加工,造价高,并且整体性也差,机械行走不安全,且工期长,因此,提高了造价,安全性差并且还不环保。
发明内容
本发明的目的在于,提供一种特软地基固结方法,以节约砂石资源的使用,缩短工期,降低造价。
本发明提供的方法包括以下步骤:A)在软土地基上铺设土工布;B)在土工布上铺设毛竹竿网格;C)插入塑料排水板;D)铺设水平透水管;E)塑料排水板紧贴环绕水平透水管,并连接至抽真空设备;F)覆真空膜,并在真空膜上覆压,抽真空。
根据本发明的一个优选实施例,毛竹竿网格为1~5层方网格,毛竹杆的间距为20~120cm。
根据本发明的一个优选实施例,步骤E和F之间还包括铺设土工布的步骤。
根据本发明的一个优选实施例,使用的履带式插板机包括塑料履带,所述履带上有一支架结构,所述支架结构在支架顶端通过一液压动力装置相连,该液压动力装置提供插板动力,在液压动力装置上联有液压导管,以进行塑料排水插板。
根据本发明的一个优选实施例,使用的水平透水管为长条型扁管或圆管,内层设有多个隔断,以增强水平透水管的抗压能力。
根据本发明的一个优选实施例,覆压的方式采用覆水压或覆土压的方式。
采用本发明提供的方法施工,与采用目前国内外常用方式(如真空预压法或堆载预压法)进行施工相比,由于不使用砂垫层,因此,节约的造价约为35~70元/m2,且施工工期可缩短20%以上,并且操作轻便安全。
附图说明
图1为本发明的特软地基固结方法的施工流程框图。
图2是本发明的施工方法所使用的水平透水管的结构示意图。
图3是本发明的施工方法所使用的塑料排水板轻便插板机械的结构示意图。
具体实施方式
以下结合具体实施例,对本发明作进一步说明。应理解,以下实施例仅用于说明本发明而非用于限定本发明的范围。
如图1所示,本发明的特软地基固结方法具体包括以下步骤:
1、在需要施工的软土地基上铺设土工布;
2、在土工布上铺设毛竹竿网格;
3、在施工区域按矩阵插入用于抽真空排水的塑料排水板;
4、铺设水平透水管;
5、塑料排水板紧贴环绕水平透水管,并连接至抽真空设备;
6、覆真空膜,并在真空膜上覆压,抽真空。
在抽真空步骤以后,还可以包括检测步骤,以确定是否停止抽真空。
与现有用于处理特软地基的真空预压法或堆载预压法等方法相比,本发明的主要特点在于采用毛竹竿网格取代常规结合水平透水管方法中所使用的砂垫层,同样能够满足施工机械(插板机)安全进入施工现场和满足真空水平畅通的要求。
在本发明的下述实施例中,使用了一种自制的水平透水管,其结构如图2所示,该水平透水管为长条形的扁管6,管体的内部设有多个隔断5,以用于增强水平透水管的抗压能力,同时保持透水管的畅通。如图所示的隔断为W形设置,但并不限于此种特定的形式,本领域的技术人员容易理解,所述扁管也可采用其它形状管道,如圆管,所述隔断也可以采用其它形状的设置,同样均可以达到增强水平透水管的抗压能力的目的。
根据本发明,用于插入排水板的插板机可以采用现有技术已知的轻便履带式插板机,其结构如图3所示,塑料履带3的尺寸为长×宽=3m×0.6m(2条),该履带3上有一支架结构4,该支架结构4的顶端为一液压动力装置1,用于提供进行插板的动力,在液压动力装置1上联有液压双头导管2(也可根据施工的需要,采用多头导管或1头导管),以用于进行插板。出于减轻机械自重的目的,本发明的以下实施例中所使用的履带式插板机作了一些改进,主要是将插板机的金属履带改为塑料履带。同样的,本领域的技术人员根据本发明的公开,可以采用其它方式减轻机械的自重以利于施工,这是显而易见的,因此也应当属于本发明的范围。
在本发明的方法中,将水平透水管与竖插的塑料排水板紧贴环绕,并保持水平向真空度的畅通,从而可以代替常规施工过程中使用的砂垫层为透水透气作用,节约了成本,也利于环保;同时,使用网格状毛竹竿交叉叠层,通过控制毛竹竿的间距、层数达到满足轻便施工机械的抗弯强度,使轻便施工机械能在该软土地基上安全行走,从而可以代替常规施工过程中使用的砂垫层(的支持作用)的目的,节约了成本,也利于环保。
具体地,通过下述方法计算获得施工参数:
第一步:施工机械安全承载力fap的计算
f ap = z . p s > f ak
式中:p为施工设备自重;
s为毛竹竿的有效受力面积;
z为安全系数,取1.2~2
fap为施工机械安全承载力。
通过调整毛竹竿的有效受力面积,使得fap大于软土地基的承载力fak,满足施工机械安全施工。
第二步:网格状毛片竿抗弯计算。
N p = p ΣN ;
Np为机械安全行走弯矩;
p为机械自重;
∑N为毛竹竿有效面积,即为每根毛竹的抗弯总和;
第三步:依据使用要求的承载力fak及工后沉降控制值,依据综合叠加法,计算塑料排水板的插入深度h和间距d。
依据使用要求知使用荷载和工后沉降的要求,工后沉降记作S工后,使用荷载下的沉降记作S,施工沉降记作S施工,则可以通过不等式:
S_S工后≤S施工,即
Figure A20081004143100061
算出hi的值,
再根据排水板的插入深度h≥∑hi,从而获得排水板的插入深度h的值。
ψs为沉降经验系数,对于大面积地基可取1.0;
hi为土层厚度;
Esi为土层压缩模量;
排水板的间距公式: d = γQ αq gβ
式中:Q为排水总量;
q为每根塑料排水板影响范围内的出水量;
γ为考虑综合影响的经验折减系数,一般取0.8~1;
α为考虑涂抹等作用的经验系数,一般取1.0~1.5;
β为经验系数,一般取1.0~1.2;
第四步:水平透水管流量的计算
Q<∑Q;
Q为一台真空泵透气流量V/h;
∑Q为水平透水管总流量。
实施例1、某工程的特软地基的固结
该工程位于临海某开发区,该工程进行了大面积吹填淤泥,需要进行地基固结,要求经处理后fak>80kpa,工后沉降小于50cm。
该工地的地质资料为:吹填淤泥质土,平均厚4.5米,含水量90%,承载力12kPa,原土层为淤泥质粉土,平均厚10米,含水量w=45%,fak≈40kpa;下卧层为粉质粘土,fak=80kpa。
具体实施方案如下:
选用自制轻便履带式插板机进行施工。具体施工参数采用以下方法确定:
1、fap的确定
f ap &GreaterEqual; 150 &times; 1.5 6 &times; 6 &ap; 6 kPa < 12 kPa , 经计算,设备符合安全施工要求。
2、毛竹竿网格状抗弯计算
P=15000kg;每根毛竹竿的安全抗弯为100kg;插板机的履带3长为3m,设二层十字方网格, N p = 15000 l . na &prime; = 15000 n 100 kg 根,取n=16根。
从而,三米内8根毛竹竿网格状的间距d为 300 cm 8 = 37.5 cm , 取d=37.5cm。
3、塑料排水板的插入深度h和排水板间距d计算
使用荷载下的沉降为: s = &Sigma; i = 1 n &psi; s ph i E si = &psi; s g 100 ( 4.5 1.1 &times; 1000 + 10 3 &times; 1000 ) = 742 mm
施工荷载下的沉降为: s = &Sigma; i = 1 n &psi; s ph i E si = &psi; s g 80 ( 4.5 1.1 &times; 1000 + 10 3 &times; 1000 ) = 594 mm
因此,工后沉降:742-594=148mm=14.8cm<50cm
所以经固结理论计算,插排水板深h≥∑hi=14.5m,故取排水板深15m。叠加法计算使用荷载下的沉降为742mm,施工荷载下的沉降为594mm,工后沉降满足要求,并远远小于50cm。每台真空泵按1000m2控制,1000m2排除水量约为1500m3
计算得:排水板间距d排水板为1.0m,抽真空约为100天。
4、水平透水管间距的计算
以每台泵控制1000m2计算,
Figure A20081004143100081
取2×10cm水平透气板,经查水平透水管排水流量满足排水要求。另水平透水管重点考虑水平真空能有效传递到竖向排水板,取水平透水管间距2m,每根水平透水管有二排竖向塑料排水板采用紧贴环绕两圈以上的方式与其连接。
根据上述结果,进行施工,具体施工过程及施工参数如下:
1)在施工区域铺设300g有土工布一层;
2)在土工布上布置毛竹竿网格(为了防止毛片杆施工机械压碎,毛竹竿周边可回填约15cm的砂土作保护),各网格大小为0.3×0.3m2,二层。
3)使用插板机插入长度为15m的塑料排水板,排水板间距1m,排水板头部预留1.2m;
4)每隔2m铺设一根水平透水管,将其布置在二排塑料排水板中间,塑料排水板和水平透水管采用紧贴方式环绕两圈以上;
5)铺一层150g的土工布后,再在土工布上方铺设1-2层真空膜;
6)真空膜的四周筑2.5m高的小围墙,膜上履水2m,然后抽真空。
检测沉降曲线(由地面沉降检测仪测得沉降数据,通过数据分析得出沉降曲线),当其满足七天平均小于2mm时即停机(时间约为100天),经测(地面沉降检测仪)fak>80kpa,工后沉降<50cm,满足设计要求。
经计算分析,采用本发明提供的方法施工,与采用目前国内外常用方式(如真空预压法或堆载预压法)进行施工相比,由于不使用砂垫层,因此,节约的造价约为35~70元/m2,且施工工期可缩短20%以上,并且操作轻便安全。

Claims (9)

1、一种特软地基固结方法,其特征在于,所述方法包括以下步骤:
A)在需要施工的软土地基上铺设土工布;
B)在土工布上铺设1~5层毛竹竿网格;
C)在施工区域按矩阵插入用于抽真空的塑料排水板;
D)铺设水平透水管;
E)塑料排水板紧贴环绕水平透水管,并连接至抽真空设备;
F)覆真空膜,并在真空膜上覆压,抽真空。
2、如权利要求1所述的方法,其特征在于,所述土工布铺设为铺设1~3层土工布。
3、如权利要求1所述的方法,其特征在于,所述毛竹竿网格为1-5层纵横交叉方网格,毛竹竿的间距为20~120cm。
4、如权利要求1所述的方法,其特征在于,所述塑料排水板紧贴环绕水平透水管为2圈以上。
5、如权利要求1所述的方法,其特征在于,在步骤E和F之间还包括铺设土工布的步骤。
6、如权利要求1所述的方法,其特征在于,所述覆压为覆水压或覆土压。
7、如权利要求1-7中任一项所述的方法,其特征在于,所述抽真空步骤后还包括检测步骤,以确定是否停止抽真空。
8、如权利要求1所述的方法,其特征在于,所述塑料排水板使用履带式插板机插入,所述插板机包括塑料履带,所述履带上有一支架结构,所述支架结构在支架顶端通过一液压动力装置相连,所述液压动力装置提供插板动力,在所述液压动力装置上联有液压导管,以进行插板。
9、如权利要求1所述的方法,其特征在于,所述水平透水管为长条型扁管或圆管,内层设有多个隔断,以增强水平透水管的抗压能力。
CN2008100414317A 2008-08-06 2008-08-06 一种特软地基固结方法 Active CN101324063B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100414317A CN101324063B (zh) 2008-08-06 2008-08-06 一种特软地基固结方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100414317A CN101324063B (zh) 2008-08-06 2008-08-06 一种特软地基固结方法

Publications (2)

Publication Number Publication Date
CN101324063A true CN101324063A (zh) 2008-12-17
CN101324063B CN101324063B (zh) 2011-08-31

Family

ID=40187753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100414317A Active CN101324063B (zh) 2008-08-06 2008-08-06 一种特软地基固结方法

Country Status (1)

Country Link
CN (1) CN101324063B (zh)

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101831903A (zh) * 2010-05-18 2010-09-15 上海港湾软地基处理工程(集团)有限公司 一种软地基处理方法
CN101831898A (zh) * 2010-04-19 2010-09-15 中交天津港湾工程研究院有限公司 水平向浅层负压固结工作垫层技术
WO2010108433A1 (zh) * 2009-03-25 2010-09-30 上海港湾软地基处理工程(集团)有限公司 一种改进的高真空击密软地基处理方法
CN101881024A (zh) * 2010-06-28 2010-11-10 连云港港口工程设计研究院有限公司 一种淤泥软基的冻融固结方法
CN101591907B (zh) * 2009-06-26 2010-11-17 上海大学 吹填流泥地基的连体真空预压快速处理方法
CN101967818A (zh) * 2010-09-16 2011-02-09 厦门鑫海陆软土地基科技有限公司 软土地基的生物处理方法
CN101463601B (zh) * 2009-01-16 2011-08-03 上海港湾软地基处理工程(集团)有限公司 预置式“高真空击密”软地基处理方法
CN102220757A (zh) * 2011-04-18 2011-10-19 中交四航工程研究院有限公司 超软弱土浅表层空间排水固结快速处理方法
CN102704458A (zh) * 2012-06-27 2012-10-03 河海大学 一种软地基无砂垫层真空-堆载联合预压加固装置及方法
CN102912787A (zh) * 2012-11-14 2013-02-06 天津港建设公司 粉细砂垫层滤管加密的真空预压方法
CN103233455A (zh) * 2013-04-26 2013-08-07 江苏鸿基水利建设工程有限公司 格栅水平排水板网
CN103410139A (zh) * 2013-08-20 2013-11-27 深圳市市政工程总公司 基坑狭窄区域回填密实方法
CN103422490A (zh) * 2012-05-21 2013-12-04 中交上海航道局有限公司 无砂垫层真空预压超软土地基处理技术
CN104563063A (zh) * 2014-12-30 2015-04-29 浙江广川工程咨询有限公司 一种利用复式排水板的真空预压处理方法
CN104775415A (zh) * 2015-04-03 2015-07-15 重庆大学 吹填超软土地基快速加固的工作平台及施工方法
CN108265698A (zh) * 2018-01-19 2018-07-10 吴慧明 一种堆填废弃泥浆的生态处理方法
CN108661043A (zh) * 2017-03-31 2018-10-16 中国二十冶集团有限公司 大面积无砂垫层真空预压软基处理膜上中粗砂吹填方法
CN108824416A (zh) * 2018-06-06 2018-11-16 武汉二航路桥特种工程有限责任公司 轻快型快速插板机及基于其的软土地基处理的施工方法
CN108978681A (zh) * 2018-08-10 2018-12-11 吴慧明 一种大面积泥浆场地回填土的方法
CN109537528A (zh) * 2018-11-28 2019-03-29 上海港湾基础建设(集团)股份有限公司 一种环保淤泥造岛的施工方法
CN112942298A (zh) * 2021-02-02 2021-06-11 阳江市源丰建设工程有限公司 一种泥沙软质地基的固结方法

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101463601B (zh) * 2009-01-16 2011-08-03 上海港湾软地基处理工程(集团)有限公司 预置式“高真空击密”软地基处理方法
WO2010108433A1 (zh) * 2009-03-25 2010-09-30 上海港湾软地基处理工程(集团)有限公司 一种改进的高真空击密软地基处理方法
CN101591907B (zh) * 2009-06-26 2010-11-17 上海大学 吹填流泥地基的连体真空预压快速处理方法
CN101831898B (zh) * 2010-04-19 2012-02-22 中交天津港湾工程研究院有限公司 水平向浅层负压固结工作垫层的方法
CN101831898A (zh) * 2010-04-19 2010-09-15 中交天津港湾工程研究院有限公司 水平向浅层负压固结工作垫层技术
CN101831903B (zh) * 2010-05-18 2012-02-08 上海港湾软地基处理工程(集团)有限公司 一种软地基处理方法
CN101831903A (zh) * 2010-05-18 2010-09-15 上海港湾软地基处理工程(集团)有限公司 一种软地基处理方法
CN101881024A (zh) * 2010-06-28 2010-11-10 连云港港口工程设计研究院有限公司 一种淤泥软基的冻融固结方法
CN101967818A (zh) * 2010-09-16 2011-02-09 厦门鑫海陆软土地基科技有限公司 软土地基的生物处理方法
CN102220757A (zh) * 2011-04-18 2011-10-19 中交四航工程研究院有限公司 超软弱土浅表层空间排水固结快速处理方法
CN102220757B (zh) * 2011-04-18 2013-01-09 中交四航工程研究院有限公司 超软弱土浅表层空间排水固结快速处理方法
CN103422490A (zh) * 2012-05-21 2013-12-04 中交上海航道局有限公司 无砂垫层真空预压超软土地基处理技术
CN102704458A (zh) * 2012-06-27 2012-10-03 河海大学 一种软地基无砂垫层真空-堆载联合预压加固装置及方法
CN102912787A (zh) * 2012-11-14 2013-02-06 天津港建设公司 粉细砂垫层滤管加密的真空预压方法
CN103233455A (zh) * 2013-04-26 2013-08-07 江苏鸿基水利建设工程有限公司 格栅水平排水板网
CN103410139A (zh) * 2013-08-20 2013-11-27 深圳市市政工程总公司 基坑狭窄区域回填密实方法
CN103410139B (zh) * 2013-08-20 2015-08-26 深圳市市政工程总公司 基坑狭窄区域回填密实方法
CN104563063A (zh) * 2014-12-30 2015-04-29 浙江广川工程咨询有限公司 一种利用复式排水板的真空预压处理方法
CN104563063B (zh) * 2014-12-30 2016-08-24 浙江广川工程咨询有限公司 一种利用复式排水板的真空预压处理方法
CN104775415A (zh) * 2015-04-03 2015-07-15 重庆大学 吹填超软土地基快速加固的工作平台及施工方法
CN104775415B (zh) * 2015-04-03 2016-06-15 重庆大学 吹填超软土地基快速加固的工作平台及施工方法
CN108661043A (zh) * 2017-03-31 2018-10-16 中国二十冶集团有限公司 大面积无砂垫层真空预压软基处理膜上中粗砂吹填方法
CN108265698A (zh) * 2018-01-19 2018-07-10 吴慧明 一种堆填废弃泥浆的生态处理方法
CN108824416A (zh) * 2018-06-06 2018-11-16 武汉二航路桥特种工程有限责任公司 轻快型快速插板机及基于其的软土地基处理的施工方法
CN108824416B (zh) * 2018-06-06 2020-07-07 武汉二航路桥特种工程有限责任公司 轻快型快速插板机及基于其的软土地基处理的施工方法
CN108978681A (zh) * 2018-08-10 2018-12-11 吴慧明 一种大面积泥浆场地回填土的方法
CN109537528A (zh) * 2018-11-28 2019-03-29 上海港湾基础建设(集团)股份有限公司 一种环保淤泥造岛的施工方法
CN112942298A (zh) * 2021-02-02 2021-06-11 阳江市源丰建设工程有限公司 一种泥沙软质地基的固结方法
CN112942298B (zh) * 2021-02-02 2022-07-29 阳江市源丰建设工程有限公司 一种泥沙软质地基的固结方法

Also Published As

Publication number Publication date
CN101324063B (zh) 2011-08-31

Similar Documents

Publication Publication Date Title
CN101324063B (zh) 一种特软地基固结方法
CN100582377C (zh) 快速“信息化高真空击密”软地基处理方法
CN203603105U (zh) 一种壁板式生态挡墙护岸结构
CN101413261B (zh) 双层低位真空预压加固装置及软土地基加固方法
CN102116022A (zh) 一种超压真空密实软地基处理方法
CN102787236B (zh) 一种离子吸附型稀土原地浸矿母液回收工艺
CN101949153A (zh) 地基排水控制法
CN205636758U (zh) 一种全砂质地层干坞边坡支护结构
CN109024458A (zh) 一种采煤沉陷地景观护岸及水底防渗的构建方法
CN102776877B (zh) 超软土地基梯级真空排水固结方法
WO2021072941A1 (zh) 一种滨海淤泥软土地基二次强夯碎石置换加固方法
CN102767174A (zh) 动静排水振击法
CN214194602U (zh) 适用于高承压富水岩溶地层深基坑的降水构造
CN106049413B (zh) 一种应用于深层饱和软土地基的复合动力排水固结系统及施工方法
CN103898915B (zh) 建筑物小面积深基坑抗浮止水施工方法
CN106337422B (zh) 一种处理湿陷性黄土地区填方地基的方法
CN209891205U (zh) 一种基坑侧壁外渗水疏排结构
CN202644589U (zh) 软土地质预应力管桩静压防挤土结构
CN103774639A (zh) 一种堆载预压系统及施工方法
CN208803456U (zh) 一种采用砂桩以及排水板加固泥炭土的结构
CN103122631A (zh) 软土地基堆载冲压加固法
CN212026271U (zh) 一种软土基坑的支护结构
CN108978679A (zh) 一种电缆隧道在高水位区域施工的方法
CN204982857U (zh) 低位负压立体多通道排水组合夯实装置
CN108149775A (zh) 一种pe预制提升泵站及其安装工艺

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: SHANGHAI GEOHABOUR SOFT GROUND TREATMENT ENGINEERI

Free format text: FORMER OWNER: SHANGHAI GEOHABOUR SOFT GROUND TREATMENT ENGINEERING CO., LTD.

Effective date: 20100326

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20100326

Address after: 26, 1188 floor, ocean Plaza, No. 200092 Siping Road, Shanghai

Applicant after: Introduction To Geoharbour Group

Address before: 26, 1188 floor, ocean Plaza, No. 200092 Siping Road, Shanghai

Applicant before: Shanghai Gangwan Soft Foundation Treatment Engineering Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI HARBOUR BASIC CONSTRUCTION (GROUP) CO., L

Free format text: FORMER NAME: SHANGHAI HARBOUR SOFT SOIL TREATMENT ENGINEERING (GROUP) CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 26, 1188 floor, ocean Plaza, No. 200092 Siping Road, Shanghai

Patentee after: Shanghai harbor infrastructure (Group) Co., Ltd.

Address before: 26, 1188 floor, ocean Plaza, No. 200092 Siping Road, Shanghai

Patentee before: Introduction To Geoharbour Group

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 201507 Shanghai Jinshan District, Caojing Town, Ting Wei Road, 3316, 1, two, 207 rooms.

Patentee after: Shanghai Bay infrastructure construction (Group) Limited by Share Ltd

Address before: 200092 26 floor, ocean Plaza, 1188 Siping Road, Shanghai.

Patentee before: Shanghai harbor infrastructure (Group) Co., Ltd.