CN101302739A - A prestressed concrete box girder hydraulic internal mold vehicle and hydraulic internal mold system - Google Patents

A prestressed concrete box girder hydraulic internal mold vehicle and hydraulic internal mold system Download PDF

Info

Publication number
CN101302739A
CN101302739A CNA2008101326934A CN200810132693A CN101302739A CN 101302739 A CN101302739 A CN 101302739A CN A2008101326934 A CNA2008101326934 A CN A2008101326934A CN 200810132693 A CN200810132693 A CN 200810132693A CN 101302739 A CN101302739 A CN 101302739A
Authority
CN
China
Prior art keywords
formwork
box girder
concrete box
internal mold
prestressed concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008101326934A
Other languages
Chinese (zh)
Other versions
CN101302739B (en
Inventor
马涛
秦顺全
郭春荣
朱斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Original Assignee
China Railway Major Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Co Ltd filed Critical China Railway Major Bridge Engineering Co Ltd
Priority to CN2008101326934A priority Critical patent/CN101302739B/en
Publication of CN101302739A publication Critical patent/CN101302739A/en
Application granted granted Critical
Publication of CN101302739B publication Critical patent/CN101302739B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种铁路、公路、城市道路桥梁用预应力混凝土箱梁的液压内模车。包括组合内模板,若干液压油缸组、纵移小车和若干组撑杆,纵移小车设置在组合内模板的内部空腔内,组合内模板中的顶模板分别与左右中模板的端面抵接;顶模板伸缩油缸以及左右中模板伸缩油缸分别与纵移小车和顶模板以及中模板的内表面铰接,左右下模板伸缩油缸分别与下模板和中模板铰接;组合内模板支起后,用若干撑杆支撑。本发明还提供了一种预应力砼箱梁液压内模系统。本发明,中模板采用了与顶模相同的直线移动脱模方式,使模板的剥离更加容易,模板运动所需要的空间更小,从而更容易通过箱梁端隔板预留孔,内模系统适应能力更强,且液压油缸布置更加合理。

The invention discloses a hydraulic internal mold vehicle for prestressed concrete box girders used in railways, highways and urban road bridges. It includes the combined inner formwork, several hydraulic cylinder groups, longitudinal moving trolleys and several groups of struts, the longitudinal moving trolleys are arranged in the inner cavity of the combined inner formwork, and the top formwork in the combined inner formwork respectively abuts against the end faces of the left and right middle formworks; The telescopic oil cylinder of the top formwork and the telescopic cylinders of the left and right middle formwork are respectively hinged with the longitudinal moving trolley and the inner surface of the top formwork and the middle formwork, and the telescopic cylinders of the left and right lower formwork are respectively hinged with the lower formwork and the middle formwork; rod support. The invention also provides a prestressed concrete box girder hydraulic internal mold system. In the present invention, the middle formwork adopts the same linear movement demoulding method as the top formwork, which makes the stripping of the formwork easier, and the space required for the movement of the formwork is smaller, so that it is easier to pass through the reserved holes of the box girder end partitions, and the internal formwork system The adaptability is stronger, and the layout of the hydraulic cylinder is more reasonable.

Description

A kind of prestress concrete box girder hydraulic internal mold car and hydraulic internal mold system
Technical field
The present invention relates to a kind of hydraulic internal mold device of producing railway, highway, the employing of urban road bridge prestress concrete box girder.
Background technology
PC Box Girder Structure is simple, elegant in appearance, easily manufactured, supporting capacity is strong, dominate in railway, highway, urban road bridge, it is produced the prefabricated and bridge location of branch factory and builds two kinds, and main production process has mould installation, reinforcing bar binding, concreting and maintenance, mould dismounting etc.Case beam production mould is made up of internal mold, external mold wing plate mould, side form and end mould and supporting basis, and its internal mold generally is made up of polylith template and braced structures thereof, installs and removes by manually carrying out.Its weak point is that operating environment is poor, labour intensity is big, production efficiency is low.
Application number provides a kind of full-automatic hydraulic prefabricated box girder inner formwork system for 200610201284.6 Chinese patent, the inner formword of this system is by backform and a pair ofly go up the inner corner trim mould and a pair of down the inner corner trim mould is hinged forms, going up oblique oil cylinder is connected between backform and the last inner corner trim mould, oblique oil cylinder is connected between inner corner trim mould and the following inner corner trim mould down, be interval with bracing frame in the cavity bottom central authorities that inner formword is enclosed along case beam depth, set up rail on the bracing frame, walking translation dolly on the rail, the translation dolly comprises travelling wheel, a vehicle frame and a seat beam that is fixed on the vehicle frame, the vehicle frame of translation dolly extends to outside the inner formword, lays hydraulic power unit and operating desk on it.The translation dolly can whole be walked, and has made things convenient for the integral body of internal mold to come in and go out.
But, middle template in the said system and top template adopt rotating stripping demoulding, its weak point is: rotating stripping demoulding is undesirable because of the angle of power that hydraulic jack applies, can produce very big component, the part of hydraulic jack applied force makes the template rotation, plays the effect of the demoulding, part component there is no help to the rotation of template, but directly bear by formwork structure, pass to the center hinge of rotation, cause demoulding difficulty; In addition, because the existence of above-mentioned harmful component, the needed rigidity of template is bigger, and the template materials are more, and the needed segment of rotating stripping demoulding space is bigger.
Summary of the invention
Technical problem to be solved by this invention is the problem that solves demoulding difficulty in the hydraulic internal mold devices that prestressed concrete box girder adopted such as railway, highway, urban road bridge.
In order to solve the problems of the technologies described above, the technical solution adopted in the present invention provides a kind of prestress concrete box girder hydraulic internal mold car, comprise the combined inner mold plate, some hydraulic jack groups, vertical shift dolly and some groups of struts, described vertical shift dolly is arranged in the internal cavities of combined inner mold plate and moves along the longitudinal axis of combined inner mold plate, described combined inner mold plate comprise top template, about in template and left and right sides lower bolster, template and left and right sides lower bolster are hinged respectively in about described, described top template respectively with about the end face butt of middle template; Described hydraulic jack group comprise the top template telescopic oil cylinder, about in template telescopic oil cylinder and left and right sides lower bolster telescopic oil cylinder, described top template telescopic oil cylinder and about in the cylinder body of template telescopic oil cylinder and piston rod hinged with the inner surface of vertical shift dolly and top template, middle template respectively, the cylinder body of described left and right sides lower bolster telescopic oil cylinder and piston rod are hinged with lower bolster and middle template respectively; Described top template, about on the inner surface of template and left and right sides lower bolster and be respectively equipped with some adjustable strut fixed hinged seats on the vertical shift dolly.
The cross section of template is that three bendings are tabular in about described, and its top bending part is parallel with top template respectively.The cross section of described top template is up-small and down-big trapezoidal, described about in the end face of top bending part of template be the inclined-plane and contact with the inclined end face of top template.
Described every group of strut comprises adjustable strut and sleeve strut, and described adjustable strut comprises top template strut, middle form spreader and lower bolster strut, and the two ends of described top template strut, middle form spreader and lower bolster strut are respectively equipped with and are connected free bearing.Described sleeve strut is made up of a jacket casing and a tube core that is inserted in the jacket casing, and jacket casing is connected with the following bending part and the vertical shift cart stationary of middle template inner surface respectively with the other two ends of tube core, is respectively equipped with fixed pin shaft on jacket casing and the tube core and installs through hole.
Also comprise bracing piece and following bracing piece, described last bracing piece is fixedlyed connected with the adjacent inner surface of jacket casing and middle template respectively with following bracing piece two ends with the both sides up and down and the last bracing piece of the jacket casing that following bracing piece is separately positioned on.
The following bending part of template inner surface during the pin joint of template telescopic oil cylinder and middle template is arranged in about described.
At least four of described top template telescopic oil cylinders are respectively perpendicular to the soffit of top template.
Described vertical shift dolly comprises binding-beam and some driving wheels of two girders that be arranged in parallel, the described girder of some connections, and described driving wheel is by motor-driven.
The present invention also provides a kind of prestress concrete box girder hydraulic internal mold system, comprise above-mentioned prestress concrete box girder hydraulic internal mold car, track and Hydraulic Station, described track is arranged on the bed die of this case beam along the prestress concrete box girder longitudinal axis by the rail support built-in fitting, the setting of described prestress concrete box girder hydraulic internal mold car vertically moves in orbit and along track, and described Hydraulic Station is connected with the hydraulic jack group of prestress concrete box girder hydraulic internal mold car respectively by hydraulic tube
This prestress concrete box girder hydraulic internal mold system also comprises some template supporting built-in fittings, and described template supporting built-in fitting is arranged between the bed die of lower bolster and prestress concrete box girder.
The present invention, top template and middle template butt, after the top template demoulding, template telescopic oil cylinder axis shrinks to the vertical shift dolly in the middle template edge, and middle template has adopted the straight line identical with backform to move stripping means, and peeling off of template is more prone to, the template needed space of moving is littler, template can bounce back to littler volume, thereby easier of case beam-ends dividing plate preformed hole, the inner formwork system adaptive capacity is stronger.In addition, it is more reasonable that hydraulic jack is arranged, the axis of hydraulic jack and the angle of concrete surface bigger (90 degree are for best) make harmful component of hydraulic jack littler, and the design load of hydraulic jack is littler, and the demoulding is convenient, operation safe.
Description of drawings
Fig. 1 is a structural representation of the present invention;
Fig. 2 is the A-A schematic cross-section of Fig. 1;
Fig. 3 is the B-B schematic cross-section of Fig. 1;
Fig. 4 is the C-C schematic cross-section of Fig. 1;
Fig. 5 is the D-D schematic cross-section of Fig. 1;
Fig. 6~Fig. 8 is a demoulding step schematic diagram of the present invention;
Wherein:
The 10-template, the 11-top template, middle template about 12-, 13-left and right sides lower bolster, 14-cuts with scissors with one heart;
The adjustable strut of 20-, 21-top template strut, 22-left and right sides lower bolster strut is strengthened strut on the middle template telescopic oil cylinder about 23-, and middle template telescopic oil cylinder is strengthened strut down about 24-, the middle vertical strut of template about 25-, the middle oblique strut of template about 26-;
30-sleeve strut, 3 1-jacket casings, 32-tube core, the last bracing piece of 33-, bracing piece under the 34-, 35-bearing pin;
40-vertical shift dolly, 41-dolly girder, 42-dolly driving wheel, 43-dolly girder bracing;
The 50-Hydraulic Station;
The 60-hydraulic jack, middle template telescopic oil cylinder about 61-, 62-top template telescopic oil cylinder, 63-left and right sides lower bolster telescopic oil cylinder;
The 70-track;
The 80-built-in fitting, 81-rail support built-in fitting, 82-template supporting built-in fitting.
The specific embodiment
Below in conjunction with accompanying drawing the present invention is made detailed explanation.
Fig. 1 to Fig. 5 props up the state of time-out for combined inner mold plate of the present invention.
As shown in Figure 1, the present invention mainly is made up of combined inner mold plate 10, some groups of adjustable struts 20, some groups of sleeve struts 30, vertical shift dolly 40 and some groups of hydraulic jack groups 60.Described combined inner mold plate 10 is fixed on the vertical shift dolly 40 by adjustable strut 20, sleeve strut 30, hydraulic jack group 60; Hydraulic jack group 60 of the present invention vertically lays respectively in the different cross sections along the hydraulic internal mold car with adjustable strut 20, sleeve strut 30.
Fig. 2 is the A-A schematic cross-section of Fig. 1, and the A-A cross section is a supporting section of the present invention, and adjustable strut 20 and sleeve strut 30 can be positioned at this cross section.As shown in Figure 2, in this cross section, described vertical shift dolly 40 comprises binding-beam 43 and some driving wheels 42 of two girders that be arranged in parallel 41, the described girder 41 of some connections, and described driving wheel 42 is by motor-driven.Described combined inner mold plate 10 by top template 11, about in template 12 and left and right sides lower bolster 13 form; The cross section of top template 11 is up-small and down-big trapezoidal, about in the cross section of template 12 be that three bendings are tabular, its top bending part is parallel with top template 11 respectively, and about in the end face of top bending part of template 12 be the inclined-plane.Top template 11 is placed in the middle, and both sides respectively are provided with a middle template 12, about in the lower end of template 12 be connected with lower bolster 13 by concentric hinge 14 respectively; Top template 11 from bottom to top with the inclined-plane butt of middle template 12.Adopt this structure, can not only effectively prevent spillage, also can be conveniently stripped.
Adjustable strut 20 comprise top template strut 21, about in the vertical strut 25 of template, about in the oblique strut 26 of template and left and right sides lower bolster strut 22, described top template strut 21, about in the vertical strut 25 of template, about in the two ends of the oblique strut 26 of template and left and right sides lower bolster strut 22 be respectively equipped with and be connected free bearing.The two ends of top template strut 21 and left and right sides lower bolster strut 22 are hinged with top template 11, left and right sides lower bolster 13 and dolly girder 41 respectively; Sleeve strut 30 is made up of a jacket casing 31 and tube cores 32 that are inserted in the jacket casing 31, the following turn of bilge of tearing open of template 12 inner surfaces in about jacket casing 31 is welded on, the both sides up and down of jacket casing 31 also are respectively equipped with bracing piece 33 and following bracing piece 34, the described bracing piece 33 of going up welds with two of jacket casing 31 and middle template 12 adjacent inner surfaces respectively with following bracing piece 34, to add the rigidity of persistent erection template 12; One end of tube core 32 is welded on the dolly girder 41, movable jacket casing 31 inner chambers that insert of the other end, and jacket casing 31 overlaps with the axis of tube core 32, and the two insertion portion connects by bearing pin 35.
Hydraulic jack group 60 by some top template telescopic oil cylinders 62, about in template telescopic oil cylinder 61 and left and right sides lower bolster telescopic oil cylinder 63 form.Fig. 3 is a B-B schematic cross-section of the present invention, and the B-B cross section is the flexible cross section of combined inner mold plate 10 of the present invention, top template telescopic oil cylinder 62 and about in template telescopic oil cylinder 61 be positioned at this cross section.As shown in Figure 3, two top template telescopic oil cylinders 62 are respectively perpendicular to the inner surface of top template 11, and the cylinder body of top template telescopic oil cylinder 62 and tailpiece of the piston rod are hinged with the girder 41 of the inner surface of top template 11 and vertical shift dolly respectively; About in the cylinder body of template telescopic oil cylinder 61 and tailpiece of the piston rod respectively with about in the girder 41 of the following bending part of template 12 inner surfaces and vertical shift dolly hinged; In order to add the rigidity of persistent erection template 12 when the demoulding, about in the both sides up and down of template telescopic oil cylinder 61 also be respectively equipped with about in the upper and lower reinforcement strut 23,24 of template telescopic oil cylinder, described about in the two ends of the upper and lower reinforcement strut 23,24 of template telescopic oil cylinder be articulated and connected respectively about in template telescopic oil cylinder 61 cylinder body and about on the two adjacent inner surfaces of middle template 12.
Fig. 4 is the C-C schematic cross-section of Fig. 1, and left and right sides lower bolster telescopic oil cylinder 63 is positioned at this cross section.As shown in Figure 4, about in the upper inside surface of template 12 and the lower inner surface of left and right sides lower bolster 13 be articulated and connected by left and right sides lower bolster telescopic oil cylinder 63, simultaneously, the rigidity of template 12 and left and right sides lower bolster 13 in about be strengthening, about in also distinguish between template 12 and the left and right sides lower bolster 13 hinged about the middle vertical strut 25 of template.
Fig. 5 is the D-D schematic cross-section of Fig. 1, and this cross section is a supporting section schematic diagram of the present invention.As shown in Figure 5, top template 11 is articulated and connected by the girder 41 of two vertical with top template 11 soffits respectively top template struts 21 with the vertical shift dolly, about in template 12 pass through about in the oblique strut of template 26 hinged with the girder 41 of vertical shift dolly, left and right sides lower bolster 13 is articulated and connected with the girder 41 of vertical shift dolly respectively by lower bolster strut 22.
The purpose that above-mentioned each cross section is provided with adjustable strut is to strengthen the rigidity of combined inner mold plate, and the demand of visible combinations formwork rigidity takes the circumstances into consideration to increase and decrease adjustable strut quantity.
Fig. 6~Fig. 8 is a demoulding step schematic diagram of the present invention.
Fig. 6 is left and right sides lower bolster 13 demoulding schematic diagrames, and step is: remove left and right sides lower bolster strut 22, about in the vertical strut 25 of template; Start Hydraulic Station 50, lower bolster telescopic oil cylinder 63 retractions in the left and right sides drive left and right sides lower bolster 13 around concentric hinge 14 rotations, peel off with concrete surface.
Fig. 7 is top template 11 demoulding schematic diagrames, and step is: remove top template strut 21; Start Hydraulic Station 50, top template telescopic oil cylinder 62 retractions drive top template 11 and descend along vertical, peel off with concrete surface.
Fig. 8 be about in template 12 demoulding schematic diagrames, step is: about dismounting in the oblique strut 26 of template; Extract bearing pin 35; Start Hydraulic Station 50, about in template telescopic oil cylinder 61 retractions, about drive in template 12 simultaneously inwardly, move down, peel off with concrete surface.
The present invention also provides a kind of prestress concrete box girder hydraulic internal mold system, comprise some above-mentioned prestress concrete box girder hydraulic internal mold cars, track 70 and Hydraulic Station 50, vertical shift dolly 40 belows are provided with two tracks 70 along prestress concrete box girder longitudinal axis direction, and track 70 is fixed on the bed die of concrete box girder by rail support built-in fitting 81; Vertical shift dolly 40 is arranged on the track 70, and under motor-driven, vertically moves along track 70, moves into or shift out the inner chamber of concrete box girder.Hydraulic Station 50 links to each other with hydraulic jack group 60 by oil pipe, the stretching, contract and action such as static of control hydraulic jack group 60.The internal mold of a slice concrete box girder is made up of several prestress concrete box girder hydraulic internal mold car word orders.
Built-in fitting of the present invention adopts precast unit, and the built-in fitting concrete adopts and equates or a high grade with the box girder body concrete label, and the contact surface cutter hair of built-in fitting and newly placed concrete is cleaned, and the two helps improving beam physique amount in conjunction with better.
Installation of the present invention and job step are as follows:
Built-in fitting 80 is made up of rail support built-in fitting 81 and template supporting built-in fitting 82, and behind the concrete box girder reinforcing bar binding, at first attachment rail supporting built-in fitting 81, template support built-in fitting 82 and be fixed on the beam body steel mesh reinforcement; Install then and trapped orbit 70, will contract and sail the design attitude of case beam inner chamber to the present invention of minimum dimension along track 70 into; The 3rd step is with reference to Fig. 8 to Fig. 6, template 12, top template 11, left and right sides lower bolster 13 in about opening successively, install respectively top template strut 21, about in the vertical strut 25 of template, about in the oblique strut 26 of template and left and right sides lower bolster strut 22, and adjust above-mentioned adjustable strut, the inner surface of itself and inner formword is firmly supported; The 4th step, the present invention adjust to the right place and fixing after, concreting, vibrate, health.The installation of the adjustable strut of the present invention is example all with manual operations with certain 32 rice bin beam, and its inner chamber height is 2.25 meters, deduct about 0.12 meter of the height of template, 2.13 meters of remaining space height, the end partition wall inner chamber height at case beam two ends is 1.75 meters, deduct back 1.63 meters, enough workman's operations.The operating personnel operates by reaching from the empty crotch between two girders of dolly, and is very convenient.
Demounting procedure of the present invention:
Contract to minimum dimension according to the described step demoulding of Fig. 6 to Fig. 8 and with the present invention; Drive vertical shift dolly 40, the present invention is rolled away from the inner chamber of finished product concrete box girder along track 70; Remove track 70 and rail support built-in fitting 81 in the case beam inner chamber.
The present invention can save steel 20%~40% than conventional art.32 meters simple supported box beam is an example to stride directly, and its weight can be reduced to 10kN/ rice.In addition, the present invention shrinks the back volume and reduces significantly, and adaptive capacity is strong.The simple supported box beam internal mold car of striding 32 meters in footpath with certain is an example, and its section is contracted to 3.9 * 1.6 meters by 5.44 * 2.25 meters, and reduced cross-sectional reaches 50%, so just makes the adaptive capacity of internal mold car stronger.
The present invention is not limited to above-mentioned preferred forms, and anyone should learn the structural change of making under enlightenment of the present invention, and every have identical or close technical scheme with the present invention, all falls within protection scope of the present invention.

Claims (11)

1、一种预应力砼箱梁液压内模车,包括组合内模板,若干液压油缸组、若干组可调撑杆和纵移小车,所述纵移小车设置在组合内模板的内部空腔内,其特征在于:所述组合内模板包括顶模板、左右中模板和左右下模板,所述左右中模板与左右下模板分别铰接,所述顶模板分别与左右中模板的端面抵接;所述液压油缸组包括顶模板伸缩油缸、左右中模板伸缩油缸和左右下模板伸缩油缸,顶模板伸缩油缸以及左右中模板伸缩油缸的缸体和活塞杆分别与纵移小车和顶模板、中模板的内表面铰接,所述左右下模板伸缩油缸的缸体和活塞杆分别与下模板和中模板铰接;所述顶模板、左右中模板和左右下模板的内表面上和纵移小车上分别设有若干可调撑杆连接铰座。1. A prestressed concrete box girder hydraulic internal mold vehicle, comprising a combined inner formwork, several hydraulic cylinder groups, several groups of adjustable struts and a longitudinal moving trolley, the longitudinal moving trolley is arranged in the inner cavity of the combined inner formwork , characterized in that: the combined inner formwork includes a top formwork, a left and right middle formwork and a left and right lower formwork, the left and right middle formworks are respectively hinged to the left and right lower formworks, and the top formwork abuts against the end faces of the left and right middle formworks respectively; The hydraulic cylinder group includes the telescopic oil cylinder of the top formwork, the telescopic cylinder of the left and right middle formwork and the telescopic cylinder of the left and right lower formwork. The surface is hinged, and the cylinder body and piston rod of the telescopic cylinders of the left and right lower templates are respectively hinged with the lower template and the middle template; The adjustable strut connects the hinged seat. 2、如权利要求1所述的预应力砼箱梁液压内模车,其特征在于所述左右中模板的横截面为三折弯板状,其上部折弯部分别与顶模板平行。2. The prestressed concrete box girder hydraulic internal mold vehicle according to claim 1, characterized in that the cross-section of the left and right middle formworks is a three-bend plate shape, and the upper bending parts are respectively parallel to the top formwork. 3、如权利要求2所述的预应力砼箱梁液压内模车,其特征在于所述顶模板的横截面为上小下大的梯形,所述左右中模板的上部折弯部的端面为斜面且与顶模板的倾斜端面接触。3. The prestressed concrete box girder hydraulic internal mold vehicle according to claim 2, characterized in that the cross section of the top template is a trapezoid with a small top and a large bottom, and the end faces of the upper bending parts of the left and right middle templates are beveled and in contact with the beveled end face of the top formwork. 4、如权利要求1所述的预应力砼箱梁液压内模车,其特征在于所述每组撑杆包括可调撑杆和套筒撑杆,可调撑杆包括顶模板撑杆、左右中模板撑杆和左右下模板撑杆,所述顶模板撑杆、左右中模板撑杆和左右下模板撑杆的两端分别设有连接铰座。4. The prestressed concrete box girder hydraulic internal mold vehicle according to claim 1, characterized in that each group of struts includes adjustable struts and sleeve struts, and the adjustable struts include top formwork struts, left and right The middle formwork braces and the left and right lower formwork braces, the two ends of the top formwork braces, the left and right middle formwork braces and the left and right lower formwork braces are respectively provided with connecting hinge seats. 5、如权利要求4所述的预应力砼箱梁液压内模车,其特征在于所述套筒撑杆由筒套和插装在筒套内的筒芯组成,筒套和筒芯的另外两端分别与左右中模板内表面的下折弯部以及纵移小车固定连接,筒套和筒芯上分别设有固定销轴穿装通孔。5. The prestressed concrete box girder hydraulic internal mold vehicle according to claim 4, characterized in that the sleeve strut is composed of a sleeve and a core inserted in the sleeve, and the sleeve and the core are additionally The two ends are respectively fixedly connected with the lower bending part of the inner surface of the left and right middle templates and the longitudinal moving trolley, and the barrel sleeve and the barrel core are respectively provided with fixed pin shaft penetration holes. 6、如权利要求5所述的预应力砼箱梁液压内模车,其特征在于还包括上加强杆和下加强杆,所述上加强杆和下加强杆分别设置在的筒套的上下两侧且分别与筒套和左右中模板的相邻内表面固定连接。6. The prestressed concrete box girder hydraulic internal mold car according to claim 5, characterized in that it also includes an upper reinforcing rod and a lower reinforcing rod, and the upper reinforcing rod and the lower reinforcing rod are respectively arranged on the upper and lower sides of the sleeve. The sides are fixedly connected with the adjacent inner surfaces of the cylinder sleeve and the left and right middle templates respectively. 7、如权利要求1至6项任一项权利要求所述的预应力砼箱梁液压内模车,其特征在于所述左右中模板伸缩油缸与中模板的铰接点设置在中模板内表面的下折弯部。7. The prestressed concrete box girder hydraulic internal mold vehicle according to any one of claims 1 to 6, characterized in that the hinge points between the left and right middle formwork telescopic cylinders and the middle formwork are set on the inner surface of the middle formwork. Lower bend. 8、如权利要求7所述的预应力砼箱梁液压内模车,其特征在于所述顶模板伸缩油缸至少设置四个,分别垂直于顶模板的下表面。8. The prestressed concrete box girder hydraulic internal mold vehicle according to claim 7, characterized in that there are at least four telescopic oil cylinders for the top formwork, which are respectively perpendicular to the lower surface of the top formwork. 9、如权利要求8所述的预应力砼箱梁液压内模车,其特征在于所述纵移小车包括两根平行设置的主梁、若干连接所述主梁的联结梁和若干驱动轮,所述驱动轮由电机驱动。9. The prestressed concrete box girder hydraulic internal mold vehicle according to claim 8, characterized in that the longitudinal moving trolley includes two main beams arranged in parallel, several connecting beams connecting the main beams and several driving wheels, The drive wheel is driven by a motor. 10、一种预应力砼箱梁液压内模系统,其特征在于包括若干如权利要求1所述的预应力砼箱梁液压内模车,轨道和液压站,所述轨道沿预应力砼箱梁纵向轴线通过轨道支承预埋件设置在该箱梁的底模上,所述预应力砼箱梁液压内模车设置在轨道上且沿轨道纵向移动,所述液压站通过液压管分别与预应力砼箱梁液压内模车的液压油缸组连接。10. A prestressed concrete box girder hydraulic internal mold system, characterized in that it comprises a number of prestressed concrete box girder hydraulic internal mold vehicles as claimed in claim 1, a track and a hydraulic station, and the track runs along the prestressed concrete box girder. The longitudinal axis is set on the bottom form of the box girder through the rail support embedded parts, the prestressed concrete box girder hydraulic inner mold car is set on the track and moves longitudinally along the track, and the hydraulic station is respectively connected to the prestressed concrete box girder through hydraulic pipes. The hydraulic cylinder group connection of the concrete box girder hydraulic internal mold vehicle. 11、如权利要求10所述的预应力砼箱梁液压内模系统,其特征在于还包括若干模板支承预埋件,所述模板支承预埋件设置在下模板和预应力砼箱梁的底模之间。11. The hydraulic internal mold system of prestressed concrete box girder according to claim 10, characterized in that it also includes several formwork support embedded parts, and the formwork support embedded parts are arranged on the lower formwork and the bottom form of the prestressed concrete box girder between.
CN2008101326934A 2008-07-10 2008-07-10 A prestressed concrete box girder hydraulic internal mold vehicle and hydraulic internal mold system Expired - Fee Related CN101302739B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101326934A CN101302739B (en) 2008-07-10 2008-07-10 A prestressed concrete box girder hydraulic internal mold vehicle and hydraulic internal mold system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101326934A CN101302739B (en) 2008-07-10 2008-07-10 A prestressed concrete box girder hydraulic internal mold vehicle and hydraulic internal mold system

Publications (2)

Publication Number Publication Date
CN101302739A true CN101302739A (en) 2008-11-12
CN101302739B CN101302739B (en) 2010-06-02

Family

ID=40112808

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101326934A Expired - Fee Related CN101302739B (en) 2008-07-10 2008-07-10 A prestressed concrete box girder hydraulic internal mold vehicle and hydraulic internal mold system

Country Status (1)

Country Link
CN (1) CN101302739B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101885206A (en) * 2010-07-02 2010-11-17 中铁四局集团第四工程有限公司 Hydraulic internal mold truss type walking track system of high speed railway prefabricating box girder
CN102189595A (en) * 2011-04-14 2011-09-21 湖南中铁五新钢模有限责任公司 Guide pillar type hydraulic internal mold for straight web plate box girder
CN102409621A (en) * 2011-11-17 2012-04-11 中铁十五局集团有限公司 Easy-to-detach steel mould of hollow beam of bridge
CN104746434A (en) * 2015-03-31 2015-07-01 中铁第五勘察设计院集团有限公司 Closure segment formwork system without dismantling outer formwork
CN105442838A (en) * 2015-12-24 2016-03-30 湖南中铁五新钢模有限责任公司 Stub matching prefabricated U-shaped segmental beam formwork and formwork retracting method thereof
CN107387122A (en) * 2017-08-17 2017-11-24 中铁上海工程局集团有限公司 A kind of formwork jumbo and its construction method for the construction of piping lane tunneling boring
EP3187657A4 (en) * 2014-07-29 2018-05-09 Rubrica Ingenieria Y Arquitectura, S.L. Collapsible formwork for a bridge deck and method for advancing the formwork
CN110524687A (en) * 2019-08-13 2019-12-03 中交第四航务工程局有限公司 A kind of immersed tube tunnel inner formwork system and construction method
CN111136779A (en) * 2020-01-13 2020-05-12 山东博远重工有限公司 Internal mold structure convenient for demolding
CN111778853A (en) * 2019-04-06 2020-10-16 广州振中建设有限公司 An inner cavity formwork recycling construction method with a closed inner cavity concrete structure
CN112726425A (en) * 2021-02-09 2021-04-30 中交三公局桥梁隧道工程有限公司 Inner formwork frame for continuous beam suspension casting construction
CN113605208A (en) * 2021-08-11 2021-11-05 长安大学 Corrugated steel web PC box girder, internal support external pulling device and construction method of support before lining

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201244857Y (en) * 2008-07-10 2009-05-27 中铁大桥局股份有限公司 Prestress concrete box girder hydraulic internal mold vehicle and hydraulic internal mold system

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101885206A (en) * 2010-07-02 2010-11-17 中铁四局集团第四工程有限公司 Hydraulic internal mold truss type walking track system of high speed railway prefabricating box girder
CN102189595A (en) * 2011-04-14 2011-09-21 湖南中铁五新钢模有限责任公司 Guide pillar type hydraulic internal mold for straight web plate box girder
CN102409621A (en) * 2011-11-17 2012-04-11 中铁十五局集团有限公司 Easy-to-detach steel mould of hollow beam of bridge
CN102409621B (en) * 2011-11-17 2013-11-20 中铁十五局集团有限公司 Easy-to-detach steel mould of hollow beam of bridge
EP3187657A4 (en) * 2014-07-29 2018-05-09 Rubrica Ingenieria Y Arquitectura, S.L. Collapsible formwork for a bridge deck and method for advancing the formwork
CN104746434A (en) * 2015-03-31 2015-07-01 中铁第五勘察设计院集团有限公司 Closure segment formwork system without dismantling outer formwork
CN105442838A (en) * 2015-12-24 2016-03-30 湖南中铁五新钢模有限责任公司 Stub matching prefabricated U-shaped segmental beam formwork and formwork retracting method thereof
CN107387122A (en) * 2017-08-17 2017-11-24 中铁上海工程局集团有限公司 A kind of formwork jumbo and its construction method for the construction of piping lane tunneling boring
CN111778853A (en) * 2019-04-06 2020-10-16 广州振中建设有限公司 An inner cavity formwork recycling construction method with a closed inner cavity concrete structure
CN111778853B (en) * 2019-04-06 2022-04-12 振中建设集团有限公司 An inner cavity formwork recycling construction method with a closed inner cavity concrete structure
CN110524687A (en) * 2019-08-13 2019-12-03 中交第四航务工程局有限公司 A kind of immersed tube tunnel inner formwork system and construction method
CN110524687B (en) * 2019-08-13 2020-09-29 中交第四航务工程局有限公司 An immersed tunnel internal formwork system and construction method
CN111136779A (en) * 2020-01-13 2020-05-12 山东博远重工有限公司 Internal mold structure convenient for demolding
CN112726425A (en) * 2021-02-09 2021-04-30 中交三公局桥梁隧道工程有限公司 Inner formwork frame for continuous beam suspension casting construction
CN113605208A (en) * 2021-08-11 2021-11-05 长安大学 Corrugated steel web PC box girder, internal support external pulling device and construction method of support before lining

Also Published As

Publication number Publication date
CN101302739B (en) 2010-06-02

Similar Documents

Publication Publication Date Title
CN101302739B (en) A prestressed concrete box girder hydraulic internal mold vehicle and hydraulic internal mold system
CN207109856U (en) Piping lane, culvert construction hydraulic steel formwork jumbo
CN201244857Y (en) Prestress concrete box girder hydraulic internal mold vehicle and hydraulic internal mold system
CN105365042B (en) A kind of preparation method of prefabricated small box girder
CN104594918B (en) Split integrated underground passage steel mold plate trolley and construction method thereof
CN113235472B (en) Concrete placement platform truck is contained to apron
CN106089253A (en) A fully hydraulic formwork system for culvert pouring
CN109968499B (en) Special die for pouring T-shaped beam and application method thereof
CN105952482A (en) Self-propelled tunnel invert lining trolley
CN113417219B (en) Hydraulic internal mold asynchronous traveling system and method for bridge suspension casting basket box chamber
CN102660925B (en) A mobile formwork for a variable width curved bridge
CN202658533U (en) Movable formwork of curved bridge with variable width
CN107326930A (en) On-site rapid prototyping machine for urban underground comprehensive pipe gallery and its working method
CN111809660A (en) Rectangular trolley for integrated pipe gallery and construction method
CN114575892B (en) Off-wall vault lining trolley and construction method thereof
CN109605547B (en) Rapid forming device and method for prefabricated pipe gallery
CN109371851B (en) Multi-bottom die head cover support frame trough making machine
CN208122869U (en) Template trolley for pipe gallery construction
CN206035507U (en) Rectangle box culvert and for tunnel construction platform truck
CN111501570A (en) Automatic adjusting and supporting die frame for small-span arch bridge
CN213116322U (en) A tunnel secondary lining full-section integrated construction trolley
CN116378711B (en) A separated trolley device and construction method for a shallow buried tunnel
CN114657884B (en) Construction method of descending movable formwork for bridge abutment assembly and sectional propulsion
CN210317334U (en) A formwork trolley for concrete pouring of thin-walled partition walls in tunnels
CN105799054A (en) Self-propelled hydraulic positioning and demolding type tunnel sinking pipe section prefabricating formwork

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Ma Tao

Inventor after: Qin Shunquan

Inventor after: Guo Rongchun

Inventor after: Zhu Bin

Inventor before: Ma Tao

Inventor before: Qin Shunquan

Inventor before: Guo Chunrong

Inventor before: Zhu Bin

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: MA TAO QIN SHUNQUAN GUO CHUNRONG ZHU BIN TO: MA TAO QIN SHUNQUAN GUO RONGCHUN ZHU BIN

ASS Succession or assignment of patent right

Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU

Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD.

Effective date: 20150216

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 430000 WUHAN, HUBEI PROVINCE TO: 430050 WUHAN, HUBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20150216

Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Patentee after: CHINA RAILWAY MAJOR BRIDGE ENGINEERING GROUP Co.,Ltd.

Address before: 430000 Hubei province Wuhan Dongxin East Lake New Technology Development Zone Road SBI Venture Street No. 6 Building 12 layer Railway Bridge Bureau Limited by Share Ltd

Patentee before: CHINA RAILWAY MAJOR BRIDGE ENGINEERING Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100602

CF01 Termination of patent right due to non-payment of annual fee