CN101302739A - A prestressed concrete box girder hydraulic internal mold vehicle and hydraulic internal mold system - Google Patents
A prestressed concrete box girder hydraulic internal mold vehicle and hydraulic internal mold system Download PDFInfo
- Publication number
- CN101302739A CN101302739A CNA2008101326934A CN200810132693A CN101302739A CN 101302739 A CN101302739 A CN 101302739A CN A2008101326934 A CNA2008101326934 A CN A2008101326934A CN 200810132693 A CN200810132693 A CN 200810132693A CN 101302739 A CN101302739 A CN 101302739A
- Authority
- CN
- China
- Prior art keywords
- formwork
- box girder
- concrete box
- internal mold
- prestressed concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开了一种铁路、公路、城市道路桥梁用预应力混凝土箱梁的液压内模车。包括组合内模板,若干液压油缸组、纵移小车和若干组撑杆,纵移小车设置在组合内模板的内部空腔内,组合内模板中的顶模板分别与左右中模板的端面抵接;顶模板伸缩油缸以及左右中模板伸缩油缸分别与纵移小车和顶模板以及中模板的内表面铰接,左右下模板伸缩油缸分别与下模板和中模板铰接;组合内模板支起后,用若干撑杆支撑。本发明还提供了一种预应力砼箱梁液压内模系统。本发明,中模板采用了与顶模相同的直线移动脱模方式,使模板的剥离更加容易,模板运动所需要的空间更小,从而更容易通过箱梁端隔板预留孔,内模系统适应能力更强,且液压油缸布置更加合理。
The invention discloses a hydraulic internal mold vehicle for prestressed concrete box girders used in railways, highways and urban road bridges. It includes the combined inner formwork, several hydraulic cylinder groups, longitudinal moving trolleys and several groups of struts, the longitudinal moving trolleys are arranged in the inner cavity of the combined inner formwork, and the top formwork in the combined inner formwork respectively abuts against the end faces of the left and right middle formworks; The telescopic oil cylinder of the top formwork and the telescopic cylinders of the left and right middle formwork are respectively hinged with the longitudinal moving trolley and the inner surface of the top formwork and the middle formwork, and the telescopic cylinders of the left and right lower formwork are respectively hinged with the lower formwork and the middle formwork; rod support. The invention also provides a prestressed concrete box girder hydraulic internal mold system. In the present invention, the middle formwork adopts the same linear movement demoulding method as the top formwork, which makes the stripping of the formwork easier, and the space required for the movement of the formwork is smaller, so that it is easier to pass through the reserved holes of the box girder end partitions, and the internal formwork system The adaptability is stronger, and the layout of the hydraulic cylinder is more reasonable.
Description
Claims (11)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2008101326934A CN101302739B (en) | 2008-07-10 | 2008-07-10 | A prestressed concrete box girder hydraulic internal mold vehicle and hydraulic internal mold system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2008101326934A CN101302739B (en) | 2008-07-10 | 2008-07-10 | A prestressed concrete box girder hydraulic internal mold vehicle and hydraulic internal mold system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN101302739A true CN101302739A (en) | 2008-11-12 |
| CN101302739B CN101302739B (en) | 2010-06-02 |
Family
ID=40112808
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2008101326934A Expired - Fee Related CN101302739B (en) | 2008-07-10 | 2008-07-10 | A prestressed concrete box girder hydraulic internal mold vehicle and hydraulic internal mold system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN101302739B (en) |
Cited By (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101885206A (en) * | 2010-07-02 | 2010-11-17 | 中铁四局集团第四工程有限公司 | Hydraulic internal mold truss type walking track system of high speed railway prefabricating box girder |
| CN102189595A (en) * | 2011-04-14 | 2011-09-21 | 湖南中铁五新钢模有限责任公司 | Guide pillar type hydraulic internal mold for straight web plate box girder |
| CN102409621A (en) * | 2011-11-17 | 2012-04-11 | 中铁十五局集团有限公司 | Easy-to-detach steel mould of hollow beam of bridge |
| CN104746434A (en) * | 2015-03-31 | 2015-07-01 | 中铁第五勘察设计院集团有限公司 | Closure segment formwork system without dismantling outer formwork |
| CN105442838A (en) * | 2015-12-24 | 2016-03-30 | 湖南中铁五新钢模有限责任公司 | Stub matching prefabricated U-shaped segmental beam formwork and formwork retracting method thereof |
| CN107387122A (en) * | 2017-08-17 | 2017-11-24 | 中铁上海工程局集团有限公司 | A kind of formwork jumbo and its construction method for the construction of piping lane tunneling boring |
| EP3187657A4 (en) * | 2014-07-29 | 2018-05-09 | Rubrica Ingenieria Y Arquitectura, S.L. | Collapsible formwork for a bridge deck and method for advancing the formwork |
| CN110524687A (en) * | 2019-08-13 | 2019-12-03 | 中交第四航务工程局有限公司 | A kind of immersed tube tunnel inner formwork system and construction method |
| CN111136779A (en) * | 2020-01-13 | 2020-05-12 | 山东博远重工有限公司 | Internal mold structure convenient for demolding |
| CN111778853A (en) * | 2019-04-06 | 2020-10-16 | 广州振中建设有限公司 | An inner cavity formwork recycling construction method with a closed inner cavity concrete structure |
| CN112726425A (en) * | 2021-02-09 | 2021-04-30 | 中交三公局桥梁隧道工程有限公司 | Inner formwork frame for continuous beam suspension casting construction |
| CN113605208A (en) * | 2021-08-11 | 2021-11-05 | 长安大学 | Corrugated steel web PC box girder, internal support external pulling device and construction method of support before lining |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201244857Y (en) * | 2008-07-10 | 2009-05-27 | 中铁大桥局股份有限公司 | Prestress concrete box girder hydraulic internal mold vehicle and hydraulic internal mold system |
-
2008
- 2008-07-10 CN CN2008101326934A patent/CN101302739B/en not_active Expired - Fee Related
Cited By (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101885206A (en) * | 2010-07-02 | 2010-11-17 | 中铁四局集团第四工程有限公司 | Hydraulic internal mold truss type walking track system of high speed railway prefabricating box girder |
| CN102189595A (en) * | 2011-04-14 | 2011-09-21 | 湖南中铁五新钢模有限责任公司 | Guide pillar type hydraulic internal mold for straight web plate box girder |
| CN102409621A (en) * | 2011-11-17 | 2012-04-11 | 中铁十五局集团有限公司 | Easy-to-detach steel mould of hollow beam of bridge |
| CN102409621B (en) * | 2011-11-17 | 2013-11-20 | 中铁十五局集团有限公司 | Easy-to-detach steel mould of hollow beam of bridge |
| EP3187657A4 (en) * | 2014-07-29 | 2018-05-09 | Rubrica Ingenieria Y Arquitectura, S.L. | Collapsible formwork for a bridge deck and method for advancing the formwork |
| CN104746434A (en) * | 2015-03-31 | 2015-07-01 | 中铁第五勘察设计院集团有限公司 | Closure segment formwork system without dismantling outer formwork |
| CN105442838A (en) * | 2015-12-24 | 2016-03-30 | 湖南中铁五新钢模有限责任公司 | Stub matching prefabricated U-shaped segmental beam formwork and formwork retracting method thereof |
| CN107387122A (en) * | 2017-08-17 | 2017-11-24 | 中铁上海工程局集团有限公司 | A kind of formwork jumbo and its construction method for the construction of piping lane tunneling boring |
| CN111778853A (en) * | 2019-04-06 | 2020-10-16 | 广州振中建设有限公司 | An inner cavity formwork recycling construction method with a closed inner cavity concrete structure |
| CN111778853B (en) * | 2019-04-06 | 2022-04-12 | 振中建设集团有限公司 | An inner cavity formwork recycling construction method with a closed inner cavity concrete structure |
| CN110524687A (en) * | 2019-08-13 | 2019-12-03 | 中交第四航务工程局有限公司 | A kind of immersed tube tunnel inner formwork system and construction method |
| CN110524687B (en) * | 2019-08-13 | 2020-09-29 | 中交第四航务工程局有限公司 | An immersed tunnel internal formwork system and construction method |
| CN111136779A (en) * | 2020-01-13 | 2020-05-12 | 山东博远重工有限公司 | Internal mold structure convenient for demolding |
| CN112726425A (en) * | 2021-02-09 | 2021-04-30 | 中交三公局桥梁隧道工程有限公司 | Inner formwork frame for continuous beam suspension casting construction |
| CN113605208A (en) * | 2021-08-11 | 2021-11-05 | 长安大学 | Corrugated steel web PC box girder, internal support external pulling device and construction method of support before lining |
Also Published As
| Publication number | Publication date |
|---|---|
| CN101302739B (en) | 2010-06-02 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101302739B (en) | A prestressed concrete box girder hydraulic internal mold vehicle and hydraulic internal mold system | |
| CN207109856U (en) | Piping lane, culvert construction hydraulic steel formwork jumbo | |
| CN201244857Y (en) | Prestress concrete box girder hydraulic internal mold vehicle and hydraulic internal mold system | |
| CN105365042B (en) | A kind of preparation method of prefabricated small box girder | |
| CN104594918B (en) | Split integrated underground passage steel mold plate trolley and construction method thereof | |
| CN113235472B (en) | Concrete placement platform truck is contained to apron | |
| CN106089253A (en) | A fully hydraulic formwork system for culvert pouring | |
| CN109968499B (en) | Special die for pouring T-shaped beam and application method thereof | |
| CN105952482A (en) | Self-propelled tunnel invert lining trolley | |
| CN113417219B (en) | Hydraulic internal mold asynchronous traveling system and method for bridge suspension casting basket box chamber | |
| CN102660925B (en) | A mobile formwork for a variable width curved bridge | |
| CN202658533U (en) | Movable formwork of curved bridge with variable width | |
| CN107326930A (en) | On-site rapid prototyping machine for urban underground comprehensive pipe gallery and its working method | |
| CN111809660A (en) | Rectangular trolley for integrated pipe gallery and construction method | |
| CN114575892B (en) | Off-wall vault lining trolley and construction method thereof | |
| CN109605547B (en) | Rapid forming device and method for prefabricated pipe gallery | |
| CN109371851B (en) | Multi-bottom die head cover support frame trough making machine | |
| CN208122869U (en) | Template trolley for pipe gallery construction | |
| CN206035507U (en) | Rectangle box culvert and for tunnel construction platform truck | |
| CN111501570A (en) | Automatic adjusting and supporting die frame for small-span arch bridge | |
| CN213116322U (en) | A tunnel secondary lining full-section integrated construction trolley | |
| CN116378711B (en) | A separated trolley device and construction method for a shallow buried tunnel | |
| CN114657884B (en) | Construction method of descending movable formwork for bridge abutment assembly and sectional propulsion | |
| CN210317334U (en) | A formwork trolley for concrete pouring of thin-walled partition walls in tunnels | |
| CN105799054A (en) | Self-propelled hydraulic positioning and demolding type tunnel sinking pipe section prefabricating formwork |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C53 | Correction of patent of invention or patent application | ||
| CB03 | Change of inventor or designer information |
Inventor after: Ma Tao Inventor after: Qin Shunquan Inventor after: Guo Rongchun Inventor after: Zhu Bin Inventor before: Ma Tao Inventor before: Qin Shunquan Inventor before: Guo Chunrong Inventor before: Zhu Bin |
|
| COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: MA TAO QIN SHUNQUAN GUO CHUNRONG ZHU BIN TO: MA TAO QIN SHUNQUAN GUO RONGCHUN ZHU BIN |
|
| ASS | Succession or assignment of patent right |
Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD. Effective date: 20150216 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 430000 WUHAN, HUBEI PROVINCE TO: 430050 WUHAN, HUBEI PROVINCE |
|
| TR01 | Transfer of patent right |
Effective date of registration: 20150216 Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No. Patentee after: CHINA RAILWAY MAJOR BRIDGE ENGINEERING GROUP Co.,Ltd. Address before: 430000 Hubei province Wuhan Dongxin East Lake New Technology Development Zone Road SBI Venture Street No. 6 Building 12 layer Railway Bridge Bureau Limited by Share Ltd Patentee before: CHINA RAILWAY MAJOR BRIDGE ENGINEERING Co.,Ltd. |
|
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100602 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |