CN101294397A - 钢筋砼挡土墙主筋一次绑扎成型施工方法 - Google Patents

钢筋砼挡土墙主筋一次绑扎成型施工方法 Download PDF

Info

Publication number
CN101294397A
CN101294397A CNA2008101115435A CN200810111543A CN101294397A CN 101294397 A CN101294397 A CN 101294397A CN A2008101115435 A CNA2008101115435 A CN A2008101115435A CN 200810111543 A CN200810111543 A CN 200810111543A CN 101294397 A CN101294397 A CN 101294397A
Authority
CN
China
Prior art keywords
wall
foundation
construction method
cast
colligation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008101115435A
Other languages
English (en)
Inventor
童建民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Jingtang Construction Co Ltd
Original Assignee
MCC Jingtang Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Jingtang Construction Co Ltd filed Critical MCC Jingtang Construction Co Ltd
Priority to CNA2008101115435A priority Critical patent/CN101294397A/zh
Publication of CN101294397A publication Critical patent/CN101294397A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Retaining Walls (AREA)

Abstract

本发明涉及钢筋砼挡土墙及类似工程的施工方法,尤其是一种钢筋砼挡土墙主筋一次绑扎成型施工方法,其步骤是:在绑扎完成基础钢筋后,在外围搭一个简易固定架;将墙体主筋弯折90度角,其端头平直部分插进基础底网筋的分布钢筋底部并绑扎牢固,插进网筋底部的端头平直部分的长度视主筋进入基础的锚固长度而定;在基础砼与墙体交接处增加三道分布筋,其间矩为设计分布间矩的1/2;浇注墙体与基础砼:一次浇注完成;先浇注基础砼,待基础砼强度达到1.2MPa以上时再进行墙体浇注。与传统方法相比,本发明既保证了施工质量、缩短了工期,又降低了成本。具有技术先进、经济合理、安全适用、确保工程质量的特点。

Description

钢筋砼挡土墙主筋一次绑扎成型施工方法
技术领域:
本发明涉及钢筋砼挡土墙及类似工程的施工方法,尤其是一种钢筋砼挡土墙主筋一次绑扎成型施工方法。
背景技术:
目前,墙体主筋采用插筋方法施工,即第一次插筋施工,待基础强度达到1.2Mpa后,再按设计要求搭接墙体主筋及绑扎施工,即第二次绑扎搭接主筋,从而完成墙体钢筋的施工任务,这种设计给施工带来很多不便,在施工过程中很难满足设计要求,存在的问题有:
①墙体主筋的插筋,使锚固长度很难满足设计要求和规范标准;
②主筋插筋很难固定,插筋间矩不均匀,沿墙面长度方向插筋不在同一条直线上,其保护层不等,主筋受力不同步;
③由于墙体主筋与插筋采用搭接绑扎工艺,钢筋直径越大,则搭接长度越长,钢筋的使用量越大;
④整个挡土墙钢筋分三道工序完成,即基础钢筋绑扎、插筋、接筋绑扎。
⑤基础砼强度达到1.2Mpa以上方可进行,这不但增加了施工工序,而且工序又不能连续施工,延长了施工时间,如接筋过早时,砼未达到要求强度,对基础强度有一定影响。
发明内容:
本发明旨在提供一种钢筋砼挡土墙主筋一次绑扎成型施工方法,以解决二次绑筋工序多、施工时间长,即浪费人工又加大成本,还很难保证工程质量问题。
本发明解决上述问题采用的技术方案是:
一种钢筋砼挡土墙主筋一次绑扎成型施工方法,按以下步骤进行:
a、在绑扎完成基础钢筋后,在外围搭一个简易固定架;
b、将墙体主筋弯折90°角,其端头平直部分插进基础底网筋的分布钢筋底部并绑扎牢固,插进网筋底部的端头平直部分的长度视主筋进入基础的锚固长度而定;
c、在基础砼与墙体交接处增加三道分布筋,其间矩为设计分布间矩的1/2;
d、浇注墙体与基础砼:一次浇注完成;先浇注基础砼,待基础砼强度达到1.2Mpa以上时再进行墙体浇注。
与传统方法相比,本发明既保证了施工质量、缩短了工期,又降低了成本。具有技术先进、经济合理、安全适用、确保工程质量的特点,直接经济效益以下例子可说明:
①一个接头节约材料费:按主筋Ф14,搭接长度48d计算,一个接头重量0.826kg,按预算价节约1.65元。
②一个接头节约人工费:按100个接头计算,可节省插筋、下料、运料、接筋等用工日15个工日;一个接头按预算价节约0.45元;一个接头节约材料、人工费合计2.1元。
具体实施方式:
以下结合实施例详述本发明。
本实施例所述的钢筋砼挡土墙主筋一次绑扎成型施工方法,具体作法如下:
1、在绑扎完成基础钢筋后,在外围搭一个十分简易的固定架,主要起固定搭靠主筋使用;
2、将墙体主筋弯折90°角,其端头平直部分插进基础底网筋的分布钢筋底部并绑扎牢固,插进网筋底部的端头平直部分的长度视主筋进入基础的锚固长度而定;
3、在基础砼与墙体交接处增加三道分布筋,其间矩为设计分布间矩的1/2;
4、挡体与基础砼可一次浇注完,如分二次浇注,基础砼强度必须达到1.2Mpa以上方可进行墙体浇注。

Claims (1)

1、一种钢筋砼挡土墙主筋一次绑扎成型施工方法,按以下步骤进行:
a、在绑扎完成基础钢筋后,在外围搭一个简易固定架;
b、将墙体主筋弯折90°角,其端头平直部分插进基础底网筋的分布钢筋底部并绑扎牢固,插进网筋底部的端头平直部分的长度视主筋进入基础的锚固长度而定;
c、在基础砼与墙体交接处增加三道分布筋,其间矩为设计分布间矩的1/2;
d、浇注墙体与基础砼:一次浇注完成;先浇注基础砼,待基础砼强度达到1.2Mpa以上时再进行墙体浇注。
CNA2008101115435A 2008-06-06 2008-06-06 钢筋砼挡土墙主筋一次绑扎成型施工方法 Pending CN101294397A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008101115435A CN101294397A (zh) 2008-06-06 2008-06-06 钢筋砼挡土墙主筋一次绑扎成型施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008101115435A CN101294397A (zh) 2008-06-06 2008-06-06 钢筋砼挡土墙主筋一次绑扎成型施工方法

Publications (1)

Publication Number Publication Date
CN101294397A true CN101294397A (zh) 2008-10-29

Family

ID=40064908

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008101115435A Pending CN101294397A (zh) 2008-06-06 2008-06-06 钢筋砼挡土墙主筋一次绑扎成型施工方法

Country Status (1)

Country Link
CN (1) CN101294397A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102776895A (zh) * 2012-08-06 2012-11-14 中国建筑第六工程局有限公司 一种钢筋无需连接施工方法
CN104712146A (zh) * 2013-12-12 2015-06-17 中国核工业第五建设有限公司 墙体施工中钢筋绑扎的施工方法
CN108086244A (zh) * 2017-12-26 2018-05-29 刘文胜 河堤防浪基脚结构及施工方法
CN111424706A (zh) * 2020-03-31 2020-07-17 上海宝冶集团有限公司 地下室墙体免基础插筋的施工方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102776895A (zh) * 2012-08-06 2012-11-14 中国建筑第六工程局有限公司 一种钢筋无需连接施工方法
CN104712146A (zh) * 2013-12-12 2015-06-17 中国核工业第五建设有限公司 墙体施工中钢筋绑扎的施工方法
CN104712146B (zh) * 2013-12-12 2017-06-30 中国核工业第五建设有限公司 墙体施工中钢筋绑扎的施工方法
CN108086244A (zh) * 2017-12-26 2018-05-29 刘文胜 河堤防浪基脚结构及施工方法
CN111424706A (zh) * 2020-03-31 2020-07-17 上海宝冶集团有限公司 地下室墙体免基础插筋的施工方法

Similar Documents

Publication Publication Date Title
CN205917838U (zh) 一种阳台板安装节点
CN105064555A (zh) 叠合装饰层和保温层的结构墙板及施工方法
CN205712590U (zh) 一种装配式剪力墙与预制钢管混凝土柱的连接结构
CN108678218A (zh) 基于多用途薄壁钢管的装配式混凝土剪力墙及其建造方法
CN207919748U (zh) 一种装配式高延性混凝土梁柱节点
CN205024731U (zh) 一种用于地下室外墙后浇带的预制板构件
CN201738463U (zh) 主体结构与填充墙体之间的竖向连接结构
CN207003634U (zh) 一种阳台板安装节点
CN205875417U (zh) 后置梁钢筋用预埋直螺纹套筒连接施工结构
CN104295003A (zh) 一种构造柱施工方法
CN101294397A (zh) 钢筋砼挡土墙主筋一次绑扎成型施工方法
CN107313532A (zh) 装配式保温混凝土墙结构连接件及连接结构和方法
CN108316513A (zh) 一种快速施工装配式剪力墙结构及其施工方法
CN103866866A (zh) 超高层核心筒与外框架梁后浇节点
CN206128281U (zh) 一种阳台板安装节点
CN203247698U (zh) 能够水平连接的预制混凝土结构构件
CN206844138U (zh) 一种坡形独立基础的钢筋结构
CN207144237U (zh) 装配式保温混凝土墙结构连接件及连接结构
CN202882164U (zh) 使用钢筋两端约束灌浆锚固连接的构件
CN209568450U (zh) 一种用于基坑装配式内支撑构件与冠梁的连接结构
CN102912928A (zh) 使用钢筋两端约束灌浆锚固连接的构件及连接方法
CN106337443A (zh) 一种scc与普通混凝土结合无缝施工结构
CN202658766U (zh) 钢筋砼拉结带结构
CN204876210U (zh) 叠合装饰层和保温层的结构墙板
CN206570961U (zh) 一种外墙预制板复合后浇带结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20081029