CN101293599B - 船厂龙门起重机整机卸船至船坞的方法 - Google Patents

船厂龙门起重机整机卸船至船坞的方法 Download PDF

Info

Publication number
CN101293599B
CN101293599B CN 200710040076 CN200710040076A CN101293599B CN 101293599 B CN101293599 B CN 101293599B CN 200710040076 CN200710040076 CN 200710040076 CN 200710040076 A CN200710040076 A CN 200710040076A CN 101293599 B CN101293599 B CN 101293599B
Authority
CN
China
Prior art keywords
dock
barge
leg
crane
flexible leg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 200710040076
Other languages
English (en)
Other versions
CN101293599A (zh
Inventor
黄红雨
张明海
余华宝
严冬华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Zhenghua Heavy Industries Co Ltd
Original Assignee
Shanghai Zhenghua Heavy Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Zhenghua Heavy Industries Co Ltd filed Critical Shanghai Zhenghua Heavy Industries Co Ltd
Priority to CN 200710040076 priority Critical patent/CN101293599B/zh
Publication of CN101293599A publication Critical patent/CN101293599A/zh
Application granted granted Critical
Publication of CN101293599B publication Critical patent/CN101293599B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明涉及一种船厂龙门起重机整机卸船至船坞的方法,使用甲板驳和卷扬机,将船厂龙门起重机搁置到二个塔架上,将刚性腿侧塔架与主梁连接设计成固定形式,将柔性腿侧塔架与主梁相对小车轨道方向设为释放式的固定形式;将甲板驳用拖轮运至用户船坞的外港池,调整驳船位置,使其刚性腿和柔性腿法兰面与预先组装在用户码头的大车行走机构法兰面对位准确;待江海水平潮时,将驳船舱压水,先用引销导向,用铰制螺栓定位,接着安装刚性腿侧螺栓,同时调整柔性腿侧,利用引销导向使螺栓孔对位后安装螺栓;待江海水落潮时,驳船随潮水缓慢下降脱离龙门起重机结构,整个龙门起重机就卸船至船坞,既安全、可靠、快速、便捷,又省工、省时、省船坞场地。

Description

船厂龙门起重机整机卸船至船坞的方法
技术领域
本发明涉及龙门起重机,特别涉及一种船厂龙门起重机整机快速卸船至船坞的方法。
背景技术
当今船舶向大型化发展趋势迅猛,随之船坞也建造得越来越大,与之配套的船坞龙门起重机跨度和高度也在增加,这类大型龙门起重机由于构件尺寸和重量大,传统的做法是在工厂分段制造,运至船厂的船坞处,分段拼装成构件,然后使用独角龙门架或双龙门架,采用钢索提升法一件一件地在船坞现场总装。一台龙门起重机从构件拼装到吊装完成,采用现场塔架的总装方案至少要占用船坞三个月时间,由于现场总装将使用大量的人力、物力和船坞场地,时间过长,且安全性差,严重影响到船厂作业,制约了生产发展。
发明内容
本发明的任务是提供一种船厂龙门起重机整机卸船至船坞的方法,它解决了传统的现场总装占用场地大,耗费了人力、物力和时间,其安全性差,影响船厂作业的问题。
本发明的技术解决方案如下:
一种船厂龙门起重机整机卸船至船坞的方法,使用一艘甲板驳,在甲板驳上固定安装二个竖立的塔架,并且配置数个卷扬机,将船厂龙门起重机搁置到二个塔架上,首先将龙门起重机与预先和驳船焊接成一体的塔架固定连接,将刚性腿侧塔架与主梁连接设计成固定形式,将柔性腿侧塔架与主梁相对小车轨道方向设为释放式的固定形式;
将甲板驳用拖轮运至用户船坞的外港池,待江海水高潮时调整驳船位置,使其刚性腿和柔性腿法兰面与预先组装在用户码头的大车行走机构法兰面对位准确;待江海水平潮时,将驳船舱压水,在刚性腿和柔性腿与大车行走机构接触前,先用引销导向,待刚性腿侧螺栓孔对准后,用铰制螺栓定位,接着安装刚性腿侧螺栓,同时调整柔性腿侧,利用引销导向使螺栓孔对位后安装螺栓;
待江海水落潮时,驳船随潮水缓慢下降脱离龙门起重机结构,整个龙门起重机就快速便捷地卸船至船坞。
采用本发明的船厂龙门起重机整机卸船至船坞的方法,整个龙门起重机上岸时间仅为2小时,将占用船坞时间从过去使用常规的现场塔架总装方案的三个月时间缩短至两个小时,由此说明本发明的浮式驳船总装方案既安全、可靠、快速、便捷,又省工、省时、省船坞场地,实现了船厂大型龙门起重机整机交货的飞跃发展。
采用本发明的卸船技术,利用潮水落差实现龙门起重机整机上岸,总装落位时对位快、准、稳,在原来大车行走机构和龙门起重机主结构连接位置增加了法兰螺栓连接形式,有效地实现了最终的快速而准确的落位。
附图说明
附图是按本发明的一种船厂龙门起重机整机卸船至船坞的方法的实施示意图。
具体实施方式
参看附图,按照本发明的一种船厂龙门起重机整机卸船至船坞的方法,使用一艘甲板驳1,在甲板驳1上固定安装二个竖立的塔架2,并且配置数个卷扬机,将船厂龙门起重机主梁3搁置到二个塔架2上。
首先将龙门起重机与预先和驳船焊接成一体的塔架2固定连接,考虑到在运输过程中驳船本身的变形对塔架上部与主梁的连接处会引起集中力变形,所以将刚性腿4侧塔架与主梁3连接设计成固定形式,将柔性腿5侧塔架与主梁3相对小车轨道方向设为释放式的固定形式。
将甲板驳1用拖轮运至用户船坞的外港池,待江海水高潮时调整驳船位置,使其刚性腿4和柔性腿5法兰面与预先组装在用户码头的大车行走机构法兰面对位准确。
待江海水平潮时,将驳船舱压水,在刚性腿4和柔性腿5与大车行走机构接触前,先用引销导向,待刚性腿4侧螺栓孔对准后,用铰制螺栓定位,接着安装刚性腿侧螺栓,同时调整柔性腿5侧,利用引销导向使螺栓孔对位后安装螺栓。
本发明准确地设计了驳船的调载水要求,利用短暂的一个小时左右的高平潮时间,完成驳船进入龙门起重机安装位置、刚性腿对位、柔性腿调整、全部螺栓连接的卸船程序。同时使驳船在最低潮时安全地离开卸船位置。
待江海水落潮时,驳船随潮水缓慢下降脱离龙门起重机结构,整个龙门起重机就快速便捷地卸船至船坞。
为了有效地调整柔性腿与地面大车行走机构螺栓对位,除了在驳船上布置调整驳船移位用绞车外,另外在地面布置二个5吨重绞车及手拉葫芦与柔性腿下部结构连接,使柔性腿最后对位时左右前后方向都能进行调整,保证最终的准确对位。
下面提供本发明的一个船厂龙门起重机整机卸船至船坞方法的实施例,其具体数据如下:
龙门起重机总重近4600吨,跨距185米,起升高度76米,梁高10米。
驳船总长151.7米,宽40.6米,设计吃水约4米,型深6.5米,载重约17000吨。
以上数据仅为其中一个实施例,不论龙门起重机再大或更重,采用本发明的船厂龙门起重机整机卸船至船坞的方法也能实现。
当然,本技术领域内的一般技术人员应当认识到,上述实施例仅是用来说明本发明,而并非用作对本发明的限定,只要在本发明的实质精神范围内,对上述实施例的变换、变型都将落在本发明权利要求的范围内。

Claims (1)

1.一种船厂龙门起重机整机卸船至船坞的方法,使用一艘驳船,在驳船上固定安装二个竖立的塔架,并且配置数个卷扬机,将船厂龙门起重机搁置到二个塔架上,其特征在于,首先将龙门起重机与预先和驳船焊接成一体的塔架固定连接,将刚性腿侧塔架与主梁连接设计成固定形式,将柔性腿侧塔架与主梁相对小车轨道方向设为释放式的固定形式;
将驳船用拖轮运至用户船坞的外港池,待江海水高潮时调整驳船位置,使龙门起重机刚性腿和柔性腿法兰面与预先组装在用户码头的大车行走机构法兰面对位准确;
待江海水平潮时,将驳船舱压水,在刚性腿和柔性腿与大车行走机构接触前,先用引销导向,待刚性腿侧螺栓孔对准后,用铰制螺栓定位,接着安装刚性腿侧螺栓,同时调整柔性腿侧,利用引销导向使螺栓孔对位后安装螺栓;
待江海水落潮时,驳船随潮水缓慢下降脱离龙门起重机结构,整个龙门起重机就快速便捷地卸船至船坞。
CN 200710040076 2007-04-27 2007-04-27 船厂龙门起重机整机卸船至船坞的方法 Active CN101293599B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200710040076 CN101293599B (zh) 2007-04-27 2007-04-27 船厂龙门起重机整机卸船至船坞的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200710040076 CN101293599B (zh) 2007-04-27 2007-04-27 船厂龙门起重机整机卸船至船坞的方法

Publications (2)

Publication Number Publication Date
CN101293599A CN101293599A (zh) 2008-10-29
CN101293599B true CN101293599B (zh) 2011-04-20

Family

ID=40064206

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200710040076 Active CN101293599B (zh) 2007-04-27 2007-04-27 船厂龙门起重机整机卸船至船坞的方法

Country Status (1)

Country Link
CN (1) CN101293599B (zh)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101648656B (zh) * 2009-07-20 2011-08-31 南通振华重型装备制造有限公司 卸船机整机半吊半过驳上岸的方法
CN102328731B (zh) * 2011-05-31 2013-11-13 江苏熔盛造船有限公司 一种管子装卸起重机的超长导轨安装方法
CN103171976B (zh) * 2011-12-20 2015-04-01 上海振华重工(集团)股份有限公司 船厂龙门式起重机的吊装方法
CN102514953A (zh) * 2011-12-28 2012-06-27 江苏中泰桥梁钢构股份有限公司 桥梁整跨梁段滚装上船的方法
CN103171972B (zh) * 2013-03-01 2015-06-17 上海振华重工集团(南通)有限公司 塔架组装吊装工艺
CN103171911B (zh) * 2013-03-01 2014-12-10 上海振华重工集团(南通)有限公司 装船机安装工艺
JP2015124053A (ja) * 2013-12-26 2015-07-06 住友重機械搬送システム株式会社 ゴライアスクレーンの製造方法及び解体方法
CN105480387B (zh) * 2016-01-22 2018-06-12 上海振华重工(集团)股份有限公司 造船龙门起重机整体船运方法
CN115140255B (zh) * 2022-07-01 2023-12-01 浙江合兴船业有限公司 港湾物资转运的高效运输的驳船

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2253379A5 (zh) * 1973-11-29 1975-06-27 Doris Dev Richesse Sous Marine
US4067468A (en) * 1974-10-11 1978-01-10 Garsten Carl J Method of distributing cargo
CN1118327A (zh) * 1994-08-02 1996-03-13 Pwh设备和系统有限公司 用于卸船的方法和设备
CN1463908A (zh) * 2002-06-25 2003-12-31 上海港口机械制造厂 一种造船用门式起重机的总装方法及其装置
CN1833988A (zh) * 2005-03-18 2006-09-20 同济大学 门式起重机的安装方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2253379A5 (zh) * 1973-11-29 1975-06-27 Doris Dev Richesse Sous Marine
US4067468A (en) * 1974-10-11 1978-01-10 Garsten Carl J Method of distributing cargo
CN1118327A (zh) * 1994-08-02 1996-03-13 Pwh设备和系统有限公司 用于卸船的方法和设备
CN1463908A (zh) * 2002-06-25 2003-12-31 上海港口机械制造厂 一种造船用门式起重机的总装方法及其装置
CN1833988A (zh) * 2005-03-18 2006-09-20 同济大学 门式起重机的安装方法

Also Published As

Publication number Publication date
CN101293599A (zh) 2008-10-29

Similar Documents

Publication Publication Date Title
CN101293599B (zh) 船厂龙门起重机整机卸船至船坞的方法
CN107683371B (zh) 构造、组装浮动式风力涡轮机平台以及使其下水的方法
KR101491740B1 (ko) 베이스 및 수력 터빈 설치 방법
CN101429928B (zh) 风力发电机组海上整体吊装的方法
CN100581976C (zh) 龙门起重机在驳船总装技术
CN102079477A (zh) 一种风机抱举装置及移动式水上作业平台
EP3209548B1 (en) Method for transporting a buoyant structure with a vessel, and the vessel associated with the method
CN102079476A (zh) 一种风机抱举装置及移动式水上作业平台
CN102107720B (zh) 海上风机整体式设置系统
CN112523969B (zh) 一种桁架拉索型漂浮式海上风电机组结构
CN101949146A (zh) 一种海上辅助施工平台装置及其使用方法
CN101428712B (zh) 风力发电机组整体牵引装船的方法
CN103693170A (zh) 一种漂浮式海上风电组装平台及用该平台组装海上风机的方法
CN115788782A (zh) 一种漂浮式风机海上安装工艺
JP5820953B1 (ja) 風力発電装置の組み付け方法、風力発電装置の分解方法、風力発電装置の設置方法、及び風力発電装置の作業用船舶
CN110712721A (zh) 一种海上风场风机安装作业工程船及其作业方法
CN212149193U (zh) 一种船舶可倒式雷达桅
EP0945338A1 (en) SPAR construction method
CN102206938A (zh) 一种新的海上平台上部组块安装方法
CN201762699U (zh) 一种海上辅助施工平台装置
CN103395478A (zh) 一种海上风机整机运输及安装成套专用设备
US11867148B2 (en) Delivery of a high volume of floating systems for wind turbines
CN101468759B (zh) 多台风力发电机串联牵引装船的方法
Dymarski et al. Technology concept of TLP platform towing and installation in waters with depth of 60 m
CN212202356U (zh) 新型海上风电整体运输安装装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant