CN101272040B - A Method of Lightning Protection Configuration for Transmission Lines Using Lightning Damage Distribution of Power Grid - Google Patents

A Method of Lightning Protection Configuration for Transmission Lines Using Lightning Damage Distribution of Power Grid Download PDF

Info

Publication number
CN101272040B
CN101272040B CN2008100474750A CN200810047475A CN101272040B CN 101272040 B CN101272040 B CN 101272040B CN 2008100474750 A CN2008100474750 A CN 2008100474750A CN 200810047475 A CN200810047475 A CN 200810047475A CN 101272040 B CN101272040 B CN 101272040B
Authority
CN
China
Prior art keywords
lightning
damage
thunder
crops caused
shielding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2008100474750A
Other languages
Chinese (zh)
Other versions
CN101272040A (en
Inventor
王剑
陈家宏
张爱军
刘亚新
张勤
罗毅
童雪芳
谷山强
李晓岚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Electric Power Research Institute Co Ltd
Wuhan Nari Co Ltd of State Grid Electric Power Research Institute
Original Assignee
GUOWANG WUHAN HIGH VOLTAGE INST
North China Electric Power Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUOWANG WUHAN HIGH VOLTAGE INST, North China Electric Power Research Institute Co Ltd filed Critical GUOWANG WUHAN HIGH VOLTAGE INST
Priority to CN2008100474750A priority Critical patent/CN101272040B/en
Publication of CN101272040A publication Critical patent/CN101272040A/en
Application granted granted Critical
Publication of CN101272040B publication Critical patent/CN101272040B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Landscapes

  • Elimination Of Static Electricity (AREA)

Abstract

The invention relates to a method using lightning disturbance distribution to carry out lightening protection configuration of the transmission line, which adopts a computer to processing to the lightening automatic monitoring data, establishes a database and uses a geographical information system and the database as an analysis platform; the method also adopts a grid method to compute lightening parameters and sets an amplitude range for dangerous lightning currents of the lightening disturbance of the objects according to the lightning stroke against ability and the characteristics of ground objects, and acquires the correspondent lightning disturbance distribution according to the amplitude range for dangerous lightning currents and the lightening data computed by the computer; by adopting the reliable index in operation confirmed by the transmission line and the statistic data of the lightning stroke flashover types, the method sets critical density value in the lightning disturbance distribution which can cause lightning strike flashover: the method computes the scale and distribution of the lightning disturbance based on the critical density value and confirms the lightning-proof configuration of the transmission line based on the scale and distribution of the lightning disturbance. The invention can be adopted to judge the correspondent area and probability of 'shielding failure flashover' and 'back flashover' of the transmission line and can effectively configure the correspondent lightning-proof measures of the transmission line based on the characteristics of the two lightning disturbances, thus improving the performance-price ratio.

Description

利用电网雷害分布进行输电线路防雷配置的方法 A Method of Lightning Protection Configuration for Transmission Lines Using Lightning Damage Distribution of Power Grid

技术领域technical field

本发明涉及输电线路的防雷技术,具体地说是利用雷害分布进行输电线路防雷配置的方法。The invention relates to lightning protection technology for transmission lines, in particular to a method for lightning protection configuration of transmission lines by utilizing lightning damage distribution.

背景技术Background technique

防雷配置是为使架空线路能有效地应对雷击侵害而采取的必要防护措施和技术手段。现有的输电线路的防雷配置主要是遵照现行电力行业规程《交流电气装置的过电压保护和绝缘配合》(DL/T620-1997)推荐的方法,即依照气象部门长期人工记录的雷电日定义的雷电活动强弱分区,结合输电线路的绝缘结构,确定其防雷配置,就具体措施而言,防反击闪络是采用降低杆塔接地电阻或增强线路绝缘,防绕击闪络则采用减小避雷线保护角。工程试验结果证明,该方法存在明显的不足之处是:“雷电日”本身不能完全表征雷电活动特征,即一个雷电日无法完全表示具体雷电出现的频次,因而其指导作用很有限;近年来逐渐采用表征雷电分布的地闪密度(fl/km2/a)来替代雷电日,申请人在研究中发现,因电网本身的结构特征以及所代表的绝缘特性,并非全部雷电都可能引起高压架空输电线路的闪络,而只是部分被称为危险的雷电才能造成高压架空输电线路的闪络;这部分对电网有危害的雷电的实际分布并不等同于地闪密度分布;上述两种方法都不能正确地表示出输电线路可能出现的“反击”和“绕击”两类雷害事故,即不能判断出因避雷线屏蔽失效时发生的“绕击闪络”和雷击避雷线或塔顶引起的“反击闪络”所对应的区域和发生雷害的概率,并且无法对应两种雷害特征配置相应的输电线路所需的防雷措施,以致造成防雷措施的性价比一直很低的现状。Lightning protection configuration is the necessary protective measures and technical means to make overhead lines effectively deal with lightning strikes. The lightning protection configuration of existing transmission lines is mainly in accordance with the method recommended by the current power industry regulations "Overvoltage Protection and Insulation Coordination of AC Electrical Installations" (DL/T620-1997), that is, according to the definition of lightning days manually recorded by the Meteorological Department for a long time According to the intensity of lightning activity, the lightning protection configuration is determined in combination with the insulation structure of the transmission line. In terms of specific measures, the anti-backlash flashover is to reduce the grounding resistance of the tower or strengthen the line insulation, and the anti-shield flashover is to reduce the Lightning wire protection corner. The results of engineering tests prove that this method has obvious shortcomings: "thunder day" itself cannot fully characterize the characteristics of lightning activities, that is, a thunder day cannot fully represent the frequency of specific lightning occurrences, so its guiding role is very limited; in recent years, it has gradually The ground flash density (fl/km 2 /a) representing the lightning distribution is used to replace the lightning day. The applicant found in the research that due to the structural characteristics of the power grid itself and the insulation characteristics represented, not all lightning may cause high-voltage overhead transmission. The flashover of the high-voltage overhead transmission line can only be caused by part of the lightning that is called dangerous; the actual distribution of this part of the lightning that is harmful to the power grid is not equal to the distribution of the lightning density on the ground; neither of the above two methods can Correctly express the two types of lightning accidents that may occur on the transmission line, "counterattack" and "shielding", that is, it cannot be judged that the "shielding flashover" that occurs when the shielding of the lightning conductor fails and the lightning strike caused by the lightning conductor or the top of the tower The area corresponding to the "counter-flashover" and the probability of lightning damage, and the lightning protection measures required for the corresponding transmission lines cannot be configured corresponding to the two characteristics of lightning damage, resulting in the current situation that the cost performance of lightning protection measures has always been very low.

发明内容Contents of the invention

本发明的目的是,针对现有技术的不足,进行改进,提出利用电网雷害分布进行输电线路防雷配置的方法。The object of the present invention is to improve the deficiencies of the prior art, and propose a method for lightning protection configuration of transmission lines by using the lightning damage distribution of the power grid.

本发明的技术解决方案是,采用计算机对雷电自动监测数据进行处理,建立数据库,以地理信息系统(简称GIS)和数据库为分析平台,采用网格法统计雷电参数,并针对地面物体的抵御雷击能力及其特征,设定物体雷害的危险雷电流幅值范围,并依据该危险雷电流幅值范围采用计算机统计的雷电资料,获得相应电网雷害分布,其特征在于,采用输电线路确定的运行可靠性指标以及雷击闪络类型的统计数据,设定能引发雷击闪络的雷害分布中的临界密度值,以该临界密度值为判据,统计雷害的分级与分布,再依据雷害分级与分布,确定输电线路防雷配置,采用的基本步据骤如下:The technical solution of the present invention is to use a computer to process the lightning automatic monitoring data, establish a database, use the geographic information system (GIS for short) and the database as the analysis platform, use the grid method to count the lightning parameters, and aim at the ground objects to resist lightning strikes Ability and its characteristics, set the range of the dangerous lightning current amplitude of the object lightning damage, and use the lightning data of the computer statistics according to the range of the dangerous lightning current amplitude to obtain the corresponding lightning damage distribution of the power grid, which is characterized in that the transmission line is used to determine Statistical data of operational reliability indicators and lightning flashover types, set the critical density value in the distribution of lightning damage that can cause lightning flashover, and use the critical density value as a criterion to calculate the classification and distribution of lightning damage The basic steps to determine the lightning protection configuration of the transmission line are as follows:

(1)首先,将雷电自动监测数据按时间、位置、雷电流幅值与极性、主放电与次序放电的专题属性数据通过计算机分类存入数据库;采用有地理信息系统处理功能的计算机程序在数字地图上确定雷电自动监测数据的对应区域,对数字地图上的选定区域进行等面积网格划分;由计算机对每个网格的数据资料进行统计;并且使雷电监测数据被赋于雷电专题属性和地理属性,自动划分的每个网格具有与雷电监测数据相同坐标系地理属性;采用网格法统计出的雷电参数关联网格所在地域,设定每个网格为一个雷电统计单元;将数据库中的专题数据按地理属性调入对应网络作为统计样本,统计每个网格出现雷电次数;(1) First, the lightning automatic monitoring data is stored in the database according to time, location, lightning current amplitude and polarity, main discharge and sequence discharge, and the computer program is used to process the data in the database. Determine the corresponding area of the lightning automatic monitoring data on the digital map, and divide the selected area on the digital map into equal-area grids; the computer counts the data of each grid; and assigns the lightning monitoring data to the lightning topic Attributes and geographic attributes, each grid automatically divided has the same coordinate system geographic attributes as the lightning monitoring data; the lightning parameters calculated by the grid method are associated with the area where the grid is located, and each grid is set as a lightning statistical unit; Transfer the thematic data in the database to the corresponding network according to the geographical attributes as a statistical sample, and count the number of lightning occurrences in each grid;

(2)根据电网绝缘结构,将能引起输电线路的绝缘子串发生闪络的危险雷电流幅值范围值作为判据,统计每个网格中雷电的电流幅值属性,剔除判据之外的数据,再将各网格的年雷电次数除以网格面积,获得电网雷害分布;电网绝缘结构包括电网电压等级、输电线路构架、地形因素;(2) According to the insulation structure of the power grid, the range value of the dangerous lightning current amplitude that can cause flashover of the insulator string of the transmission line is used as the criterion, and the current amplitude attribute of the lightning in each grid is counted, and the ones other than the criterion are excluded Data, and then divide the annual lightning times of each grid by the grid area to obtain the lightning damage distribution of the grid; the grid insulation structure includes the grid voltage level, transmission line structure, and terrain factors;

(3)将已发生的输电线路雷击闪络事件的记录按发生时间、位置坐标、闪络类型、电压等级的专题属性进行分类,其数据存储进计算机中的雷击故障数据库,将雷击闪络事件依次按照其专题属性调入其对应的电网雷害分布的网格,以该网格为中心,对相连的网格进行标记,获得电网历史雷害区域,按故障点性质分成电网反击历史雷害区域、电网绕击历史雷害区域;(3) Classify the records of lightning flashover events of transmission lines that have occurred according to the special attributes of time of occurrence, location coordinates, flashover type, and voltage level, store the data in the lightning fault database in the computer, and record lightning flashover events According to its thematic attributes, it is transferred to the grid corresponding to the lightning damage distribution of the power grid in turn, and the connected grid is marked with the grid as the center to obtain the historical lightning damage area of the power grid. Regions and power grids shield historical lightning-damaged areas;

(4)将各电压等级的电网反击雷害分布和电网反击历史雷害区域,电网绕击雷害分布和电网绕击历史雷害区域用计算机计算出相应地理分布图层,再运用地理信息系统分别获得电网综合反击雷害分布图、电网综合绕击雷害分布图;(4) Use computer to calculate the corresponding geographical distribution layer for the distribution of power grid counterattack lightning damage and the historical lightning damage area of power grid counterattack for each voltage level, the distribution of power grid shielding lightning damage and the historical lightning damage area of power grid shielding strike, and then use the geographic information system Obtain the distribution map of power grid comprehensive counter-attack lightning damage and the distribution map of power grid comprehensive shielding lightning damage;

(5)根据输电线路防雷可靠性控制指标即跳闸次数/(百公里·40个雷电日),和雷击闪络类型统计数据,设定能引发绕击闪络和反击闪络的雷害分布中的临界密度值,以该临界密度值为判据,统计雷害分布网格地闪密度值,分别标定超标值与未超标值;(5) According to the lightning protection reliability control index of the transmission line, that is, the number of trips/(100 kilometers · 40 lightning days), and the statistical data of lightning flashover types, set the distribution of lightning damage that can cause shielding flashover and counter flashover In the critical density value, the critical density value is used as a criterion to calculate the lightning damage distribution grid ground flash density value, and respectively calibrate the exceeding value and the non-exceeding value;

(6)统计雷害分布网格,按照反击和绕击的超标值和未超标值不同组合设定四个级别的雷害区,其中,具有反击未超标值及绕击未超标值的数据区域设定为1级雷害区,具有反击超标值及绕击未超标值的数据区域设定为2级雷害区,具有反击未超标值及绕击超标值的数据区域设定为3级雷害区,具有反击超标值及绕击超标值的数据区域设定为4级雷害区;(6) Statistical lightning damage distribution grid, set four levels of lightning damage areas according to different combinations of counterattack and shielding exceeding the standard value and not exceeding the standard value, among them, there are data areas with counterattack not exceeding the standard value and shielding attack not exceeding the standard value It is set as level 1 lightning damage area, the data area with counterattack exceeding standard value and shielding attack not exceeding standard value is set as level 2 lightning damage area, and the data area with counter attack not exceeding standard value and shielding attack exceeding standard value is set as level 3 lightning damage area. Harmful area, the data area with counterattack exceeding the standard value and shielding attack exceeding the standard value is set as a level 4 mine damage area;

(7)用上述设定的四个级别的雷害区进行输电线路的防雷配置:其中,(7) Carry out the lightning protection configuration of the transmission line with the lightning damage zone of four levels of above-mentioned setting: Wherein,

a.对于1级雷害区,按DL/T620-1997进行常规防雷配置;a. For Class 1 mine damage area, carry out conventional lightning protection configuration according to DL/T620-1997;

b.对于2级雷害区,增强输电线路防反击闪络的配置,输电线路杆塔接地电阻值要求,110kV-500kV线路杆塔在山区的接地电阻不高于:15Ω,在平原地区的接地电阻不高于7Ω;或者增强输电线路的绝缘强度,要求复合绝缘子:在满足风偏和导线对地距离要求的前提下,500kV线路使用复合绝缘子的干弧距离不小于30片悬式瓷绝缘子或玻璃绝缘子的结构长度;220kV线路使用复合绝缘子的干弧距离不宜小于14片悬式瓷绝缘子或玻璃绝缘子的结构长度;110kV线路使用复合绝缘子的干弧距离不小于7片悬式瓷或玻璃绝缘子的结构长度;要求瓷、玻璃绝缘子选用片数:500kV选30至32片;220kV选15片;110kV选9片;b. For Level 2 lightning hazard areas, strengthen the configuration of anti-reflection flashover of transmission lines, the grounding resistance value of transmission line towers, the grounding resistance of 110kV-500kV line towers in mountainous areas should not be higher than: 15Ω, and the grounding resistance in plain areas should not be higher. Higher than 7Ω; or to enhance the insulation strength of transmission lines, composite insulators are required: under the premise of meeting the requirements of wind deflection and wire-to-ground distance, the dry arc distance of composite insulators used for 500kV lines is not less than 30 pieces of suspension porcelain insulators or glass insulators The structural length of composite insulators used for 220kV lines should not be less than the structural length of 14 suspended porcelain insulators or glass insulators; the dry arc distance of composite insulators used for 110kV lines should not be less than the structural length of 7 suspended porcelain or glass insulators ;Required number of pieces for porcelain and glass insulators: 30 to 32 pieces for 500kV; 15 pieces for 220kV; 9 pieces for 110kV;

c.对于3级雷害区,增强输电线路防绕击闪络的配置,减小避雷线保护角,新建110kV~500kV线路应全线架设双根架空地线,500kV和220kV应采用负角保护,110kV线路保护角应采用10°以下;c. For Level 3 lightning hazard areas, strengthen the configuration of transmission line anti-shielding flashover and reduce the protection angle of lightning protection lines. Newly built 110kV ~ 500kV lines should erect double overhead ground wires on the whole line, and 500kV and 220kV should adopt negative angle protection. 110kV line protection angle should be less than 10°;

d.对于4级雷害区,要同时增强输电线路防反击闪络和饶击闪络配置,联合采用2、3级雷害区的防雷配置。d. For Level 4 lightning hazard areas, it is necessary to simultaneously strengthen the anti-counterattack flashover and Rao strike flashover configurations of transmission lines, and jointly adopt the lightning protection configurations for Level 2 and 3 lightning hazard areas.

本发明的优点是,采用本发明能判断出因输电线路“绕击闪络”和“反击闪络”对应的区域和概率,并对应两种雷害特征,能做到有效地配置相应的输电线路防雷措施,提高性价比。本发明的实现方法简单、明了,具有很好的操作性和实用性。The advantage of the present invention is that the area and probability corresponding to the "shielding flashover" and "counter-attack flashover" of the transmission line can be judged by using the present invention, and corresponding to the two lightning damage characteristics, the corresponding power transmission can be effectively configured. Line lightning protection measures to improve cost performance. The realization method of the present invention is simple and clear, and has good operability and practicability.

附图说明Description of drawings

图1、本发明的原理框图。Fig. 1, functional block diagram of the present invention.

具体实施方式Detailed ways

下面,结合附图对本发明作进一步详细说明。Below, the present invention will be described in further detail in conjunction with the accompanying drawings.

如图1所示,本发明以雷电定位系统自动监测数据为统计样本,使用计算机处理程序,将自动监测数据输入到具有地理信息系统(简称GIS)处理功能的计算机中,建立数据库,以地理信息系统和数据库为分析平台,采用网格法统计雷电参数。针对地面物体的抵御雷击能力及其特征,设定物体雷害的危险雷电流幅值范围,再依据此范围,采用计算机统计处理的雷电资料,获得相应电网雷害分布,采用输电线路确定的运行可靠性指标以及雷击闪络类型的统计数据,设定能引发雷击闪络的雷害分布中的临界密度值,以该临界密度值为判据,统计雷害的分级与分布,再依据雷害分级与分布,确定输电线路防雷配置。As shown in Figure 1, the present invention uses the automatic monitoring data of the lightning location system as a statistical sample, uses a computer processing program to input the automatic monitoring data into a computer with a geographic information system (abbreviated as GIS) processing function, sets up a database, and uses geographic information The system and database are analysis platforms, and the grid method is used to count lightning parameters. According to the ability and characteristics of ground objects to resist lightning strikes, set the range of dangerous lightning current amplitudes of object lightning hazards, and then according to this range, use the lightning data processed by computer statistics to obtain the corresponding distribution of lightning hazards in the power grid, and use the operation determined by transmission lines Statistical data of reliability index and lightning flashover type, set the critical density value in the distribution of lightning damage that can cause lightning Classification and distribution to determine the lightning protection configuration of transmission lines.

结合各电压等级电网绕击特征电流、反击特征电流,建立危险电流数据分析系统,采用网格法确定所需的数据和分析结果,对分析结果采用雷击事故记录进行比较、校验和修正。获得相应物体的雷害分布。依据雷害分布和相应的可靠性指标确定对应雷害分布的临界密度值,依据该密度值将电网雷害区域分成四级,对这四级雷害区进行针对性雷电防护措施配置。其采用如下步骤:(1)将雷电自动监测数据按时间、位置、雷电流幅值与极性专题属性数据通过计算机存入数据库。采用有GIS处理功能的计算机,使用专用软件,设定程序对目标对象——数字地图上的选定区域进行等面积网格划分,设定每个网格为一个雷电统计单元,将雷电数据库的数据与地理上的对应网格进行位置比较,将雷电数据库中的专题数据按地理属性调入对应网格作为统计样本,统计每个网格中的地闪数。(2)依据电网绝缘裕度设定绕击危险电流范围值、反击危险电流范围值。按照该范围进行幅值比较,将各网格中雷电流幅值在绕击、反击危险电流范围值外的数据剔除,由余下的地闪次数除以相应网格面积分别得到电网绕击雷害分布和电网反击雷害分布。(3)同时,将电网历史雷击闪络事故记录按发生时间、雷击点经纬度坐标、闪络类型、电压等级的专题属性数据存储进计算机,建立电网雷击故障数据库。将雷击故障数据库的数据与地理上的对应网格进行位置比较,依据地理信息的经纬度坐标将绕击故障点、反击故障点分别调入对应的地理网格中,以该网格为中心,对相邻网格进行标记,获得电网绕击历史雷害区域、电网反击历史雷害区域;(4)联合绕击电网雷害分布和绕击电网历史雷害区域得到综合电网绕击雷害分布,联合反击电网雷害分布和电网反击历史雷害区域,获得综合电网反击雷害分布图。(5)依据现有的防雷可靠性控制指标(即雷击跳闸率,单位次/(百公里·40个雷电日))进行防雷计算,获得对应于各电压等级可靠性指标的电网雷害分布图上的网格的密度值,此网格的危险雷电的密度值即为临界密度值,以该临界密度值为判据,比较网格的密度值,在电网雷害图上,网格的密度值超过此临界密度值的网格区域标定为超标区,网格的密度值不超过此临界密度值的网格区域标定为不超标区。根据雷害性质,临界密度值分为临界绕击危险雷电密度值和临界反击危险雷电密度值,设定相定的临界绕击危险雷电密度值和临界反击危险雷电密度值作为判据,根据判据将相应的雷害区域分为绕击超标区和绕击不超标区,反击超标区和反击不超标区。(6)综合这四个区域,将电网雷害分布图上的区域进行分级,共分成四级雷害区:反击不超标区和绕击不超标区的交集称为1级雷害区,反击超标区和绕击不超标区的交集称为2级雷害区,反击不超标区和绕击超标区的交集称为3级雷害区,反击超标区和绕击超标区的交集称为4级雷害区。(7)依据四级雷害区的雷害性质,进行针对性的防雷配置,1级雷害区对应的网格危险雷电密度值既没有超过对应的反击临界密度值(判据),也没有超过对应的绕击临界密度值(判据),雷害发生严重程度相对较低,依据中国电力行业标准《交流电气装置的过电压保护和绝缘配合》(DL/T 620-1997)进行常规的防雷配置;2级雷害区对应的网格危险雷电密度虽然没有超过对应的绕击临界密度值(判据),却超过了对应的反击临界密度值(判据),除了按中国电力行业规程DL/T 620-1997进行常规的防雷配置外,还需加装专门的针对反击的防雷措施,如降低接地电阻,加强绝缘等;3级雷害区对应的网格危险雷电密度没有超过对应的反击临界密度值,但却超过了对应的绕击临界密度值,除了按中国电力行业规程DL/T 620-1997进行常规的防雷配置外,还需加装专门针对绕击的防雷措施,如减小保护角等;4级雷害区对应的网格危险雷电密度值既超过了对应的反击临界密度值,也超过了对应的绕击临界密度值,为雷害相对严重的区域,除了按中国电力行业规程DL/T 620-1997进行常规的防雷配置外,还需加装其他防绕击、反击的防雷措施,并综合运用2、3级雷区的防雷措施。Combining the shielding characteristic current and counterattack characteristic current of power grids of various voltage levels, a dangerous current data analysis system is established, and the required data and analysis results are determined by grid method, and the analysis results are compared, verified and corrected by lightning accident records. The lightning damage distribution of the corresponding object is obtained. According to the distribution of lightning damage and the corresponding reliability index, the critical density value corresponding to the distribution of lightning damage is determined. According to the density value, the lightning damage area of the power grid is divided into four levels, and targeted lightning protection measures are configured for these four levels of lightning damage areas. It adopts the following steps: (1) The lightning automatic monitoring data is stored in the database through the computer according to the time, position, lightning current amplitude and polarity thematic attribute data. Use a computer with GIS processing function, use special software, set the program to divide the target object—the selected area on the digital map into equal-area grids, set each grid as a lightning statistical unit, and use the data in the lightning database The data is compared with the corresponding grid in geography, and the thematic data in the lightning database is transferred to the corresponding grid as a statistical sample according to the geographical attributes, and the number of ground lightning in each grid is counted. (2) Set the shielding dangerous current range value and the counterattack dangerous current range value according to the grid insulation margin. Perform amplitude comparison according to this range, remove the data in each grid whose lightning current amplitude is outside the range of shielding and counterattack dangerous currents, and divide the remaining number of lightning strikes by the corresponding grid area to obtain the power grid shielding lightning damage Distribution and Lightning Damage Distribution of Grid Counterattack. (3) At the same time, the history of lightning flashover accident records of the power grid is stored in the computer according to the time of occurrence, the longitude and latitude coordinates of the lightning strike point, the type of flashover, and the voltage level, and the lightning strike fault database of the power grid is established. Comparing the data of the lightning strike fault database with the corresponding geographical grid, the shielding fault point and the counterattack fault point are respectively transferred to the corresponding geographic grid according to the latitude and longitude coordinates of the geographical information, and centered on the grid, the Adjacent grids are marked to obtain the historical lightning damage area of the power grid shielding and the historical lightning damage area of the grid counterattack; (4) the lightning damage distribution of the power grid shielding and the historical lightning damage area of the shielding power grid are obtained to obtain the lightning damage distribution of the integrated power grid, Combining the lightning damage distribution of the power grid counterattack and the historical lightning damage area of the power grid counterattack, the distribution map of the integrated power grid counterattack lightning damage is obtained. (5) According to the existing lightning protection reliability control index (that is, the lightning strike trip rate, unit time/(100 kilometers · 40 lightning days)), the lightning protection calculation is carried out to obtain the lightning damage of the power grid corresponding to the reliability index of each voltage level The density value of the grid on the distribution map, the density value of the dangerous lightning in this grid is the critical density value, and the critical density value is used as a criterion to compare the density value of the grid. On the lightning damage map of the power grid, the grid The grid area whose density value exceeds the critical density value is marked as the over-standard area, and the grid area whose density value does not exceed the critical density value is marked as the non-over-standard area. According to the nature of lightning damage, the critical density value is divided into critical shielding dangerous lightning density value and critical counterattack dangerous lightning density value. According to the corresponding lightning damage area is divided into the shielding exceeding the standard area and the shielding not exceeding the standard area, the counterattack exceeding the standard area and the counterattack not exceeding the standard area. (6) Combining these four areas, the areas on the lightning damage distribution map of the power grid are classified into four levels of lightning damage areas: the intersection of the counterattack no-exceeding area and the shielding area not exceeding the standard is called the first-level lightning damage area, and the counterattack area does not exceed the standard area. The intersection of the exceeding standard area and the shielding non-exceeding area is called the second-level lightning damage area, the intersection of the counterattack non-exceeding area and the shielding exceeding the standard area is called the third-level lightning damage area, and the intersection of the counterattack exceeding the standard area and the shielding exceeding the standard area is called 4 Level mine damage area. (7) According to the nature of the lightning damage in the fourth-level lightning damage area, carry out targeted lightning protection configuration. If the corresponding shielding critical density value (criterion) is not exceeded, the severity of lightning damage is relatively low. According to the Chinese power industry standard "Overvoltage Protection and Insulation Coordination of AC Electrical Installations" (DL/T 620-1997), routine Although the grid dangerous lightning density corresponding to the second-level lightning damage area does not exceed the corresponding shielding critical density value (criterion), it exceeds the corresponding counterattack critical density value (criterion). Industry regulation DL/T 620-1997 In addition to the conventional lightning protection configuration, it is necessary to install special lightning protection measures for counterattack, such as reducing grounding resistance, strengthening insulation, etc.; grid dangerous lightning density corresponding to level 3 lightning damage area It does not exceed the corresponding counterattack critical density value, but exceeds the corresponding shielding critical density value. In addition to the conventional lightning protection configuration according to the Chinese Electric Power Industry Regulations DL/T 620-1997, it is also necessary to install special shielding protection Lightning protection measures, such as reducing the protection angle, etc.; the grid dangerous lightning density value corresponding to the level 4 lightning damage area exceeds both the corresponding counterattack critical density value and the corresponding shielding critical density value, which means that the lightning damage is relatively serious In the area, in addition to the conventional lightning protection configuration according to the regulations of China's electric power industry DL/T 620-1997, other lightning protection measures against shielding and counterattack should be installed, and the lightning protection of level 2 and 3 minefields should be comprehensively used measure.

用上述设定的四个级别的雷害区进行输电线路的防雷配置具体实施如下:The lightning protection configuration of transmission lines using the four levels of lightning damage areas set above is specifically implemented as follows:

a.对于1级雷害区,按DL/T620-1997进行常规防雷配置;a. For Class 1 mine damage area, carry out conventional lightning protection configuration according to DL/T620-1997;

b.对于2级雷害区,增强输电线路防反击闪络的配置,输电线路杆塔接地电阻值要求,110kV-500kV线路杆塔在山区的接地电阻不高于:15Ω,在平原地区的接地电阻不高于7Ω;或者增强输电线路的绝缘强度,要求复合绝缘子:在满足风偏和导线对地距离要求的前提下,500kV线路使用复合绝缘子的干弧距离不小于30片悬式瓷绝缘子或玻璃绝缘子的结构长度;220kV线路使用复合绝缘子的干弧距离不宜小于14片悬式瓷绝缘子或玻璃绝缘子的结构长度;110kV线路使用复合绝缘子的干弧距离不小于7片悬式瓷或玻璃绝缘子的结构长度;要求瓷、玻璃绝缘子选用片数:500kV选30至32片;220kV选15片;110kV选9片;b. For Level 2 lightning hazard areas, strengthen the configuration of anti-reflection flashover of transmission lines, the grounding resistance value of transmission line towers, the grounding resistance of 110kV-500kV line towers in mountainous areas should not be higher than: 15Ω, and the grounding resistance in plain areas should not be higher. Higher than 7Ω; or to enhance the insulation strength of transmission lines, composite insulators are required: under the premise of meeting the requirements of wind deflection and wire-to-ground distance, the dry arc distance of composite insulators used for 500kV lines is not less than 30 pieces of suspension porcelain insulators or glass insulators The structural length of composite insulators used for 220kV lines should not be less than the structural length of 14 suspended porcelain insulators or glass insulators; the dry arc distance of composite insulators used for 110kV lines should not be less than the structural length of 7 suspended porcelain or glass insulators ;Required number of pieces for porcelain and glass insulators: 30 to 32 pieces for 500kV; 15 pieces for 220kV; 9 pieces for 110kV;

c.对于3级雷害区,增强输电线路防绕击闪络的配置,减小避雷线保护角,新建110kV~500kV线路应全线架设双根架空地线,500kV和220kV应采用负角保护,110kV线路保护角应采用10°以下;c. For Level 3 lightning hazard areas, strengthen the configuration of transmission line anti-shielding flashover and reduce the protection angle of lightning protection lines. Newly built 110kV ~ 500kV lines should erect double overhead ground wires on the whole line, and 500kV and 220kV should adopt negative angle protection. 110kV line protection angle should be less than 10°;

d.对于4级雷害区,要同时增强输电线路防反击闪络和饶击闪络配置,联合采用2、3级雷害区的防雷配置。d. For Level 4 lightning hazard areas, it is necessary to simultaneously strengthen the anti-counterattack flashover and Rao strike flashover configurations of transmission lines, and jointly adopt the lightning protection configurations for Level 2 and 3 lightning hazard areas.

上述的电网雷害分布图和判据的获取数据处理可以在一台计算机上进行处理,也可以在多台计算机上通过网络连接,进行数据交换处理。从而有效地为本发明获得统计数据资源,做到统计数据资源共享。The acquisition data processing of the lightning damage distribution map and criterion of the power grid mentioned above can be processed on one computer, and can also be processed on multiple computers through network connection for data exchange processing. Therefore, statistical data resources are effectively obtained for the present invention, and statistical data resource sharing is achieved.

采用计算机录入收集到的、含有地理属性的华北电网雷电定位系统自动监测数据和电网雷击事故数据,使用计算机程序进行处理。其中:The collected automatic monitoring data of the lightning location system of North China Power Grid and the data of lightning strike accidents of the power grid, which contain geographic attributes, are input by computer, and processed by computer programs. in:

1、电网雷害分布图的确定1. Determination of the lightning damage distribution map of the power grid

(1)危险电流范围的选取(1) Selection of dangerous current range

电网雷害的发生有其特有的特征,受到电网绝缘水平的影响,只有在某些电流幅值段的地闪才能引起雷击事故,幅值不同的雷电流其危害程度也不同。The occurrence of power grid lightning damage has its unique characteristics. Affected by the insulation level of the power grid, only ground lightning in certain current amplitude ranges can cause lightning strikes, and lightning currents with different amplitudes have different damage degrees.

确定危险电流范围是确定电网雷害分布的前提条件,危险电流的选取是以电网中绝大部分输电线路的耐雷性能前提并利用现有计算方法来确定的。不同电压等级电网,其绝缘水平显著不同,同一电压等级的电网,其抗绕击、反击性能因所面临的应用环境条件不同也会显著不同,且从应用角度来说,针对绕击和反击雷电防护措施不同,所以针对不同电压等级提出不同的绕击危险电流范围和反击危险电流范围。同时对同一电压等级来说,塔型不同、接地电阻不同、保护角不同时危险电流的范围也不同,危险电流范围选取应使绝大部分输电线路的危险电流都落在所选危险电流范围内。反击危险电流的范围(起止值)依据现行电力行业规程《交流电气装置的过电压保护和绝缘配合》(DL/T620-1997)求解,绕击耐雷水平仍然依据该规程,绕击最大临界电流则依据电气几何模型确定。Determining the range of dangerous currents is a prerequisite for determining the distribution of lightning damage in the power grid. The selection of dangerous currents is based on the lightning withstand performance of most transmission lines in the power grid and determined by using existing calculation methods. The insulation level of power grids with different voltage levels is significantly different. For power grids of the same voltage level, the performance of anti-shielding and counterattack will also be significantly different due to different application environmental conditions. The protective measures are different, so different shielding dangerous current ranges and counterattack dangerous current ranges are proposed for different voltage levels. At the same time, for the same voltage level, the range of dangerous current is also different when the tower type is different, the grounding resistance is different, and the protection angle is different. The range of dangerous current should be selected so that the dangerous current of most transmission lines falls within the selected dangerous current range. . The range (start and stop value) of the counterattack dangerous current is solved according to the current electric power industry regulations "Overvoltage Protection and Insulation Coordination of AC Electrical Installations" (DL/T620-1997). Determined according to the electrical geometric model.

对500kV电网,假定绝缘子采用28片,U50%为2420kV,档距为450m;临近杆塔接地电阻为15Ω,计算结果见表1所示。从计算结果可见,工频电压对于耐雷水平的影响是非常大的,考虑工频电压的影响(这是与实际相符的)情况下,耐雷水平比不考虑工频电压时平均下降了18%。For the 500kV power grid, it is assumed that 28 insulators are used, U 50% is 2420kV, and the span is 450m; the grounding resistance of the adjacent tower is 15Ω, and the calculation results are shown in Table 1. It can be seen from the calculation results that the impact of power frequency voltage on the lightning withstand level is very large. In the case of considering the influence of power frequency voltage (which is consistent with the actual situation), the lightning withstand level drops by an average of 18% compared with that without considering the power frequency voltage.

因此,对于500kV输电线路可以取反击危险电流下限值134kA(标准化线路要求满足15Ω),考虑更普遍的结果,取125kA。Therefore, for a 500kV transmission line, the lower limit of the counterattack dangerous current can be taken as 134kA (standardized line requirements meet 15Ω), and considering more general results, take 125kA.

同理,对220kV输电线路可以取反击危险电流下限值75kA。Similarly, for 220kV transmission lines, the lower limit of counter-attack dangerous current can be 75kA.

表1500kV线路反击耐雷水平的计算结果Table 1 Calculation results of back-attack lightning withstand level of 1500kV line

按照规程法:一般220kV绕击耐雷水平为14.0kA(对应U50%为1400kV)。According to the rules and regulations: the general 220kV shielding lightning resistance level is 14.0kA (corresponding to U 50% is 1400kV).

对表2中的两种典型输电线路进行绕击临界电流计算,结果见表3所示。对承德地区2006年6月份7次220kV电网雷击跳闸事故进行分析,包含4次绕击事故,绕击电流计算结果见表4。The shielding critical current is calculated for the two typical transmission lines in Table 2, and the results are shown in Table 3. The analysis of 7 220kV power grid lightning tripping accidents in Chengde area in June 2006 includes 4 shielding accidents. The calculation results of shielding current are shown in Table 4.

综合表3、表4,可见应用击距法计算得到对于220kV输电线路发生绕击的电流值一般在15-40kA左右。进一步对山西省电网和河北南网雷电绕击调查统计,绕击电流样本大小一般也在本研究中的绕击危险电流范围内。Combining Table 3 and Table 4, it can be seen that the current value of shielding for 220kV transmission lines calculated by the stroke distance method is generally about 15-40kA. Further survey and statistics of lightning shielding in Shanxi Provincial Power Grid and Hebei Southern Power Grid show that the size of the shielding current sample is generally within the range of shielding dangerous current in this study.

综合考虑下将220kV绕击危险电流范围取为[10kA,40kA]。Under comprehensive consideration, the 220kV shielding dangerous current range is taken as [10kA, 40kA].

同理,将500kV电网绕击危险电流范围取为[20kA,50kA]。In the same way, the dangerous current range of 500kV grid shielding is taken as [20kA, 50kA].

表2两种典型220kV输电线路参数表Table 2 Parameters of two typical 220kV transmission lines

  杆塔类型Tower type   档距(m)Gap (m)   导线挂线点对地高度(m)Height of wire hanging point to ground (m)   避雷线挂线点对地高度(m)The height of the hanging point of the lightning conductor to the ground (m)   导线挂线点对塔中心水平距离(m)Horizontal distance from wire hanging point to tower center (m)   避雷线挂线点对塔中心水平距离(m)The horizontal distance from the hanging point of the lightning protection line to the center of the tower (m)   绝缘子串长度(m)Insulator string length (m)   SZ<sub>2</sub>SZ<sub>2</sub>   358358   3030   4040   1313   8.58.5   2.342.34   SJ<sub>2</sub>SJ<sub>2</sub>   306306   30.530.5   41.541.5   7.27.2   3.83.8   2.342.34

表3最大绕击电流计算结果Table 3 Calculation results of maximum shielding current

表4220kV线路绕击电流的计算情况(实例)Table 4220kV line shielding current calculation (example)

Figure G2008100474750D00072
Figure G2008100474750D00072

(2)电网雷害分布图的确定(2) Determination of the lightning damage distribution map of the power grid

首先应确定反击电网雷害分布和绕击电网雷害分布。以上述危险电流起止值为危险电流范围,统计0.2°×0.2°网格下各网格中雷电流幅值在此范围内的地闪数目,再除以相应的网格面积,得到各网格危险雷电密度值。Firstly, the lightning damage distribution of the counter-strike power grid and the lightning damage distribution of the shielding power grid should be determined. Taking the start and end values of the above-mentioned dangerous current as the dangerous current range, count the number of ground flashes with lightning current amplitude within this range in each grid under the 0.2°×0.2° grid, and then divide it by the corresponding grid area to obtain the dangerous current range of each grid. Lightning density value.

统计各网格中幅值范围在125kA及以上范围内的地闪密度,得到华北500kV电网反击雷害分布;统计各网格中幅值范围在20kA~50kA范围内的地闪密度,得到华北500kV电网绕击雷害分布;统计各网格中幅值在75kA及以上范围内的地闪密度,得到华北220kV电网反击雷害分布;统计各网格中幅值在10kA~40kA范围内的地闪密度,得到华北220kV电网绕击雷害分布。Count the lightning density in the range of 125kA and above in each grid, and obtain the lightning damage distribution of the North China 500kV power grid; count the lightning density in the range of 20kA to 50kA in each grid, and obtain the 500kV North China Distribution of power grid shielding lightning damage; count the lightning density in each grid with amplitude within the range of 75kA and above, and obtain the distribution of lightning damage in North China 220kV power grid; count the ground lightning with amplitude in the range of 10kA to 40kA in each grid Density, get lightning damage distribution of 220kV power grid in North China.

再确定反击电网历史雷害区域和绕击电网历史雷害区域。运行经验是对所有措施和基础理论的验证和总结,是电网与自然相结合的具体体现,雷害分布在危险雷电分布的基础上首先应考虑采用运行经验进行补充。以华北地区2000年~2007年四年的雷击事故记录为基础建立具有地理属性的雷击故障数据库。华北地区2000~2007年500kV输电线路共出现雷击故障43次,220kV输电线路共出现雷击故障74次。将反击故障点和绕击故障点分别标注在华北地理电子地图中,找到与其相交的网格,将该网格及其相邻两个网格挑选出来,形成反击历史电网雷害区域、绕击历史电网雷害区域。Then determine the historical lightning damage area of the counterattack power grid and the historical lightning damage area of the shielding power grid. Operation experience is the verification and summary of all measures and basic theories, and it is a concrete manifestation of the combination of power grid and nature. The distribution of lightning damage should first be supplemented by operation experience on the basis of the distribution of dangerous lightning. Based on the four-year lightning accident records in North China from 2000 to 2007, a lightning fault database with geographic attributes was established. From 2000 to 2007, there were 43 lightning faults on 500kV transmission lines in North China, and 74 lightning faults on 220kV transmission lines. Mark the counterattack fault point and shielding fault point on the geographic electronic map of North China respectively, find the grid that intersects with it, and select the grid and its adjacent two grids to form the counterattack historical power grid lightning damage area and shielding Historical power grid lightning damage area.

最后将反击电网雷害分布图和反击历史电网雷害区域、绕击电网雷害分布图和绕击电网历史雷害区域分别综合起来,形成综合反击电网雷害分布图和综合绕击电网雷害分布图。将这两个电网历史雷害区域分别叠加在反击电网雷害分布图、绕击电网雷害分布图上,对两图中的历史故障区域采用与该区域向上相邻的属性进行渲染。Finally, the lightning damage distribution map of the counter-attack power grid and the lightning damage area of the counter-attack historical power grid, the lightning damage distribution map of the shielding power grid and the historical lightning damage area of the shielding power grid are respectively combined to form a comprehensive lightning damage distribution map of the counter-attack power grid and a lightning damage distribution map of the comprehensive shielding power grid Distribution. These two power grid historical lightning damage areas are superimposed on the lightning damage distribution map of the counterattack power grid and the lightning damage distribution map of the shielding power grid respectively, and the historical fault area in the two maps is rendered with the attribute adjacent to the area upward.

2、临界密度值的确定(判据的选定)2. Determination of critical density value (selection of criteria)

以华北电网500kV托源一回线256#杆塔和220kV潘遵一线50#杆塔为例进行计算。Take the 256# tower of the 500kV Tuoyuan primary circuit line and the 50# tower of the 220kV Panzun line of the North China Power Grid as examples for calculation.

雷击跳闸率的计算依据中国电力行业标准《交流电气装置的过电压保护和绝缘配合》(DL/T 620-1997)推荐的方法,按式(1)进行。The calculation of the lightning trip rate is based on the method recommended by the Chinese electric power industry standard "Overvoltage Protection and Insulation Coordination of AC Electrical Installations" (DL/T 620-1997), and is carried out according to formula (1).

N=NLη(gP1+PαP2)        (1)N=N L η(gP 1 +P α P 2 ) (1)

其中,N为雷击跳闸率,NL为40雷电日下每百公里的年雷击次数,NL=0.28(b+4h),b为两避雷线间的距离,h为避雷线平均高度;g为击杆率;η为建弧率,P1为超过雷击杆塔顶部时耐雷水平的雷电流概率,P2为绕击危险电流出现的概率;Pα为绕击率,对于平原线路,

Figure G2008100474750D00081
对于山区线路,
Figure G2008100474750D00082
Among them, N is the lightning strike tripping rate, N L is the annual number of lightning strikes per 100 kilometers under 40 lightning days, N L =0.28(b+4h), b is the distance between two lightning protection lines, h is the average height of lightning protection lines; g is the stroke rate; η is the arc building rate, P 1 is the lightning current probability exceeding the lightning resistance level when lightning strikes the top of the tower, P 2 is the probability of dangerous current shielding; P α is the shielding rate, for plain lines,
Figure G2008100474750D00081
For mountain routes,
Figure G2008100474750D00082

定义危险雷电密度为Ngc,反击危险雷电密度为Ngc1,绕击危险雷电密度为Ngc2,则Define the dangerous lightning density as N gc , the counterattack dangerous lightning density as N gc1 , and the shielding dangerous lightning density as N gc2 , then

Ngc1=NgP1,Ngc2=NgP2,N gc1 = N g P 1 , N gc2 = N g P 2 ,

则反击跳闸率counter trip rate

Figure G2008100474750D00091
Figure G2008100474750D00091

Figure G2008100474750D00093
Figure G2008100474750D00093

绕击跳闸率Shielding trip rate

Figure G2008100474750D00094
Figure G2008100474750D00094

Figure G2008100474750D00095
Figure G2008100474750D00095

Figure G2008100474750D00096
Figure G2008100474750D00096

雷击跳闸率N=nr+nf Lightning trip rate N=n r +n f

根据国网公司设定的可靠性控制指标进行计算,国网公司设定500kV线路可靠性控制指标为0.14次/(百公里·40个雷电日),220kV线路可靠性控制指标为0.315次/(百公里·40个雷电日)。对于可靠性控制指标在绕击跳闸率和反击跳闸率的分配上,依据运行经验进行,对500kV线路,反击跳闸事故和绕击跳闸事故比率分别占30%,70%,对220kV线路,反击跳闸事故和绕击跳闸事故比率各占50%。Calculated according to the reliability control index set by the State Grid Corporation, the State Grid Corporation set the 500kV line reliability control index as 0.14 times/(100 kilometers · 40 lightning days), and the 220kV line reliability control index as 0.315 times/( 100 kilometers · 40 thunder days). For the distribution of reliability control index on shielding tripping rate and counterattack tripping rate, it is carried out according to operating experience. For 500kV lines, counterattack tripping accidents and shielding tripping accidents account for 30% and 70%, respectively. For 220kV lines, counterattack tripping Accidents and shielding trip accidents account for 50% each.

A.对华北电网500kV托源一回线256#杆塔,临界密度值计算A. Calculation of the critical density value for the 256# tower of the 500kV Tuoyuan primary circuit line of the North China Power Grid

杆塔参数如下:ZKI型,A相高度40.66m,A相中距12.4m,双避雷线,避雷线距离21.3m,避雷线高度49.5m。此处地面倾角10°。The parameters of the tower are as follows: ZKI type, the height of phase A is 40.66m, the middle distance of phase A is 12.4m, double lightning protection lines, the distance between lightning protection lines is 21.3m, and the height of lightning protection lines is 49.5m. Here the ground slope is 10°.

则可算得,避雷线平均高度h=49.5-2/3*9.5=43.167(m),保护角α=11.198°,绕击率Pα=0.0037。Then it can be calculated that the average height of the lightning protection line h=49.5-2/3*9.5=43.167(m), the protection angle α=11.198°, and the shielding rate P α =0.0037.

临界反击危险雷电密度值:Critical counterattack dangerous lightning density value:

nno gcgc 11 == 0.140.14 &times;&times; 3030 %% &times;&times; 1010 (( bb ++ 44 hh )) &times;&times; 11 &eta;&eta; &times;&times; gg &times;&times; TT dd 4040 &ap;&ap; 0.0060.006 [[ ff // (( kmkm 22 &CenterDot;&Center Dot; aa )) ]]

(Td根据256#塔所处位置和按0.15°网格取26)(T d is taken as 26 according to the location of 256# tower and 0.15° grid)

临界绕击危险雷电密度值:Critical shielding hazard lightning density value:

nno gcgc 11 == 0.140.14 &times;&times; 7070 %% &times;&times; 1010 (( bb ++ 44 hh )) &times;&times; 11 &eta;&eta; &times;&times; PP &alpha;&alpha; &times;&times; TT dd 4040 &ap;&ap; 1.0261.026 [[ ff // (( kmkm 22 &CenterDot;&Center Dot; aa )) ]]

从电网反击雷害分布和电网绕击雷害分布中查询,发现此塔所处网格反击危险雷电密度大于此临界反击危险雷电密度值,绕击危险雷电密度也大于此临界绕击危险雷电密度值,所以此塔所处位置既为反击超标区,也为绕击超标区,即此处为4级雷害区。Inquiring from the distribution of lightning strike back strike and lightning strike distribution of the power grid, it is found that the dangerous lightning density of the grid where the tower is located is greater than the critical counterattack dangerous lightning density value, and the shielding dangerous lightning density is also greater than the critical shielding dangerous lightning density value value, so the location of this tower is not only the counterattack exceeding the standard area, but also the shielding attack exceeding the standard area, that is, it is a level 4 mine damage area.

B.对华北电网220kV姜兴一线54#杆塔,临界密度值计算B. Calculation of critical density value for 54# tower of 220kV Jiangxing Line 1 in North China Power Grid

杆塔参数如下:Z43-L型,杆塔高度38.25m,双避雷线,避雷线距离6m,避雷线弧垂6.9m,保护角13°。此处地形为山顶。The parameters of the tower are as follows: Z43-L type, the height of the tower is 38.25m, double lightning protection lines, the distance between lightning protection lines is 6m, the arc sag of lightning protection lines is 6.9m, and the protection angle is 13°. The terrain here is the top of a mountain.

则可算得,避雷线平均高度h=38.25-2/3*6.9=33.65(m),绕击率Pα=0.0038。Then it can be calculated that the average height of the lightning protection line h=38.25-2/3*6.9=33.65(m), and the shielding rate P α =0.0038.

临界反击危险雷电密度值:Critical counterattack dangerous lightning density value:

nno gcgc 11 == 00 .. 315315 &times;&times; 5050 %% &times;&times; 1010 (( bb ++ 44 hh )) &times;&times; 11 &eta;&eta; &times;&times; gg &times;&times; TT dd 4040 == 0.0420.042 [[ ff // (( kmkm 22 &CenterDot;&CenterDot; aa )) ]]

(Td根据此塔所处位置和按0.15°网格取30)(T d is 30 according to the position of the tower and the 0.15° grid)

临界绕击危险雷电密度值:Critical shielding hazard lightning density value:

nno gcgc 11 == 00 .. 315315 &times;&times; 5050 %% &times;&times; 1010 (( bb ++ 44 hh )) &times;&times; 11 &eta;&eta; &times;&times; PP &alpha;&alpha; &times;&times; TT dd 4040 == 22 .. 764764 [[ ff // (( kmkm 22 &CenterDot;&CenterDot; aa )) ]]

从电网反击雷害分布和电网绕击雷害分布中查询,发现此塔所处网格反击危险雷电密度大于此临界反击危险雷电密度值,绕击危险雷电密度小于此临界绕击危险雷电密度值,所以此塔所处位置为反击超标区,绕击不超标区,即此处为2级雷害区。Inquiry from the distribution of lightning strike back strike and lightning strike distribution of the power grid, it is found that the dangerous lightning density of the grid where the tower is located is greater than the critical counterattack dangerous lightning density value, and the shielding dangerous lightning density is less than the critical shielding dangerous lightning density value , so the location of this tower is the counterattack exceeding the standard area, and the shielding attack does not exceed the standard area, that is, this is the second-level mine damage area.

3、防雷配置方案3. Lightning protection configuration scheme

依据上述这种对各杆塔进行临界危险雷电密度计算,再依据电网雷害分布图上相应位置的绕击危险雷电密度和反击危险雷电密度值与之进行比较,判断杆塔所处的雷害区域等级,根据其雷害等级进行雷电防护措施配置的方法,华北电网生产部于2007年在沙昌双回线等10条500kV输电线路和承隆一回线等15条220kV输电线路上有针对性的装设了防绕击避雷针及侧针共计1420套,安装线路避雷器121支,改造接地装置1003基,接地加接地模块257基,加装连续接地体166km。According to the above-mentioned critical lightning density calculation for each tower, and then compare the shielding dangerous lightning density and counterattack dangerous lightning density values at the corresponding positions on the lightning damage distribution map of the power grid to judge the level of the lightning damage area where the tower is located According to the method of configuring lightning protection measures according to the level of lightning damage, the production department of North China Power Grid installed targeted installations on 10 500kV transmission lines including the Shachang double-circuit line and 15 220kV transmission lines including the Chenglong single-circuit line in 2007. A total of 1,420 sets of anti-shielding lightning rods and side pins were installed, 121 line arresters were installed, 1,003 bases of grounding devices were modified, 257 bases of grounding and grounding modules were added, and 166km of continuous grounding bodies were installed.

Claims (2)

1. utilize damage to crops caused by thunder to distribute and carry out the method for transmission line lightning protection configuration, adopt computer that the thunder and lightning automatic monitoring data is handled, set up database, with GIS-Geographic Information System and database is analysis platform, adopt gridding method statistics lightning parameter, and resist thunderbolt ability and feature thereof at ground object, set the dangerous amplitude of lightning current scope of object damage to crops caused by thunder, and adopt the thunder and lightning data of computer statistics according to this danger amplitude of lightning current scope, obtaining corresponding electric network thunderstorm damage distributes, it is characterized in that, adopt the operational reliability index that transmission line determines and the statistics of lightning stroke flashover type, the critical density value during the damage to crops caused by thunder that setting can cause lightning stroke flashover distributes, with this critical density value is criterion, the classification and the distribution of statistics damage to crops caused by thunder again according to damage to crops caused by thunder classification and distribution, are determined transmission line lightning protection configuration; In conjunction with each electric pressure electrical network shielding characteristic current, counterattack characteristic current, set up the dangerous currents data analysis system, adopt gridding method to determine required data and analysis result, to analysis result adopt that the lightning strike accident record compares, verification and correction, the damage to crops caused by thunder that obtains respective objects distributes; Critical density value according to damage to crops caused by thunder distributes and reliability index is determined corresponding damage to crops caused by thunder distribution accordingly is divided into level Four according to this density value with the electric network thunderstorm damage zone, and this level Four damage to crops caused by thunder district is carried out specific aim lightning protection measure configuration, and the basic step of employing is as follows:
(1) at first, deposit the thunder and lightning automatic monitoring data in database by time, position, amplitude of lightning current and polarity, main discharge and time continuous thematic attribute data that discharges by computer classes; Employing has the computer program of GIS-Geographic Information System processing capacity to determine the corresponding region of thunder and lightning automatic monitoring data on numerical map, the selection area on the numerical map is carried out the homalographic grid divide; By computer the data information of each grid is added up; And make the lightning monitoring data be given thunder and lightning special topic attribute and geographical attribute, each grid of dividing has and lightning monitoring data same coordinate system geographical attribute automatically; The region, the related grid place of lightning parameter of adopting gridding method to count, setting each grid is a thunder and lightning statistic unit; Thematic data in the database is called in map network as statistical sample by geographical attribute, add up each grid and the thunder and lightning number of times occurs;
(2) according to the line insulation structure, the dangerous amplitude of lightning current value range of insulator string generation flashover that can cause transmission line is as criterion, add up the current amplitude attribute of thunder and lightning in each grid, reject the data outside the criterion, again with each grid year the thunder and lightning number of times divided by the grid area, obtain electric network thunderstorm damage and distribute; The line insulation structure comprises line voltage grade, transmission line framework, orographic factor; Set shielding dangerous currents value range, counterattack dangerous currents value range according to line insulation nargin; Carry out amplitude relatively according to this scope, amplitude of lightning current in each grid is rejected in shielding, the outer data of counterattack dangerous currents value range, dodge number of times by the ground of remainder and obtain respectively divided by corresponding grid area that electrical network shielding damage to crops caused by thunder distributes and electrical network is strikeed back the damage to crops caused by thunder distribution;
The record of the transmission line lightning stroke flashover incident that (3) will take place is classified by the thematic attribute of time of origin, position coordinates, flashover type, electric pressure, its storage is advanced the lightning fault database in the computer, the lightning stroke flashover incident is called in the grid that its corresponding electric network thunderstorm damage distributes according to its thematic attribute successively, with this grid is the center, the grid that links to each other is carried out mark, obtain the historical damage to crops caused by thunder of electrical network zone, be divided into electrical network by fault point character and strike back historical damage to crops caused by thunder zone, the historical damage to crops caused by thunder of electrical network shielding zone;
(4) the electrical network counterattack damage to crops caused by thunder distribution and the electrical network of each electric pressure are strikeed back historical damage to crops caused by thunder zone, electrical network shielding damage to crops caused by thunder distributes and the historical damage to crops caused by thunder of electrical network shielding zone goes out corresponding geographic distribution layer with COMPUTER CALCULATION, uses GIS-Geographic Information System to obtain electric network synthetic counterattack damage to crops caused by thunder distribution map, electric network synthetic shielding damage to crops caused by thunder distribution map respectively again;
(5) promptly trip number of times/(hundred kilometers 40 thunder and lightning days) according to transmission line lightning protection reliability control index, with lightning stroke flashover type statistics data, critical density value during the damage to crops caused by thunder that setting can cause shielding flashover and counterattack flashover distributes, with this critical density value is criterion, the ground of the grid that statistics damage to crops caused by thunder distributes dodges density value, demarcates the exceed standard value and the value that do not exceed standard respectively;
(6) statistics damage to crops caused by thunder distribution grid, exceed standard value and four other damage to crops caused by thunder districts of level of the value various combination that do not exceed standard setting according to counterattack and shielding, wherein, have counterattack the do not exceed standard data area of value of value and shielding that do not exceed standard and be set at 1 grade of damage to crops caused by thunder district, have counterattack the do not exceed standard data area of value of value and shielding that exceeds standard and be set at 2 grades of damage to crops caused by thunder districts, have counterattack the exceed standard data area of value of value and shielding that do not exceed standard and be set at 3 grades of damage to crops caused by thunder districts, have counterattack the exceed standard data area of value of value and shielding that exceeds standard and be set at 4 grades of damage to crops caused by thunder districts;
(7) carry out the lightning protection configuration of transmission line with other damage to crops caused by thunder district of four levels of above-mentioned setting.
2. the method for utilizing damage to crops caused by thunder distribution carrying out transmission line lightning protection configuration according to claim 1 is characterized in that, carries out the lightning protection configuration of transmission line with other damage to crops caused by thunder district of four levels of above-mentioned setting: wherein,
A. for 1 grade of damage to crops caused by thunder district, carry out conventional lightning protection configuration by DL/T620-1997;
B. for 2 grades of damage to crops caused by thunder districts, strengthen the configuration of the anti-counterattack of transmission line flashover, the requirement of powerline pole tower ground resistance value, the 110kV-500kV overhead line structures are not higher than at the earth resistance in mountain area: 15 Ω, the earth resistance in the plains region is not higher than 7 Ω; Perhaps strengthen the dielectric strength of transmission line, require composite insulator: under the prerequisite that satisfies windage yaw and the requirement of lead distance to the ground, the 500kV circuit uses the dry arcing distance of composite insulator to be not less than the structure length of 30 suspended porcelain insulators or glass insulator; The 220kV circuit uses the dry arcing distance of composite insulator to be not less than the structure length of 14 suspended porcelain insulators or glass insulator; The 110kV circuit uses the dry arcing distance of composite insulator to be not less than the structure length of 7 suspension type porcelain or glass insulator; Require porcelain or glass insulator to select for use sheet number: 500kV to select 30 to 32; 220kV selects 15; 110kV selects 9;
C. for 3 grades of damage to crops caused by thunder districts, strengthen the configuration of the anti-shielding flashover of transmission line, reduce the lightning conducter shielding angle, newly-built 110kV~500kV circuit should set up the double joint overhead ground wire completely, 500kV and 220kV should adopt the negative angle protection, and 110kV route protection angle should be adopted below 10 °;
D. for 4 grades of damage to crops caused by thunder districts, strengthen transmission line anti-counterattack flashover and the configuration of shielding flashover simultaneously, unite the lightning protection configuration of adopting 2,3 grades of damage to crops caused by thunder districts.
CN2008100474750A 2008-04-28 2008-04-28 A Method of Lightning Protection Configuration for Transmission Lines Using Lightning Damage Distribution of Power Grid Active CN101272040B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100474750A CN101272040B (en) 2008-04-28 2008-04-28 A Method of Lightning Protection Configuration for Transmission Lines Using Lightning Damage Distribution of Power Grid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100474750A CN101272040B (en) 2008-04-28 2008-04-28 A Method of Lightning Protection Configuration for Transmission Lines Using Lightning Damage Distribution of Power Grid

Publications (2)

Publication Number Publication Date
CN101272040A CN101272040A (en) 2008-09-24
CN101272040B true CN101272040B (en) 2010-06-09

Family

ID=40005797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100474750A Active CN101272040B (en) 2008-04-28 2008-04-28 A Method of Lightning Protection Configuration for Transmission Lines Using Lightning Damage Distribution of Power Grid

Country Status (1)

Country Link
CN (1) CN101272040B (en)

Families Citing this family (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101900779B (en) * 2010-07-28 2012-10-17 西南交通大学 A method for measuring lightning shielding tripping rate of high-voltage transmission lines combined with topography
CN101908190A (en) * 2010-07-29 2010-12-08 中国电力科学研究院 A Radar Chart Index Representation Method for Electricity Market Analysis and Evaluation
CN102324060A (en) * 2011-05-13 2012-01-18 北京市电力公司 Method for acquiring multidimensional space-time power-engineering geological information and device
WO2013181981A1 (en) * 2012-06-04 2013-12-12 Gao Lei Method for calculating lightning frequency interception area of construction and building under consideration of surrounding objects
CN102590639B (en) * 2012-01-10 2014-07-16 四川省电力公司 Lightning accident warning method
CN102565628B (en) * 2012-02-07 2014-04-30 云南电力试验研究院(集团)有限公司电力研究院 Method for identifying properties of lightning faults of overhead line on basis of amplitude interval distribution of lightning current
CN102840850B (en) * 2012-07-26 2014-09-17 云南电力试验研究院(集团)有限公司电力研究院 Determination method of power transmission line actual lightning protection angle
CN102915387B (en) * 2012-09-10 2015-08-05 中国电力科学研究院 A kind of power grid ice region distribution diagram method for drafting
CN102880920A (en) * 2012-09-29 2013-01-16 上海市电力公司 Lightning risk warning information processing method
CN102957115B (en) * 2012-10-24 2015-09-23 国家电网公司 500kV electric transmission line lightning arrester arranges method
CN103078318B (en) * 2013-01-09 2014-11-26 西安交通大学 Overvoltage improvement method on basis of historical data of overhead power transmission line
CN103235192A (en) * 2013-01-10 2013-08-07 湖北省电力公司电力科学研究院 Analysis method for harmful lightning probability distribution
CN104133936B (en) * 2013-07-11 2019-04-12 深圳康雅生态环境有限公司 The method for considering to calculate each position lightning strike probability of construction of structures when the object of periphery
CN105243176B (en) * 2015-08-31 2018-12-11 华南理工大学 A Graph Analysis Method for Optimizing Arrester Arrangement in 110kV/220kV Transmission Lines
CN105610115B (en) * 2015-12-25 2017-03-29 陈凤 Active lightening arresting method based on history thunder and lightning motion track statistical property
CN105809574A (en) * 2016-03-23 2016-07-27 国家电网公司 Method for judging cloud-to-ground lightning high-risk section of line corridor in combination with topographic parameters
CN105846416A (en) * 2016-06-07 2016-08-10 贵州电网有限责任公司电力科学研究院 Lightning prevention and ground potential high-voltage counterattack suppression protection circuit of power line
CN106229959B (en) * 2016-08-12 2020-07-24 中国电力科学研究院 Overvoltage suppression method for extra-high voltage direct current transmission line
CN106372392B (en) * 2016-08-26 2019-08-02 武汉大学 A Statistical Method of Lightning Damage Distribution in Transmission Line Corridor Based on Kernel Density Estimation
CN108009351A (en) * 2017-11-30 2018-05-08 国网湖南省电力有限公司 The distribution drawing drawing method of lightning stroke trip risk
CN108493774B (en) * 2018-07-09 2020-07-14 安徽诚意电气科技有限公司 A lightning rod erection method based on the number of lightning strikes
CN109541409B (en) * 2018-11-30 2020-05-26 国家电网有限公司 Distribution line flashover rate improvement algorithm based on electrical geometric model
CN110222430A (en) * 2019-06-11 2019-09-10 刘亚峰 A kind of 10kV distribution line lightening arresting method
CN111431129B (en) * 2020-05-08 2021-02-09 湖南省湘电试研技术有限公司 Transmission line without lightning conductor
CN112149946A (en) * 2020-07-29 2020-12-29 广西电网有限责任公司电力科学研究院 Method and system for planning positions of lightning arresters of power transmission line
CN113010559A (en) * 2021-03-26 2021-06-22 云南电网有限责任公司电力科学研究院 Association mining method for micro-terrain and lightning damage characteristic parameters of power transmission corridor area
CN113378915A (en) * 2021-06-08 2021-09-10 广东电网有限责任公司广州供电局 Method for determining thunder and lightning gathering center
CN113656743A (en) * 2021-08-12 2021-11-16 贵州省建筑设计研究院有限责任公司 Weather big data-based accurate calculation method for expected lightning strike geodetic times of building year
CN116430169B (en) * 2023-04-17 2023-10-27 国网黑龙江省电力有限公司齐齐哈尔供电公司 Distribution network fault diagnosis system based on big data technology

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
陈家宏,冯万兴,王海涛,童雪芳,李晓岚.雷电参数统计方法.高电压技术33 10.2007,33(10),6-10.
陈家宏,冯万兴,王海涛,童雪芳,李晓岚.雷电参数统计方法.高电压技术33 10.2007,33(10),6-10. *
龚坚刚,童杭伟.基于雷电定位系统的浙江电网线路雷击跳闸率评估.华东电力35 1.2007,35(1),73-75.
龚坚刚,童杭伟.基于雷电定位系统的浙江电网线路雷击跳闸率评估.华东电力35 1.2007,35(1),73-75. *

Also Published As

Publication number Publication date
CN101272040A (en) 2008-09-24

Similar Documents

Publication Publication Date Title
CN101272040A (en) A Method of Lightning Protection Configuration for Transmission Lines Using Lightning Damage Distribution of Power Grid
CN100578488C (en) Method for Determining Distribution of Lightning Damage in Power Network
CN107992962B (en) Power transmission line lightning protection measure optimal selection method based on entropy weight method
CN110309527B (en) Electrical geometric model-based lightning damage risk assessment method for overhead distribution line
CN111431129B (en) Transmission line without lightning conductor
CN106099753B (en) Weight ice-covering area without lightning conducter Transmission Line Design method
CN102435921A (en) Judgment method for insulation and lightning impact resistance performance of double-circuit transmission lines on the same tower
Rawi et al. A case study on 500 kV line performance related to lightning in Malaysia
CN108921370A (en) A kind of appraisal procedure and system of transmission line of electricity section damage to crops caused by thunder risk
CN104392327A (en) Electric transmission line typical disaster factor evaluation method
CN117933692A (en) Distribution network lightning hazard risk assessment method and system based on lightning trip-out rate calculation
CN117291418A (en) A method and device for line lightning risk assessment based on distributed monitoring data
CN105322460B (en) Overhead distribution anti-lightning planing method under a kind of Thunderstorm Weather
CN112821339B (en) Lightning protection measure transformation method for operating power distribution network
CN111062609A (en) Method for evaluating lightning damage risk of power transmission line tower
Chun et al. Research on differentiated lightning protection comprehensive management for the 500-kV power network in the area near the three gorges project
CN110796327A (en) A method for assessing the risk of wind-biased flashover in transmission line dust environment
Shi et al. Analysis of lightning strike failure of extra high voltage overhead lines in Hubei power grid
CN103235192A (en) Analysis method for harmful lightning probability distribution
CN109888711B (en) Analysis, operation and maintenance method of grounding state of 500kV transmission line towers
Wang et al. Analysis of shielding failure flash-over rate of collection lines of wind farms in mountainous areas
Wang et al. Risk analysis method based on FMEA for transmission line in lightning hazards
CN112149946A (en) Method and system for planning positions of lightning arresters of power transmission line
Lei et al. A Regionalized Evaluation Method for Indirect Lightning Stroke Flashover Rate in 10kV Distribution Networks
Chen et al. Analysis of a New Method for Evaluating Lightning Trip-Out Fault Rate in Active Distribution Networks

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: WUHAN NARI CO., LTD., STATE GRID ELECTRIC POWER RE

Free format text: FORMER OWNER: WUHAN HIGH VOLTAGE RESEARCH INSTITUTE OF STATE GRID

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20100701

Address after: 100045 Beijing city Xicheng District Fuxingmenwai No. 1 Nan Xiang Di Zang an

Co-patentee after: Wuhan Nari Limited Liability Company of State Grid Electric Power Research Institute

Patentee after: North China Electrical Power Research Institute LLC

Co-patentee after: State Grid Electric Power Research Insititute

Address before: 100045 Beijing city Xicheng District Fuxingmenwai No. 1 Nan Xiang Di Zang an

Co-patentee before: Guowang Wuhan High Voltage Inst

Patentee before: North China Electrical Power Research Institute LLC

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160902

Address after: 100045 Beijing city Xicheng District Fuxingmenwai No. 1 Nan Xiang Di Zang an

Patentee after: North China Electrical Power Research Institute LLC

Patentee after: Wuhan Nari Limited Liability Company of State Grid Electric Power Research Institute

Address before: 100045 Beijing city Xicheng District Fuxingmenwai No. 1 Nan Xiang Di Zang an

Patentee before: North China Electrical Power Research Institute LLC