CN101265723B - 由复合建筑板材组装而成的建筑结构体系及建造方法 - Google Patents
由复合建筑板材组装而成的建筑结构体系及建造方法 Download PDFInfo
- Publication number
- CN101265723B CN101265723B CN2008101058574A CN200810105857A CN101265723B CN 101265723 B CN101265723 B CN 101265723B CN 2008101058574 A CN2008101058574 A CN 2008101058574A CN 200810105857 A CN200810105857 A CN 200810105857A CN 101265723 B CN101265723 B CN 101265723B
- Authority
- CN
- China
- Prior art keywords
- panel
- roof
- cement
- wall
- connector
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Load-Bearing And Curtain Walls (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2008101058574A CN101265723B (zh) | 2008-05-07 | 2008-05-07 | 由复合建筑板材组装而成的建筑结构体系及建造方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2008101058574A CN101265723B (zh) | 2008-05-07 | 2008-05-07 | 由复合建筑板材组装而成的建筑结构体系及建造方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN101265723A CN101265723A (zh) | 2008-09-17 |
| CN101265723B true CN101265723B (zh) | 2012-08-15 |
Family
ID=39988387
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2008101058574A Expired - Fee Related CN101265723B (zh) | 2008-05-07 | 2008-05-07 | 由复合建筑板材组装而成的建筑结构体系及建造方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN101265723B (zh) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104631617A (zh) * | 2013-11-13 | 2015-05-20 | 戎军民 | 一种建筑承重结构件及其装配方法 |
| WO2022032390A1 (en) * | 2020-08-13 | 2022-02-17 | Nexii Building Solutions Inc. | Systems and methods for constructing a multi-storey building |
| US12152389B2 (en) | 2018-02-13 | 2024-11-26 | Nexii Building Solutions Inc. | Prefabricated insulated building panel with cured cementitious layer bonded to insulation |
Families Citing this family (26)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201512887U (zh) * | 2009-09-18 | 2010-06-23 | 张跃 | 一种建筑楼板 |
| CN101709591B (zh) * | 2009-10-21 | 2011-10-05 | 王宏链 | 一种排列式活动房 |
| CN102767239A (zh) * | 2012-07-05 | 2012-11-07 | 江苏海陆科技股份有限公司 | 集装箱太阳能房的墙体与屋架连接结构 |
| CN103089024A (zh) * | 2013-02-05 | 2013-05-08 | 中国十七冶集团有限公司 | 玻璃钢屋顶构架装置 |
| CN104695559A (zh) * | 2013-12-09 | 2015-06-10 | 达州市家美建材厂 | 一种组装式板式活动房 |
| CN103821271A (zh) * | 2014-02-28 | 2014-05-28 | 长春工程学院 | 一种轻质保温隔音免支撑楼板 |
| CN104074385B (zh) * | 2014-07-14 | 2016-10-26 | 四川三阳钢结构有限公司 | 一种绿色建筑体系 |
| CN105464246A (zh) * | 2014-09-06 | 2016-04-06 | 任丘市永基建筑安装工程有限公司 | 装配式住房角板安装技术 |
| CN104805957A (zh) * | 2015-02-25 | 2015-07-29 | 成都格瑞思文化传播有限公司 | 墙板连接件 |
| CN105421826B (zh) * | 2015-12-08 | 2018-11-27 | 太空智造股份有限公司 | 一种装配式整体卫生间及其建造方法 |
| CN105421657B (zh) * | 2015-12-08 | 2018-10-02 | 太空智造股份有限公司 | 具有燕尾槽式钢边肋结构的发泡水泥复合板及其连接方法 |
| BR112018017083A2 (pt) * | 2016-02-22 | 2019-01-02 | Vega Building Systems Llc | plataforma de piso para edifícios de múltiplos andares usando treliças de parede de aço estrutural empilhadas |
| CN106088669B (zh) * | 2016-06-14 | 2018-05-22 | 苏州杰姆斯特机械有限公司 | 一种智能耐老化节能别墅 |
| CN106436915A (zh) * | 2016-10-26 | 2017-02-22 | 南宁众创空间科技有限公司 | 稳固简体房 |
| CN107288210A (zh) * | 2017-06-05 | 2017-10-24 | 湖北源盛钢构有限公司 | 装配式住宅及施工方法 |
| CN107190889A (zh) * | 2017-06-21 | 2017-09-22 | 中天建设集团浙江钢构有限公司 | 钢框架轻质三明治板集成墙及其施工方法 |
| CN107217815B (zh) * | 2017-07-28 | 2022-11-11 | 江苏沪宁钢机股份有限公司 | 一种抗压、安全型装配式钢结构电梯井 |
| CN107700747A (zh) * | 2017-08-24 | 2018-02-16 | 华声(天津)国际企业有限公司 | 一种预制装配式建筑物 |
| CN107747386A (zh) * | 2017-11-20 | 2018-03-02 | 鞠明发 | 框架结构轻钢混凝土复合保温装饰一体化外填充墙及方法 |
| CN108049531B (zh) * | 2018-01-19 | 2023-06-23 | 辽宁工业大学 | 模块化轻木结构山墙山形板及其安装方法 |
| CN109235703A (zh) * | 2018-11-06 | 2019-01-18 | 辽宁福瑞达建筑科技有限公司 | 轻钢结构装配建筑的墙面结构 |
| CN109339447A (zh) * | 2018-11-06 | 2019-02-15 | 辽宁福瑞达建筑科技有限公司 | 轻钢结构装配建筑墙面与底盘的节点连接工法 |
| CN109339448A (zh) * | 2018-11-06 | 2019-02-15 | 辽宁福瑞达建筑科技有限公司 | 低层建筑轻钢结构墙面与墙面节点连接工法 |
| CN109577487A (zh) * | 2018-12-24 | 2019-04-05 | 重庆聚泽福机械有限公司 | 一种钢结构装配式建筑 |
| EP3816360A1 (en) * | 2019-10-30 | 2021-05-05 | Ecole Polytechnique Federale De Lausanne (EPFL) EPFL-TTO | Load bearing device |
| CN112502286A (zh) * | 2020-11-23 | 2021-03-16 | 上海绿筑住宅系统科技有限公司 | 一种模块化装配式建筑及安装方法 |
-
2008
- 2008-05-07 CN CN2008101058574A patent/CN101265723B/zh not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104631617A (zh) * | 2013-11-13 | 2015-05-20 | 戎军民 | 一种建筑承重结构件及其装配方法 |
| US12152389B2 (en) | 2018-02-13 | 2024-11-26 | Nexii Building Solutions Inc. | Prefabricated insulated building panel with cured cementitious layer bonded to insulation |
| WO2022032390A1 (en) * | 2020-08-13 | 2022-02-17 | Nexii Building Solutions Inc. | Systems and methods for constructing a multi-storey building |
Also Published As
| Publication number | Publication date |
|---|---|
| CN101265723A (zh) | 2008-09-17 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101265723B (zh) | 由复合建筑板材组装而成的建筑结构体系及建造方法 | |
| US6779314B1 (en) | Structure formed of foaming cement and lightweight steel, and a structure system and method of forming the structure system | |
| CN103821276B (zh) | 一种装配式、模块化建筑系统 | |
| CN105421818B (zh) | 嵌入式钢结构装配住宅 | |
| CN101457552A (zh) | 一种复合空心板房屋及其建造方法 | |
| CN100588810C (zh) | 既有建筑节能改造的装配式建造方法 | |
| CN102051912B (zh) | 一种低层混合轻钢结构建筑物 | |
| WO2013135108A1 (zh) | 组装式钢结构中空建筑 | |
| CN111005442B (zh) | 一种结合轻钢的sip板式结构装配式房屋建筑及其建造方法 | |
| CN110397158A (zh) | 一种箱板钢结构装配式建筑系统 | |
| CN210459560U (zh) | 用于装配式被动房热桥处理的结构及其装配式被动房 | |
| WO2007031020A1 (fr) | Type de système structurel formé de matériaux à changement de phase | |
| CN201367643Y (zh) | 由复合建筑板材组装而成的建筑结构体系 | |
| CN219241456U (zh) | 一种钢结构装配式一体化住宅 | |
| CN1888344B (zh) | 一种复合保温隔热混凝土承重墙 | |
| CN1632252B (zh) | 轻钢密柱框架建筑体系 | |
| KR101219873B1 (ko) | 구조체의 발포폼 충진을 특징으로 하는 건축공법 | |
| CN215054296U (zh) | 一种高强度防火保温隔墙结构 | |
| CN109779040B (zh) | 预制装配式轻型木结构及其安装方法 | |
| KR101387602B1 (ko) | 가구식과 벽식의 결구식 복합골조에 의한 복층 한식건축물의 층간구조 | |
| CN101016753A (zh) | 相变蓄能、循环环保、节约资源及节能省地建筑结构体系 | |
| CN2816173Y (zh) | 板式房屋的屋面结构 | |
| CN113931487B (zh) | 一种钢结构与蒸压加气混凝土板装配式别墅体系 | |
| CN105089166A (zh) | 一种自承重装配式轻型保温墙体 | |
| CN201915497U (zh) | 一种低层混合轻钢结构建筑物 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| ASS | Succession or assignment of patent right |
Owner name: BEIJING TAIKONG PANEL INDUSTRY CORP. Free format text: FORMER OWNER: FAN LI Effective date: 20100712 Free format text: FORMER OWNER: FAN ZHI |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 100077 5TH FLOOR, NORTH BUILDING, NO.1, ZHONGHE ROAD, BRIDGE SOUTH, FENGTAI DISTRICT, BEIJING CITY TO: 100070 5TH FLOOR, NORTH BUILDING, NO.1, ZHONGHE ROAD, BRIDGE SOUTH, FENGTAI DISTRICT, BEIJING CITY |
|
| TA01 | Transfer of patent application right |
Effective date of registration: 20100712 Address after: 100070 Beijing city Fengtai District bridge in No. 1 North Road, building five floor Applicant after: BEIJING TAIKONG PANEL INDUSTRY Corp. Address before: 100077 Beijing city Fengtai District bridge in No. 1 North Road, building five floor Applicant before: Fan Li Co-applicant before: Fan Zhi |
|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20080917 Assignee: Shanghai dream Investment Advisory Service Center (limited partnership) Assignor: Beijing Taikong Panel Industry Corp. Contract record no.: 2017990000023 Denomination of invention: Architecture structure system assembled by composite building board and building method Granted publication date: 20120815 License type: Common License Record date: 20170113 |
|
| LICC | Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120815 |