CN101210729B - Air-conditioner - Google Patents

Air-conditioner Download PDF

Info

Publication number
CN101210729B
CN101210729B CN2007101598741A CN200710159874A CN101210729B CN 101210729 B CN101210729 B CN 101210729B CN 2007101598741 A CN2007101598741 A CN 2007101598741A CN 200710159874 A CN200710159874 A CN 200710159874A CN 101210729 B CN101210729 B CN 101210729B
Authority
CN
China
Prior art keywords
tooth bar
mentioned
shutter
air conditioner
blinds
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2007101598741A
Other languages
Chinese (zh)
Other versions
CN101210729A (en
Inventor
古田辰夫
新井康之
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Publication of CN101210729A publication Critical patent/CN101210729A/en
Application granted granted Critical
Publication of CN101210729B publication Critical patent/CN101210729B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The aim of the present invention is to provide an air conditioner with good appearance capable of opening and closing swimmingly and automatically a louver of an air outlet locatig on the top of the main body front. The air conditioner is characterized in that including a louver (9), tracks (11) (12) for the louver, rack (20), tracks (18) (19) for the rack, rack side connecting part, louver side connecting part, left and right cams; the louver (9) can move up and down to open or close the air outlet (6); the tracks (11) (12) for the louver is provided with track grooves (11a) (12a) locating on the left and the right of the air outlet (6) for guiding pins (9a) of the louver (9); the rack (20) is lifted by a pinion (16), and setting sliding pins on left and right end of the upper and the lower; the tracks (18) (19) for the rack is provided with track groove for guiding sliding pins, to hold the rack moving up and down, and locating on left-right sides; the rack side connecting part is formed on left-right end of the upper of the rack (20); the louver side connecting part is formed inside the bottom of the louver (9) relative to the rack side connecting part; the two cams, rack side mounting axis and rack side connecting part are connected with each other; the louver side mounting axis is connected with the opposite louver side connecting part.

Description

Air conditioner
Technical field
The present invention relates to be provided with the air conditioner of shutter at blow-off outlet.
Background technology
In order to provide a kind of batten not outstanding to foreign side from the opening surface of air blow-off outlet, and has the air conditioner that can not carry out the batten of ugly motion, following air conditioner has been proposed, promptly, have a series of cell body, flexible batten and drive member, this a series of cell body from the lower end, both sides of the opening surface of air blow-off outlet towards the top, and near top lentamente towards the rear, with the length setting of regulation; These flexibility batten both sides engage with this cell body, move forward and backward up and down, and simultaneously, moving up and down at the left and right directions that opens and closes the air blow-off outlet of its front is strong, have flexibility at fore-and-aft direction up and down; This drive member makes this batten move along cell body to stop (for example, with reference to patent documentation 1).
In addition, also proposed cabinet door move up and down device, the door of this cabinet move up and down device opens and closes peristome in electronic instrument door when moving up and down, when door is mentioned upward, close with respect to peristome and to cover, along guide groove to the pilot pin channeling conduct, so that the front of face and chassis body is with one side in front of the door, simultaneously, when door is open, translational speed when descending (for example, with reference to patent documentation 2) by the damping member control gate.
[patent documentation 1] spy open flat 5-141765 communique (second page-three pages, Fig. 4-Fig. 5)
[patent documentation 2] real open flat 5-25515 communique (the 5th page-six pages, Fig. 1-Fig. 4)
But, as the batten of the described flexibility by ripple etc. of above-mentioned patent documentation 1 open and close in the device of blow-off outlet, have following problem, that is, batten price height, in addition, the outward appearance of ripple is not so good, also has sonorific possibility when moving up and down.
In addition, as above-mentioned patent documentation 2 described have with the front of chassis body for one side and block in the device of shutter door of peristome, not to make shutter door automatically up and down driving constitute and do not describe particularly.
The present invention produces in order to solve problem as described above, and its objective is provides that a kind of to have aesthetic appearance good, and automatic shutter is configured in the air conditioner of shutter of the air blow-off outlet of main body front upper swimmingly.
Summary of the invention
A kind of air conditioner, this air conditioner is to carrying out heat exchange by blowing fan from the room air that the suction inlet of bottom sucks, blow out to indoor from the blow-off outlet on top, it is characterized in that, have shutter, two used in blinds tracks, tooth bar, tooth bar with track, tooth bar side linking part, blinds reveal linking part, about two cams
Described shutter moves up and down, the above-mentioned blow-off outlet of automatic shutter, and left and right end portions is provided with pin on top;
Described two used in blinds tracks have the rail groove to the above-mentioned pin channeling conduct of above-mentioned shutter, be arranged on above-mentioned blow-off outlet about;
The pinion oscilaltion that described tooth bar rotates by Yin Mada, the left and right end portions in the upper and lower is being provided with sliding pin;
Described tooth bar has the rail groove that guides above-mentioned sliding pin with track, can keep above-mentioned tooth bar up or down, and be arranged on the left and right sides sidepiece of above-mentioned tooth bar;
Described tooth bar side linking part is formed on the top left and right end portions of above-mentioned tooth bar;
Described blinds reveal linking part is formed on the inside, bottom of above-mentioned shutter with respect to above-mentioned tooth bar side linking part;
The tooth bar side installation portion and the above-mentioned tooth bar side linking part of one on two cams links another blinds reveal installation portion and relative above-mentioned blinds reveal linking part binding about described;
End difference is formed at the bottom at above-mentioned shutter, and when above-mentioned shutter was closed, the above part of the end difference of above-mentioned shutter became and the roughly same one side of above-mentioned front panel.
The invention effect
Relevant air conditioner aesthetic appearance of the present invention good and swimmingly automatic shutter be configured in the air blow-off outlet of main body front upper.
Description of drawings
Fig. 1 is the figure of expression embodiment 1, is the stereogram of expression vertical air conditioner 100.
Fig. 2 is the figure of expression embodiment 1, is the part front view ((a) is the state of having closed shutter 9, (b) is the state of having opened shutter 9) of vertical air conditioner 100.
Fig. 3 is the figure of expression embodiment 1, is that inner body, the suction grid 2 that has omitted vertical air conditioner 100 waits the exploded perspective view of representing.
Fig. 4 is the figure of expression embodiment 1, is the stereogram that the formation of the batten unit 10 of vertical air conditioner 100 and back plate 15 describes.
Fig. 5 is the figure of expression embodiment 1, is the front view of the tooth bar 20 of expression vertical air conditioner 100.
Fig. 6 is the figure of expression embodiment 1, sees the stereogram of the tooth bar 20 of vertical air conditioner 100 from the inboard.
Fig. 7 is the figure of expression embodiment 1, is partly cut-away's tooth bar 20, and the major part stereogram of the engagement of the tooth bar 20 of vertical air conditioner 100 and pinion 16 is described.
Fig. 8 is the figure of expression embodiment 1, is the stereogram of the installation of explanation motor 17 of vertical air conditioner 100 and pinion 16.
Fig. 9 is the figure of expression embodiment 1, represents the tooth bar 20 of vertical air conditioner 100 and the figure of the cam 21 that shutter 9 links ((a) is front view, (b) is stereogram).
Figure 10 is the figure of expression embodiment 1, is the major part stereogram of the linking part of expression tooth bar 20 of vertical air conditioner 100 and cam 21.
Figure 11 is the figure of expression embodiment 1, sees the stereogram of the shutter 9 of vertical air conditioner 100 from the inboard.
Figure 12 is the figure of expression embodiment 1, is the used in blinds track 11,12 of vertical air conditioner 100 and the stereogram that tooth bar describes with track 18,19.
Figure 13 is the figure of expression embodiment 1, is based on the major part side view cutaway drawing that shutter 9 bottoms of vertical air conditioner 100 and cam 21 and tooth bar describe with the action of track 18.
Figure 14 is the figure of expression embodiment 1, is the flow chart that the on-off action based on the shutter 9 of the running of vertical air conditioner 100 is described.
Symbol description
1 air conditioner main body, 2 suck grid, 3 suction inlets, 4 filters, 6 blow-off outlets, 7 front panels, 8 controller portions, 9 shutters, the 9a pin, the 9b end difference, 9c below end difference, 9d top end difference, the 9e installation portion, 10 batten unit, the 10a horizontal slats, 11 used in blinds tracks, the 11a rail groove, the 11b rake, 12 used in blinds tracks, the 12a rail groove, the 12b rake, 13 side covers, 14 side covers, 15 back plates, 16 pinions, 17 motors, 18 tooth bar tracks, the 18a rail groove, 18b presses the last item guiding groove, the 18c front side wall, the open rake of 18d, 19 tooth bar tracks, the 19a rail groove, 19b presses the last item guiding groove, the 19c front side wall, the open rake of 19d, 20 tooth bars, the 20a gear, the 20b sliding pin, the 20c installation portion, the 20d installing hole, 20e erects sheet is set, the 20f guiding wall, 21 cams, 22 tooth bar side installation shaft, the 22a root portion, the 22b leading section, 23 blinds reveal installation shaft, the 23a root portion, the 23b leading section, 24 press last item, 30 press pad, 100 vertical air conditioners.
The specific embodiment
Embodiment 1
Below, by Fig. 1 to Figure 14, the air conditioner based on embodiments of the present invention 1 is described.In addition, the example of vertical air conditioner as air conditioner described.
Fig. 1 to Figure 14 is the figure of expression embodiment 1.Fig. 1 is the stereogram of expression vertical air conditioner 100, Fig. 2 is that ((a) is the state of having closed shutter 9 for the partial front elevation view of vertical air conditioner 100, (b) be the state of having opened shutter 9), Fig. 3 is the inner body that has omitted vertical air conditioner 100, suck grid 2 and wait the exploded perspective view of representing, Fig. 4 is the batten unit 10 of explanation vertical air conditioner 100 and the stereogram of the formation of back plate 15, Fig. 5 is the front view of the tooth bar 20 of expression vertical air conditioner 100, Fig. 6 is a stereogram of seeing the tooth bar 20 of vertical air conditioner 100 from the inboard, Fig. 7 is the major part stereogram of the engagement of explanation tooth bar 20 of vertical air conditioner 100 and pinion 16, Fig. 8 is the stereogram of the installation of explanation motor 17 of vertical air conditioner 100 and pinion 16, Fig. 9 represents that ((a) is front view for the tooth bar 20 of vertical air conditioner 100 and the figure of the cam 21 that shutter 9 links, (b) be stereogram), Figure 10 is the major part stereogram of the linking part of expression tooth bar 20 of vertical air conditioner 100 and cam 21, Figure 11 is a stereogram of seeing the shutter 9 of vertical air conditioner 100 from the inboard, Figure 12 is the used in blinds track 11 of explanation vertical air conditioner 100,12 and tooth bar with track 18,19 stereogram, Figure 13 is explanation based on shutter 9 bottoms of vertical air conditioner 100 and cam 21 and the tooth bar major part side view cutaway drawing with the action of track 18, and Figure 14 is the flow chart of explanation based on the on-off action of the shutter 9 of the running of vertical air conditioner 100.
In Fig. 1, as the air conditioner main body 1 of the indoor unit of vertical air conditioner 100 will be by blowing fan 5 the suction inlet 3 offered from the left and right side of the suction grid 2 that is arranged on the below, front of rotation (Fig. 1, one-sided two) room air that sucks by the filter 4 that is used to remove dust, heat exchanger by the not shown inside that goes out, cool off or heat, and blow out to indoor from the blow-off outlet 6 (among Fig. 1, being covered by shutter 9) on top, carry out indoor refrigeration and heat.
In addition, below blow-off outlet 6 and suck between the grid 2 and have front panel 7, the controller portion 8 that the running of vertical air conditioner 100 is controlled is set in the bottom of this front panel 7.
Then, have the shutter 9 of automatic shutter at blow-off outlet 6, the shutter 9 of this automatic shutter is by elevating mechanism described later, shown in Fig. 2 (a) and (b), when the running of vertical air conditioner 100 stops, roughly simultaneously close blow-off outlet 6 together with front panel 7 in front, can make aesthetic appearance good, and do not make foreign matter enter blow-off outlet 6, simultaneously, when making vertical air conditioner 100 runnings, descend automatically, blow-off outlet 6 is opened at the rear of hidden plate in front 7.
In addition, in this example shown in Figure 1, it is not only plate 7 in front, also the suction inlet 3 that sucks grid 2 is set at left and right sides face, can be not noticeable so that see from the place ahead, therefore, under the state of having closed shutter 9, can access as Fig. 1, Fig. 2 (a), make the front of air conditioner main body 1 rare concavo-convex, outward appearance is very good.
As shown in Figure 2, about shutter 9 and front panel 7, width and the side cover 13,14 that the front and back width of the side that sucks grid 2 equates are set, make aesthetic appearance better.
Shown in Fig. 2 (b), blow-off outlet 6 is made of batten unit 10.On batten unit 10, be installed with and make wind direction deflection a plurality of horizontal slats 10a up and down, the a plurality of vertical batten that makes about wind direction deflection (not shown go out) is installed at its rear, by changing the inclination angle of this horizontal slats 10a and vertical batten, can regulate the air supply direction that blows out from blow-off outlet 6 according to user's hobby.
By Fig. 3, inner part formation in addition is described.The cabinet 1a of air conditioner main body 1 is made of left and right side, top, the inside, base.
Batten unit 10 is installed on the cabinet 1a.The left and right sides in batten unit 10 by the screw connection etc., is installed with long up and down used in blinds track 11,12, and this used in blinds track 11,12 guides up and down for shutter 9 is opened and closed, and is left-right symmetry shape roughly.
In the inboard separately of this used in blinds track 11,12, form rail groove 11a, 12a, enter this rail groove 11a, 12a and slide up and down at the set pair of pin 9a in the top, left and right side of shutter 9.Above the top of rail groove 11a, 12a forms along with convergence respectively and to rake 11b, the 12b of front face side transition, rise at shutter 9, when closing blow-off outlet 6, about the forwards mobile 15mm in shutter 9 tops, make shutter 9 tops and front panel 7 be positioned at anterior locations equally.
Then, to be arranged on batten unit 10 below, be configured in the back of front panel 7, and the back plate 15 that is installed on the chassis body 1a describes.This back plate 15 is fixed on the cabinet 1a, makes air conditioner main body 1 firm, simultaneously, part that makes shutter 9 liftings etc. is installed.In addition, this back plate 15 when opening shutter 9, the shutter 9 that formation will be fallen be housed in and front panel 7 between the space.
Then, this back plate 15 central portion near, from the back plate 15 the inboard connecting motor 17 by screw, this motor 17 is so that the mode that pinion 16 exposes slightly is configured, this pinion 16 is set in the rising or falling speed of shutter 9 about 20-30mm/s.In addition, as shown in Figure 8, pinion 16 is inserted on the axle that is fixed on motor 17.Then, has tooth bar 20, this tooth bar 20 the inboard between the width of the left and right sides form with the tooth engagement of this pinion 16 on next column gear 20a (with reference to Fig. 6), by the rotation based on motor 17 of pinion 16, form with lengthwise and the wider width ground that moves up and down.
Then, to roughly symmetry and vertically long tooth bar are fixed on the front of plate 15 afterwards with track 18,19 by screw etc. about being shaped as of this tooth bar 20 channeling conducts, tooth bar 20, can remain on the plate 15 of back (with reference to Fig. 4) with track 18,19 up or down by tooth bar.
In addition; in the width of the left and right sides of this tooth bar 20; the pinion 16 of Xing Chenging is housed in the left and right sides width interior (with reference to Fig. 7) of tooth bar 20 significantly, and therefore, cover in tooth bar 20 joint portion of the tooth of pinion 16, pinion 16; be protected; can prevent that foreign matter etc. from entering engaging piece, causes fault, simultaneously; by the tooth bar 20 of wider width, tooth bar 20 can positively move up and down.In addition, because make motor 17 become the formation of coming screw to connect from the rear side of back plate 15, so, can carry out the dismounting of motor 17 and pinion 16 easily.
Then,, make the structure of the tooth bar 20 of shutter 9 liftings, use Fig. 5 to illustrate in further detail moving up and down.Tooth bar 20 is formed long up and down shape, has outstanding to the left and right, one-sided each two sliding pin 20b in the upper and lower of left and right side.These one-sided each two sliding pin 20b are spreading all over tooth bar with up and down formed relative rail groove 18a, the 19a of track 18,19 and be directed by entering, make tooth bar 20 under the state that left and right directions and fore-and-aft direction are firmly held, passing through gear 20a based on the rotation of pinion 16 and the engagement of counter-rotating, make tooth bar 20 be maintained under the state of plate 15 fronts, back oscilaltion.
In addition, prevent situation such as Fig. 3, shown in Figure 7 that tooth bar 20 moves to the left and right, about the right side of pinion 16, be arranged on back plate 15 sides by pad 30, in the gear 20a of the tooth of pinion 16 and tooth bar 20 engagement and when moving up and down, the guiding wall 20f up and down of the inside by will being formed on tooth bar 20 more longways is by pressing to this by pad 30, in view of the above, tooth bar 20 can oscilaltion by the rotation of pinion 16 can not side-to-side movement under the maintained state in ground.
In addition, both sides on tooth bar 20 tops that constitute by plastic components, form installation portion 20c as tooth bar side linking part highlightedly to both sides of the chest integratedly, this installation portion 20c direction forwards, backwards rotates two cams 21 that freely are installed with as the binding parts that link with shutter 9 respectively.This installation portion 20c erects relatively upward respectively and is provided with, and simultaneously, by the setting with relative installing hole 20d that usefulness is installed sheet 20e is set, and is formed in integratedly on the tooth bar 20.In addition,, make left and right sides balance good, and tooth bar 20 is configured in apart from the central authorities of the left and right directions of shutter 9 identical position, the left and right sides roughly for the position, the left and right sides that makes installation portion 20c width with respect to shutter 9.
Then, by Fig. 9, the detailed structure of cam 21 is described.Two cams 21 of as a comparison little part use identical cam in this embodiment, and at the linking part of tooth bar 20, shutter 9, for easy rotation, the plastic components by the material of skidding easily forms.Like this, cam 21 has the tooth bar side installation shaft 22 as tooth bar side installation portion on one, with the blinds reveal installation shaft 23 that has on another as blinds reveal installation portion, this tooth bar side installation portion is as rotating the installation portion that freely links to tooth bar 20, and two side-prominent to the left and right; This blinds reveal installation portion as with this tooth bar side installation shaft 22 on the same straight line of vertical direction up and down, rotate freely the installation portion that the bottom with shutter 9 links at fore-and-aft direction, and two side-prominent to the left and right.
In addition, between tooth bar side installation shaft 22 and blinds reveal installation shaft 23, integrally formed push usefulness by last item 24, this is pushed comparing with the straight line that tooth bar side installation shaft 22 and blinds reveal installation shaft 23 are linked by last item 24 of usefulness and is formed on rear side, compare further to the left and right about each outstanding 10mm of side with tooth bar side installation shaft 22 and blinds reveal installation shaft 23, the shapes of cam 21 itself are formed at the center almost left-right symmetry.Like this, make the position that the axle center constituted relation become configuration triangular in shape by last item 24 and tooth bar side installation shaft 22 and blinds reveal installation shaft 23.In addition, in the mode that the front and back position and the blinds reveal installation shaft 23 of tooth bar side installation shaft 22 are compared at rear side, the installation portion 20c of configuration tooth bar side and the installation portion 9e of blinds reveal.
In addition, the shape of tooth bar side installation shaft 22 is in order to link with installation portion 20c as the linking part of tooth bar 20 well, the root portion 22a of Y-axis form than the diameter dimension of installing hole 20d thick (
Figure G200710159874101D00081
About), be sandwiched in to erect and be provided with between the sheet 20e and form.
Embedding installing hole 20d also is bonded, and the leading section 22b that has ladder of rotation is formed diameter dimension and installing hole 20d is roughly the same.Like this, as shown in figure 10, on the installation portion 20c about tooth bar 20, the tooth bar side installation shaft 22 of cam 21 is pressed into to erect is provided with between the sheet 20e, the leading section 22b of tooth bar side installation shaft 22 embeds installing hole 20d, and cam 21 is with respect to tooth bar 20, and freedom of movement ground links well forwards, backwards.
In addition, the shape of blinds reveal installation shaft 23 is formed also that roughly rugosity and size and tooth bar side installation shaft 22 are roughly the same.Installation to shutter 9 sides of cam 21 describes.Seeing shown in the stereogram of shutter 9 from the inboard as shown in figure 11 in the bottom of the shutter 9 that is made of plastic components, spreaded all over the whole width of shutter, and the mode so that the front from shutter 9 rearward descends forms end difference 9b.This end difference 9b be formed the below below end difference 9c with compare two ladders up and down that further rearward conceal into the top end difference 9d of several millimeter above it with below end difference 9c.
Then, on end difference 9b as the bottom of these shutter 9 the insides, as to the blinds reveal installation shaft 23 of cam 21 about the installation portion 9e that fore-and-aft direction rotates the blinds reveal linking part that freely links is formed on.Installation portion 9e about this is the shape roughly the same with the installation portion 20c of tooth bar 20, be set at tooth bar 20 about roughly the same position, the installation portion 20c left and right sides.Same with the installation portion 20c of tooth bar 20, be provided with by relatively erectting upward respectively, simultaneously, the setting with relative installing hole 9f that usefulness is installed is provided with sheet 9g, is formed on the shutter 9.
In addition, in this embodiment, be the circular hole shape identical with leading section 22b though represented installing hole 20d, but, as long as the leading section 22b that embeds can rotate well, can not come off, other shape also can, for example, also can be made into, making installing hole 20d is the U word shape, forms to suppress, the projection that the leading section 22b of embedding can be rotated well, can not come off etc., and be wholely set on tooth bar 20.
Like this, be formed with tooth bar side installation shaft 22 and roughly link well for installation portion 9e with shutter 9 with the blinds reveal installation shaft 23 of shape, the root portion 23a of Y-axis form diameter than the diameter of installing hole 9f thick (
Figure G200710159874101D00091
About), be sandwiched between the installation sheet 9g.
Embedding installing hole 9f also is bonded, and the leading section 23b that has ladder of rotation is formed diameter dimension and installing hole 9f is roughly the same.Like this, same with the installation portion 20c of tooth bar 20, on the installation portion 9e about shutter 9, the blinds reveal installation shaft 23 of cam 21 is pressed into to erect is provided with between the sheet 9g, the leading section 23b of blinds reveal installation shaft 23 embeds installing hole 9f, cam 21 with respect to shutter 9 forwards, backwards direction rotate freely and link well, by cam 21, the bottom of shutter 9 is attached on the tooth bar 20 well, by tooth bar 20, and the bottom motion to the left and right of restriction shutter 9.Then, like this, from the installation portion 20c of tooth bar 20 by cam 21, the installation portion 9e of shutter 9 about on the same straight line under being attached at haply, therefore,, can mention the bottom of shutter 9 swimmingly by the rising of tooth bar 20.
Then, to further the side is outstanding to the left and right from the tooth bar side installation shaft 22 of cam 21 and blinds reveal installation shaft 23, and is formed diameter and describes than tooth bar side installation shaft 22 and the 23 thick motions of blinds reveal installation shaft by last item 24.Because the tooth bar about relative is used on the track 18,19, form front side wall 18c, 19c, can forwards not push so that make by last item 24 with exposing, so, shown in Figure 12 waits, the outside about from top to the centre, being formed on, and with arranged side by side being formed on the tooth bar usefulness track 18,19 with guiding groove 18b, 19b of rail groove 18a, the 19a of tooth bar 20 usefulness by last item.
Like this, the tooth bar that the axle by last item 24 its right sides of the cam 21 on right side enters the right side with track 19 by last item with guiding groove 19b and be directed, in addition, the axle by its left side of last item 24 of the cam 21 in the left side tooth bar that enters the left side with track 18 by last item with guiding groove 18b and be directed.
In addition, make this by last item guiding groove 18b, the front side wall 18c of 19b, the front side wall on the top of 19c partly becomes along with the convergence top, open rake 18d and form to the front face side transition, 19d, rising to this opening rake 18d by last item 24, during 19d, press last item 24 at open rake 18d, 19d reaches front face side, simultaneously, it is forwards open to press last item 24, cam 21 forwards rotates, the bottom of shutter 9 forwards is pushed out, by the top end difference 9d of shutter 9, the top becomes the anterior locations same with front panel 7, can block blow-off outlets 6 by shutter 9.
Illustrate in greater detail the action of shutter 9 bottoms.Figure 13 is that the tooth bar in explanation left side is analysed and observe key diagram with the side-looking of the major part of the action of the cam 21 on the top of track 18 and shutter 9.The line of cam 21 usefulness single-points is represented.In addition, tooth bar 20 is only represented the sliding pin 20b on top with the single-point line.The action of position when the position of B rises of shutter 9 A from figure is described then.
In the drawings about the position of A, shutter 9 is positioned at the rear of comparing with front panel 7 at shutter 9, and shutter 9 rises on the rear of plate in front.At this moment, the tooth bar side installation shaft 22 of deadweight of having born shutter 9 forms installation portion 20c being positioned at the mode at the rear of comparing with blinds reveal installation shaft 23, and therefore, because the deadweight of shutter 9, forwards Xuan Zhuan power always is applied on the cam 21.But, because be pressed axle with the front side wall 18c pushing of guiding groove 18b, so even shutter 9 rises, shutter 9 can forwards not move yet by last item 24.
Then, if because the rising of tooth bar 20, shutter 9 further rises to the position of B among the figure, then arrive at by the open rake 18d of last item with guiding groove 18b by last item 24, forwards move along open rake 18d, because the deadweight of shutter 9, cam 21 forwards rotates, release the bottom of shutter 9, therefore, shutter 9 forwards stretches out, by the top end difference 9d of shutter 9, be the anterior locations identical up, can block blow-off outlet 6 with front panel 7.In addition, in the explanation of Figure 13, the tooth bar in left side is illustrated with track 18, the tooth bar on relative right side by cam 21, similarly forwards stretches out shutter 9 with track 19 also action simultaneously.
In addition, in the bottom of shutter 9 when so forwards mobile, top at shutter 9, the pin 9a on top is also as above-mentioned, forwards move from rake 11b, the 12b of rail groove 11a, the 12a of used in blinds track 11,12, the part of the covering blow-off outlet 6 of shutter 9 and front panel 7 front and back are with one side.
In addition, in this embodiment, when end difference 9b is formed at the bottom at shutter 9, during shutter 9 total blockage blow-off outlets 6, end difference 9b overlaps the back of plate 7 in front, therefore, because the end difference 9b of front panel 7 and shutter 9 can not see the inside of air conditioner main body 1 from the gap of upper section.
In addition, end difference 9b also is two ladders, top end difference 9d forms deeplyer than below end difference 9c, and therefore, the angle one side when the end difference 9b top of the top of front panel 7 and shutter 9 is moving forward and backward, during the one side lifting, be difficult to interfere with front panel 7, can easily make the shape on front panel 7 tops, simultaneously, by dark top end difference 9d, can improve the intensity of the left and right sides width of shutter 9.
In addition, in above-mentioned, shutter 9 is risen, the situation of closing blow-off outlet 6 is illustrated, and under the situation of opening shutter 9, can certainly shutter 9 rearward be moved by the opposite action of each part, is housed in the rear of front panel 7.
In addition, in this embodiment, what represent is, because formed to prevent when rising to the position of regulation by last item 24, cam 21 forwards rotates, simultaneously, and at open rake 18d, 19d, the front side wall 18 that the mode that can forwards rotate is open, 19c, so, at tooth bar track 18, form on 19 by last item guiding groove 18b, 19b has reduced number of spare parts, make easily, cheap article, but, also can with tooth bar with track 18,19 splits ground forms pushes axle guiding groove 18b, 19b also can only form front side wall 18c, the part of 19c, even not necessarily groove shape also can form.
Then, to shutter 9 can by tooth bar 20 and cam 21 can the side-to-side vibrations smooth and easy lifting in ground suitable dimensions describe.As can be seen from Figure 5, form highlightedly at the left and right sides both sides of the chest on tooth bar 20 tops, as respectively and about the linking part that links of cam 21 about installation portion 20c between size E, be narrow width with respect to the scope of the 1/4-2/4 of the width G size of shutter shown in Figure 11 9.In addition, form highlightedly as inboard one at the shutter 9 that constitutes by plastic components, as respectively and about cam 21 another binding linking part about installation portion 9e between size F too, be the narrow width with respect to the scope of the 1/4-2/4 of the width G size of shutter 9, lifting shutter 9 very swimmingly.
Like this, linking the size F between the installation portion 9e of size E between the installation portion 20c of tooth bar 20 of both sides up and down of this left and right sides cam 21 and shutter 9 respectively, if 1/4 left and right sides than the width dimensions G size of shutter 9 is narrow, then the width of tooth bar 20 is narrow, tooth bar 20 tilts easily, not only is difficult to carry out the lifting of tooth bar 20, and, the lifting power of tooth bar 20 is difficult to transmit to shutter 9 from cam 21, is difficult to mention swimmingly shutter 9.
In addition, size E and size F get final product about half of G size.If the size F between the installation portion 9e of size E between installation portion 20c and shutter 9 is 2/4 wideer than the width dimensions G size of shutter 9, then exist the left and right sides width of tooth bar 20 wide, tooth bar 20 increases, weightening finish, tilt easily, simultaneously, in order to make 20 liftings of big, heavy tooth bar, the big motor that needs strong moment of torsion, the technical problem of energy that need be useless etc.
Therefore, the size of space F of installation portion 9e that makes the installation portion 20c size of space E of tooth bar 20 and shutter 9 gets final product in the narrow scope (scope of about 25%-about 50%) of the 1/4-2/4 of the left and right sides of shutter 9 width G size shown in following formula.
(G*1/4)≤E≤(G*2/4)
(G*1/4)≤F≤(G*2/4)
By becoming such size, prevented inclination as the installation portion 20c about the linking part on tooth bar 20 tops, can by about cam 21, mention shutter 9 swimmingly, can carry out the lifting of shutter 9 swimmingly.
In addition, size E and size F are in same position, the left and right sides with respect to cam 21.
Like this, because make the size of space F of installation portion 9e of the size of space E of installation portion 20c of tooth bar 20 and shutter 9 identical, be in identical position, the left and right sides, so, the power of tooth bar 20 liftings easily by about cam 21 transmit to shutter 9, can make shutter 9 liftings swimmingly.
In addition, the size of space F of the size of space E of installation portion 20c and installation portion 9e makes the warpage of cam 21, even there are some different sizes also passable.
In addition,, make the width G of shutter 9 be of a size of 500mm, make size E between tooth bar 20 installation portion 20c and the size G between shutter 9 installation portion 9e be respectively 190mm, just can make shutter 9 liftings swimmingly by the lifting of tooth bar 20 as an example.
In addition, in the above-described embodiment, expression be to make about being shaped as of cam 21 roughly symmetry, about cam 21 use same cam, because of assembly defect, produce the cheap article of expense that cause in batches, but, press in the last item 24, the cam 21 on right side can not have the left side by last item 24, in addition, the cam 21 in left side can not have yet the right side by last item 24, can be about respectively different cam faces.
Then, by the flow chart of Figure 14, the summary with the automatic shutter action of the shutter 9 of the running of vertical air conditioner 100 action interlock is described.
(1) in step 101, pushes the running switch of the controller portion 8 of vertical air conditioner 100.
(2) in step 102, motor 17 starting operations, tooth bar 20 descends, and shutter 9 descends, and opens blow-off outlet 6.
(3) in step 103,, detect the situation that shutter 9 is opened fully by the not shown detecting sensor that goes out etc.
(4) in step 104, if detecting shutter 9 opens fully, then motor 17 stops.
(5) in step 105, the running of putting in blast fan 5, carry out based on the not shown cold-producing medium circulation that goes out etc. refrigeration, heat.
(6) then, under the situation of the running that finishes air conditioner, in step 106, slave controller portion 8 closes the running switch of air conditioner.
(7) in step 107, the running of out-of-blast fan 5, stop based on cold-producing medium circulation etc. refrigeration, heat.
(8) in step 108, make motor 17 counter-rotatings, tooth bar 20 is risen, mention shutter 9, close blow-off outlet 6.
(9) in step 109,, detect the situation that shutter 9 is closed fully by the not shown detecting sensor that goes out etc.
(10) if by detecting sensor etc., detect shutter 9 to close fully, then in step 110, stop motor 17, stop the running of vertical air conditioner 100, until next running instruction is arranged.
Like this, can access that to have the shutter 9, the aesthetic appearance that automatically open and close swimmingly good, and the dust vertical air conditioner 100 that is difficult to enter.
The air conditioner of relevant present embodiment since make size between tooth bar side linking part and the size between blinds reveal linking part in the scope of the 1/4-2/4 of the left and right sides of shutter width, therefore, can open and close shutter swimmingly.
In addition, the air conditioner of relevant present embodiment because have rake, by last item and by the last item guiding groove, described rake is formed on the top of the rail groove of used in blinds track, the inclination forwards along with the convergence top; Between the described tooth bar side installation shaft and blinds reveal installation shaft that is formed on cam by last item, outstanding laterally from tooth bar side installation shaft and blinds reveal installation shaft; Described have the front side wall that is arranged on tooth bar usefulness track by last item with guiding groove, with the part on the top that makes this front side wall along with the convergence top, and to the front inclination oblique open rake, therefore, the front that can make shutter and front panel is that aesthetic appearance is good with one side.
In addition, the air conditioner of relevant present embodiment is owing to form end difference in the bottom of shutter, when shutter is closed, the part more than the end difference of shutter with front panel for roughly with one side, so can not see inside from the gap.
In addition, about the air conditioner of present embodiment because end difference has the below end difference and also to be deep into than below end difference in the top end difference of portion, therefore, can suppress the interference of shutter and front panel, and improve the intensity of shutter.
In addition, the air conditioner of relevant present embodiment is owing to driven by motor, and the pinion that will have with the tooth of the gears engaged of tooth bar is arranged in the left and right sides width of tooth bar, therefore, can also prevent that foreign matter etc. from entering the engaging piece of pinion, causes the situation of fault.

Claims (5)

1. air conditioner, this air conditioner is to carrying out heat exchange by blowing fan from the room air that the suction inlet of bottom sucks, blow out to indoor from the blow-off outlet on top, it is characterized in that, have shutter, two used in blinds tracks, tooth bar, tooth bar with track, tooth bar side linking part, blinds reveal linking part, about two cams
Described shutter moves up and down, the above-mentioned blow-off outlet of automatic shutter, and left and right end portions is provided with pin on top;
Described two used in blinds tracks have the rail groove to the above-mentioned pin channeling conduct of above-mentioned shutter, be arranged on above-mentioned blow-off outlet about;
The pinion oscilaltion that described tooth bar rotates by Yin Mada, the left and right end portions in the upper and lower is being provided with sliding pin;
Described tooth bar has the rail groove that guides above-mentioned sliding pin with track, can keep above-mentioned tooth bar up or down, and be arranged on the left and right sides sidepiece of above-mentioned tooth bar;
Described tooth bar side linking part is formed on the top left and right end portions of above-mentioned tooth bar;
Described blinds reveal linking part is formed on the inside, bottom of above-mentioned shutter with respect to above-mentioned tooth bar side linking part;
The tooth bar side installation portion and the above-mentioned tooth bar side linking part of one on two cams links another blinds reveal installation portion and relative above-mentioned blinds reveal linking part binding about described;
End difference is formed at the bottom at above-mentioned shutter, and when above-mentioned shutter was closed, the above part of the end difference of above-mentioned shutter became and the roughly same one side of above-mentioned front panel.
2. air conditioner as claimed in claim 1 is characterized in that, above-mentioned end difference has the below end difference and also will be deep into the top end difference of the inside than above-mentioned below end difference.
3. air conditioner as claimed in claim 1 or 2 is characterized in that, makes size between above-mentioned tooth bar side linking part and the size between the above-mentioned blinds reveal linking part scope at the 1/4-2/4 of the left and right sides of above-mentioned shutter width.
4. air conditioner as claimed in claim 1 or 2 is characterized in that, have rake, by last item and about the front side wall of using by last item,
Described rake is formed on the top of the rail groove of above-mentioned used in blinds track, forwards tilts along with the convergence top;
Between the described above-mentioned tooth bar side installation portion and above-mentioned blinds reveal installation portion that is formed on above-mentioned cam by last item, outstanding laterally from above-mentioned tooth bar side installation portion and above-mentioned blinds reveal installation portion;
The front side wall of using by last item about described is pushed, so that above-mentionedly can forwards not expose by last item, simultaneously, has open rake, and this opening rake makes the part on top oblique to the front inclination along with the convergence top.
5. air conditioner as claimed in claim 1 is characterized in that, is driven by said motor, and the above-mentioned pinion that has with the tooth of the gears engaged of above-mentioned tooth bar is arranged in the left and right sides width of above-mentioned tooth bar.
CN2007101598741A 2006-12-26 2007-12-25 Air-conditioner Active CN101210729B (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2006-348709 2006-12-26
JP2006348709A JP4328353B2 (en) 2006-12-26 2006-12-26 Air conditioner
JP2006348709 2006-12-26

Publications (2)

Publication Number Publication Date
CN101210729A CN101210729A (en) 2008-07-02
CN101210729B true CN101210729B (en) 2010-08-04

Family

ID=39610920

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007101598741A Active CN101210729B (en) 2006-12-26 2007-12-25 Air-conditioner

Country Status (2)

Country Link
JP (1) JP4328353B2 (en)
CN (1) CN101210729B (en)

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4698726B2 (en) * 2008-12-18 2011-06-08 三菱電機株式会社 Floor-standing air conditioner
KR101552614B1 (en) * 2009-10-08 2015-09-18 엘지전자 주식회사 air conditioner
JP5289271B2 (en) * 2009-10-23 2013-09-11 三菱電機株式会社 Air conditioner
JP6116840B2 (en) * 2012-09-14 2017-04-19 三菱重工業株式会社 Air conditioner
JP6053410B2 (en) * 2012-09-14 2016-12-27 三菱重工業株式会社 Air conditioner
NZ730234A (en) 2014-12-22 2019-03-29 Mitsubishi Electric Corp Printed wiring board, circuit board, and control unit
CN105194938B (en) * 2015-10-14 2017-03-29 北京卫家环境技术有限公司 A kind of BAIYE wind-guiding type air purifier
CN106369676B (en) * 2016-09-28 2019-11-12 珠海格力电器股份有限公司 Wind-guiding plate movement mechanism and air conditioner
CN107044682A (en) * 2017-01-09 2017-08-15 珠海格力电器股份有限公司 A kind of indoor apparatus of air conditioner and air-conditioning
CN107606768B (en) * 2017-08-28 2023-11-03 珠海格力电器股份有限公司 Cover plate and panel body matching structure and dehumidifier
JP6687917B2 (en) * 2018-05-31 2020-04-28 株式会社富士通ゼネラル Ceiling embedded air conditioner
CN109297112A (en) * 2018-10-10 2019-02-01 福建省中卫安职业卫生工程科学研究院 A kind of air pollutant purification apparatus
JP7055238B2 (en) * 2019-03-19 2022-04-15 三菱電機株式会社 Air conditioner
WO2023109518A1 (en) * 2021-12-17 2023-06-22 广东美的制冷设备有限公司 Air outlet structure of air conditioner and air conditioner

Also Published As

Publication number Publication date
CN101210729A (en) 2008-07-02
JP2008157575A (en) 2008-07-10
JP4328353B2 (en) 2009-09-09

Similar Documents

Publication Publication Date Title
CN101210729B (en) Air-conditioner
KR20090043227A (en) Air conditioner
EP2386802B1 (en) Air conditioner
KR20090043232A (en) Air conditioner
CN101231025A (en) Air conditioner
CN101290156A (en) Air conditioner
EP2184551A2 (en) Indoor unit of air conditioner
KR101487531B1 (en) Air conditioner and Control method of the same
CN114383207A (en) Indoor unit of air conditioning equipment
CN101430113B (en) Air conditioner
KR20100025357A (en) Air conditioner and control process of the same
KR101318354B1 (en) Air conditioner
KR20090093600A (en) Control method of the same
KR101482126B1 (en) Air Conditioner
KR20090043238A (en) Air conditioner
CN100362288C (en) Air outlet structure of air conditioner
KR100728351B1 (en) Wall mounted style air-conditioner having going up and down type flow guide unit with double-flap and control method of the same
KR20100050312A (en) Air conditioner
CN101737859B (en) Air conditioner
JP7055238B2 (en) Air conditioner
KR100947612B1 (en) Air conditioner and Control method of the same
KR20090044258A (en) Air conditioner
KR101582240B1 (en) Air conditioner and Control method of the same
KR101328937B1 (en) Air conditioner
KR101450564B1 (en) Air conditioner

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant