CN101122219A - Well-repairing process for casing deformed oil and water well - Google Patents

Well-repairing process for casing deformed oil and water well Download PDF

Info

Publication number
CN101122219A
CN101122219A CNA200710012939XA CN200710012939A CN101122219A CN 101122219 A CN101122219 A CN 101122219A CN A200710012939X A CNA200710012939X A CN A200710012939XA CN 200710012939 A CN200710012939 A CN 200710012939A CN 101122219 A CN101122219 A CN 101122219A
Authority
CN
China
Prior art keywords
well
sand
oil
filling
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA200710012939XA
Other languages
Chinese (zh)
Inventor
张飘石
廉锡金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaohe Petroleum Exploration Bureau
Original Assignee
Liaohe Petroleum Exploration Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaohe Petroleum Exploration Bureau filed Critical Liaohe Petroleum Exploration Bureau
Priority to CNA200710012939XA priority Critical patent/CN101122219A/en
Publication of CN101122219A publication Critical patent/CN101122219A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to a casing deformation oil-water well repair technics. The sand-washing technology and the anti-sand technics with a gravel-filled string are adopted by the invention. Sand is first washed to a preset position with a specially made sand-washing tool, and then the anti-sand string is put into the well. A certain amount of quartz sand is filled outside the string to complete the well. Thus, a well bore hole is reinforced and an oil flow or water injection passage is formed, so as to reach the purpose of production recovery for an oil well and water injection recovery for a water injection well. The casing deformation oil-water well repair technics provided by the invention avoids the overhaul procedure. The sand prevention work can be directly carried out, the well repair cost is reduced, and the construction period is shortened. Moreover, when the sand is effectively prevented, the intention is provided with a certain channelizing effect for an oil layer, which is favorable for increasing the oil well output or the water injection amount of the water injection well.

Description

A kind of well-repairing process for casing deformed oil and water well
Technical field:
The present invention relates to a kind of process that casing deformation oil, well well workover reproduce that is used for, belong to oil recovery workover treatment technology class.
Background technology:
Along with the prolongation of oil field development time, many oil fields enter middle and advanced stage, and the oil-water well of casing deformation, fault is more and more.At present, field by using multiple sleeve pipe recovery technique, as casing patching, get and change cover, following small casing well cementation secondary completion etc.Because these technologies are subjected to the restriction of specific well conditions, and the work progress complexity, the duration is longer, does not have reasonability economically, its application is affected, and oil field development and production actual needs are developed the casing deformation well repair process that can overcome above-mentioned deficiency.
Summary of the invention:
The object of the present invention is to provide a kind of operation is simple, easy to implement, construction cost is low, the duration is short casing deformation oil, well workover process method.
Technical scheme of the present invention is as follows.It is to adopt casing deformation well sand washing technology and gravel pack tubing string anti-sand process technology that this kind cover becomes oil-water well workover process method, at first use special sand flushing tool sand washing behind the precalculated position, be lowered to special sand preventing tool tubing string, a certain amount of quartz sand completion of filling outside pipe, realize the reinforcing of casing deformation well well, form oil stream or waterflood path, reach the purpose that oil well reproduces, water injection well is annotated again.
The construction sequence of this kind process is as follows:
1, washes kill-job, trip out tubing string in the well.
2, sand washing: adopt no box cupling or little tail pipe sand washing tubing string to visit the sand face, have sand then sand washing to the precalculated position;
3, drifting: the drifting of following corresponding size drift size gauge tool is to projected depth;
4, pipe cleaning: following pipeline scraper is scraped well, scrapes the back and uses hot water two weeks of anti-flushing well;
5, be lowered to bottom filling or top filling anti-sand tubing string or not filling tubing string, the seat envelope;
6, dress high-pressure well mouth, connecting line, sand control construction;
7, give up, trip out the filling tubing string, form completion tubular column by device for filling and screen casing in the well.
The technical essential of this process is as follows:
1, adopt the no box cupling of series towards sand control pipe or minor diameter tail pipe sand washing tubing string.
Because the special limitation of casing deformation well section, the feasible conventional problem that has the box cupling tubing string in removing, scratching very easily to take place or can not be lowered at all, no box cuplingization towards sand control pipe has solved the problems referred to above effectively, the measure that guaranteed is effectively carried out smoothly, not having the box cupling sand control screen simultaneously makes into well casing post external diameter unified, form the smooth face of cylinder, the friction factor of outer wall is reduced to 0.09 by 0.25 of band box cupling, salvage resistance only for original 1/3rd thereby make, efficiently solve in the past sand control pipe and salvage difficult problem.
No box cupling sand washing tubing string external diameter is φ 73mm, also can make the integral joint tubing that adopts φ 42mm, φ 52mm, φ 60.3mm plurality of specifications.
2, adopt towards sand control pipe direction swivel joint.
Casing deformation well section in many places cover change, the sand washing tubing string is bearing crooked and multiple stress such as is reversing, make tubing string easily thread off or bending, and on the sand washing tubing string, connect the swivel joint of respective numbers, make down-hole string freely crooked rotation when bearing bending and torsional stress, can address the above problem effectively.
3, adopt high strength slit self-cleaning sand-proof screen pipe.
The casing deformation well sand control screen is the most important ring of this technology, and the sand control screen one that this class well requires is to want the intensity height, is unlikely to distortion under the local stress effect of casing deformation position; The 2nd, external diameter can not be too thick, so that go into the well; The 3rd, certain self-cleaning ability is arranged, applicability is strong; The 4th, salvage if desired, salvage easily.The slit self-cleaning sand-proof screen pipe can satisfy above-mentioned requirements fully.
4, adopt the gravel filling sand prevention tubing string.This tubing string is followed successively by plug+tubing nipple+centralizer+high-pressure packing sand-control screen casing+tubing nipple+safety joint+signal pipe nipple+plain end oil well pipe+device for filling+heavy wall tubing from bottom to top.
Casing deformation well workover process method provided by the invention has been saved the overhaul operation, directly carry out sand control and administer, can save workover cost, shorten construction period, and, help improving oil well output or water injection well injection rate effectively in the sand control oil reservoir being had certain effect of dredging.
Description of drawings:
Accompanying drawing is an operating tool string structural representation of the present invention.Among the figure, label " 7 ", " 8 " are respectively oil-gas Layer and shaft bottom.
The specific embodiment:
Be illustrated below in conjunction with accompanying drawing.
As shown in the figure: the gravel filling sand prevention tubing string that the present invention adopts is made up of heavy wall tubing 1, device for filling 2, signal pipe nipple 3, high-pressure packing sand-control screen casing 4, centralizer 5, plug 6 from top to bottom, can be one of following three kinds of package assemblies from bottom to top according to the hole condition tubing string:
Top filling: plug+integral joint tubing pipe nipple+no box cupling sand control screen+integral joint tubing pipe nipple+no box cupling safety joint+tell tale screen+integral joint tubing pipe nipple+top device for filling+oil pipe
Bottom filling: plug+integral joint tubing pipe nipple+bottom filling device+no box cupling sand control screen+integral joint tubing pipe nipple+no box cupling safety joint+tell tale screen+integral joint tubing pipe nipple+packer+oil pipe
Not filling: plug+integral joint tubing pipe nipple+no box cupling sand control screen+integral joint tubing pipe nipple+no box cupling safety joint+integral joint tubing pipe nipple+packer+oil pipe.

Claims (6)

1. well-repairing process for casing deformed oil and water well, it is characterized in that: this process is to adopt casing deformation well sand washing technology and gravel filling sand prevention process technology, at first use special sand flushing tool sand washing behind the precalculated position, be lowered to special sand preventing tool tubing string, at the outer a certain amount of quartz sand of filling of pipe or do not carry out the direct completion of gravel pack, realize that the casing deformation well well reinforces, form liquid and flow or waterflood path, reach oil well and reproduce, the purpose that water injection well is annotated again.
2. well-repairing process for casing deformed oil and water well as claimed in claim 1 is characterized in that: the main construction sequence of this kind process is as follows:
1) washes kill-job, trip out tubing string in the well;
2) sand washing: adopt no box cupling or little tail pipe sand washing tubing string to visit the sand face, have sand then sand washing to the precalculated position;
3) drifting: the drifting of following corresponding size drift size gauge tool is to projected depth;
4) pipe cleaning: following pipeline scraper is scraped well;
5) be lowered to bottom filling or top filling anti-sand tubing string or not filling tubing string, the seat envelope;
6) dress high-pressure well mouth, connecting line, sand control construction;
7) give up, trip out the filling tubing string, form completion tubular column by device for filling and screen casing in the well.
3. well-repairing process for casing deformed oil and water well as claimed in claim 1 is characterized in that: adopt minor diameter tail pipe sand washing tubing string or do not have box cupling sand washing tubing string or coiled tubing sand washing tubing string.
4. well-repairing process for casing deformed oil and water well as claimed in claim 1 is characterized in that: in sleeve pipe many places distortion well, and minor diameter tail pipe sand washing tubing string as claimed in claim 3 or do not have that box cupling sand washing tubing string is optional uses universal swivel joint.
5. well-repairing process for casing deformed oil and water well as claimed in claim 1 is characterized in that: adopt high strength slit self-cleaning sand-proof screen pipe.
6. well-repairing process for casing deformed oil and water well as claimed in claim 1, it is characterized in that: adopt top gravel pack technology or bottom gravel pack technology or according to not filling of hole condition completion, the no box cupling sand control pipe that adopts is followed successively by following three kinds of package assemblies from bottom to top:
Top filling: plug+integral joint tubing pipe nipple+no box cupling sand control screen+integral joint tubing pipe nipple+no box cupling safety joint+tell tale screen+integral joint tubing pipe nipple+top device for filling+oil pipe
Bottom filling: plug+integral joint tubing pipe nipple+bottom filling device+no box cupling sand control screen+integral joint tubing pipe nipple+no box cupling safety joint+tell tale screen+integral joint tubing pipe nipple+packer+oil pipe
Not filling: plug+integral joint tubing pipe nipple+no box cupling sand control screen+integral joint tubing pipe nipple+no box cupling safety joint+integral joint tubing pipe nipple+packer+oil pipe.
CNA200710012939XA 2007-09-24 2007-09-24 Well-repairing process for casing deformed oil and water well Pending CN101122219A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA200710012939XA CN101122219A (en) 2007-09-24 2007-09-24 Well-repairing process for casing deformed oil and water well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA200710012939XA CN101122219A (en) 2007-09-24 2007-09-24 Well-repairing process for casing deformed oil and water well

Publications (1)

Publication Number Publication Date
CN101122219A true CN101122219A (en) 2008-02-13

Family

ID=39084700

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA200710012939XA Pending CN101122219A (en) 2007-09-24 2007-09-24 Well-repairing process for casing deformed oil and water well

Country Status (1)

Country Link
CN (1) CN101122219A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102330545A (en) * 2011-10-17 2012-01-25 中国石油天然气股份有限公司 Oil well sand prevention method for heavy oil reservoir
CN103967459A (en) * 2014-05-05 2014-08-06 中国石油集团渤海钻探工程有限公司 Sewage reinjection well and water injection method of sewage reinjection well
CN104632130A (en) * 2014-12-03 2015-05-20 中国庆华能源集团有限公司 Workover well completion process
CN106761590A (en) * 2015-11-24 2017-05-31 中国石油化工股份有限公司 Many slug high compact filling anti-sand processes
CN109854213A (en) * 2019-03-18 2019-06-07 中国石油化工股份有限公司 Set damage repairs the sand control pipe of well
CN110195578A (en) * 2019-03-18 2019-09-03 中国石油化工股份有限公司 The seperated layer water injection system of small casing pipe well
CN114135250A (en) * 2020-09-04 2022-03-04 中国石油天然气股份有限公司 Casing deformation well sand prevention method and device

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102330545A (en) * 2011-10-17 2012-01-25 中国石油天然气股份有限公司 Oil well sand prevention method for heavy oil reservoir
CN102330545B (en) * 2011-10-17 2014-02-05 中国石油天然气股份有限公司 Oil well sand prevention method for heavy oil reservoir
CN103967459A (en) * 2014-05-05 2014-08-06 中国石油集团渤海钻探工程有限公司 Sewage reinjection well and water injection method of sewage reinjection well
CN104632130A (en) * 2014-12-03 2015-05-20 中国庆华能源集团有限公司 Workover well completion process
CN106761590A (en) * 2015-11-24 2017-05-31 中国石油化工股份有限公司 Many slug high compact filling anti-sand processes
CN109854213A (en) * 2019-03-18 2019-06-07 中国石油化工股份有限公司 Set damage repairs the sand control pipe of well
CN110195578A (en) * 2019-03-18 2019-09-03 中国石油化工股份有限公司 The seperated layer water injection system of small casing pipe well
CN110195578B (en) * 2019-03-18 2023-05-12 中国石油化工股份有限公司 Separate layer water injection system of small cased well
CN114135250A (en) * 2020-09-04 2022-03-04 中国石油天然气股份有限公司 Casing deformation well sand prevention method and device
CN114135250B (en) * 2020-09-04 2023-08-22 中国石油天然气股份有限公司 Sand control method and device for casing change well

Similar Documents

Publication Publication Date Title
CN101122219A (en) Well-repairing process for casing deformed oil and water well
CN105134141B (en) A kind of process pipe string
CN102979495B (en) Many bunches of Limited entry fracturing tubing strings of open-hole horizontal well and fracturing process thereof
CN208966316U (en) A kind of U-shaped horizontal well
CN104879099A (en) Gravel packing pipe column and gravel packing method
CN103266868B (en) Horizontal well subsection gravel pack tool
CN104695915A (en) Sand washing and prevention integrated completion pipe string and control method thereof
CN107762444B (en) Integrated tubular column for well cementation and sand prevention and use method
CN108301785A (en) A kind of sand control completion tubing string and method
CN104632196B (en) Horizontal well section testing method by adopting soluble rubber sleeve packer
CN101255786A (en) Method for backfilling and prevention of sand in horizontal well pipe
CN201738822U (en) String for upper horizontal well cementation and lower screen pipe gravel pack completion
CN201037385Y (en) Bridge type leak-stopping pipe column
CN201443382U (en) Downhole dosing device
CN202325437U (en) Sand prevention integrated tubular column for improving oil well filling efficiency
CN100412313C (en) Plug-free cement filling method for well fixing
CN2539840Y (en) Multifunctional sand-proof tubular column
CN204552708U (en) One rushes sand prevention integrated completion tubular column
CN204252927U (en) A kind of cementing tool
CN204804733U (en) Fusiformis drift size gauge tool instrument
CN202832462U (en) Unblocking device capable of carrying out separate layer acid treatment and negative pressure acid discharge
CN207879289U (en) Well workover reacting cycle drags for sand sand-precipitating tube
CN202370461U (en) Nib flush head for coiled tubing
CN201486542U (en) Detachable layered fracturing technology pipe string
CN205013042U (en) From degradation high strength filling pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20080213