CN101117691A CNA2006100408942A CN200610040894A CN101117691A CN 101117691 A CN101117691 A CN 101117691A CN A2006100408942 A CNA2006100408942 A CN A2006100408942A CN 200610040894 A CN200610040894 A CN 200610040894A CN 101117691 A CN101117691 A CN 101117691A
Authority
CN
China
Prior art keywords
content
cold
multiple tracks
less
heavy caliber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2006100408942A
Other languages
Chinese (zh)
Inventor
王厚祥
陈生林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU ZHENGXIANG PETROCHEMICAL EQUIPMENT MANUFACTURING Co Ltd
Original Assignee
JIANGSU ZHENGXIANG PETROCHEMICAL EQUIPMENT MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU ZHENGXIANG PETROCHEMICAL EQUIPMENT MANUFACTURING Co Ltd filed Critical JIANGSU ZHENGXIANG PETROCHEMICAL EQUIPMENT MANUFACTURING Co Ltd
Priority to CNA2006100408942A priority Critical patent/CN101117691A/en
Publication of CN101117691A publication Critical patent/CN101117691A/en
Pending legal-status Critical Current

Links

Abstract

The present invention relates to a processing technique of a large-caliber tubular product, belonging to the metallurgical manufacturing field. The present invention is to add moderate Cr, Mn, Ni and the like alloyed elements to the raw melting materials, to conduct repeated cold-drawing techniques on the pierced billet through the centrifugal casting and produce a heat-resistant large-caliber alloyed tubular product that is urgently needed in the petrochemical industry. The tubular product has an excellent normal-temperature mechanical property and high-temperature mechanical feature, shortens the production period greatly, increases the alloy utilization rate by 20 percent or more and obtains a notable economic benefit.

Description

A kind of complete processing of heavy caliber pipe
Technical field: the present invention relates to a kind of tubing of heavy caliber size, particularly relate to a kind of complete processing of heavy caliber pipe, belong to metallurgical manufacturing field.
Technical background: large-scale petrochemical industry at home, widely used heating tube, boiler tube and heat-resistant component all adopt the heat-resisting alloy steel production of import.And the heat-resisting alloy steel of domestic production does not often reach designed requirement on ambient temperature mechanical properties and mechanical behavior under high temperature.And the alloy high temperature steel of import generally also need be swaged into excellent base, is processed into pipe, adds hot piercing and becomes hollow forging, after cold group of last one-tenth production tube of multi-pass.Adopt such production technique, need the multiple tracks complete processing on the one hand; On the other hand, also can waste alloy high temperature steel in a large number, the tubing of producing, quality also is difficult to the requirement that reaches designed.
Summary of the invention: purpose of the present invention is exactly the complete processing that a kind of heavy caliber pipe will be provided, and it can overcome the defective of above hot finished steel pipe, adopts centrifugally cast method direct production spun cast pipe, reduces its original multiple tracks complete processing.The complete processing of a kind of heavy caliber pipe of the present invention, its alloy content (all percentage calculation by weight) C is 0.05%, Mn less than 1.50%, P content less than 0.030%, S content less than 0.015%, Si content less than 1.0%, Cr content is 19%, Ni content is 30%, Cu content less than 0.75%, Ti content is 0.115%, Al content is 0.115%, all the other are Fe; During melting, the slag charge consumption is 25-35Kg, and its proportioning is CaO: CaFe=70: 30; Pre-deoxidation adds Si-Ca piece 250-350g, and Al piece 250-350g adds Mn; The Al-CaO powder is adopted in diffusive deoxidation, and consumption 8-9Kg divides 8-9 to criticize adding, and each batch criticized adding with 750-850g/ after first three batch criticized adding by 1Kg/; Get the stove sample after three batches of the deoxidations, insert the Ni-Mg rod, Mg content is 0.04% (weight percent); White slag kept 10-20 minute; Insert the Ni-Mg rod before the tapping, add metal Ca120-180g simultaneously; Tapping temperature is controlled at 1600-1620 ℃; Hollow forging processing; The spun cast pipe inside and outside wall carries out machining; Hollow forging must be through complete solution treatment before cold group, cooling fast, and Heating temperature is 1000-1180 ℃, soaking time 30 minutes to 4 hours; Production tube cold working will be passed through initial road, the cold system of multiple tracks, multiple tracks reaming, cold rolling, the cold skill of exchanging work of multiple tracks of multiple tracks, and per pass cold working all needs to carry out solution heat treatment.The heavy caliber alloy tubing that the present invention produces has good ambient temperature mechanical properties and high-temperature mechanics characteristic, has solved the history of extensive dependence on import alloy high-temperature resistant tube in the petrochemical industry well.
Embodiment: the present invention is a kind of complete processing of heavy caliber pipe, its alloy content (all percentage calculation by weight) C is 0.05%, Mn less than 1.50%, P content less than 0.030%, S content less than 0.015%, Si content less than 1.0%, Cr content is 19%, Ni content is 30%, Cu content less than 0.75%, Ti content is 0.115%, Al content is 0.115%, all the other are Fe; During melting, the slag charge consumption is 25-35Kg, and its proportioning is CaO: CaFe=70: 30; Pre-deoxidation adds Si-Ca piece 250-350g, and Al piece 250-350g adds Mn; The Al-CaO powder is adopted in diffusive deoxidation, and consumption 8-9Kg divides 8-9 to criticize adding, and first three batch criticized adding by 1Kg/, and each batch criticized adding with 750-850g/ later on; Get the stove sample after three batches of the deoxidations, insert the Ni-Mg rod, Mg content is 0.04% (weight percent); White slag kept 10-20 minute; Insert the Ni-Mg rod before the tapping and add metal Ca120-180g; Tapping temperature is controlled at 1600-1620 ℃; Hollow forging processing; The spun cast pipe inside and outside wall carries out machining; Hollow forging must be through complete solution treatment before cold group, cooling fast, and Heating temperature is 1000-1180 ℃, soaking time 30 minutes to 4 hours; Production tube cold working will pass through that initial road, multiple tracks are rolling, multiple tracks reaming, cold rolling, the cold skill of exchanging work of multiple tracks of multiple tracks, and per pass cold working all needs to carry out solution heat treatment.During concrete enforcement, to contain (weight percent calculating) C and be 0.05%, Mn is 1.50%, P is 0.030%, S is 0.015%, Cr is 19%, Ni is 30%, Cu is 0.75%, Ti is 0.115%, Al is 0.115%, all the other are put into smelting furnace for the raw material of Fe and smelt, during smelting, the slag charge consumption is controlled at 30Kg, pre-deoxidation adds Si-Ca piece 300g, and Al piece 300g adds Mn; The Al-CaO powder is adopted in diffusive deoxidation, consumption 9Kg, and, deoxidation feeds intake after three batches, gets the stokehold sample; White slag kept more than 15 minutes, inserted Ni-Mg rod (Mg content is 0.04%) and metal Ca150g before the tapping, and tapping temperature is controlled at 1610 ℃; During cast tube, at first to carry out inside and outside machining, carry out complete solution treatment before cold group hollow forging, cooling fast, Heating temperature is 1000-1180 ℃, is incubated 3 hours; Production tube needs before the per pass complete processing, all to need to carry out complete solution treatment through the multiple tracks complete processing.The last heavy caliber pipe that just can produce the petrochemical industry urgent need.The present invention can shorten the production cycle greatly, improves the utilization ratio of alloy, has good economic benefits and social benefit.

Claims (1)

1. the complete processing of a heavy caliber pipe, its alloy content (all percentage calculation by weight) C is 0.05%, Mn less than 1.50%, P content less than 0.030%, S content less than 0.015%, Si content less than 1.0%, Cr content is 19%, Ni content is 30%, Cu content less than 0.75%, Ti content is 0.115%, Al content is 0.115%, all the other are Fe; During melting, the slag charge consumption is 25-35Kg, and its proportioning is CaO: CaFe=70: 30; Pre-deoxidation adds Si-Ca piece 250-350g, and Al piece 250-350g adds Mn; The Al-CaO powder is adopted in diffusive deoxidation, and consumption 8-9Kg divides 8-9 to criticize adding, and first three batch criticized adding by 1Kg/, and each batch criticized adding with 750-850g/ later on; Get the stove sample after three batches of the deoxidations, insert the Ni-Mg rod, Mg content is 0.04% (weight percent); White slag kept 10-20 minute; Insert the Ni-Mg rod before the tapping and add metal Ca 120-180g; Tapping temperature is controlled at 1600-1620 ℃; Hollow forging processing; The spun cast pipe inside and outside wall carries out machining; Hollow forging must be through complete solution treatment before cold group, cooling fast, and Heating temperature is 1000-1180 ℃, soaking time 30 minutes to 4 hours; Production tube cold working will be passed through initial road, the cold system of multiple tracks, multiple tracks reaming, cold rolling, the cold skill of exchanging work of multiple tracks of multiple tracks, and per pass cold working all needs to carry out solution heat treatment.
CNA2006100408942A 2006-07-31 2006-07-31 Technique for processing heavy caliber pipes Pending CN101117691A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2006100408942A CN101117691A (en) 2006-07-31 2006-07-31 Technique for processing heavy caliber pipes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2006100408942A CN101117691A (en) 2006-07-31 2006-07-31 Technique for processing heavy caliber pipes

Publications (1)

Publication Number Publication Date
CN101117691A true CN101117691A (en) 2008-02-06

Family

ID=39053949

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2006100408942A Pending CN101117691A (en) 2006-07-31 2006-07-31 Technique for processing heavy caliber pipes

Country Status (1)

Country Link
CN (1) CN101117691A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102873126A (en) * 2012-09-29 2013-01-16 攀钢集团成都钢钒有限公司 Manufacturing method of large-aperture thin-walled seamless steel tube for nuclear power plant
CN103128129A (en) * 2011-11-24 2013-06-05 北京有色金属研究总院 Short-flow preparation method of Ni-Cr-Mo corrosion-resistant alloy tube
CN110586654A (en) * 2019-09-06 2019-12-20 山西太钢不锈钢股份有限公司 Cold machining manufacturing method of high-nickel alloy N08810 large-caliber seamless steel pipe
CN110743931A (en) * 2019-10-29 2020-02-04 浙江国邦钢业有限公司 High-strength NS1402 nickel-based alloy seamless pipe and preparation process thereof
CN114196865A (en) * 2021-12-01 2022-03-18 浙江中达新材料股份有限公司 NS1104 furnace tube for petroleum refining

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103128129A (en) * 2011-11-24 2013-06-05 北京有色金属研究总院 Short-flow preparation method of Ni-Cr-Mo corrosion-resistant alloy tube
CN102873126A (en) * 2012-09-29 2013-01-16 攀钢集团成都钢钒有限公司 Manufacturing method of large-aperture thin-walled seamless steel tube for nuclear power plant
CN102873126B (en) * 2012-09-29 2014-12-03 攀钢集团成都钢钒有限公司 Manufacturing method of large-aperture thin-walled seamless steel tube for nuclear power plant
CN110586654A (en) * 2019-09-06 2019-12-20 山西太钢不锈钢股份有限公司 Cold machining manufacturing method of high-nickel alloy N08810 large-caliber seamless steel pipe
CN110586654B (en) * 2019-09-06 2021-01-12 山西太钢不锈钢股份有限公司 Cold machining manufacturing method of high-nickel alloy N08810 large-caliber seamless steel pipe
CN110743931A (en) * 2019-10-29 2020-02-04 浙江国邦钢业有限公司 High-strength NS1402 nickel-based alloy seamless pipe and preparation process thereof
CN110743931B (en) * 2019-10-29 2021-02-05 浙江国邦钢业有限公司 High-strength NS1402 nickel-based alloy seamless pipe and preparation process thereof
CN114196865A (en) * 2021-12-01 2022-03-18 浙江中达新材料股份有限公司 NS1104 furnace tube for petroleum refining

Similar Documents

Publication Publication Date Title
CN102367550B (en) Rare-earth-containing wet H2S corrosion resisting steel pipe used in heat exchanger, and production method thereof
CN106583491B (en) A kind of manufacturing method of Cr-Ni-Mo-Nb nickel-base alloy seamless pipe
CN101633999B (en) Austenitic stainless steel, steel tube thereof and manufacturing method thereof
CN101705437B (en) Heat-resistant stainless steel with high-lasting strength and manufacturing method thereof
CN102312172B (en) B3R hot work die steel with high strength and toughness and resistance to tempering, and preparation process thereof
CN101665891A (en) Stainless heat-resistant alloy steel seamless steel tube and preparation method thereof
CN104073739A (en) Heatproof stainless steel seamless steel pipe and manufacture method of stainless steel and seamless steel pipe
CN102581250B (en) Centrifugally cast TP310Cb/T11 bimetal composite tube blank and method for producing same
CN105499933B (en) Manufacturing process using F92 steel as the ring forging of material
CN104988403B (en) A kind of oil-gas mining martensitic stainless steel seamless steel pipe and its manufacture method
CN103962411A (en) GH3600 alloy fine thin-walled seamless pipe manufacturing method
CN104894485A (en) Production method of nuclear power plant used high-temperature-resisting brittleness-resisting seamless steel tube with outer diameter of more than 508mm
CN101967608A (en) Nitrogen-containing corrosion-resistance plastic die steel and preparation process thereof
CN106636742B (en) A kind of ZSA-3 titanium alloy tubes, preparation method and applications
CN101117691A (en) Technique for processing heavy caliber pipes
CN105463311A (en) High-precision cold drawn pipe and manufacturing method thereof
CN108220690A (en) The forging material and forging method of a kind of exhasut valve stem peculiar to vessel
CN107620011B (en) A kind of heat-resistance stainless steel seamless pipe and preparation method thereof
CN102059271B (en) Manufacture method of seamless steel tube for (ultra-)supercritical boiler
CN112962027B (en) Optimized machining method of alloy structural steel
CN100441715C (en) Super large-scale aluminium alloy free forging piece and its prodn. method
CN108796392B (en) Preparation method of heat-resistant alloy steel material and pipe
CN106334883A (en) High-strength corrosion-resistant high-temperature copper-based brazing material and manufacturing method thereof
CN102836870A (en) Rolling and cogging production method for large austenite stainless and heat-resistant gas valve steel 21-4N ingot
CN101623748A (en) Method for manufacturing water-cooling type pipe dies

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20080206