CN101078299B - Method for reconstructing frontage multilayer brick-concrete structure building to frame structure building - Google Patents

Method for reconstructing frontage multilayer brick-concrete structure building to frame structure building Download PDF

Info

Publication number
CN101078299B
CN101078299B CN200710018099A CN200710018099A CN101078299B CN 101078299 B CN101078299 B CN 101078299B CN 200710018099 A CN200710018099 A CN 200710018099A CN 200710018099 A CN200710018099 A CN 200710018099A CN 101078299 B CN101078299 B CN 101078299B
Authority
CN
China
Prior art keywords
building
frame
construction
column
concrete
Prior art date
Application number
CN200710018099A
Other languages
Chinese (zh)
Other versions
CN101078299A (en
Inventor
李林
Original Assignee
李林
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 李林 filed Critical 李林
Priority to CN200710018099A priority Critical patent/CN101078299B/en
Publication of CN101078299A publication Critical patent/CN101078299A/en
Application granted granted Critical
Publication of CN101078299B publication Critical patent/CN101078299B/en

Links

Abstract

The invention discloses a method of changing multistory brick-concrete structure building near street into frame structure building. The technical method provides changed building structure project according to owner changing intension and using performance of new building after changed. By calculating the changed total structure project construction drawings of changing and strengthening building structure are drawn. According to construction drawings, foundation underpinning construction and underpinning brick-wall construction of new concrete frame beam-column are carried out. Thereinto, the construction of new concrete frame beam-column structure system adopts reverse process. By adopting the invention existing building is changed and used. Compared with demolishing and rebuilding to existing building, it is provided with no land expropriation, no demolishing, land and social source saving, small invest and quick result. It strengthens the capability that existing building adopts market development and change and improves the usage efficiency of existing building near street. To an extent social economical development is promoted.

Description

Overlooking multistory brick-and-concrete structure building renovation is the method for frame structure building
Technical field
The present invention relates to the remodeling method of building, particularly a kind of method that is frame structure building with overlooking multistory brick-and-concrete structure building renovation.
Background technology
Along with the enhancing and the development of market economy of china's overall national strength, the construction work of China has begun to enter newly-built and has transformed the developing period that maintenance is laid equal stress on.At first, from the social visual angle of present stage, the degree of safety in large quantities of old rooms of building after the founding of the state and dwelling environment all more and more are difficult to satisfy people's the existing standard of living and the needs of social sustainable development, some old room even have serious potential safety hazard.Secondly, along with the quickening of China's process of industrialization, industry restructuring and renewal of the equipment, production technology renewal etc. are increased, and the function in existing house also must adapt to this variation.
Existing all kinds of overlooking multistory brick-and-concrete structure buildings are transformed, make it adapt to the new functional requirement that people propose, satisfy the commercial needs of continuous development and change, rebuild with existing building is removed, there is not expropriation of land, do not have and remove, save soil and social resources, small investment, instant effect, strengthen existing building and adapted to the ability that market development changes, improved the service efficiency of existing overlooking building, promoted socio-economic development to a certain extent.
Summary of the invention
The objective of the invention is deficiency, the method that the overlooking multistory brick-and-concrete structure building renovation that provides a kind of and save the soil, saves social resources, small investment, instant effect is a frame structure building at the prior art existence.
For achieving the above object, the technical solution used in the present invention is: the method that a kind of overlooking multistory brick-and-concrete structure building renovation is a frame structure building is characterized in that this method specifically may further comprise the steps:
(1) transforms intention and transform the new building function of use requirement that back hope reaches according to the owner, propose to transform back building structure scheme;
(2) will transform the level that the back whole structural scheme decomposes member, the improved actual cross-section of structural element of selected various situations; Determine the joint construction of member;
(3) determine to transform back member actual cross-section and rigidity representative section, set up improved monolithic architecture structural model;
(4) carry out structural analysis, draw whole displacement, anti-seismic performance and the reinforced component data of new construction; Carry out the adjustment that building structure is arranged repeatedly, require and the component performance requirement up to the structural seismic overall performance that satisfies the current specifications requirement;
(5), draw and transform the building structure construction drawing of reinforcing by above structural analysis result of calculation;
(6) according to the construction drawing of step (5), at first carry out the construction of ground stabilization and foundation underpinning, promptly wear the method that muscle cooperates concreting, under the situation of not destroying original brickwork bar base, the brick bar base of rigidity is transform as the strip foundation under columns of flexibility by bar planting, boring;
(7) secondly increase the concrete frame beam column bracket newly and change the brick wall construction, promptly at existing structure underfloor installation frame beam column reinforcing bar, install and underpin the frame beam column template, the method that be combined on original body of wall and the floor boring, holes is built to finish and is underpined frame beam column structural system; After the newly-increased frame beam column system that underpins reaches the design strength requirement, remove and underpined body of wall, finish the process that underpins to the existing building brick wall;
(8) in concrete frame post and beam structure system construction, adopts and plant: first underfloor and original structure body of wall side installation beam column cage of reinforcement at original structure with the subinverse workmanship; Install column template again; Build the post concrete; Remove column template; Install beam forms; The casting beams concrete; The frame beam column system of successively having constructed new, and after it reaches the design supporting capacity fully, remove the original structure brick wall that is underpined; Form by the combo box trestle at last, underpin the new frame structure system that beam and original structure floor are formed.
The present invention compared with prior art has the following advantages: adopt the present invention that existing building is carried out renovation and utilization, with being removed to rebuild, existing building compares, have and do not have expropriation of land, do not have the characteristics of removing, saving soil and social resources, small investment and instant effect, strengthen existing building and adapted to the ability that market development changes, improve the service efficiency of existing overlooking building, promoted socio-economic development to a certain extent.
Description of drawings
Fig. 1 is for transforming the actual cross-section schematic diagram of back member (frame column).
Fig. 2 is for calculating the equivalent stiffness cross section of actual cross-section ad limit and bc limit quantity of reinforcement.
Fig. 3 is for calculating the equivalent stiffness cross section of actual cross-section ab limit and cd limit quantity of reinforcement.
Fig. 4 is for underpining girder construction and template schematic diagram.
Fig. 5 is the A-A cutaway view Amplified image of Fig. 4.
Fig. 6 is the B-B cutaway view Amplified image of Fig. 4.
Fig. 7 is the schematic diagram of first kind of specific embodiment of foundation underpinning structure.
Fig. 8 is the schematic diagram of second kind of specific embodiment of foundation underpinning structure.
Among the figure: 1-transforms the concrete part of after-frame trestle, the former brick wall of 2-, and 3-connects short beam, the former concrete floor of 4-, 5-concreting hole, the 6-concrete beam, 7-underpins beam forms, 8-sealing rectangle hoop, 9-young concrete matrix, 10-reinforcing bar.
The specific embodiment
The present invention is further described by the following embodiment.
(1) transforms intention and transform the new building function of use requirement that back hope reaches according to the owner, propose to transform back building structure scheme;
(2) will transform the level that the back whole structural scheme decomposes member, the improved actual cross-section of structural element of selected various situations; Determine the joint construction of member;
(3) determine to transform back member actual cross-section and rigidity representative section, set up improved monolithic architecture structural model;
(4) carry out structural analysis, draw whole displacement, anti-seismic performance and the reinforced component data of new construction; Carry out the adjustment that building structure is arranged repeatedly, require and the component performance requirement up to the structural seismic overall performance that satisfies the current specifications requirement;
(5), draw and transform the building structure construction drawing of reinforcing by above structural analysis result of calculation;
(6) according to the construction drawing of step (5), at first carry out the construction of ground stabilization and foundation underpinning, promptly wear the method that muscle cooperates concreting, under the situation of not destroying original brickwork bar base, the brick bar base of rigidity is transform as the strip foundation under columns of flexibility by bar planting, boring;
(7) secondly increase the concrete frame beam column bracket newly and change the brick wall construction, promptly at existing structure underfloor installation frame beam column reinforcing bar, install and underpin the frame beam column template, the method that be combined on original body of wall and the floor boring, holes is built to finish and is underpined frame beam column structural system; After the newly-increased frame beam column system that underpins reaches the design strength requirement, remove and underpined body of wall, finish the process that underpins to the existing building brick wall;
(8) in concrete frame post and beam structure system construction, adopts and plant: first underfloor and original structure body of wall side installation beam column cage of reinforcement at original structure with the subinverse workmanship; Install column template again; Build the post concrete; Remove column template; Install beam forms; The casting beams concrete; The frame beam column system of successively having constructed new, and after it reaches the design supporting capacity fully, remove the original structure brick wall that is underpined; Form by the combo box trestle at last, underpin the new frame structure system that beam and original structure floor are formed.

Claims (1)

1. method that overlooking multistory brick-and-concrete structure building renovation is a frame structure building is characterized in that this method divides design and construct two stages, specifically may further comprise the steps:
(1) transforms intention and transform the new building function of use requirement that back hope reaches according to the owner, propose to transform back building structure scheme;
(2) will transform the level that the back whole structural scheme decomposes member, the improved actual cross-section of structural element of selected various situations; Determine the joint construction of member;
(3) determine to transform back member actual cross-section and rigidity representative section, set up improved monolithic architecture structural model;
(4) carry out structural analysis, draw whole displacement, anti-seismic performance and the reinforced component data of new construction; Carry out the adjustment that building structure is arranged repeatedly, require and the component performance requirement up to the structural seismic overall performance that satisfies the current specifications requirement;
(5), draw and transform the building structure construction drawing of reinforcing by above structural analysis result of calculation;
(6) according to the construction drawing of step (5), at first carry out the construction of ground stabilization and foundation underpinning, promptly wear the method that muscle cooperates concreting, under the situation of not destroying original brickwork bar base, the brickwork bar base of rigidity is transform as the strip foundation under columns of flexibility by bar planting, boring;
(7) secondly increase the concrete frame beam column bracket newly and change the brick wall construction, promptly at existing structure underfloor installation frame beam column reinforcing bar, install and underpin the frame beam column template, the method that be combined on original body of wall and the floor boring, holes is built to finish and is underpined frame beam column structural system; After the newly-increased frame beam column system that underpins reaches the design strength requirement, remove and underpined body of wall, finish the process that underpins to the existing building brick wall;
(8) in concrete frame post and beam structure system construction, adopts and plant: first underfloor and original structure body of wall side installation beam column cage of reinforcement at original structure with the subinverse workmanship; Install column template again; Build the post concrete; Remove column template; Install beam forms; The casting beams concrete; The frame beam column system of successively having constructed new, and after it reaches the design supporting capacity fully, remove the original structure brick wall that is underpined; Form by the combo box trestle at last, underpin the new frame structure system that beam and original structure floor are formed.
CN200710018099A 2007-06-25 2007-06-25 Method for reconstructing frontage multilayer brick-concrete structure building to frame structure building CN101078299B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200710018099A CN101078299B (en) 2007-06-25 2007-06-25 Method for reconstructing frontage multilayer brick-concrete structure building to frame structure building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200710018099A CN101078299B (en) 2007-06-25 2007-06-25 Method for reconstructing frontage multilayer brick-concrete structure building to frame structure building

Publications (2)

Publication Number Publication Date
CN101078299A CN101078299A (en) 2007-11-28
CN101078299B true CN101078299B (en) 2010-05-19

Family

ID=38905936

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200710018099A CN101078299B (en) 2007-06-25 2007-06-25 Method for reconstructing frontage multilayer brick-concrete structure building to frame structure building

Country Status (1)

Country Link
CN (1) CN101078299B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101832034A (en) * 2010-04-22 2010-09-15 上海市第一建筑有限公司 Construction method of whole reverse replacement of structure
CN102108791A (en) * 2010-12-17 2011-06-29 上海市第四建筑有限公司 Construction method for old building reformation by adopting reverse structural replacement
CN103711327A (en) * 2012-10-08 2014-04-09 中国石油化工集团公司 Method for joist reinforcement during demolition of lower portion of masonry bearing wall
CN104141353B (en) * 2013-11-05 2017-01-04 中国建筑第四工程局有限公司 The construction method of a kind of non-bearing thin-wall and structure
CN104746892B (en) * 2015-03-30 2017-03-15 山东双得利建设科技有限公司 Construction method that joist demolishes walls device and joist is demolished walls
CN106245931A (en) * 2016-09-30 2016-12-21 合肥工业大学 The underpinning device of load bearing wall and construction method in brick mix structure
CN206562792U (en) * 2016-10-13 2017-10-17 浙江杰地建筑设计有限公司 Overlapping for existing structure strengthening reconstruction changes antitorque structure
CN108756295A (en) * 2018-06-14 2018-11-06 上海二十冶建设有限公司 The former pond platform removal method of newly-increased net circulation cooling tower
CN109488037A (en) * 2018-11-19 2019-03-19 沙洲职业工学院 A kind of environmental protection construction method that private residence is quickly rebuild
CN110644803B (en) * 2019-09-26 2020-10-27 南充职业技术学院 Method for underpinning building brick-concrete structure into frame structure
CN111794555B (en) * 2020-09-09 2020-11-20 上海建工一建集团有限公司 Method for repairing multi-story historical building

Also Published As

Publication number Publication date
CN101078299A (en) 2007-11-28

Similar Documents

Publication Publication Date Title
CN2685429Y (en) Precasted deformed column for integral prestress assembling plate-column structure
CN104912190A (en) Dry type joggle frame structure
CN104060717B (en) A kind of fabricated shear wall structural wall board fractionation-assemble method
CN203834739U (en) End steel board connection, positioning and assembly type shear wall structure
CN102733606B (en) The construction method of High Large Cantilever structure
CN201217898Y (en) Concrete prefabricated stairs
CN202245617U (en) Elevator well wall assembled by adopting combined type derricks
CN103243838B (en) Connection structure of integrally assembled concrete frame and shear wall
CN105649360A (en) Integral assembling type building system and installing method
CN206503230U (en) A kind of fabricated steel building
CN105484388A (en) Prefabricated assembly type shear wall vertical slit connecting structure and construction method thereof
CN103924797B (en) Rural area assembling type steel structure dwelling house system and construction method
CN203049832U (en) Assembling type shear wall structure
CN100595395C (en) Static pressure pile process for construction of existing building basement
CN105804283B (en) Full assembly concrete-filled steel tube frame combined shear wall construction
CN105297978A (en) Prefabricated assembled type steel-concrete combined beam connected through bolt nails
CN102003080B (en) Anti-seismic reinforcing structure and method of old brickwork building
CN105089178B (en) A kind of pre-splicing Standard formula building of prefabricated steel reinforced concrete shear walls
CN205242773U (en) Adopt prefabricated assembled steel - concrete combination beam of cant chisei connection
CN101769008B (en) Method for constructing quake-proof masonry house by utilizing prefabricated constructional column ring beams
CN103469798B (en) A kind of foundation pit supporting construction and construction method thereof
CN104213717B (en) Multi-storey building integration transformation method of construction
CN105863110A (en) Modular assembling type cold-bent thin-wall type steel wall board structural system
CN205171747U (en) Prefabricated assembled shear force wall perps connection structure
CN204826308U (en) Structure assembly type structure is pieced together in advance to prefabricated shaped steel concrete shear force wall

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
GR01 Patent grant
C14 Grant of patent or utility model
TR01 Transfer of patent right

Effective date of registration: 20160927

Address after: 710082, two floor, hospital design institute, 272 North West Road, Lianhu District, Lianhu District, Shaanxi, Xi'an

Patentee after: Shaanxi Construction Research Institute of structural engineering Limited by Share Ltd

Address before: 710002 Shaanxi city of Xi'an province rice Park Lane 95A Bamboo Garden District

Patentee before: Li Lin