CN101033601A - Direction unrestrained viaduct without crossing point and conflict point and capable of high speed running - Google Patents

Direction unrestrained viaduct without crossing point and conflict point and capable of high speed running Download PDF

Info

Publication number
CN101033601A
CN101033601A CN 200710001195 CN200710001195A CN101033601A CN 101033601 A CN101033601 A CN 101033601A CN 200710001195 CN200710001195 CN 200710001195 CN 200710001195 A CN200710001195 A CN 200710001195A CN 101033601 A CN101033601 A CN 101033601A
Authority
CN
China
Prior art keywords
line
hand rotation
bridge
main
overpass
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200710001195
Other languages
Chinese (zh)
Other versions
CN100526557C (en
Inventor
郑学信
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2007100011951A priority Critical patent/CN100526557C/en
Publication of CN101033601A publication Critical patent/CN101033601A/en
Application granted granted Critical
Publication of CN100526557C publication Critical patent/CN100526557C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

An all-pass mode overpass without intersection points and conflict points can facilitate driving with high speed. It is a full-fresh design proposal of overpass which breaks conventionality and traditional custom. Taking world acknowledged physical conservation law as the principle, an overpass with more smart conception, more unique model, more natural connection, more entire function, more clear simpleness, more rational fluency and capability of resolving all difficulties in transportation is designed. The overpass has small area, low cost, on conflict points, no intersection points and can reduce traffic accidents, protect lives, save energy sources and time, initiate separated driving of automobiles and non-automobiles, close history of left turning vehicles turning right firstly, has clear direction of turn-around line which is clear at a glance for both new and old drivers. It integrates many merits in the smallest diameter and changes the structure thoroughly.

Description

The overpass bridge that ten thousand general formulas do not have the intertwined point, do not have conflict point to run at high speed
Technical field
The present invention relates to the overpass bridge of field of traffic.
Background technology
In view of in recent years, raising along with developing of automobile industry and living standards of the people, automobile has become the first-selected instrument of people's trip, because automobile quantity rapidly increases, bring immense pressure to urban traffic, add that the city traffic lights are too much, the overpass bridge design is unreasonable again, so cause the phenomenon of traffic jam to be on the rise.Especially in international metropolis, whenever rush hour morning and evening urban traffic just be absorbed in a slice state of paralysis, streets and lanes are that the automobile of creeping forms the dragon group that head and the tail lose everywhere.Its one of the main reasons is: a lot of crossroads do not have overpass bridge, complete in traffic lights control, and existing overpass bridge common design falls behind, unreasonable structure, and design shape is huge, cost is very high, with traffic lights control saving fund, be actually and hindered development and national economy on the surface, it all is stereotyped making a general survey of global overpass bridge design, it is the arch-criminal of traffic congestion, and motor vehicle can not directly turn left and intersect with the opposing party's vehicle that turns left.Add motor vehicle and mix the situation that interweaves and cause confusion with bicycle.Existing overpass bridge design direction is uncertain again, sometimes in addition the pedestrian all be hard to tell direction, let alone driver.Xizhimen overpass bridge is exactly an example, know just after building up that its design is unreasonable, can't resolve traffic congestion at all, cause the fund repetition and waste on the contrary, Yuquan Ying Qiao also is like this, not only floor space is too huge, and it also is to travel to the right earlier just can finish that motor vehicle turns left, and motor vehicle and bicycle can not cause people's car to mix traffic congestion by separated running.And for example application number be two layers of overpass bridge of 00105270.5 it not only floor space is big, design uningenious, especially four craspedodrome lines can not compactly be kept straight on, and bending is too big, and sight line is unclear to be easy in crossing generation traffic accident, cause personal injury, vehicle on loop wire all should be run at high speed, four left-hand rotation lines also because of angle too Xiao Yi traffic jam takes place, China is because of the populous kingdom of a bicycle especially, the overpass bridge of this design does not have nonmotorized vehicle lane, does not know how bicycle travels.It is unclear that application number is that 97121861.7 overpass bridge designs mixed and disorderly direction, because of overpass bridge designs unreasonable, cause the unreasonable the old and new of the causing driver of road sign to confuse at this, the impassable traffic jam that causes, again because of not observing the law of conservation of physics, so inconvenience is advocated, and is complicated simple thing, be oneself trapping well.
Summary of the invention
The purpose of this invention is to provide the overpass bridge that a kind of ten thousand general formulas do not have the intertwined point, do not have conflict point to run at high speed, broken traditional design scheme, thoroughly all difficult problems of transport solution obstruction.
Purpose of the present invention is to implement like this, viaduct is taking up an area just thoroughly transport solution obstruction within 130 meters of the diameters, its cost is little, fill out viaduct on the soil with ditching, easy construction, simple in structure, it utilizes universally acknowledged physics law of conservation and geometry principle cleverly, started the way to get there that people's car separates, the historical record that the motor vehicle that is through with turns left and travels to the right earlier, turn line need not be striden main bridge and just can directly be reversed end for end.
Adopt the overpass bridge of above technical scheme construction to have following advantage:
One, floor space is little, only 130 meters of diameters, and present overpass bridge diameter 400-500 rice (four Weybridges, Yuquan battalion overpass bridge diameter reaches 500-600 rice) cost is low, (can save according to structure different ten thousand logical overpass bridges 50% cost).
Two, do not have conflict point, do not have the intertwined point, reduce traffic accident, protection people's life, energy conservation is saved time, human and material resources.
Three, started the precedent of motor vehicle and bicycle separated running, the history that the motor vehicle that is through with turns left and travels to the right earlier can directly be turned left.
Four, do not have turn line, the road sign direction is clear, and the old and new driver can come into plain view.
Five, the gradient, angle, highly reasonable, sight line is good, meets international regulation.
Six, can thoroughly eradicate all worries of bringing to the driver because of blocking up, allow them not have the driving of misgivings.
Description of drawings
Accompanying drawing is overpass plane figure of the present invention.
AB, A among the figure 1B 1Be main stem, CD, C 1D is main bridge, EF, E 1F 1, E 2F 2, E 3F 3Be the left-hand rotation line, GH, G 1H 1, G 2H 2, G 3H 3Be the right-hand rotation line, NP, N 1P 1, N 2P 2, N 3P 3Be turn line, LM, L 1M 1, L 2M 2, L 3M 3Be the bicycle line.
The specific embodiment
The viaduct that a kind of ten thousand general formulas do not have the intertwined point, do not have conflict point to run at high speed is by two main stem AB, A 1B 1, two main bridge CD, C 1D 1, four left-hand rotation line EF, E 1F 1, E 2F 2, E 3F 3, four right-hand rotation line GH, G 1H 1, G 2H 2, G 3H 3, four turn line NP, N 1P 1, N 2P 2, N 3P 3, four bicycle line LM, L 1M 1, L 2M 2, L 3M 3Form one three layers viaduct system.Main stem is square crosswise center compactness than straight main bridge than straight branch levels does not have the slit, article two, main stem be the groove shape therefrom the mind-set two ends stretch symmetry by narrow to wide separately, two main stem symmetries are passed right side left-hand bend line and main bridge and are passed opposite left-hand rotation line again and finish craspedodrome.Two main bridge symmetries are one high and one low shape, and bridge one end lower is slope groove shape, and to be high sloping shape symmetry separated up and down to wide by narrow the bridge other end, and two main bridge symmetries stride across right side left-hand rotation line and stride across main stem and pass opposite left-hand rotation line accomplish linear again.
Article four, motor vehicle left-hand rotation line EF, E 1F 1, E 2F 2, E 3F 3, two left-hand rotation lines of main stem direction pass the right side turning guide marking and stride across opposite Through Lane and bicycle lane on the turn line right side, pass left side bicycle lane and craspedodrome line, pass left side left-hand rotation curved line again and finish left-hand bend; Angle of turn between 120 degree-160 degree, two left-hand rotation lines in addition, main bridge direction stride across from low to high right side left-hand rotation line opposite craspedodrome line and bicycle lane, stride across again left side bicycle lane, Through Lane and left side left-hand rotation curved line, finish left-hand bend; Angle of turn is between 120 degree-160 degree.
Article four, motor vehicle right-hand rotation line GH, G 1H 1, G 2H 2, G 3H 3, wherein two main stem directions stride across craspedodrome bicycle line, stride across the left side bicycle lane and finish right-hand bend; Two right-hand rotation curved lines in addition, main bridge direction is passed the craspedodrome bicycle lane, strides across left side craspedodrome bicycle lane and finishes right-hand bend.
Be provided with turn line NP, the N of four direction 1P 1, N 2P 2, N 3P 3, 10 meters-15 meters distances in track are reserved respectively as the tune dedicated Lanes in the center line both sides.
Two bicycle lanes on the main stem, adjacent car lane passes the right-hand rotation line, passes right side left-hand rotation line, passes to be slope groove shape behind main bridge and opposite left-hand rotation curved line and the right side turning guide marking and to finish from low to high craspedodrome; Bicycle lane on the main bridge, the car lane on the adjacent main bridge strides across motor vehicle right-hand rotation line, is from high to low slope groove shape after striding across main bridge, passes opposite left-hand rotation line and finishes craspedodrome.

Claims (5)

1. a general formula does not have the intertwined point, the overpass bridge that does not have conflict point to run at high speed, by two main stems, two main bridges, article four, left-hand rotation line, article four, right-hand rotation line, article four, turn line, article four, the bicycle line is formed one three layers overpass bridge system, it is characterized in that, main stem is square crosswise center compactness than straight main bridge than straight branch levels does not have the slit, article two, main stem be the groove shape therefrom the mind-set two ends stretch symmetry by narrow to wide separately, article two, the main stem symmetry is passed right side left-hand bend line and main bridge and is passed opposite left-hand rotation line again and finish craspedodrome, two main bridge symmetries are one high and one low shape, bridge one end lower is a slope groove shape, to be high sloping shape symmetry separated up and down to wide by narrow the bridge other end, and two main bridge symmetries stride across right side left-hand rotation line and stride across main stem and pass opposite left-hand rotation line again and finish straight line.
2. the overpass bridge that ten thousand general formulas according to claim 1 do not have the intertwined point, do not have conflict point to run at high speed, it is characterized in that, article four, motor vehicle left-hand rotation line, two left-hand rotation lines of main stem direction are on the turn line right side, pass the right side turning guide marking and stride across opposite direct lane and nonmotorized vehicle lane, pass left side nonmotorized vehicle lane and motor vehicle craspedodrome line, pass left side left-hand bend line again and finish left-hand bend; Angle of turn between 120 degree-160 degree, two left-hand rotation lines in addition, main bridge direction stride across left-hand rotation line opposite, right side motor vehicle craspedodrome line and nonmotorized vehicle lane from low to high, stride across left side nonmotorized vehicle lane, direct lane and left side left-hand bend line again, finish left-hand bend; Angle of turn is between 120 degree-160 degree.
3. the ten thousand general formulas according to claim 1 viaduct that do not have the intertwined point, do not have conflict point to run at high speed, it is characterized in that four motor vehicle right-hand rotation lines, wherein two main stem directions, stride across craspedodrome bicycle line, stride across the left side bicycle lane and finish right-hand bend; Two right-hand rotation curved lines in addition, main bridge direction is passed the craspedodrome bicycle lane, strides across left side craspedodrome bicycle lane and finishes right-hand bend.
4. the overpass bridge that ten thousand general formulas according to claim 1 do not have the intertwined point, do not have conflict point to run at high speed is characterized in that, is provided with the turn line of four direction, and the center line both sides are reserved 10 meters-15 meters distances in track respectively as the tune dedicated Lanes.
5. the overpass bridge that ten thousand general formulas according to claim 1 do not have the intertwined point, do not have conflict point to run at high speed, it is characterized in that, two nonmotorized vehicle lanes on the main stem, adjacent motorway, pass the right-hand rotation line, pass right side left-hand rotation line, pass and be slope groove shape behind main bridge and opposite left-hand bend line and the right side turning guide marking and finish craspedodrome from low to high; Nonmotorized vehicle lane on the main bridge, the motorway on the adjacent main bridge strides across motor vehicle right-hand rotation line, strides across behind the main bridge to be slope groove shape by height to low, passes opposite left-hand rotation line and finishes craspedodrome.
CNB2007100011951A 2006-03-09 2007-01-22 Direction unrestrained viaduct without crossing point and conflict point and capable of high speed running Expired - Fee Related CN100526557C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2007100011951A CN100526557C (en) 2006-03-09 2007-01-22 Direction unrestrained viaduct without crossing point and conflict point and capable of high speed running

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN200610057115 2006-03-09
CN200610057115.X 2006-03-09
CNB2007100011951A CN100526557C (en) 2006-03-09 2007-01-22 Direction unrestrained viaduct without crossing point and conflict point and capable of high speed running

Publications (2)

Publication Number Publication Date
CN101033601A true CN101033601A (en) 2007-09-12
CN100526557C CN100526557C (en) 2009-08-12

Family

ID=38730328

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2007100011951A Expired - Fee Related CN100526557C (en) 2006-03-09 2007-01-22 Direction unrestrained viaduct without crossing point and conflict point and capable of high speed running

Country Status (1)

Country Link
CN (1) CN100526557C (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101831850A (en) * 2010-04-09 2010-09-15 赵殿龙 Layered throughout connection type overpass
CN101871194A (en) * 2010-06-30 2010-10-27 赵殿龙 Asymmetrical span type full-interchange overpass
CN102268853A (en) * 2011-06-10 2011-12-07 邱世军 Intersection flyover
CN102345259A (en) * 2010-08-03 2012-02-08 陈海水 Overhead gain road connection method
CN102493302A (en) * 2011-11-30 2012-06-13 中国市政工程中南设计研究总院 Viaduct technology under innovated traffic organization method
CN102605692A (en) * 2012-03-14 2012-07-25 贾德玉 Unobstructed flyover

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101831850A (en) * 2010-04-09 2010-09-15 赵殿龙 Layered throughout connection type overpass
CN101871194A (en) * 2010-06-30 2010-10-27 赵殿龙 Asymmetrical span type full-interchange overpass
CN102345259A (en) * 2010-08-03 2012-02-08 陈海水 Overhead gain road connection method
CN102268853A (en) * 2011-06-10 2011-12-07 邱世军 Intersection flyover
CN102493302A (en) * 2011-11-30 2012-06-13 中国市政工程中南设计研究总院 Viaduct technology under innovated traffic organization method
CN102605692A (en) * 2012-03-14 2012-07-25 贾德玉 Unobstructed flyover
CN102605692B (en) * 2012-03-14 2015-02-25 贾德玉 Unobstructed flyover

Also Published As

Publication number Publication date
CN100526557C (en) 2009-08-12

Similar Documents

Publication Publication Date Title
CN1249302C (en) Full spatial urban road system and traffic method using same
CN202090252U (en) Road structure for relieving urban traffic jam
CN100526557C (en) Direction unrestrained viaduct without crossing point and conflict point and capable of high speed running
CN101405458A (en) Hexagonal roadway system and traffic control system thereof
WO2007133018A1 (en) Four sides half freeway for traffic system in the crossroad
LT5330B (en) Junction of roads
CN102277806A (en) Shift-type interchange for all-time omnidirectional traffic at intersection of roads
WO2007133019A1 (en) Half u-turn underground roadway directed to both sides connected with traffic system when pedestrian's crossing is needed on the road
CN105951545A (en) Well field type non-traffic-light non-overpass road traffic system for one-way traffic in whole course
CN202323599U (en) Full-through flyover
CN101338541B (en) Crossing elevated passage for relaxing traffic jam
CN202090253U (en) Two crossroad full unblocked cross composite bridges of right turn bridges
CN1378017A (en) Overpass for city
CN102797207A (en) Urban two-layer interchange overpass formed by crossing one-way traffic and one-way traffic
CN101177927A (en) Rapid passing road system
CN2869104Y (en) Parallel overhead expressway
CN101298749B (en) Winding across method of communicated crossroads
CN203128965U (en) Traffic-light-free crossroad single-layer viaduct
CN1908304A (en) Crossroad access bridge
CN204753287U (en) Six motor vehicle lane crossroad on system of turning right individual layer bridge
CN202194042U (en) Traffic junction utilizing lane changing way
CN102605694A (en) T-junction flyover with pedestrian and vehicle lanes
CN105002796A (en) Single-layer overpass without traffic lights on crossroads
CN203113183U (en) Urban two-layer interchange with intersected one-way streets
CN204803699U (en) Economical cross overpass

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: Zheng Xuexin

Document name: Notification to Pay the Fees

DD01 Delivery of document by public notice

Addressee: Zheng Xuexin

Document name: Notification to Pay the Fees

DD01 Delivery of document by public notice

Addressee: Zheng Xuexin

Document name: Notification of Termination of Patent Right

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090812

Termination date: 20120122