CN101024954B - Steel wall manufacturing method - Google Patents

Steel wall manufacturing method Download PDF

Info

Publication number
CN101024954B
CN101024954B CN2007100862450A CN200710086245A CN101024954B CN 101024954 B CN101024954 B CN 101024954B CN 2007100862450 A CN2007100862450 A CN 2007100862450A CN 200710086245 A CN200710086245 A CN 200710086245A CN 101024954 B CN101024954 B CN 101024954B
Authority
CN
China
Prior art keywords
steel
joint
welding
sheet pile
steel sheet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2007100862450A
Other languages
Chinese (zh)
Other versions
CN101024954A (en
Inventor
鹿野裕
喜田浩
中野启真
池田昌弘
吉田伦夫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUMITOMO ENVIRONMENT ENGINEERING
Nippon Steel Corp
Original Assignee
Live Mine Environmental Engineering Co Ltd
Sumitomo Metal Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from JP2003033848A external-priority patent/JP3664166B2/en
Priority claimed from JP2003033847A external-priority patent/JP3633604B2/en
Priority claimed from JP2003106932A external-priority patent/JP3659249B2/en
Priority claimed from JP2003106931A external-priority patent/JP3633606B2/en
Priority claimed from JP2003302553A external-priority patent/JP3664717B2/en
Application filed by Live Mine Environmental Engineering Co Ltd, Sumitomo Metal Industries Ltd filed Critical Live Mine Environmental Engineering Co Ltd
Publication of CN101024954A publication Critical patent/CN101024954A/en
Application granted granted Critical
Publication of CN101024954B publication Critical patent/CN101024954B/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention provides a method for manufacturing a steel wall by connecting a plurality of steel elements with joints at two terminals with each other, wherein: embedding joints of the steel elements with each other while punching, forming a dual-wall structure steel wall with a close space at the internal side, then removing sand and/or water in the close space, welding the joints of the steel wall automatically. Thereby, comparing with manual welding, the evenness of welding is confirmed by setting the welding process to be automatic welding, requiring no special device and technique used in underwater welding since sand and/or water in the close space is removed, besides no requirement for large working area.

Description

The manufacture method of steel plate wall
The application divides an application, the application number of its female case application: 200310113838.3, and the applying date: 2003.10.31, denomination of invention: steel plate wall and manufacture method thereof
Technical field
The present invention relates to a kind of subterranean wall that is suitable for offal treatment field, building, road retaining wall etc. needs the manufacture method of steel plate wall in the place of water proof.
Background technology
In interim embankment when retaining wall in the construction of underground structure and waters, bay Facilities Construction etc., adopt steel sheet pile more.Its reason is that the high rigidity body of wall that utilizes this high quality material of steel to make except that can building up, also has better water-resisting property in the short construction period.
Though the steel of steel sheet pile main body self not water flowing fully certainly,, under chimerism, because the gap portion that exists in connector portions passes through water, so there is very big influence in the gap of this blank area to the water-resisting property of steel sheet pile.
Generally speaking, even the connector portions after squeezing under than the state that is easier to water flowing, after a while, because grogs etc. are blocked in joint inside with current, also can improve water-resisting property.But, in the time can not expecting that packed joint such as grogs is inner, and, also considering a kind of scheme that as far as possible reduces the gap of this joint inside in order further to improve water-resisting property.
But,, exist in the very large problem of driving resistance of blank area if the gap is too small, because water-resisting property and application property are conflicting performance requirements, so, can not reduce the gap of blank area entirely or increase the gap, and the water-resisting property that how to improve connector portions is a big problem.
For example, the water proof method as in the past offal treatment field etc. has when adopting steel sheet-pile wall, is reaching the last, and applies the dilatancy water proof material of ormal weight in connector portions, after squeezing into, utilizes the method for this water proof material because of water proofs that expands such as seawater.
In addition, in Japanese publication communique 2001-026925 (patent documentation 1), put down in writing a kind of " core wall ", as shown in figure 45, by welding the joint 62 of a plurality of U font steel sheet piles 61, form the core wall constituting body 63 of one, on one side the joint 64 of chimeric this side edge to each other, on one side a plurality of core wall constituting bodies 63 connected be arranged in the ground, simultaneously, around the core wall constituting body 63 that adjoins each other joint 64 to each other, implement foundation improvement 65.
In addition, in Japanese publication communique 07-324329 (patent documentation 2), put down in writing the method for a kind of " utilizing the construction method of the core wall of steel pipe colonnade ", as shown in figure 46, one side's the female joint material 73 of the joint of steel pipe sheet pile 71 is set, at a pair of alar part 74, the outward extending edge 75a of portion is set on the side's alar part 75 in 75, link a plurality of these steel pipe sheet piles 71 by mutual chimeric male joint material 72 and female joint material 73, after forming the steel pipe plate piling wall, excavate the ground of constructing side one side of building, expose connector portions, by welding 76, the front end of the 75a of edge portion of female joint material 73 is connected waterproofly the steel pipe external side of main body face of the other side's steel pipe sheet pile 71.
In addition, as technology in the past, the invention of putting down in writing is arranged in the open communique 01-168766 of Japan Patent, the open communique 2000-192446 of Japan Patent, the open communique 2000-192451 of Japan Patent, the open communique 2000-073361 of Japan Patent, the open communique 2000-234330 of Japan Patent, the open communique 2001-214435 of Japan Patent, the open communique 2001-248152 of Japan Patent, the open communique 2002-146772 of Japan Patent.
In the steel plate wall that construction is made of steel sheet pile etc., adopt the method for dilatancy water proof material to be subjected to the environmental safety of dilatancy water proof material self and the restriction of durability, simultaneously, when from the coating of steel sheet pile etc. or installation, to steel sheet pile etc. squeeze into during when longer, worry that the water proof material expands because of rain or dew, moisture etc., make squeezing into of steel sheet pile etc. bothersome, or the water proof material peels off when squeezing into steel sheet pile, or because of the heat charing etc., this just needs to confirm the water-resisting property of the core wall that forms.
At this moment, for example, need to check whether flow out water from the offal treatment field side direction core wall outside, or for guaranteeing abundant water-resisting property, and need improve leakage area ground on every side etc. in the not so good part of water proof, also there is the problem that can not erase the uneasy sense of leaking in this except that increasing man-hour and prolonging the duration.
And when adopting U shaped steel sheet pile, because the water proof material is positioned at the neutral axis place, cross section that connects steel sheet-pile wall, in work progress, the water proof material produces the dislocation repeatedly that the dislocation shearing force causes because of being subjected to wave external force, worries to destroy the water proof material.
In addition, in the invention of in the open communique 2001-026925 (patent documentation 1) of Japan Patent, putting down in writing, except that heavy-duty machinery and instrument that the weight of selecting with incorporate core wall constituting body 63 is complementary, also need near the joint 64 by core wall constituting body 63 foundation improvements 65 to guarantee water-resisting property and guarantee to be used for the environmental safety of the material of foundation improvement.
In addition, in the invention of Japanese publication communique 07-324329 (patent documentation 2) record, the butt joint head welds, but owing to be that water proof with respect to building is the phreatic water proof of ground, so be different from water proof with respect to offal treatment field etc., as long as the degree of water-resisting property is the degree for being complementary with the drainage of common building side setting, and the objective of the invention is to seek higher water-resisting property and reliable function is inequality.
In addition, in the invention of Japanese publication communique 07-324329 (patent documentation 2) record, owing to adopt the female joint material 73 of special shape, so when squeezing into, worry female joint material 73 distortion, suspect be in by moisture state such as the underground water in undermining or in water the vertical welding reliability of exposing connector portions under the state, in addition, said method can not use automatic welding machine.
Summary of the invention
The present invention seeks to solve the problem that exists in the above-mentioned conventional art and makes, purpose is to provide a kind of steel plate wall and manufacture method thereof, its formation is the space of welded-joint automatically, does not damage application property, and can high efficiency, obtain good water-resisting property at an easy rate.
The 1st invention of the present invention, be a kind of by connecting the manufacture method of the steel plate wall that a plurality of steel that two ends have joint constitute to each other, it is characterized in that: Yi Bian the chimeric above-mentioned joint in above-mentioned steel one side is squeezed into to each other, form the local or whole of steel plate wall, simultaneously, side at above-mentioned steel plate wall is squeezed into interim steel, form the temporary steel board wall, removal is by the sand in above-mentioned steel plate wall and the folded zone of above-mentioned temporary steel board wall, after the connector portions of cleaning above-mentioned steel plate wall, weld this connector portions automatically.
As the steel that constitute steel plate wall with joint, can adopt have web and its both sides have lateral margin U shaped steel sheet pile, linear pattern steel sheet pile, steel pipe sheet pile in addition with steel such as the shaped steel of above-mentioned steel combination and other, do not limit especially at this.
Interim steel do not limit especially yet, can adopt have web and its both sides have lateral margin U shaped steel sheet pile, linear pattern steel sheet pile, steel pipe sheet pile in addition with steel such as the shaped steel of above-mentioned steel combination and other, be not particularly limited at this, in addition, interim steel also can be the forms that is different from the steel that constitute the steel plate wall main body.
The purpose that adopts interim steel is to form the space that can weld automatically, and these interim steel can utilize in construction or after the construction again.In addition, the temporary steel board wall that is formed by interim steel is not limited to the continuous situation that forms a plurality of interim steel, also can form with single interim steel sometimes.
The cleaning of connector portions is for can welding, and guarantees that further welding quality carries out, and the high-pressure injection of water or air etc. etc. is an effective method.
The automatic welding of connector portions for example, can adopt usual way to carry out by with magnet the automatic guide rail that welds usefulness etc. is installed on steel plate wall.
In the present invention, can guarantee the speed of welding of desired thickness and weld part length, for example, with CO 2Gas is about 10~20cm/ minute as in the MAG of the protective gas welding, in the plasma welding, can adopt approximately double speed, by simple adjusting, and can be in the welding of carrying out for a long time substantially with the quality degree.Therefore, compare with the manual welding operation, can high-quality, the high efficiency welding, for the offal treatment field of adopting steel sheet pile etc., weld length is long more, can reduce welding cost more.
Place beyond the blank area of steel plate wall, preferred steel plate wall and temporary steel board wall roughly are close, but according to the size of automatic welding machine, and have the specification etc. of pile driver of steel of the joint of steel sheet pile etc., if desired, each other also can away from.
In addition, performance about the joint weld part, employing has the steel sheet pile of the asymmetric joint of wetting state in advance, by changing weld interval and speed, tested the automatic welding of connector portions, by cutting off this weld part of test, study throat thickness and welded portion, the result shows, even joint under moisture state, utilizes automatic welding also can obtain sufficient throat thickness and welding portion.
The present invention, aspect material, satisfy environmental safety, and, when manual welding, need the space of scaffold and the time of rest, and should welding itself be the vertical direction welding (transverse weld) that connects the difficulty of comparing with down hill welding, but confirm to utilize welding automatically, under wetting state, also can weld the steel connector portions, and use it for practice of construction.
Promptly, by the present invention, form the zone that surrounds the welding object connector portions by steel, during sand in cutting out this zone, if underground water then can utilize automatic welding to carry out the water proof of connector portions from the degree of interface (also can directly not join, the sandwich sand) turnover of connector portions or steel plate wall and temporary steel board wall, even and consider the corrosion of this weld part, also can make the water proof steel plate wall that keeps water isolating.
In addition, pattern or mode according to the steel that form steel plate wall, the position of the plane width of steel plate wall and welding object connector portions, the numbers of packages of the interim steel of needs etc. are different, but in zone by above-mentioned formation, owing to judge the situation of leaking behind the sand in removing this zone, as being the state of guaranteeing to weld automatically, according to the position and the situation of leaking of leaking, for example, in the outside of the connector portions of steel plate wall or connector portions, band plate or bar-like member are set, or steel pipe or the band plate that also can split in the arranged outside that contacts facial or immediate position of steel plate wall and temporary steel board wall.
And, when water route etc. is arranged, also above-mentioned parts can be set as required near pile driving position.The steel pipe and band plate or the bar-like member that are provided with because hydraulic pressure and soil pressure are pushed to region direction, not only reduce water leakage, also can make turnover amount equalization, can guarantee the state that can weld automatically.
Whether really can water proof about the welding object connector portions, for example,, can after welding, be confirmed at once if video camera is installed on automatic welding machine.
Amount of separation at steel plate wall and temporary steel board wall is big, when plane of structure enters sand, plants phenomenon here for anti-, also can be provided with between steel sheet-pile wall and temporary steel sheet pile wall and block parts arbitrarily.
The 2nd invention is based on the manufacture method of the 1st invention record, it is characterized in that, between above-mentioned steel sheet-pile wall and above-mentioned temporary steel sheet pile wall, or the end of above-mentioned steel sheet-pile wall and above-mentioned temporary steel sheet pile wall, setting prevents that sand from entering the parts that block in the above-mentioned zone, forms above-mentioned zone.
Block the also preferred steel of parts, still,, and do not limit especially as long as can between steel plate wall and temporary steel board wall, squeeze into.In addition, occlusion part also can combine with steel sheet pile and temporary steel sheet pile, but also not necessarily must in conjunction with.
In addition, the present invention provides the manufacture method of the high water proof steel plate wall of the water isolating of connector portions, but the water-resisting property when just not making is also considered the corrosion rate (at fresh water, 0.2mm/ is following) of steel etc., determines the length of welding of weld part with this.As with weld part welding length setting more than the minimum thickness of steel sheet pile, can guarantee to be higher than the good corrosion resistance of steel plate wall main body.
In addition, from the sand of removals such as digging out by steel plate wall and the folded zone of temporary steel board wall, and, can dispose and dig out soil by the backfill after the automatic welding end of connector portions.In addition, about the water proof steel plate wall position thing that whether goes out of use is set and pollutes, can utilize cuts the earth checks, is confirmed before the construction beginning.
And, after the backfill of discharging soil,, can greatly reduce the extent of corrosion of water proof steel plate wall as air portion with covering water proof steel plate walls such as concrete crest tables, can prolong service life significantly.
The 3rd invention is a kind of by connecting the manufacture method of the steel plate wall that a plurality of steel that two ends have joint constitute to each other, it is characterized in that: Yi Bian the chimeric above-mentioned joint in above-mentioned steel one side is squeezed into to each other, be formed on the steel plate wall that the inboard has the dual wall construction of closed area, then, behind the sand and/or moisture of removing above-mentioned closed area, the connector portions of welding this steel plate wall automatically.
The present invention is applicable to that sea or water surface offal treatment field etc. mainly are that the water yield of water-bed ground etc. is many, need the method in the place of water proof.
Steel as the joint with the steel plate wall that forms dual wall construction have so-called box type steel sheet pile etc., by the joint in the chimeric inboard and the outside, form the closed area in its space.
In addition, about box type steel sheet pile, duplex configuration linear pattern steel sheet pile is arranged and linear pattern steel sheet pile formula, inside and outside dual configuration H shaped steel sheet pile, Z-shape steel sheet pile, the U shaped steel sheet pile of compartment wall is set or can and be combined into the steel sheet pile that linearity ground obtains at asymmetric U shaped steel sheet pile along same direction alignment cross sectional shape; Or, constitute the steel sheet pile of case shape etc. by making up these and the steel plate that constitutes compartment wall or the shaped steel of H shaped steel and T-steel etc.As long as can be formed in the steel plate wall that the inboard has the dual wall construction of closed area, do not do special qualification.
About setting the reason of dual wall construction or box; except that implementing the welding automatically within the walls easily dual; also have dual and can check that within the walls the water from offal treatment field etc. spills situation; even just in case spill; also easily again the welding and to the dual water proof material etc. of filling within the walls, these are the safeguard protection along with programming.
Can the form of the shape invar sheet pile of dual wall and different when getting rid of at the dual water within the walls that forms etc., be distinguished from the state of the leaching water of the connector portions of steel plate wall and dual wall bottom surface, also can judge thus and weld automatically.
Particularly, when being the steel plate wall of constructing in the waters, by squeezing into steel, form the steel plate wall of dual wall construction, utilize to be arranged on dual water pump within the walls etc. and to carry out draining, under the water yield state seldom that immerses from connector portions or dual wall bottom surface, for example, if the amount of moisture of moisture that adheres to and inflow is in the degree of electric arc heat of vaporization that can be soldered, or below it, can weld automatically.In addition, from the weld part situation of leaking,, carry out field patch by affirmations such as visual or video cameras as needs.
In addition, about closed area of the present invention, if when water is medium, with drainings such as water pump just can, but in wetland etc. the time, also to remove sand, or as required, clean the welding region of wanting of connector portions.
The cleaning of connector portions is in order can to weld, and then guarantees that welding quality carries out, and the high-pressure injection of water spray or air etc. etc. all is effectively.
The automatic welding of connector portions for example, can be adopted by with magnet the usual ways such as track that weld usefulness automatically are installed on steel sheet pile and be undertaken.
In the present invention, guarantee desired thickness and the speed of welding of welding minister's degree, for example, with CO 2In the MAG welding as protective gas, be set in about 10~20cm/ minute, in the plasma panel welding, can adopt above-mentioned double speed,, can carry out the quality welding of equal extent substantially for a long time by simple adjusting.Therefore, compare with manual welding, can carry out quality on average, welding efficiently, in the offal treatment field of adopting steel sheet pile etc., the welding development length is long more, can reduce welding cost more.
In addition, performance about the joint weld part, employing has the steel sheet pile of wetting in advance asymmetric joint, change weld interval and speed, the automatic welding of test connector portions is by cutting off this weld part of test, study throat thickness and welding portion, the result shows, even joint under moisture state, utilizes automatic welding also can obtain sufficient throat thickness and welding portion.
Whether really can water proof about the welding object connector portions, for example,, can after welding, be confirmed at once if video camera is installed on automatic welding machine.
And, about welding, need the space of scaffold and the time of rest when utilizing manual welding, and should welding itself be the vertical direction welding (transverse weld) that connects the difficulty of comparing with down hill welding.In the present invention, by welding being set at automatic welding, compare during with the manual welding operation, except that need not guaranteeing big operating area, owing to removed sand and/or the moisture in the closed area, do not need the special installation and the technology of welding usefulness in the water, so can guarantee the uniformity of welding quality.
That is, the present invention is a kind of, satisfies environmental safety aspect material, and, have the manufacture method of piling construction with the water proof steel plate wall of the safety device function of ejector half.
In addition, because of the water leakage from connector portions big, directly automatically during welding difficulty etc., for example, in the outside or joint fitting portion of connector portions, continue to use in the continuous strip member of length direction of the joint in packed joint gap to each other by setting, reduction is leaked from connector portions, can weld automatically easily.
Particularly,, can insert resinous bar-like member, pipe or the round metal bars etc. of the path in the gap that can enter welding object joint fitting portion as strip member, or at high resin plate of arranged outside thin plate, the fusing point of joint etc.
Under this state, get rid of the dual water within the walls of steel as drawing water with pump, utilize inside and outside differential water pressures, make the gap of strip member near connector portions, can access the water proof effect.Thus, reduce water leakage, be easy to automatic welding.
The 4th invention is based on the manufacture method of the steel plate wall of the 3rd invention record, it is characterized in that: remove the sand and/or the moisture on the water barrier top that exists in the above-mentioned closed area, be welded to automatically below the water-bed face.
For example, offal treatment field, sea in foundation of sea floor, have water barrier the time, think that benthic division promptly allows to water proof, also insufficient at water proof from the water barrier layer up of the argillic horizon of foundation of sea floor etc. sometimes, in such cases, by removing the sand on water barrier top, in addition, as possible, also remove the part water barrier, automatically weld, also can guarantee the water-resisting property of benthic division.
Specifically be to utilize sprinkler and excavation machinery etc., the excessive ground that excavates water barrier carries out the draining of related sand with sand pump etc., then, as mentioned above, makes object connector portions water proof by automatic welding.
Then, once more, make downside become water barrier, do not need casting to handle by backfill, and, the water of discharging with sand pump etc. is divided into fine fraction and coarse component, as required after filtering on flatboat and the cripple, after dropping into the water proof material, it is within the walls dual to be backfilling into steel as the order by fine fraction, coarse component, can reduce can access the higher waterproof structure of reliability from the permeability rate of the dual wall of steel bottom surface.
The 5th invention is a kind of steel plate wall, the a plurality of steel that have joint by above-mentioned joint connection two ends constitute to each other, it is characterized in that: the water proof with steel covers connector portions with section bar, uses section bar and above-mentioned steel and/or water proof with section bar to each other along the above-mentioned water proof of length direction continuous welding seamlessly.
The present invention is the high water-resisting property of the connector portions that obtains steel plate wall, and except that the blank area that covers steel such as steel sheet pile with water proof with section bar, along length direction seamlessly continuous welding steel and water proof section bar, or water proof is with section bar to each other, or its both.
Such welding by removing near sand and the moisture the welding position, is guaranteed welding space, can utilize automatic welding etc. to carry out.
The 6th invention is based on the steel plate wall of the 5th invention record, it is characterized in that: above-mentioned water proof is covered above-mentioned joint ground with section bar engage or be welded near the joint of above-mentioned steel.
Cover the water proof section bar of connector portions, can utilize welded and installed in advance on a side steel, the holding section of extending along the length direction of these steel also can be set on steel, adopt band edge channel-section steel or band edge angle steel etc. as the water proof section bar, water proof is fastened on the holding section of steel with the leading edge portion of section bar end.
Welded and installed be located at section bar steel plate wall, welding to each other at the water proof on both sides' steel with steel plate wall, the welded and installed of section bar and other steel at the water proof on the steel water proof that is installed on the steel with the steel plate wall of the holding section on section bar and other steel, weld water proof with the leading edge portion or the side edge portions of section bar and be located at both sides' steel or both sides' steel on the steel plate wall etc. of holding section, no matter which kind of steel plate wall can both fully reach purpose of the present invention.
As water proof section bar so, except that above-mentioned band edge channel-section steel or band edge angle steel, so long as can cover blank area, and on steel plate wall, to install easily and get final product, cross sectional shapes etc. are not done special qualification.
In addition, about the material of water proof,, also can be the material beyond the steel as long as have the intensity and the weldability of appropriateness with section bar.
The 7th invention, the steel plate wall based on the 5th or the 6th invention record is characterized in that: in the above-mentioned steel injection water that will link and/or in the ground.
The 8th invention is a kind of by connecting the manufacture method of the steel plate wall that a plurality of steel that two ends have joint constitute to each other, it is characterized in that: Yi Bian the chimeric above-mentioned joint in above-mentioned steel one side is squeezed into to each other, be formed on the steel plate wall that the inboard has the dual wall construction of closed area, to cover the state of the above-mentioned closed area of above-mentioned joint with the water proof material of steel, utilize welding automatically, the water proof that covers above-mentioned joint along length direction continuous welding is seamlessly used section bar and above-mentioned steel and/or water proof with section bar to each other.
Steel as the joint with the steel plate wall that forms dual wall construction have so-called box type steel sheet pile etc., by the joint in the chimeric inboard and the outside, form the closed area in this space.
In addition, about box type steel sheet pile, there is duplex configuration linear pattern steel sheet pile and the linear pattern steel sheet pile formula of compartment wall is set; Inside and outside dual configuration H shaped steel sheet pile, Z-shape steel sheet pile, U shaped steel sheet pile; Or can be combined into the steel sheet pile that the asymmetric U shaped steel sheet pile of linearity forms along same direction alignment cross sectional shape; Or, constitute the steel sheet pile of case shape etc. by making up these and the steel plate or the shaped steel such as H shaped steel and T-steel that constitute above-mentioned steel compartment wall.As long as can be formed in the steel plate wall that the inboard has the dual wall construction of closed area, and be that the shape of water proof with section bar can be installed near joint, do not do special qualification.
The manufacture method of the steel plate wall of the 9th invention, be a kind of by connecting the manufacture method of the steel plate wall that a plurality of steel that two ends have joint constitute to each other, it is characterized in that: Yi Bian the chimeric above-mentioned joint in above-mentioned steel one side is squeezed into to each other, form steel plate wall, then, excavate near the sand of above-mentioned joint of above-mentioned steel plate wall, up to water barrier, form the closed area, to cover the state of the above-mentioned closed area side of above-mentioned joint with section bar with the water proof of steel, utilize welding automatically, the water proof that covers above-mentioned joint along length direction continuous welding is seamlessly used section bar and above-mentioned steel or water proof with section bar to each other.
Steel plate wall for the 5th~7 invention, be not limited to as the manufacture method of the steel plate wall of the 8th invention, form the steel plate wall of dual wall construction, when the steel plate wall of single layer structure, as the 9th invention record, by near the sand the above-mentioned joint of steel plate wall is excavated water barrier, form the closed area, also can make.
That is, can with at least in closed area that a side of steel plate wall forms as the space of welding automatically etc.
In addition, in the manufacture method of the steel plate wall of the 8th or 9 invention, about preventing in the inboard of dual wall construction or the closed area water inlet that forms of a side of steel plate wall, as required, can get rid of the moisture that is trapped in the zone that surrounds with section bar and steel with water proof, or drop into packing material with the zone that section bar and steel surround with water proof.
As packing material,, also can use pitch, clay, silica sand etc. except that cement paste, mortar and macromolecule water absorbent material etc. absorb, solidify the material of moisture.
In addition, about sand and the moisture that exists in the closed area of removal in the manufacture method of the steel plate wall of the 8th or the 9th invention, if it is medium at water, only just can with drainings such as water pumps, but in the time of in wetland etc., also to remove sand, or as required, clean the gap that the water proof that covers joint is used section bar and steel.
About the concrete removal method of sand etc., utilize sprinkler and excavation machinery etc., the excessive ground that excavates water barrier, the method for draining when discharging sand with sand pump etc.
About steel such as steel sheet pile and cover the welding of the water proof of its joint with section bar, or water proof is with section bar welding to each other, for example, can adopt that the usual ways such as track of welding usefulness carry out by installing automatically with magnet on steel.
In the present invention, guarantee desired thickness and the speed of welding of welding minister's degree, for example, with CO 2In the MAG welding as protective gas, be set in about 10~20cm/ minute, in the plasma panel welding, can adopt above-mentioned double speed,, can carry out the quality welding of equal extent substantially for a long time by simple adjusting.Thereby, compare with manual welding, can carry out homogeneous, welding efficiently, in the offal treatment field of adopting steel sheet pile etc., the welding development length is long more, and the effect that reduces welding cost is big more.
In addition, when utilizing manual welding, need the space of scaffold and the time of rest, and for welding of the present invention, it is the vertical direction welding (transverse weld) that connects the difficulty of comparing with down hill welding, if but welding is set at automatic welding, compare during with the manual welding operation, when not needing to guarantee the big operating area as manual welding, because the sand that can remove in the closed area reaches/moisture, do not need the special installation and the technology of welding usefulness in the water, so can guarantee the uniformity of welding quality.
The 10th invention is based on the manufacture method of the steel plate wall of the 8th or the 9th invention record, it is characterized in that: will have sand in the above-mentioned closed area and/or the moisture removal top to water barrier.
For example, the water barrier situation etc. that is provided with in foundation of sea floor of offal treatment field, sea thinks that benthic division promptly allows to water proof, and from the water barrier layer up of the argillic horizon of foundation of sea floor etc., water proof is insufficient sometimes.
In such cases, by removing the sand on water barrier top, in addition, as possible, also remove the part water barrier, the water proof that covers joint is arrived water barrier with the section bar injection, then, drop into packing material in the zone that surrounds with section bar and steel with water proof, or by be trapped in the moisture in the zone that surrounds with section bar and steel with water proof with eliminatings such as water pumps, prevent from above-mentioned closed area, to enter water from this zone, then, remove sand and/or moisture that the closed area exists, last, by automatic welding water proof with section bar to each other, also can guarantee the water-resisting property of benthic division with the welding portion of section bar or water proof.
The 11st invention is a kind of steel sheet pile that constitutes to each other by a plurality of steel sheet piles that had joint by above-mentioned joint connection two ends, it is characterized in that above-mentioned steel sheet pile: have near the joint at above-mentioned two ends and the equidirectional boss portion of piling normal direction; The shape of cross section of the joint at above-mentioned two ends is non-bilateral symmetry; With respect to above-mentioned boss portion, a side of the above-mentioned joint of engaging is inwardly to formation mutually, and with respect to above-mentioned boss portion, the opposing party of above-mentioned joint is outwardly to formation; And the base portion of at least one side's of above-mentioned joint joint has projection; State with the shape of cross section of this steel sheet pile that aligns along same direction can link a plurality of steel sheet piles to each other by linearity; Lateral surface along the above-mentioned projection of the above-mentioned side's of length direction continuous welding seamlessly joint and the opposing party's joint.
As steel sheet pile, can be any in the linear pattern, U type (web and have shape of lateral margin etc. in its both sides) with asymmetric joint.
In addition, the method about the welding between the lateral surface of the projection of an above-mentioned side's joint and the opposing party's joint can adopt gas shielded arc weldings such as TIG, MIG, MAG, plasma arc, does not limit the kind of welding material and protective etc.
By being located at the projection of joint base portion, can limit the rotation of steel sheet pile in connector portions.
The 12nd invention is a kind of sheet pile formula steel plate wall that constitutes to each other by a plurality of steel sheet piles that had joint by above-mentioned joint connection two ends, it is characterized in that: above-mentioned steel sheet pile has near the joint at above-mentioned two ends and the equidirectional boss portion of piling normal direction, the shape of cross section of the joint at above-mentioned two ends is non-bilateral symmetry, one side of the above-mentioned joint that engages mutually with respect to above-mentioned boss portion is inwardly to formation, with respect to the opposing party of the above-mentioned joint of above-mentioned boss portion outwardly to formation; In above-mentioned to the base portion of joint side have towards interior to projection; And, the base portion of the lateral surface of above-mentioned joint towards extroversion have towards interior to riser portions, with the align state of shape of cross section of this steel sheet pile of same direction, can a plurality of steel sheet piles of linearly binding to each other; Along the lateral surface of the above-mentioned joint towards extroversion of length direction continuous welding seamlessly and the projection of above-mentioned introversion.
That is, the 12nd invention is equivalent in the sheet pile formula steel plate wall of the 11st invention record, a side joint promptly in to the base portion of joint side have above-mentioned projection, the opposing party's joint promptly the base portion of the joint side of extroversion have riser portions.
The 13rd invention is based on the sheet pile formula steel plate wall of the 11st or the 12nd invention record, it is characterized in that:, will connect 2 sheet pile walls that a plurality of steel sheet piles constitute by the joint at above-mentioned two ends to each other in the injection water and/or in the ground with the linking part of the above-mentioned joint of separately the sheet pile wall state of subtend inwardly mutually to each other.
As the common other problems that exists of the various technology of in one of background technology, introducing, except needing the steel sheet pile to make and installation interval keeps beyond joint component, water proof parts or the limiting part with convex object, special shape, also having needs can improve the water proof encapsulant of water-resisting property or have expansile water proof material, or grouting agent etc., increase the cost (manufacturing cost and the site operation costs of water proof parts, water proof material etc.) of realizing water proof thus.
And, the problem that the water isolating that peeling off when also having the water proof encapsulant, have the aging of expansile water proof material or grouting agent and acting on sheet pile wall because of external force causes reduces.
The applicant is for solving such problem, invents out a kind of feature of joint geometry of the steel sheet pile with above-mentioned asymmetric joint, and the butt joint linking part is implemented new departure of welding.
And, as following detailed introduction, to linking part at non-symmetrical joint, along the lateral surface of the export-oriented joint of the length direction continuous welding of steel sheet pile and interior between projection the time, and at the base portion of export-oriented joint side, along the length direction continuous welding of steel sheet pile towards interior to projection riser portions and interior lateral surface to joint between the time two kinds of situations compare, discovery is in the previous case, stable welding than being easier to seamlessly form welding bead, can access the water-resisting property in this part.
In addition, when at the lateral surface of export-oriented joint and the interior welding that in the welding of projection, adopts the such non-consumable electrode type of TIG and plasma arc welding (PAW), without welding material, pass through melt protrusion, be welded in lateral surface, or while melt protrusion and lateral surface, also can form integrated.
The 14th invention is the steel sheet pile that a kind of two ends have joint, it is characterized in that: have near the joint at above-mentioned two ends and the equidirectional boss portion of piling normal direction; The shape of cross section of the joint at above-mentioned two ends is non-bilateral symmetry; With respect to above-mentioned boss portion, a side of the above-mentioned joint of engaging is inwardly to formation mutually, and with respect to above-mentioned boss portion, the opposing party of above-mentioned joint is outwardly to formation; Base portion at least one side's of above-mentioned joint joint has projection; With the state of the shape of cross section of this steel sheet pile that aligns along same direction, can a plurality of steel sheet piles of linearly binding to each other; And the part of above-mentioned projection or whole is made of low-melting material of comparing with other parts.
About a shape of steel sheet pile, can be any in the linear pattern, U type (web and have shape of lateral margin etc. in its both sides).
About constituting local or whole low melting material of projection, be fit to adopt fusing point low-melting welding material (filling metal) and the cored solder (brazing solder and silver solder) lower than steel.
By being located at the projection of joint base portion, can limit the rotation of steel sheet pile in connector portions.
The 15th invention is the steel sheet pile that a kind of two ends have joint, it is characterized in that: near the joint at above-mentioned two ends, have and the equidirectional boss portion of piling normal direction, the shape of cross section of the joint at above-mentioned two ends is non-bilateral symmetry, one side of the above-mentioned joint that engages mutually with respect to above-mentioned boss portion is inwardly to formation, with respect to the opposing party of the above-mentioned joint of above-mentioned boss portion outwardly to formation, in above-mentioned to the base portion of joint side have towards interior to projection; In the base portion of the joint side of above-mentioned extroversion has to riser portions; With the state of the shape of cross section of this steel sheet pile that aligns along same direction, can a plurality of steel sheet piles of linearly binding to each other, and above-mentioned projection local or all is made of low-melting material of comparing with other parts.
That is, the 15th invention is equivalent in the steel sheet pile of the 14th invention record, a side joint promptly in to the base portion of joint side have in to projection, the opposing party's joint be in the base portion of the joint side of extroversion has to riser portions.
The steel sheet pile that is attached at the 14th or 15 invention record with above-mentioned connector portions by heating above-mentioned projection, along the lateral surface and the above-mentioned projection of length direction continuous welding connector portions seamlessly, can provide high water-resisting property for sheet pile formula steel plate wall to each other.
The method of the above-mentioned projection of heating when forming weld part so if gas shielded arc welding can adopt non-consumable electrode types such as TIG, plasma arc, does not limit the kind of protective.For example, if weld in water, suitable employing utilizes the method for the electric arc heated welding position of plasma arc welding (PAW), if weld in atmosphere, also can adopt the heating and melting that utilizes gas burner to fill the method for metal and solder.
The applicant, identical with the situation of the 11st~13 invention, at non-symmetrical fitting portion, with lateral surface and introversive projection along the export-oriented joint of the length direction continuous welding seamlessly of steel sheet pile is purpose, to with interior to roughly all being set at when comparing low-melting material of projection with other parts of steel sheet pile, and with interior to the two kind situations of projection when being set at other part identical materials with steel sheet pile compare.
In addition, at this moment, as heating arrangements, adopting a kind of of gas shielded arc welding of non-consumable electrode type is the PLASMA ARC WELDING device, adopt in atmosphere to interior to the method for projection fixed point heating.
In the previous case, before mother metal begins fusion, form the low melting material of introversive projection by fusing, can the lateral surface of export-oriented joint and interior to projection between, seamlessly, have water-resisting property ground, form the welding material that forms by the fusion low melting material with comparalive ease.
(effect of invention)
If employing the present invention, at the steel that have joint by connection to each other, when making steel pile, by forming the space that connector portions can be welded automatically, and can not damage application property ground high efficiency, cheapness obtains high water-resisting property.
Particularly in the manufacture method of the steel plate wall that the 1st, 2 invention put down in writing, by adopting the temporary steel sheet pile, form the connector portions space of the connector portions of weldable steel making sheet piling wall automatically, can carry out the homogeneous welding of high efficiency, cheapness, for the steel plate wall of finishing, also can expect high reliability as core wall.
In addition, in the manufacture method of the steel plate wall that the 3rd, 4 invention put down in writing, it is the enclose inside space that utilizes the steel plate wall of dual wall construction, carry out the method for the automatic welding of connector portions, can carry out the homogeneous welding of high efficiency, cheapness, for the steel plate wall of finishing, also can expect high reliability as core wall.
In addition, by the situation of leaking after the check welding, can weld once more at once as required, in addition, for the hazardous substances that flows out from the offal treatment field etc., can be in the dual water quality of checking within the walls, just in case when leaking, can have security function by handling at the dual water proof material of filling within the walls.
About the steel plate wall of the 5th~10 invention record, do not limit by connecting steel that two ends have a joint to each other, the enclose inside of the steel plate wall of the dual wall construction of formation zone or dual wall construction; Be to utilize near the enclosure space connector portions of steel plate wall, guarantee, adopt methods such as welding automatically, the steel plate wall that the water proof of length direction continuous welding seamlessly covering joint forms with section bar to each other with section bar and steel and/or water proof; Bring obstacle ground, high efficiency, the cheap steel plate wall of making for the connection that utilizes steel joint to each other,, also can expect high reliability as core wall for the steel plate wall of finishing.
For the sheet pile formula steel plate wall of the 11st~13 invention record, because the connector portions of the steel sheet pile of solder joint, injection seamlessly can prevent fully that underground water and seawater from entering from steel sheet pile blank area to each other.In addition, owing to do not need dilatancy water proof material and water proof parts, manufacturing cost and construction cost are low, by other steel such as combined steel plate pile and H shaped steel, the steel plate wall that can realize having the multi-section performance.
As adopt the steel sheet pile of the 14th, 15 invention record because fault-free ground can weld the time, seamlessly, stablize the connector portions of the steel sheet pile of solder joint, construction, can prevent fully that underground water and seawater from entering from steel sheet pile blank area to each other.In addition, owing to do not need dilatancy water proof material and water proof parts, manufacturing cost and construction cost are low, by other steel of combined steel plate pile and H shaped steel etc., the steel plate wall that can realize having the multi-section performance.
Description of drawings
Fig. 1 is steel and the interim steel that the expression conduct has joint, a routine flow chart of the sequence of construction of the present invention (corresponding with the 1st invention) when adopting steel sheet pile.
Fig. 2 is the steel of expression as the formation steel plate wall in the 1st invention, the plan view of a kind of embodiment when adopting U shaped steel sheet pile.
Fig. 3 be expression as the steel of the formation steel plate wall in the 1st invention, the plan view of a kind of embodiment when adopting asymmetric U shaped steel sheet pile.
Fig. 4 is the steel of expression as the one-tenth steel plate wall in the 1st invention, the plan view of a kind of embodiment when adopting the steel of one connection H shaped steel on asymmetric U shaped steel sheet pile.
Fig. 5 be expression as the steel that constitute steel plate wall, adopt the linear pattern steel sheet pile, and and the plan view of the embodiment of (corresponding) during with curtain-shaped cover member with the 2nd invention.
Fig. 6 is the steel that the expression conduct has joint, adopts box type steel sheet pile, a routine flow chart of the present invention's when being applied to saline waters (corresponding with the 3rd invention) sequence of construction.
Fig. 7 is the steel of expression as the formation steel plate wall in the 3rd invention, the plan view of a kind of embodiment when adopting the box type steel sheet pile of duplex configuration linear pattern steel sheet pile.
Fig. 8 is the steel of expression as the formation steel plate wall in the 3rd invention, the plan view of a kind of embodiment when adopting the box type steel sheet pile of duplex configuration U shaped steel sheet pile.
Fig. 9 is the steel of expression as the formation steel plate wall in the 3rd invention, the plan view of a kind of embodiment when adopting the box type steel sheet pile of the asymmetric U shaped steel of duplex configuration sheet pile.
Figure 10 is the steel of expression as the formation steel plate wall in the 3rd invention, the plan view of a kind of embodiment when adopting duplex configuration U shaped steel sheet pile.
Figure 11 is the plan view of a kind of embodiment of expression when improving water-resisting property by the strip member in connector portions arranged outside sheet.
Figure 12 is the plan view of expression by a kind of embodiment when the bar-shaped strip member of connector portions arranged outside improves water-resisting property.
Figure 13 is the plan view of expression by the another kind of embodiment when the bar-shaped strip member of connector portions arranged outside improves water-resisting property.
Figure 14 is the flow chart of summary of manufacture method of the steel plate wall of expression the 8th, 10 invention of the present invention.
Figure 15 is a kind of embodiment of the steel plate wall of expression the 5th~7 invention of the present invention, (a) is plan view, (b) is the amplification view of its main position details of expression.
Figure 16 is the plan view of another kind of embodiment of the steel plate wall of expression the 5th~7 invention of the present invention.
Figure 17 is the plan view of another embodiment of the steel plate wall of expression the 5th~7 invention of the present invention.
Figure 18 is the plan view of another embodiment of the steel plate wall of expression the 5th~7 invention of the present invention.
Figure 19 is the plan view of another embodiment of the steel plate wall of expression the 5th~7 invention of the present invention.
Figure 20 is the plan view of other embodiments of the steel plate wall of expression the 5th~7 invention of the present invention.
Figure 21 is the flow chart of summary of manufacture method of the steel plate wall of expression the 9th, 10 invention of the present invention.
Figure 22 is the plan view of the position relation of a kind of steel plate wall main body of embodiment of manufacture method of steel plate wall of expression the 9th invention of the present invention and closed area.
Figure 23 (a)~(d) is a horizontal cross of representing used water proof examples of material of the present invention and automatic welding position separately respectively.
Figure 24 (a) is expression other routine plan views as the steel sheet pile of the used steel of the present invention, (b) is the enlarged drawing of its blank area.
Figure 25 is a kind of embodiment of the sheet pile formula steel plate wall of expression the 11st, 12 invention of the present invention, (a) is plan view, (b) is the enlarged drawing of its blank area.
Figure 26 (a) is a plan view of representing to be linked by connector portions the state with a plurality of steel sheet piles that become the asymmetric joint that uses object, (b) is the enlarged drawing of its joint fitting portion.
Figure 27 is the welding method as the 11st, 12 invention, along the lateral surface of the export-oriented joint of the length direction continuous welding of steel sheet pile and interior to projection between the time key diagram.
Figure 28 is a process and poor welding method as a comparative example, and at the length direction along steel sheet pile, at the base portion of export-oriented joint side, continuous welding is towards interior key diagram between riser portions of protruding and the interior lateral surface to joint the time.
Figure 29 represents the another kind of embodiment of the sheet pile formula steel plate wall of the 11st invention, (a) is plan view, (b) is the enlarged drawing of its joint fitting portion.
Figure 30 is a kind of embodiment of sheet pile formula steel plate wall of the 13rd invention of expression, (a) the approaching situation of expression 2 strake piling walls, (b) expression 2 strake piling walls away from situation.
Figure 31 is the plan view of another kind of embodiment of the sheet pile formula steel plate wall of the 13rd invention of expression, (a) direct one 2 the U shaped steel sheet piles of welding of expression situation to each other, and (b) expression is by the situation of H shaped steel one welding.
Figure 32 is the plan view of another embodiment of the sheet pile formula steel plate wall of the 13rd invention of expression
Figure 33 is the plan view of an example of the welding method of the expression joint fitting portion that adopts mobile welding.
Figure 34 is another routine plan view of the welding method of the expression joint fitting portion that adopts mobile welding.
Figure 35 is a kind of plan view of embodiment of the steel sheet pile of expression the present invention the 14th, 15 inventions, (a) is the plan view that expression links the state of the steel sheet pile with asymmetric joint, (b), (c) be the main position enlarged drawing of expression welding pattern.
Figure 36 (a) and (b) are the plan views at the main position of the welding pattern in the another kind of embodiment of steel sheet pile of the 14th, 15 invention of expression.
Figure 37 (a) and (b) are routine key diagrams that expression is replaced with an interior part to projection the method for low melting material.
Figure 38 (a) and (b) are key diagrams of process and poor welding situation as a comparative example.
Figure 39 is another embodiment of steel sheet pile of the 14th, 15 invention of expression, (a) is the plan view that expression links the state of the steel sheet pile with asymmetric joint, (b), (c) be the main position enlarged drawing of expression welding pattern.
Figure 40 is a kind of embodiment of sheet pile formula steel plate wall of the 14th, 15 invention of expression, (a) the approaching situation of expression 2 strake piling walls, (b) expression 2 strake piling walls away from situation.
Figure 41 is the plan view of another embodiment of the sheet pile formula steel plate wall of the 14th, 15 invention of expression, (a) direct one 2 the asymmetric U shaped steel sheet piles of welding of expression situation to each other, and (b) expression is by the situation of H shaped steel one welding.
Figure 42 is the plan view of other a kind of embodiments of the sheet pile formula steel plate wall of the 14th, 15 invention of expression.
Figure 43 is the plan view of an example of the welding method of the expression joint fitting portion that adopts mobile welding.
Figure 44 is other routine plan views of the welding method of the expression joint fitting portion that adopts mobile welding.
Figure 45 is that the horizontal cross of the example of the core wall of the U shaped steel sheet pile of example is in the past adopted in expression.
Figure 46 is that the horizontal cross of the example of the core wall of the steel pipe sheet pile of example is in the past adopted in expression.
Among the figure: A ... steel plate wall, B ... the closed area, C ... joint water proof zone, D ... the temporary steel board wall, J ... connector portions (connector portions of temporary steel sheet pile), 1 ... asymmetric U shaped steel sheet pile, 1c ... link steel, 2 ... interior to joint, 2a ... introversive projection, 2b ... lateral surface, 3 ... export-oriented joint, 3a ... riser portions, 3b ... lateral surface, 3c ... export-oriented projection, 4 ... boss portion, 5 ... welding, 5a, 5b ... welding bead, 6 ... weld part, 7 ... weld part, 8 ... portable welder, 8a ... welding torch, 8b ... moving track, 8c ... move and use roller, 9 ... portable welder, 9a ... welding torch, 9b ... interval adjustment lazy-tong (pantograph) between the bonding machine, 9c ... hold concurrently to move and use roller in the location, 5c ... low melting material, 5d ... welding, 7 ' ... weld part, 8 ' ... portable welder, 9 ' ... portable welder, 9a ' ... welding torch, 11 ... U shaped steel sheet pile, 21 ... the linear pattern steel sheet pile, 21c ... link steel, 31,31 ', 31 " ... box type steel sheet pile; 31f ... side edge part (flange); 31w ... web portion (web), 32,33 ... joint, 34 ... boss portion, 36 ... the holding section, 41,41 ', 41 " ... box type steel sheet pile; 1t ... temporary steel sheet pile; 11t ... the temporary steel sheet pile, 21t ... the temporary steel sheet pile, s1 ... the strip member of sheet, s2 ... bar-shaped strip member, 1r ... the holding section, 51 ... water proof section bar (band edge channel-section steel), 51r ... leading edge portion, 51r ' ... export-oriented leading edge portion, 52,53 ... water proof section bar (angle steel).
The specific embodiment
Fig. 1 represents as the steel with joint of the 1st invention of the present invention and interim steel, and a routine flow chart of the sequence of construction when adopting steel sheet pile below carries out operation in this order.
According to steel sheet pile squeeze into machinery construction ability, use the platform number, what begin steel sheet-pile wall from arbitrary position of finishing the water proof steel plate wall builds that (Fig. 1 is a).
At least at a place, squeeze into temporary steel sheet pile (Fig. 1 b), form the zone (Fig. 1 c) that a part and temporary steel sheet pile by steel sheet-pile wall surround.
After excavating the sand of removing in the closed area (Fig. 1 d), clean the connector portions (Fig. 1 e) of the steel sheet-pile wall in the zone.
Then, automatic welding machine (Fig. 1 f) is installed in the zone, is welded (Fig. 1 g) automatically.
After confirming certain water proof, take out interim sheet pile (Fig. 1 h).
Repeat the operation of above-mentioned a~h, finish the water proof steel plate wall.
In addition, also can h take out interim sheet pile before, squeeze into next temporary steel sheet pile, carry out b~g operation, at this moment, taking out of the temporary steel sheet pile of squeezing into earlier can be carried out in any time during this period, for example, also took out after the affirmation of the certainty of the water proof of the weld part that can formerly carry out.
Fig. 2 be expression as the steel that constitute steel plate wall A, a kind of embodiment when adopting U shaped steel sheet pile 11, steel plate wall A replace the U shaped steel sheet pile 11 of reverse configuration by connection the joint of both sides forms to each other.
In the side of this steel plate wall A, being configured in this example by same U shaped steel sheet pile is the temporary steel board wall D that temporary steel sheet pile 11t constitutes, form by steel plate wall A and temporary steel board wall D round closed area B.
In addition, in this example, for forming 1 closed area B, adopt 3 temporary steel sheet pile 11t, the welding object connector portions J of the steel plate wall A among the B of this closed area is 2 places.
In addition, if 5 temporary steel sheet pile 11t are set continuously, can form 2 closed area B simultaneously, the welding object connector portions J of the steel plate wall A among the B of its closed area is 4 places.And, if 7 temporary steel sheet pile 11t are set continuously, can form 3 closed area B simultaneously, the welding object connector portions J of this moment is 6 places.Above-mentioned setting can suitably be determined according to the shape of execution conditions and steel, construction machinery, sequence of construction etc.
Fig. 3 is that expression is as the steel that constitute steel plate wall A, a kind of embodiment when adopting asymmetric U shaped steel sheet pile 1, the joint geometry of the connector portions J at its two ends is non-bilateral symmetry, shape of cross section aligns along same direction, can be combined into linearity, near the connector portions J at two ends, have the boss portion with piling normal direction equidirectional, mutually a side of the hook-shaped joint of engaging, with respect to the outer most edge of steel plate wall A, inwardly to formation, the opposing party is outwardly to formation.In addition, the shape of the joint of above-mentioned asymmetric U shaped steel sheet pile 1 will be introduced in the explanation of other embodiments in detail.
At this moment, as shown in the figure,,, can form 1 closed area B by enough 1 asymmetric U shaped steel sheet piles if also adopt asymmetric U shaped steel sheet pile as temporary steel sheet pile 1t.Certainly, if connect a plurality of asymmetric U shaped steel sheet piles, also can form a plurality of closed area B simultaneously as temporary steel sheet pile 1t.
In addition, when adopting so asymmetric U shaped steel sheet pile, compare with the U shaped steel sheet pile that has with the uniform section rigidity, can be according to the characteristic of shape of cross section at the asymmetric joint alignment of same direction, can the linearity combination, with the THICKNESS CONTROL of water proof steel plate wall A at low thickness.
Therefore, for example, when being used for the offal treatment field,, the effective volume of offal treatment field being reached make steel plate wall A the biglyyest even the space that can construct is limited.
And, if in steel plate wall A and temporary steel board wall D, adopt asymmetric U shaped steel sheet pile, as shown in Figure 3, the connector portions J of welding object can be configured in from temporary steel sheet pile 1t position farthest, and,, have the advantage that is easy to automatic welding because all welds are all in the same direction.
Fig. 4 represents that conduct constitutes the steel of steel plate wall A, a kind of embodiment when adopting the H shaped steel of the binding steel 1c of the rigidity of one connection conduct raising steel plate wall A on asymmetric U shaped steel sheet pile.
In this example, adopt asymmetric U shaped steel sheet pile at temporary steel sheet pile 1t, utilize 2 temporary steel sheet pile 1t, form temporary steel board wall D.At this moment, form big closed area B, after excavate removing the sand of closed area B, can be from the inboard connector portions J of automatic weldable steel board wall A.
Replace asymmetric U shaped steel sheet pile 1, also can adopt common U shaped steel sheet pile or linear pattern steel sheet pile, in addition, when other steel such as adopting the T type replace as the H shaped steel that links steel 1c too.In addition, as long as can access the zone that can utilize the automatic welding machine welding, can adopt any type of temporary steel sheet pile to replace temporary steel sheet pile 1t.
Fig. 5 concludes expression as the steel that constitute steel plate wall A, adopting linear pattern steel sheet pile 21, and, and temporary steel board wall D between be provided with band steel plate, H shaped steel and T-steel block parts 21s (or 21s ', 21s ") time embodiment (corresponding) with the 2nd invention.
When adopting linear pattern steel sheet pile 21 to form steel plate wall A, compare with U shaped steel sheet pile and asymmetric U shaped steel sheet pile, owing to be difficult to the spacing distance that former state strengthens steel plate wall A and temporary steel board wall D, so as shown in Figure 5, with blocking parts 21s (or 21s ', 21s ") plane of structure of sealing closed area B, guarantee the automatically MIN water-resisting property of welding, or prevent that sand from flowing into and excavate part.
As shown in Figures 2 and 3, in the distance of steel plate wall A and temporary steel board wall D not fixedly the time, for example,, be provided as the steel plate that blocks parts and shaped steel etc., can prevent from that sand from flowing into to excavate part by adjacent areas in the zone that has automatic welding point.
As shown in Figure 5, worrying to block the situation that parts 21s (or 21s ', 21s ") collapses because of soil pressure, as long as fully deepen length of embedment or dagger (spacer) is set.In addition, as mentioned above, block parts 21s (or 21s ', 21s ") and also can not necessarily be welded on steel plate wall A or the temporary steel board wall D.
Fig. 6 be expression as the steel in the 3rd invention of the present invention with joint, a routine flow chart of the sequence of construction when box type steel sheet pile is applied to saline waters below carries out operation (be used for river, lake etc. time too) in proper order by this.
According to steel sheet pile squeeze into machinery construction ability, use the platform number, begin from arbitrary position of finishing the water proof steel plate wall the dual wall construction that constitutes by box type steel sheet pile steel plate wall (the dual wall of steel sheet pile) construct that (Fig. 6 a).
Then, in each closed area of the dual wall that separates by this box type steel sheet pile, with inner seawater (Fig. 6 b) of discharge such as water pumps.
Confirming that to the water leakage of closed area hour the joint that utilizes automatic welding machine weldable steel sheet pile is (Fig. 6 c) to each other.
It more than is the basic order of this manufacture method.In addition, when the water leakage of the bottom surface ground of steel sheet pile connector portions or the dual wall of steel sheet pile is big, as previously mentioned, be implemented in the countermeasure of leaking of strip member that the gap between the packed joint is set in the outside of connector portions or the joint fitting portion etc.
In addition, soil layer according to foundation of sea floor constitutes, be that layer of sand reaches position, thickness, the proterties for the argillic horizon of water barrier, carry out the excavation of the bottom surface sand of the dual wall of steel sheet pile and remove (Fig. 6 d), after cleaning connector portions (Fig. 6 e), automatic welding machine (Fig. 6 f) is installed, after the draining of basic Fig. 6 b in proper order, is welded (Fig. 6 g) automatically.
Fig. 7 is the steel of expression as formation steel plate wall of the present invention, a kind of embodiment when adopting the box type steel sheet pile 31 of duplex configuration linear pattern steel sheet pile.
Box type steel sheet pile 31 shown in Figure 7 is the steel that connected the summary H type cross section of 2 parallel side edge part 31f by web portion 31w, and side edge part 31f separately is the pattern that has the linear pattern steel sheet pile of chimeric mutually joint 32,33 at two ends.
About the box type steel sheet pile 31 of adjacency, by the joint 32,33 at the two ends of chimeric parallel 2 side edge part 31f on one side, connection successively is formed on the steel plate wall A that the inboard has the dual wall construction of enclosure space B on one side.
In the construction in waters, become enclosure space B usually and roughly fill water, the state in the sand of water-bed ground is imbedded in its underpart.
Under this state, discharge the water of the inboard of enclosure space B with water pump etc., utilize enclosure space B, from the inboard, utilize the automatic welding machine welding by the connector portions J that chimeric joint 32,33 forms, can guarantee the water-resisting property of connector portions J by this welding.
Under the situation of water-bed side Inlet and outlet water, utilize sprinkler (water jet) or excavator etc. to remove sand at water-bed face, and after the automatic welding of the joint J that has carried out this part, the sand of part is buried in backfill underground to prescribed depth.
In addition, as mentioned above, about the welding of connector portions J, if the amount of moisture of moisture that adheres to and inflow is in the degree of electric arc heat of vaporization that can be soldered, or below it, can weld automatically, leaking when serious, need carry out the welding again of connector portions J, or implement other countermeasures of leaking.
Figure 11~Figure 13 represents an example of this countermeasure of leaking respectively.In addition, the symbol of blank area adopts the symbol (joint 32,33) of Fig. 7, but also is same for embodiments such as Fig. 9 described later, Figure 10.
Figure 11 represents, in the outside of the connector portions J that forms by chimeric joint 32,33 (steel plate wall A bears from the ratio of outside inboard high hydraulic pressure or soil pressure side), be provided with constitute by synthetic resin with flexible sheet, along the situation of the continuous strip member s1 of the length direction of connector portions.
Because one discharges the water and/or the sand of dual side within the walls, the hydraulic pressure in the dual wall outside or soil pressure just become higher than inboard, strip member s1 abuts against connector portions in the mode that is sucked by the gap between the joint 32,33, in this part, can cut off fully from the water of the lateral flows inside of dual wall.
Figure 12, Figure 13 represent, are not in the outside of connector portions J, and in the fitting portion of chimeric mutually joint 32,33, the situation of rectangular parts s2 such as the bar-like member of embedded resin system, pipe or round metal bars.
Strip member s2, when embedding, be inserted into than in the big gap of its diameter, under this state, because one discharges the water and/or the sand of dual side within the walls, the hydraulic pressure or the soil pressure in the dual wall outside just become than the inboard, so the part that strip member s1 diminishes with the gap width that is abutted against connector portions 32,33 by the mode that sucks towards dual side within the walls, in this part, can cut off from the water of the lateral flows inside of dual wall.
In addition, strip member s1, s2 have flexible material or the big more material of elasticity, increase more near degree, can be further near water proof fully, but under the degree that does not influence automatic welding, allow to leak a little.
Fig. 8 is the steel of expression as formation steel plate wall of the present invention, a kind of embodiment when adopting the box type steel sheet pile of duplex configuration U shaped steel sheet pile.
Box type steel sheet pile 31 ' shown in Figure 8, the joint 32,33 at two ends be shaped as non-bilateral symmetry, shape of cross section aligns in same direction, can be combined into linearity, near the connector portions J at two ends, have and the equidirectional boss portion of piling normal direction, a side of the mutual hook-shaped joint 32,33 of engaging inwardly to formation and the opposing party outwardly to the two ends of formation, dispose 2 asymmetric U shaped steel sheet piles dorsad with joint 32,33, have by welding and be incorporate shape.
About the box type steel sheet pile 31 ' of adjacency,,, be formed on the steel plate wall A that the inboard has the dual wall construction of enclosure space B Yi Bian connect successively by the joint 32,33 at chimeric two ends, one side.
The sand in the enclosure space B and the discharge of water and the countermeasure of welding automatically, leak are identical with the situation of the embodiment of Fig. 7.
Fig. 9 is that expression is as the steel of formation steel plate wall of the present invention, at the box type steel sheet pile 31 that adopts the asymmetric U shaped steel of duplex configuration sheet pile " time other embodiments.
The box type steel sheet pile 31 ' of Fig. 8, by disposing 2 asymmetric U shaped steel sheet piles dorsad and being integrated formation by welding, and the box type steel sheet pile 31 of Fig. 9 "; be by between 2 asymmetric U shaped steel sheet piles of configuration dorsad; the one welded H section steel is as linking steel 31c, thereby improve the cross section rigidity.
That is,, can improve the cross section rigidity,, can improve torsional rigidity, reduce the generation of welding deformation, and make easily by adopting H shaped steel as linking steel 31c by prolonging the length that links asymmetric U shaped steel sheet pile steel to each other.
In addition, in the embodiment of Fig. 7~Fig. 9, also can weld a plurality of box type steel sheet piles in advance on land, form the unit, again it be squeezed into connection.
Figure 10 is the steel of expression as formation steel plate wall of the present invention, a kind of embodiment when adopting common U shaped steel sheet pile 11, in this embodiment, the steel main body is not a box, it is the steel plate wall that forms by U shaped steel sheet pile 11 by duplex configuration, form dual wall construction, form closed area B in the inboard.
At this moment, because the change of the quantity of connector portions J is many, institute thinks the raising application property, after also considering on land a plurality of U shaped steel sheet piles 11 to be welded together in advance, squeezes into.
Figure 14 represents a routine sequence of construction flow chart, as near the steel that have boss portion joint, adopts box type steel sheet pile 31 shown in Figure 15, construct in the following order when being used for saline waters (when being used for river, lake etc. too).
(1) according to steel sheet pile squeeze into machinery construction ability, use the platform number, begin from arbitrary position of steel plate wall A the dual wall construction that constitutes by box type steel sheet pile 1 steel plate wall A (the dual wall of steel sheet pile) construct that (Figure 14 a).
Soil layer according to foundation of sea floor constitutes, be position, thickness, the proterties of layer of sand and argillic horizon, when the dual sand of piling up the water-resisting property difference within the walls on water barrier top etc., excavate the dual bottom surface sand within the walls of steel sheet pile, discharge the sand and the water (Figure 14 a ') of this part.Yet at this moment, the water among the dual closed area B does not within the walls need to get rid of fully.
(2) then, for covering the connector portions J of the box type steel sheet pile of squeezing in (1) 31, to be fastened on the holding section 31r near the joint 32,33 that is located at steel sheet pile 31 the boss portion 34 with the leading edge portion 51r of the band edge channel-section steel of section bar 51 as water proof on one side, one side dually falls within the walls to above-mentioned.If necessary, be driven in the soil in seabed (Figure 14 b).
(3) then, for the water that prevents to be trapped in the joint water proof zone C that surrounds with section bar 51 and steel sheet pile 31 with water proof enters above-mentioned dual closed area B within the walls, discharge the water (Figure 14 c) that is trapped in the joint water proof zone C often with water pump etc.
Perhaps,,, enter into inner purpose, in the joint water proof zone C that surrounds with section bar 51 and steel sheet pile 31 with the water proof that is stuck, drop into mortar packing materials (Figure 14 c ') such as (mortar) by connector portions J to prevent water from dual wall outside.
Then, by dropping into packing material, confirm not enter water to above-mentioned dual closed area B within the walls from the water proof zone C.Specifically be, as long as confirm that the water level of dual closed area B within the walls is just passable.
(4) afterwards, for dual each the closed area B within the walls that utilizes box type steel sheet pile 31 to separate, with inner seawater (according to circumstances, also comprising sand sometimes) (Figure 14 d) of discharge such as water pumps.In addition, when adopting the operation of (3), also can implement the operation of (4) in the lump.
(5) confirm not from the outside after dual each closed area B within the walls enters water, to utilize the automatic welding machine welding as band edge channel-section steel and the gap between the box type steel sheet pile 31 (Figure 14 e) of water proof with section bar 51.In Figure 15 (b), symbol 7 its weld parts of expression.
The present invention, for the part that requires water proof in the connector portions of steel such as steel sheet pile,, can form water proof completely by in length direction continuous welding seamlessly, particularly when employing had the steel of boss portion near connector portions, the advantage of its shape was more protruded.
Figure 15 represents as the steel that constitute steel plate wall A, the situation when adopting box type steel sheet pile 31.Box type steel sheet pile 31 shown in Figure 15 is the steel that link the summary H type cross section of 2 parallel side edge part 31f with web portion 31w, has the shape of linear pattern steel sheet pile, and its side edge part 31f separately has chimeric joint 32,33 mutually at two ends.
For the box type steel sheet pile 31 of adjacency,, connect successively on one side, and form the steel plate wall A that the inboard has the dual wall construction of enclosure space B by the joint 32,33 at the two ends of chimeric parallel 2 side edge part 31f on one side.
In the construction in waters, usually, enclosure space B is for roughly filling water, and the state in the sand of water-bed ground is imbedded in its underpart.
Then, as shown in the figure, be stuck close in the leading edge portion 51r at the two ends of the band edge channel-section steel of section bar 51 as water proof on the holding section 31r on the boss portion 34 of the side edge part 31f that is located at steel sheet pile 31, engage in the mode that strides across joint 32,33.
Then, discharge the water of the inboard of enclosure space B, utilize enclosure space B, with the gap between section bar 51 and the steel sheet pile 31,, realize water-resisting property completely by this welding by automatic welding machine welding water proof with water pump etc.
In addition, under the situation of water-bed side leakage water outlet, utilize sprinkler and excavator etc., remove sand to prescribed depth from water-bed face, after the automatic welding of the water proof in having carried out injection soil with steel 51 and steel sheet pile 31, the sand of part is buried in backfill underground.
Figure 16 represents as the steel that constitute steel plate wall, a kind of embodiment when adopting the box type steel sheet pile 31 ' of the asymmetric U shaped steel of duplex configuration sheet pile.
Box type steel sheet pile 31 ' shown in Figure 16, the joint 32,33 at two ends be shaped as non-bilateral symmetry, shape of cross section aligns in same direction, can be combined into linearity, near the connector portions J at two ends, have and the equidirectional boss portion 34 of piling normal direction, a side of the mutual hook-shaped joint 32,33 of engaging inwardly to formation and the opposing party outwardly to the two ends of formation, dispose 2 asymmetric U shaped steel sheet piles dorsad with joint 32,33, have shape by integrally weldedization.
About the box type steel sheet pile 31 ' of adjacency,,, be formed on the steel plate wall A that the inboard has the dual wall construction of enclosure space B Yi Bian connect successively by the joint 32,33 at chimeric two ends, one side.
The sand in the enclosure space B and/or the discharge and the automatic soldering method of water are identical with the situation of the embodiment of Figure 15.
Figure 17 represents as the steel that constitute steel plate wall A, at the box type steel sheet pile 31 that adopts the asymmetric U shaped steel of duplex configuration sheet pile " time another embodiment.
The box type steel sheet pile 31 ' of Figure 16, reach by integrally weldedization formation by disposing 2 asymmetric U shaped steel sheet piles dorsad, otherwise the box type steel sheet pile 31 of Figure 17 "; be by disposing dorsad between 2 the asymmetric U shaped steel sheet pile; as linking steel 31c; welded H section steel, forms integrated, thereby raising cross section rigidity.
That is,, can improve the cross section rigidity,, can improve torsional rigidity, reduce the generation of welding deformation, and make easily by adopting H shaped steel as linking steel 31c by prolonging the length that links asymmetric U shaped steel sheet pile steel to each other.
Figure 18 is the steel of expression as formation steel plate wall A of the present invention, another embodiment when adopting the box type steel sheet pile 41 of duplex configuration linear pattern steel sheet pile, in this embodiment, by welding make duplex configuration two pawl formulas the linear pattern steel sheet pile with the thick plate-like of its binding to be connected steel 41c integrated.
Figure 19 represents the steel as formation steel plate wall A of the present invention, the embodiment when the box type steel sheet pile 41 ' that adopts the female joint of tubulose that has crack with seam at the side edge part two ends of the steel in H type cross section and chimeric with it male joint.
Equally, Figure 20 represents the steel as formation steel plate wall A of the present invention, in that solder joint steel 41c forms incorporate steel sheet pile 41 between 2 asymmetric U shaped steel sheet pile by disposing dorsad ", with common U shaped steel sheet pile 11 " joint to each other, embodiment when combining.
In addition, in the embodiment of Figure 15~Figure 20 of above introduction, also can weld a plurality of box type steel sheet piles in advance on land, form the unit, again it be squeezed into and connect.
Figure 21 represents a routine sequence of construction flow chart, as near the steel that have boss portion joint, adopts asymmetric U shaped steel sheet pile 1 shown in Figure 22, when being used for the land, and construction in the following order.
(1) according to steel sheet pile squeeze into machinery construction ability, use the platform number, what begin the steel plate wall A (substance wall) that is made of steel sheet pile 1 from arbitrary position of steel plate wall A constructs that (Figure 21 is a).At this moment, the lower end of generally squeezing into into steel sheet pile 1 reaches water barrier.
(2) excavate water barrier near the connector portions J with above-mentioned steel plate wall A, and, guarantee enclosure space (Figure 21 b) as closed area B by discharging sand and water.About the scale of this closed area B, so long as it is just passable with the size (horizontal area * vertical depth) in the space of the embedding of section bar 51 and subsequent weld job to guarantee to carry out water proof.In addition, at this moment,, do not need to get rid of fully for the water in the B of closed area.
(3) below, be the connector portions 2,3 that covers the steel sheet pile of squeezing in (1) 1, to be fastened on the holding section 1r near the joint 2,3 that is located at steel sheet pile 1 the boss portion 4 with the band edge channel-section steel of section bar 51 on one side as water proof, one side it is fallen into (Figure 21 c) in above-mentioned closed area B.If necessary, be driven in the soil.
(4) then, for the water that prevents to be trapped in the joint water proof zone C that surrounds with section bar 51 and steel sheet pile 31 with water proof enters above-mentioned closed area B, discharge the water (Figure 21 d) that is trapped in the joint water proof zone C often with water pump etc.
Perhaps,,, enter into inner purpose, in the joint water proof zone C that surrounds with section bar 51 and steel sheet pile 1 with water proof, drop into packing materials (Figure 21 d ') such as mortar by connector portions J to prevent water from B outside, above-mentioned closed area.
And, by dropping into packing material, confirm in above-mentioned closed area B, not enter water from joint water proof zone C.Specifically be, as long as confirm the SEA LEVEL VARIATION of closed area B.
(5) afterwards, among near each the closed area B the connector portions J that is located at steel sheet pile 1, with inner water (according to circumstances, also comprising sand sometimes) (Figure 21 e) of discharge such as water pumps.In addition, when adopting the operation of (4), also can implement the operation of (5) in the lump.
(6) confirm that water can not enter from the outside in above-mentioned closed area B, utilize automatic welding machine to weld above-mentioned water proof with the gap (Figure 21 f) between section bar 51 and the steel sheet pile 1.Symbol 7 its weld parts of expression in Figure 23 (a)~(d).
Figure 23 represents to cover the water proof of connector portions of the steel that constitute steel plate wall A with the shape example of section bar 51, the situation of the band edge channel-section steel that Figure 23 (a) expression is general, Figure 23 (c) expression has the situation of the band edge channel-section steel of export-oriented leading edge portion 51r ', and the web portion of Figure 23 (b) expression band edge channel-section steel is the situation of band edge section bar of the special shape of dihedral.
In addition, also can adopt not shown circular or semicircular section bar.
Figure 23 (d) expression is as the water proof section bar, in advance near the joint 2,3 of interconnective steel, weld angle steel 51 ', 51 respectively "; by squeezing into steel, angle steel 51 ', 51 " leading section coincide, form the situation of joint water proof zone C in the inboard.
At this moment, in the B of closed area, by length direction continuous welding seamlessly as water proof with the angle steel 51 ', 51 of section bar " the equitant part of leading section, and can form water proof completely.In addition, at angle steel 51 ', 51 " intersection, as required, sometimes also in addition folder add the water proof encapsulant.As the water proof encapsulant, for example can adopt water proof rubber or water-swollen resin emulsion paint etc.
Figure 24 represents to it is characterized in that as other examples of the asymmetric U shaped steel sheet pile 1 of steel, about joint 2,3 ' all have by interior pawl (interior) to protruding 2a and outside the pawl of the double-type that constitutes of pawl (export-oriented protruding 3c).
In addition, as the height of protruding 2a, 3c among the figure (interior pawl and outer pawl), as long as can limit rotation, and, be not easy disengaging between the joint 2,3 ', be not limited to illustrated height, also can reduce again.
In addition, with respect to the position of joint 2,3 ' boss portion 4, even interior as shown not to the top that reaches export-oriented joint 2a bottom of joint 2b, and as long as do not hinder joint 2,3 ' chimeric just passable.
Figure 25 represents a kind of embodiment of the steel plate wall of the 11st, 12 invention, and after the asymmetric U shaped steel sheet pile 1 that will have asymmetric joint 2,3 connected to 1 row, the welding point fitting portion formed steel plate wall A.
In this example, at the interior base portion of asymmetric U shaped steel sheet pile 1, form interior that limiting joint portion rotates to protruding 2a to joint 2 sides, form towards interior to the riser portions 3a that protrudes at the base portion of export-oriented joint 3 sides.
By in engaging to joint 2 with export-oriented joint 3, is connected a plurality of steel sheet piles 1, the lateral surface 3b and the interior protruding 2a of length direction continuous welding seamlessly extroversion joint 3 sides, and give steel plate wall A with high water-resisting property to joint 2 sides.
As the job practices of steel plate wall A, Yi Bian, weld the method for this joint 2,3 again Yi Bian can be that chimeric one by one joint 2,3 is squeezed into steel sheet pile 1 in water and/or in the ground; Also can be in advance a plurality of steel sheet piles 1 to be linked and welding, form the steel sheet pile of one in connector portions, and prepare a plurality of this steel sheet piles, at chimeric joint 2,3 on one side, on one side squeeze in water and/or in the ground after, the method for welding this joint 2,3.
This kind steel plate wall A feature is the asymmetric joint 2 that has as shown in figure 26,3 (Figure 26 (a) is that expression links the plan view of the state of a plurality of steel sheet piles by connector portions, Figure 26 (b) is the enlarged drawing of joint fitting portion) the joint geometry of steel sheet pile 1, but the applicant is to as shown in figure 27, at non-symmetrical joint 2 shown in Figure 26,3 fitting portion, length direction along steel sheet pile 1, the lateral surface 3b of the export-oriented joint 3 of continuous welding and interior between protruding 2a the time, and, as shown in figure 28, base portion in export-oriented joint 3 sides, length direction along steel sheet pile 1, after continuous welding compares towards interior two kinds of situations between riser portions 3a that protrudes and the interior lateral surface 2b to joint 2 time, draw following opinion.
In the previous case, stable welding shown in Figure 27 (a), can make this part have water-resisting property than being easier to seamlessly at the lateral surface 3a and the interior welding bead that forms between protruding 2a of export-oriented joint 3.
On the other hand, when latter event, welding is unstable, shown in Figure 28 (b), Figure 28 (c), the state that departs from welding arc welds to the riser portions 3a that protrudes or interior arbitrary place in the lateral surface 2b of joint 2 towards interior the base portion of export-oriented joint 3 sides, all forms welding bead 5a, the 5b of accumulation at above-mentioned arbitrary place.
Therefore, when length direction continuous welding, compare with the previous case, as quite not reducing speed of welding at steel sheet pile 1, then the base portion of export-oriented joint 3 sides towards interior to the riser portions 3a that protrudes and interior between the lateral surface 2b of joint 2, be difficult to seamlessly, have water-resisting property ground and form welding bead.In addition, compare with the previous case, weld bead shape is to the bigger shape of external surface projection ratio.
About the reason of this kind phenomenon, think because: shown in Figure 27 (a), when the previous case, be acute angle (less than 90 °) by the lateral surface 3a and the interior bevel angle that forms to protruding 2a of export-oriented joint 3; Otherwise shown in Figure 28 (a), when latter event, by the base portion of export-oriented joint 3 sides towards interior be obtuse angle (greater than 90 °) to riser portions 3a and the interior bevel angle that forms to the lateral surface 2b of joint 2 protruded.
In addition, when the welding of the non-consumable electrode type that TIG or plasma arc welding (PAW) is such is used for the lateral surface 3b of export-oriented joint 3 and interior welding to protruding 2a, without welding material, also can pass through melt protrusion 2a, welding is at lateral surface 3b, or simultaneously melt protrusion 2a and lateral surface 3b, and form integrated (not shown).
Figure 29 represents the another kind of embodiment of the steel plate wall A of the 11st invention, and is identical with the embodiment of Figure 25, and after the asymmetric U shaped steel sheet pile 1 that will have asymmetric joint 2,3 connected to 1 row, the welding point fitting portion formed steel plate wall A.
About with the difference of the embodiment of Figure 25, in the embodiment of Figure 29, between engaging place of export-oriented joint 3 one sides and riser portions 3a, form the export-oriented protruding 3c that limiting joint portion rotates, engaging under the state of joint 2,3 so, along the lateral surface 3b and the interior protruding 2a of export-oriented joint 3 sides of length direction continuous welding seamlessly to joint 2 sides.
About the welding position of this moment, except that illustrated position, also can be at the protruding 3c of extroversion and interior between protruding 2 lateral surface 2b.
In addition, during any embodiment in adopting Figure 25, Figure 29, as long as the rotation that protruding 2a or protruding 3c can limiting joint portions, and, be not easy between the joint 2,3 to break away from and get final product, for example, also can reduce again than illustrated height.
And, with respect to the position of the boss portion 4 of joint 2,3, not only interior as shown to the top that reaches export-oriented joint 3 bottom of joint 2, and, do not do special qualification as long as do not hinder joint 2,3 chimeric.
Figure 30 (a) and (b) are represented a kind of embodiment of the steel plate wall of the 13rd invention, after the asymmetric U shaped steel sheet pile 1 that will have asymmetric joint 2,3 connects to 2 row, make asymmetric U template piling wall 1 to each other with respect to the outer most edge of steel sheet pile mutually towards interior under the state of subtend, weld each joint fitting portion, form steel plate wall A.The approaching situation of Figure 30 (a) expression 2 strake piling walls, and Figure 30 (b) expression 2 strake piling walls away from the time state.
About the job practices of steel plate wall, generally be with each row respectively in injection water and/or in the ground, but if possible, also can be under the state that leaves mutually the 2 row steel sheet-pile walls of injection simultaneously.
Feature about this moment, owing in injection water and/or in the 2 row steel sheet-pile walls of the subtend in the ground, form the enclosure space that is isolated from the outside, so by excavating the part in the injection ground, get rid of the sand of joint fitting portion and periphery thereof, help the welding procedure of joint fitting portion thereafter.
In addition, after water proof is handled,, also can be effective to this class purposes of the monitoring or the repairing of joint weld part because above-mentioned enclosure space cuts off with extraneous.
Figure 31 (a) and (b) are represented the another kind of embodiment of the steel plate wall A of the 13rd invention, make have asymmetric joint 32,33 2 asymmetric U shaped steel sheet piles to each other, for the outer most edge of steel sheet pile along mutually inwardly under the state of subtend, directly welding or integrally welded by steel such as steel plate or H shaped steel, after so steel plate wall connects to 1 row, the welding point fitting portion forms the good steel plate wall A of water-resisting property.Figure 31 (a) expression directly 2 asymmetric U shaped steel sheet piles of welding forms the shape of the box type steel sheet pile 31 ' of one to each other, and Figure 31 represents to weld incorporate box type steel sheet pile 31 by the H structural section as binding steel 31c " shape.
Feature as this moment, owing to can carry out in the water of 2 steel sheet piles simultaneously and/or construct in the ground, decapacitation improves outside construction (piling) efficient, because of can fixedly remain in the water/or ground in steel sheet pile 1 interval to each other after being provided with, be fit to use mobile welding shown in Figure 34, can seek the high efficiency of the welding procedure of joint fitting portion.
In addition, identical with the embodiment of Figure 30, owing to form the enclosure space be isolated from the outside,, get rid of the sand of joint fitting portion and periphery thereof so be located at part in the ground by excavation, carry out the welding procedure of the joint fitting portion of its back easily.
In addition, after water proof is handled,, also can be used for purposes such as the monitoring of joint weld part and repairing flexibly because above-mentioned enclosure space cuts off with extraneous.
Figure 32 represents another embodiment of the steel plate wall A of the 13rd invention, with for the outer most edge of steel sheet pile mutually along having 2 linear pattern steel sheet piles form to each other to ground relatively as the asymmetric joint of side edge part 31f towards the direction of introversion, will weld by steel plate as web portion 31w incorporate box type steel sheet pile 31 connect to 1 row after, the welding point fitting portion forms steel plate wall A.
At this moment, identical with the embodiment of Figure 31, owing to can carry out in the water of 2 steel sheet piles in fact simultaneously and/or construct in the ground, decapacitation improves outside construction (piling) efficient, because of can fixedly remain in the water/or ground in steel sheet pile 1 interval to each other after being provided with, and be fit to use mobile welding shown in Figure 34, can seek the high efficiency of the welding procedure of joint fitting portion.
In addition, owing to form the enclosure space that is isolated from the outside,, help the welding procedure of joint fitting portion thereafter so, get rid of the sand of joint fitting portion and periphery thereof by excavating the part in the injection ground.
In addition, after water proof is handled,, also can be used for purposes such as the monitoring of joint weld part and repairing flexibly because above-mentioned enclosure space cuts off with extraneous.
In addition, welding procedure method as above embodiment, consider from the efficiency of construction aspect, can adopt as Figure 33 and mobile welding 8,9 shown in Figure 34, that can weld assigned position in the continuous speed of welding in accordance with regulations of the length direction of steel sheet pile, preferred employing automatic welding machine people, but also can be by manual welding.
In addition, in Figure 33, symbol 8a represents that welding bead, 8b represent to move with track, 8c and represents to move with roller, in Figure 34, and symbol 9a represents that welding bead, 9b represent that the gap adjustment between the bonding machine represents the double mobile roller of using in location with lazy-tong, 9c.
In addition, in the welding of the joint fitting portion that adopts Figure 33 and the illustrated portable welder of Figure 34, be preferably eliminating and enter the foreign matters such as sand of fitting portion, and have the welding that before facing welding, can utilize the function of purge of gas welding positions such as water or air.
Figure 35 is a kind of plan view of embodiment of the steel sheet pile of the 14th, 15 invention of expression, and after the asymmetric U shaped steel sheet pile 1 that will have asymmetric joint 2,3 connected to 1 row, the welding point fitting portion formed steel plate wall A.
In this example,, to protruding 2a, form towards interior to the riser portions 3a that protrudes in forming at the base portion of export-oriented joint 3 sides at the interior base portion of asymmetric U shaped steel sheet pile 1 to joint 2 one sides.
In to part or all of protruding 2a, constitute by low-melting material of comparing with other parts.By in engaging to joint 2 and export-oriented joint 3, link a plurality of steel sheet piles 1, by along length direction seamlessly the outside 3b of the export-oriented joint 3 of continuous welding and interior protruding 2a to joint 2 sides between, can provide high water-resisting property for steel plate wall A.
As the job practices of steel plate wall A, Yi Bian can be at chimeric joint 2,3 one by one, Yi Bian in water and/or in the ground behind the injection steel sheet pile 1, weld the method for this joint 2,3 again; Also can be in advance by linking in connector portions and welding a plurality of steel sheet piles 1, form the steel of one, and prepare a plurality of this kind steel, at chimeric joint 2,3 on one side, on one side in water and/or in the ground after the injection, weld the method for this joint 2,3 again.
The 14th, also there is the asymmetric joint 2 that has as shown in figure 26 in the steel sheet pile of 15 invention records, the feature of the joint geometry of 3 steel sheet piles 1, the applicant, with at non-symmetrical joint 2 shown in Figure 26,3 fitting portion, along the length direction of steel sheet pile 1 seamlessly weld continuously export-oriented joint 3 lateral surface 3b and interior be purpose to protruding 2a, to with interior when approximately all being set at of protruding 2a compared low-melting material 5c with other parts of steel sheet pile 1 (Figure 35 (b)), and with interior when protruding 2a is set at other part identical materials with steel sheet pile 1 two kinds of situations of (Figure 35 (a)) compare, draw following opinion.
In addition, this moment, utilizing a kind of of gas shielded arc welding of non-consumable electrode type was the PLASMA ARC WELDING device as heating arrangements, adopt in atmosphere to interior to the method for protruding 2a fixed point heating.
When the previous case (Figure 35), because molten solder material (low melting material 5c) before mother metal begins fusion, the lateral surface 3b of export-oriented joint 3 and interior to protruding 2a between, than be easier to can be seamlessly, have water-resisting property ground and form welding material.
In addition, when latter event (Figure 38), introversive protruding 2a is and mother metal identical materials (steel), because the fusing point height of projection, the molten condition of this projection 2a according to the electric arc of heating usefulness towards and with the variable in distance of protruding 2a, such as Figure 38 (b) signal, according to the position of weld part length direction produce the failure welding position (the lateral surface 3b of export-oriented joint 3 and interior to protruding 2a between, have the gap of the degree that water can enter).
Perhaps, according to electric arc towards, with the distance of protruding 2a and input heat, produce the root portion of cutting introversive protruding 2a and the fault of export-oriented joint 3 parts.
For this reason, learn, along the length direction continuous welding of steel sheet pile 1 time, removing needs the correct position angle that keeps electric arc, suitably adjust outside the input heat, (Figure 35) compares with the previous case, reduces speed of welding as certain degree ground not, the fault when just being difficult to avoid above-mentioned welding, is difficult to have no gap, water-resisting property ground and welds the lateral surface 3b of export-oriented joint 3 and the protruding 2a of introversion.
More than, the joint in atmosphere welding result of experiment is illustrated, but with atmosphere in compare, when in water, welding, because the heat absorption of water on every side, the parts of solidification of molten easily, so,, must increase the input heat of heating with electric arc for fusion becomes the projection of welding material.
When not adopting low melting material in part or all of projection and in water during welding point, as mentioned above, perforate on the easier side edge part that occurs in steel sheet pile, or the fault of cutting blank area are so steel sheet pile of the present invention is adapted at welding in the water.
Figure 36 is as another kind of embodiment, the state before and after the welding of the lateral surface 3b of the export-oriented joint 3 when expression only is set at low melting material 5c with an interior part to protruding 2a and introversive protruding 2a.
In the embodiment of Figure 36, for the protruding 2a of introversion, only will be set at low melting material 5c with export-oriented joint 3 subtends one side, still, for example also the part on the top of the protruding 2a of introversion can be set at low melting material 5c.
In addition, as making low melting material 5c shown in Figure 36 (a) and introversive protruding 2a form the method for one, the method of utilizing adhesive is arranged, or after the hot rolling of steel sheet pile 1 finishes, when mother metal is suitable temperature, in the position of regulation, inject low melting material 5c with the shape of regulation, the method for hardening by cooling etc. then.
Figure 37 represents an interior part to protruding 2a is replaced with the additive method of low melting material 5c, prepare in advance low melting material 5c (hot-melt material) to be configured as part or all the material of shape of introversive protruding 2a, as the steel sheet pile of mother metal also with for example with inserting slot construction can chimeric above-mentioned introversion the mode of protruding 2a be shaped, both are chimeric to be integral.Also can be at chimeric surface application of adhesive in advance, perhaps in chimeric both backs with screw engagings such as (not shown).
Figure 39 represents another embodiment of the steel sheet pile of the 14th invention of the present invention, and is same with the embodiment of Figure 35, and after the asymmetric U shaped steel sheet pile 1 ' that will have asymmetric joint 2,3 connected to 1 row, the welding point fitting portion formed steel plate wall A.
About with the difference of the embodiment of Figure 35, in the embodiment of Figure 39, between engaging place of export-oriented joint 3 one sides and riser portions 3a, form export-oriented protruding 3c, engaging under the state of joint 2,3 so, seamlessly weld the lateral surface 3b and the interior protruding 2a of export-oriented joint 3 one sides continuously along length direction to joint 2 one sides.
About the welding position of this moment, except that illustrated position, also can be at the protruding 3c of extroversion and interior between protruding 2 lateral surface 2b.At this moment, part or all of export-oriented protruding 3c is made of the low melting material 5c that compares with other parts.
In addition, embodiment for Figure 39, also can consider with respect to the embodiment of Figure 35 with Figure 36,37 same modes of texturing, promptly, about the protruding 3c of extroversion, only interior and export-oriented protruding 3c subtend is set at low melting material 5c, or the part of the figure middle and lower part of export-oriented protruding 3c is set at the mode of texturing of low melting material; And part or all the steel of shape of preparing in advance low melting material to be shaped as introversive protruding 3c, steel of base metal sheet pile one side also with for example with inserting slot construction can chimeric above-mentioned introversion the mode of protruding 2a be shaped both chimeric landform all-in-one-piece modes of texturing.
In addition, during any embodiment in adopting Figure 35, Figure 39, as long as protruding 2a or protruding 3c can both be limited in the rotation of connector portions, and, be not easy between the joint 2,3 to break away from, for example, also can reduce again than illustrated height.
And with respect to the position of the boss portion 4 of joint 2,3, not only interior to the top that reaches export-oriented joint 3 bottom of joint 2 as shown as long as do not hinder joint 2,3 chimeric, do not done special qualification.
About the embodiment of Figure 40, after linking 2 row and having the asymmetric U shaped steel sheet pile 1 of asymmetric joint 2,3, for asymmetric U shaped steel sheet pile 1 outer most edge to each other, mutually towards interior under the state of subtend, weld each joint fitting portion, form steel plate wall A.The situation that Figure 40 (a) expression 2 row steel sheet piles are close, and Figure 40 (b) expression 2 row steel sheet piles away from situation.
About the job practices of steel plate wall, generally be with each row respectively in injection water and/or in the ground, but if possible, also can be under the state that leaves mutually the 2 row steel sheet-pile walls of injection simultaneously.
Feature about this moment, in being located at water and/or in the ground relatively to 2 row steel sheet-pile walls in owing to form the enclosure space that is isolated from the outside, so by excavating the part in the injection ground, get rid of the sand of joint fitting portion and periphery thereof, help the welding procedure of joint fitting portion thereafter.
In addition, after water proof is handled,, also can be used in purposes such as the monitoring of joint weld part and repairing because above-mentioned enclosure space cuts off with extraneous.
Figure 41 (a) and (b) are represented another embodiment, so that 2 asymmetric U shaped steel sheet piles with asymmetric joint 2,3 to each other, for the outer most edge of steel sheet pile separately mutually towards interior state to subtend, after the box type steel sheet pile that will directly weld or welding forms one by steel such as steel plate and H shaped steel connects to 1 row, the welding point fitting portion forms the good steel plate wall A of water-resisting property.Figure 41 (a) expression is by directly welding 2 asymmetric U shaped steel sheet piles to each other and the situation of integrally formed box type steel sheet pile 31 ', Figure 41 (b) expression is by as the H structural section that links steel 31c, by the box type steel sheet pile 31 of integrally weldedization " situation.
Feature as this moment, owing to can carry out in the water of 2 steel sheet piles in fact simultaneously and/or construct in the ground, so decapacitation improves outside construction (piling) efficient, can also fixedly remain in the water/or ground in steel sheet pile 11 interval to each other after being provided with, be fit to use mobile welding 8 ' shown in Figure 43, can seek the high efficiency of the welding procedure of joint fitting portion.
In addition, the same with the embodiment of Figure 40, owing to form the enclosure space be isolated from the outside,, get rid of the sand of joint fitting portion and periphery thereof so be located at part in the ground by excavation, carry out the welding procedure of the joint fitting portion of its back easily.
In addition, after water proof is handled,, can be used in purposes such as the monitoring of joint weld part and repairing because above-mentioned enclosure space cuts off with extraneous.
Figure 42 represents other embodiments, so that have to each other as 2 linear pattern steel sheet piles of the asymmetric joint of side edge part 31f, for the outer most edge of steel sheet pile mutually towards interior mode to subtend, after the incorporate box type steel sheet pile 31 that will be welded by the steel plate as web portion 31w connects to 1 row, the welding point fitting portion forms steel plate wall A.
At this moment, also the embodiment with Figure 41 is identical, owing to can carry out in the water of 2 steel sheet piles simultaneously and/or construct in the ground, so decapacitation improves outside construction (piling) efficient, can also fixedly remain in the water/or ground in steel sheet pile 11 interval to each other after being provided with, be fit to use mobile welding 8 ' shown in Figure 43, can seek the high efficiency of the welding procedure of joint fitting portion.
In addition, owing to form the enclosure space be isolated from the outside,, get rid of the sand of joint fitting portion and periphery thereof, carry out the welding procedure of the joint fitting portion of its back easily so be located at part in the ground by excavation.
In addition, after water proof is handled,, can be used in purposes such as the monitoring of joint weld part and repairing because above-mentioned enclosure space cuts off with extraneous.
In addition, welding method as above embodiment, consider from the efficiency of construction aspect, can adopt as Figure 43 and mobile welding 8 ', 9 ' shown in Figure 44, can weld assigned position along the length direction of steel sheet pile continuously with the regulation speed of welding, preferred employing automatic welding machine people, but also can be by manual welding.
In addition, adopt as the welding of the joint fitting portion of Figure 43 and mobile welding shown in Figure 44 in, be preferably to get rid of and enter the foreign matters such as sand of fitting portion, and have the welding that can utilize the function of purge of gas welding positions such as water or air before welding facing.

Claims (2)

1. the manufacture method of a steel plate wall is by connecting the manufacture method of the steel plate wall that a plurality of box type steel sheet piles that two ends have joint constitute to each other, it is characterized in that:
The chimeric above-mentioned joint in above-mentioned box type steel sheet pile one side is squeezed into to each other on one side, be formed on the steel plate wall that the inboard has the dual wall construction of closed area, then, behind the sand and/or moisture in having removed above-mentioned closed area, the connector portions of welding this steel plate wall automatically.
2. as the manufacture method of the steel plate wall of claim 1 record, it is characterized in that: remove the sand and/or the moisture on the water barrier top of existence above-mentioned closed area in, be welded to automatically below the water-bed face.
CN2007100862450A 2002-10-31 2003-10-31 Steel wall manufacturing method Expired - Fee Related CN101024954B (en)

Applications Claiming Priority (21)

Application Number Priority Date Filing Date Title
JP2002-317052 2002-10-31
JP2002317052 2002-10-31
JP2002317052 2002-10-31
JP2002-379316 2002-12-27
JP2002379316 2002-12-27
JP2002379316 2002-12-27
JP2003033848 2003-02-12
JP2003-033847 2003-02-12
JP2003033848A JP3664166B2 (en) 2003-02-12 2003-02-12 Steel wall manufacturing method
JP2003-033848 2003-02-12
JP2003033847A JP3633604B2 (en) 2003-02-12 2003-02-12 Steel wall manufacturing method
JP2003033847 2003-02-12
JP2003-106931 2003-04-10
JP2003106932A JP3659249B2 (en) 2002-12-27 2003-04-10 Steel sheet pile and sheet pile steel wall
JP2003106931 2003-04-10
JP2003106932 2003-04-10
JP2003-106932 2003-04-10
JP2003106931A JP3633606B2 (en) 2002-10-31 2003-04-10 Sheet pile steel wall
JP2003302553 2003-08-27
JP2003302553A JP3664717B2 (en) 2003-08-27 2003-08-27 Steel wall and manufacturing method thereof
JP2003-302553 2003-08-27

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CNB2003101138383A Division CN100383346C (en) 2002-10-31 2003-10-31 Steel plate wall and its mfg. method

Publications (2)

Publication Number Publication Date
CN101024954A CN101024954A (en) 2007-08-29
CN101024954B true CN101024954B (en) 2010-05-26

Family

ID=38725951

Family Applications (3)

Application Number Title Priority Date Filing Date
CNB2007100862183A Expired - Fee Related CN100537904C (en) 2002-10-31 2003-10-31 Steel plate wall and manufacture method thereof
CN2007100862450A Expired - Fee Related CN101024954B (en) 2002-10-31 2003-10-31 Steel wall manufacturing method
CN2007100862465A Expired - Fee Related CN101024955B (en) 2002-10-31 2003-10-31 Sheet type steel pile

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CNB2007100862183A Expired - Fee Related CN100537904C (en) 2002-10-31 2003-10-31 Steel plate wall and manufacture method thereof

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN2007100862465A Expired - Fee Related CN101024955B (en) 2002-10-31 2003-10-31 Sheet type steel pile

Country Status (1)

Country Link
CN (3) CN100537904C (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2463079B (en) * 2008-09-02 2013-02-20 Balfour Beatty Plc Retaining wall
CN102282315B (en) * 2009-01-16 2015-10-07 新日铁住金株式会社 The method for selecting of combined steel plate pile, the planned sheet pile wall be made up of combined steel plate pile and combined steel plate pile
JP2011084938A (en) * 2009-10-15 2011-04-28 Nippon Kankyo Seizo Kk Earth retaining wall and method of constructing the same
CN102561314A (en) * 2012-03-05 2012-07-11 张继红 Prefabricated waterproof pile (WSP pile) and inserting and pulling construction method thereof
CN108330952A (en) * 2012-05-01 2018-07-27 新日铁住金株式会社 The manufacturing method of steel wall
CN103993596B (en) * 2014-04-01 2015-09-09 东南大学 A kind of box composite steel plate pile, vertical isolation engineering barrier and water-stop curtain
CN106284297A (en) * 2016-10-13 2017-01-04 周峰 A kind of novel combined steel sheet pile
CN108468339B (en) * 2018-05-21 2024-07-23 江苏东岩科技发展有限公司 Skeleton type foundation pit supporting and basement exterior wall assembly structure and construction method thereof
CN112376577A (en) * 2020-11-13 2021-02-19 广西大学 Subway station water-rich sand layer deep foundation pit construction supporting structure and construction method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1172192A (en) * 1996-07-11 1998-02-04 木津义弘 Steel pile construction

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2507936Y2 (en) * 1990-11-27 1996-08-21 不動建設株式会社 Joint of steel unit for underground wall
JP2787372B2 (en) * 1990-11-27 1998-08-13 不動建設株式会社 Joint of steel unit for underground wall
DE69631950T2 (en) * 1995-09-29 2005-02-10 Sumitomo Metal Industries, Ltd. ASSYMETRIC STEEL SOLE AND METHOD FOR THE PRODUCTION THEREOF
JP3633426B2 (en) * 2000-03-07 2005-03-30 住友金属工業株式会社 Still structure of steel sheet pile and steel sheet pile joint

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1172192A (en) * 1996-07-11 1998-02-04 木津义弘 Steel pile construction

Also Published As

Publication number Publication date
CN100537904C (en) 2009-09-09
CN101016742A (en) 2007-08-15
CN101024955B (en) 2010-05-26
CN101024955A (en) 2007-08-29
CN101024954A (en) 2007-08-29

Similar Documents

Publication Publication Date Title
CN100383346C (en) Steel plate wall and its mfg. method
US5487622A (en) System for treating polluted groundwater
US5106233A (en) Hazardous waste containment system
CN101024954B (en) Steel wall manufacturing method
US5551807A (en) In-ground barrier system
JP2007291630A (en) Method of constructing joint fitting part of impervious wall and female joint and male joint
GB2228760A (en) In-ground barrier
US5624552A (en) In-ground water treatment system
KR101824926B1 (en) Construction incasing for concrete piles
US5782583A (en) In-ground barrier
US5957625A (en) In-ground barrier
JP4285593B2 (en) Impermeable revetment structure with leaching detection function of retained water and its repair method
JP2007051536A (en) Storage facility for rainwater or the like
JPH07504950A (en) Underground barrier sealing system
CN215486037U (en) Water-rich sand layer sand flow-proof water burst working well
JP2010083558A (en) Water cut-off sheet for reservoir
JP4538239B2 (en) Impermeable wall, impermeable wall management system and impermeable wall management method
JPH04500544A (en) Reinforcement of continuous poured concrete walls
JP2007023663A (en) Rainwater storage facility
JP2000064326A (en) Caisson for underground structure construction
JP6764441B2 (en) Open shield machine
CN216406902U (en) Mountain tunnel drainage system
JPH07150569A (en) Water shielding construction method for underground continuous wall
JP3664717B2 (en) Steel wall and manufacturing method thereof
JP2003342940A (en) Bank-body temporary coffering slit mounting construction method in checkdam and protector used for the same

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: NIPPON STEEL + SUMITOMO METAL CORPORATION

Free format text: FORMER OWNER: CHUGAI SEIYAKU KABUSHIKI KAISHA

Effective date: 20130402

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130402

Address after: Tokyo, Japan

Patentee after: NIPPON STEEL & SUMITOMO METAL Corp.

Patentee after: Sumitomo Environment Engineering

Address before: Osaka Japan

Patentee before: SUMITOMO METAL INDUSTRIES, Ltd.

Patentee before: Sumitomo Environment Engineering

CP01 Change in the name or title of a patent holder

Address after: Tokyo, Japan

Co-patentee after: Sumitomo Environment Engineering

Patentee after: NIPPON STEEL Corp.

Address before: Tokyo, Japan

Co-patentee before: Sumitomo Environment Engineering

Patentee before: NIPPON STEEL & SUMITOMO METAL Corp.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Tokyo, Japan

Co-patentee after: Sumitomo Environment Engineering

Patentee after: NIPPON STEEL & SUMITOMO METAL Corp.

Address before: Tokyo, Japan

Co-patentee before: Sumitomo Environment Engineering

Patentee before: NIPPON STEEL Corp.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100526

Termination date: 20211031

CF01 Termination of patent right due to non-payment of annual fee