CN100585095C - Carry out the positioning sinking process of steel open caisson under water - Google Patents

Carry out the positioning sinking process of steel open caisson under water Download PDF

Info

Publication number
CN100585095C
CN100585095C CN200810028040A CN200810028040A CN100585095C CN 100585095 C CN100585095 C CN 100585095C CN 200810028040 A CN200810028040 A CN 200810028040A CN 200810028040 A CN200810028040 A CN 200810028040A CN 100585095 C CN100585095 C CN 100585095C
Authority
CN
China
Prior art keywords
open caisson
steel open
steel
sinking
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200810028040A
Other languages
Chinese (zh)
Other versions
CN101289864A (en
Inventor
吴建成
王仁义
陈瑞田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Salvage Bureau
Original Assignee
Guangzhou Salvage Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Salvage Bureau filed Critical Guangzhou Salvage Bureau
Priority to CN200810028040A priority Critical patent/CN100585095C/en
Publication of CN101289864A publication Critical patent/CN101289864A/en
Application granted granted Critical
Publication of CN100585095C publication Critical patent/CN100585095C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

A kind of positioning sinking process that carries out the steel open caisson under water, according under water the deposit of getting in the seabed or water-bed geographical position arrange positioning framework and telltale mark steel, utilize the high-precision attitude instrument and or the ultra-short baseline positioning equipment measure the coordinate of positioning framework, settle the top of ultra-short baseline positioning equipment sampling beacon simultaneously at the steel open caisson, hang steel open caisson cover with crane ship and put in sedimental periphery, the outer wall at the steel open caisson helps the steel open caisson to continue to sink to the purpose degree of depth with the way of excavating mud at last.Adopt the said positioning sinking process that carries out the steel open caisson under water of the present invention, owing to do not adopt the auxiliary sinking of the mode of in the steel open caisson, excavating, do not adopt the method for assisting the steel well sinking at the water surface with vibrating hammer yet, can guarantee the accurate, steady of steel well sinking, can in the sinking process of steel open caisson, the sedimental safety in the steel open caisson not be subjected to new infringement again, reduction of erection time while, the construction danger that marine environment brings when greatly having reduced operation at sea.

Description

Carry out the positioning sinking process of steel open caisson under water
Technical field
A kind of positioning sinking process that carries out the steel open caisson under water relates to the improvement of hydraulic engineering and ocean engineering job practices.
Background technology
In hydraulic engineering and ocean engineering, generally the localization method for the steel open caisson adopts installing engineering guide pile in advance mostly, must surface in the upper edge of open caisson, by the diver after feeling of the bottom checked the location, adopt vibrating hammer to assist the steel open caisson to position and the installation of sinking at the water surface, and in the sinking process of steel open caisson, the method for excavation in continuing in the steel open caisson, to adopt, the sinking of help open caisson.This is the current basic skills that open caisson construction is installed under the more shallow river of the general depth of water, river.The open caisson of An Zhuaning is interim cofferdam substantially like this, does not generally need open caisson is hung out the water surface again after construction is finished, but places in the water as permanent underwater structures, does not need to consider sedimental safety in the steel open caisson in construction for this reason.But when carrying out this class engineering in the marine site that water level is dark, stormy waves is bigger, just can't surface when the sinking certain depth in the upper edge of steel open caisson, and vibrating hammer sinking method is just restricted; But also to guarantee that the safety of deposit in work progress can not cause new infringement in the steel open caisson, in the sinking process of steel open caisson, the method for excavation also just can't have been used in continuing to adopt in the steel open caisson so.
Summary of the invention
The object of the present invention is to provide a kind of positioning sinking process that carries out the steel open caisson under water, not only can be accurately according to the needs of engineering steadily the steel well sinking, also to after obtaining underwater sediment(s), hang out the water surface to the steel open caisson, and in the sinking process, can guarantee sedimental safety in the steel open caisson at the steel open caisson, make it not be subjected to the method for new infringement.
The said positioning sinking process that carries out the steel open caisson under water of the present invention is:
A, at first according under water the deposit of getting 4 in the seabed or water-bed geographical position arrange positioning framework and L type telltale mark steel 2, the position of L type telltale mark steel 2 and steel open caisson 1 interlayer 5 borehole wall outer wall length and widths be 〉=0.5 meter apart from w1;
B, secondly utilize coordinate that high-precision attitude instrument GAPS and/or ultra-short baseline positioning equipment measure four angles of positioning framework, simultaneously the sampling of the ultra-short baseline positioning equipment more than two or two beacon 3 is placed in the top of steel open caisson 1 as position reference;
C, adopt the large-tonnage crane ship to hang the steel open caisson 1 that has interlayer, by high-precision attitude instrument GAPS and ultra-short baseline positioning equipment monitoring sinking attitude and location, when steel open caisson 1 during near the mud face, check relative position between steel open caisson 1 and the L type telltale mark steel 2 under water by the diver, steel open caisson 1 accurately is installed in the position of L type telltale mark steel 2 and cover is put periphery at deposit 4, adopt the way that applies static pressure to help steel open caisson 1 is sunk in the mud then on steel open caisson 1, the outer wall at steel open caisson 1 helps steel open caisson 1 to continue to sink to the purpose degree of depth with the way of excavating mud at last.
Adopt the said positioning sinking process that carries out the steel open caisson under water of the present invention, owing to do not adopt the auxiliary sinking of the mode of in the steel open caisson, excavating, do not adopt the method for assisting the steel well sinking at the water surface with vibrating hammer yet, therefore both can guarantee the accurate, steady of steel well sinking, can guarantee in the sinking process of steel open caisson that again the sedimental safety in the steel open caisson is not subjected to new infringement, reduction of erection time while, the construction danger that marine environment brings when greatly having reduced operation at sea.
Description of drawings
After Fig. 1 is the said positioning sinking process that carries out the steel open caisson under water of this use invention, the relative position floor map of steel open caisson 1 between water-bed and L type telltale mark steel 2 and deposit 4.
The specific embodiment
Below in conjunction with accompanying drawing in detail specific implementation method of the present invention is described in detail.
The said positioning sinking process that carries out the steel open caisson under water of the present invention, in the time of can being used for the ancient shipwreck of salvage to the positioning sinking of steel open caisson.
Before concrete enforcement, need to measure the size of benthal deposit 4 as ancient shipwreck, make dual borehole wall steel open caisson 1 according to the volume of ancient shipwreck, the length and width of its steel open caisson 1 inwall and the distance W 2 of ancient shipwreck respectively increase more than 1 meter or 1 meter, its objective is need be covering benthal deposit 4 ancient shipwrecks safely after 1 sinking of steel open caisson, to guarantee simultaneously in the sinking process of steel open caisson 1, can not continue to damage ancient shipwreck.
Before steel open caisson 1 sinks, at first need to use high-precision attitude instrument GAPS or ultra-short baseline positioning equipment that the geographical position under water of ancient shipwreck is measured.As shown in Figure 1, arrange L type telltale mark steel 2 by the diver according to the particular location of the ancient shipwreck in seabed, the position of L type telltale mark steel 2 should be arranged in 0.5 meter apart from w1 that is equal to or greater than the length and width that covers steel open caisson 1 interlayer 5 borehole wall outer walls behind the deposit 4 ancient shipwrecks.
The sampling beacon 3 of the high accuracy ultra-short baseline positioning equipment more than two or two is placed in the top of steel open caisson 1.For carrying out steel open caisson sinking in the relatively poor marine site of marine environment, can adopt diagonal that 1 sampling beacon 3 respectively is set on steel open caisson 1 top, even can adopt at four end angles on steel open caisson 1 top and respectively place a sampling beacon 3, to increase the accuracy of sampling bootstrap information.
Adopt the large-tonnage crane ship to hang steel open caisson 1 at last, sinking attitude and location situation by high-precision attitude instrument GAPS and ultra-short baseline monitoring steel open caisson 1, when steel open caisson 1 sinks down near the deposit 4 on the underwater sludge face, earlier check relative position between steel open caisson 1 and the L type telltale mark steel 2 under water by the diver, and guiding the periphery that accurately is installed in L type telltale mark steel 2 positions and covers ancient shipwreck to steel open caisson 1, the way that applies static pressure then on steel open caisson 1 helps steel open caisson 1 is sunk in the mud.
When reality is implemented, be to adopt in the interlayer 5 of steel open caisson 1, to irritate husky in the way that applies static pressure on the steel open caisson 1, the way of placing weight simultaneously on steel open caisson 1 is to accelerate the sinking of steel open caisson 1.Adopted the positioning sinking process of the said steel open caisson of the present invention, neither adopted vibrating hammer to assist the steel well sinking, also do not adopted the mode of excavating in the steel open caisson to assist the steel well sinking, just in the end the steel open caisson has been
When sinking to the deposit top, use the static pressure sinking method, on steel open caisson 1, apply the way of static pressure, help the steel open caisson to continue to sink to covering deposit, and reduce to the required degree of depth.Therefore can guarantee the process of accurately, steadily sinking of steel open caisson, and the deposit that the safeguard protection cover is put in the steel open caisson is not subjected to new infringement.

Claims (3)

1, a kind of positioning sinking process that carries out the steel open caisson under water is characterized in that:
A, at first according under water the deposit of getting (4) in the seabed or water-bed location arrangements L type telltale mark steel (2), the length and width of the position of L type telltale mark steel (2) and steel open caisson (1) outer wall be 〉=0.5 meter apart from w1;
Secondly b, the sampling beacon (3) of two or more high-precision attitude instrument GAPS and/or ultra-short baseline positioning equipment is placed in the upper end of steel open caisson (1);
C, employing large-tonnage crane ship hang steel open caisson (1), by high-precision attitude instrument GAPS or ultra-short baseline monitoring location, when steel open caisson (1) during near underwater sludge mud face, check relative position between steel open caisson (1) and the L type telltale mark steel (2) under water by the diver, and steel open caisson (1) accurately is installed on the mud in L type telltale mark steel (2) position, cover is put in the periphery of deposit (4), goes up at steel open caisson (1) then and adopts the static pressure way to help steel open caisson (1) to continue to sink to the purpose degree of depth.
2, according to the positioning sinking process of the said steel open caisson of claim 1, it is characterized in that said steel open caisson (1) is interlayer (5) borehole wall, the length and width of its steel open caisson (1) inwall with 2 〉=1 meters of the distance W of the deposit of getting (4).
3, according to the positioning sinking process of the said steel open caisson of claim 1, it is characterized in that said way at the last employing of steel open caisson (1) static pressure is to irritate husky in the interlayer (5) of steel open caisson (1), go up the way of placing weight at steel open caisson (1) simultaneously, to accelerate the sinking of steel open caisson (1).
CN200810028040A 2008-05-13 2008-05-13 Carry out the positioning sinking process of steel open caisson under water Expired - Fee Related CN100585095C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810028040A CN100585095C (en) 2008-05-13 2008-05-13 Carry out the positioning sinking process of steel open caisson under water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810028040A CN100585095C (en) 2008-05-13 2008-05-13 Carry out the positioning sinking process of steel open caisson under water

Publications (2)

Publication Number Publication Date
CN101289864A CN101289864A (en) 2008-10-22
CN100585095C true CN100585095C (en) 2010-01-27

Family

ID=40034295

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810028040A Expired - Fee Related CN100585095C (en) 2008-05-13 2008-05-13 Carry out the positioning sinking process of steel open caisson under water

Country Status (1)

Country Link
CN (1) CN100585095C (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101787712B (en) * 2009-12-25 2011-06-01 中国水电顾问集团中南勘测设计研究院 Inclination measuring device and measuring method of sunk well
CN101787703B (en) * 2010-03-17 2011-06-15 中国二十二冶集团有限公司 Sinking construction method of sinking well with geology of gravel and pebble beds under saturated water condition
CN102704500A (en) * 2012-06-04 2012-10-03 中交第一航务工程局有限公司 Vibration sinking construction method of auxiliary lattice arc-shaped steel plate
CN103114598A (en) * 2013-01-31 2013-05-22 中交一航局第一工程有限公司 Large-diameter steel cylinder vibration sinking measurement positioning method
CN106996092A (en) * 2017-05-22 2017-08-01 中国水利水电第十二工程局有限公司 Barrier board setting method under water
CN110615064B (en) * 2019-09-30 2020-12-15 广州黄船海洋工程有限公司 Equipment installation point positioning method of saturated diving system
CN113789803A (en) * 2021-10-28 2021-12-14 北京中地恒基建筑工程有限公司 Construction method of slender open caisson and slender open caisson structure
CN114737591A (en) * 2022-04-12 2022-07-12 交通运输部上海打捞局 Cutter-suction type end plate auxiliary sinking system suitable for box-type end plate

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101003974A (en) * 2006-12-22 2007-07-25 中铁大桥局股份有限公司 Method for constructing groundwork for large-scale sinking well in deep water

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101003974A (en) * 2006-12-22 2007-07-25 中铁大桥局股份有限公司 Method for constructing groundwork for large-scale sinking well in deep water

Also Published As

Publication number Publication date
CN101289864A (en) 2008-10-22

Similar Documents

Publication Publication Date Title
CN100585095C (en) Carry out the positioning sinking process of steel open caisson under water
US20180223497A1 (en) Construction device and method for offshore wind turbine foundation with piling performed later
CN102312442A (en) Construction method of trestle steel pipe pile foundation
CN109555116A (en) A kind of high density karst intense development area fully-sleeved filled pile construction method
CN102953341A (en) Overhead trestle structure built on non-covering steep bare rocks in deep rapids
CN102979039B (en) Elevated trestle bridge construction method on covering-free steep bare rock in deepwater and rapid stream
CN108532608B (en) Precise positioning and nidation method for deepwater drilling rock-socketed foundation double-wall steel cofferdam
CN101200898A (en) Construction method of drilling pile base for bare rock and shallow overburden
CN102383436B (en) Accurate positioning construction method of double-wall steel cofferdam
CN208251108U (en) Caisson pile concrete elevation measurement and superfilled control structure
CN101274663B (en) Method for salvaging wreck integrally by steel caisson
CN104912093B (en) A kind of pile foundation in deep water positioning, the construction method of guide frame
CN103603364A (en) Deepwater suction-type gravity foundation and deepwater mounting device and deepwater mounting method thereof
CN108547331A (en) Caisson pile concrete elevation measures and superfilled control method
CN110700293B (en) Rotary excavating leading hole steel sheet pile cofferdam construction method under deep water sloping rock environment
CN106368217A (en) Overwater operation platform of wharf boat capable of being spliced and construction method of overwater operation platform
CN102605781A (en) Rocky bed steel pipe pile sinking construction process
CN204690772U (en) A kind of pile foundation in deep water location, guide frame
CN202989949U (en) Steel casing fixing structure on steep bare rock without covering layer in deep water and rapids
JP2015031148A (en) Device for both cavity volume inspection and uplift pressure removal, and method for installing the same
CN206143774U (en) Can assemble landing stage waterborne operation platform
CN110374120A (en) A kind of precast-boxed cofferdam monoblock type is put more energy into back cover construction method
CN102979090A (en) Construction method for fixing steel casing on covering-free steep bare rock in deepwater and rapid stream
JPH0835836A (en) Method and apparatus for measuring displacement of subsoil of sea bottom
CN103243727B (en) Vertical rotation method for cofferdam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100127

Termination date: 20130513