CN100552312C - Air Conditioning Unit Device and Air Treatment Method for Heat and Humidity Sectional Treatment - Google Patents

Air Conditioning Unit Device and Air Treatment Method for Heat and Humidity Sectional Treatment Download PDF

Info

Publication number
CN100552312C
CN100552312C CNB2008100238832A CN200810023883A CN100552312C CN 100552312 C CN100552312 C CN 100552312C CN B2008100238832 A CNB2008100238832 A CN B2008100238832A CN 200810023883 A CN200810023883 A CN 200810023883A CN 100552312 C CN100552312 C CN 100552312C
Authority
CN
China
Prior art keywords
air
water
chilled water
surface cooler
input
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2008100238832A
Other languages
Chinese (zh)
Other versions
CN101261024A (en
Inventor
梁彩华
张小松
蒋赟昱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CNB2008100238832A priority Critical patent/CN100552312C/en
Publication of CN101261024A publication Critical patent/CN101261024A/en
Application granted granted Critical
Publication of CN100552312C publication Critical patent/CN100552312C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Other Air-Conditioning Systems (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

热湿分段处理空调机组装置的空气处理方法分两部分,其中:热湿分段处理的空气处理方法是:室内回风与新风混合后首先经过第一表冷器(3)与高温冷冻水换热,经等湿降温到露点温度,除去大部分显热负荷后进入第二表冷器(4);在第二表冷器(4)中,空气与低温冷冻水进一步换热,降温并产生凝结水,除去湿负荷;降温除湿后的空气经加热器(5)、加湿器(6)处理到送风状态点,最终经风机(7)加压后送入空调房间;空调机组装置所采取的方法是:第一冷水机组中制冷剂在被第一压缩机(11)压缩排出后进入冷凝器(12)冷凝,然后经过第一储液罐(13)和第一过滤器(14)被第一电子膨胀阀(15)节流降压后,进入第一蒸发器(10)与冷冻水进行换热。

Figure 200810023883

The air treatment method of the air conditioning unit is divided into two parts, among which: the air treatment method of the heat and humidity section treatment is: after the indoor return air is mixed with the fresh air, it first passes through the first surface cooler (3) and high-temperature chilled water Heat exchange, cooling down to the dew point temperature after isohumidity, removing most of the sensible heat load, and then entering the second surface cooler (4); Condensed water is generated to remove the humidity load; the air after cooling and dehumidification is processed to the air supply state point by the heater (5) and humidifier (6), and finally sent to the air-conditioned room after being pressurized by the fan (7); The method adopted is: the refrigerant in the first chiller unit enters the condenser (12) to condense after being compressed and discharged by the first compressor (11), and then passes through the first liquid storage tank (13) and the first filter (14) After being throttled and depressurized by the first electronic expansion valve (15), it enters the first evaporator (10) to exchange heat with chilled water.

Figure 200810023883

Description

热湿分段处理的空调机组装置及其空气处理方法 Air Conditioning Unit Device and Air Treatment Method for Heat and Humidity Sectional Treatment

技术领域 technical field

本发明涉及一种空调负荷分段处理的空气处理方法及其实现这种方法的装置,属于制冷、空调系统设计和制造的技术领域。The invention relates to an air treatment method for segmental treatment of air-conditioning loads and a device for realizing the method, and belongs to the technical field of design and manufacture of refrigeration and air-conditioning systems.

背景技术 Background technique

空调负荷可分为显热负荷和湿负荷(潜热负荷),空气处理过程中的湿负荷处理方法主要有降温除湿、溶液除湿、吸附除湿等。受到各方面因素制约,降温除湿仍然是目前使用最普遍的空调湿负荷处理方法。The air conditioning load can be divided into sensible heat load and humidity load (latent heat load). The humidity load treatment methods in the air treatment process mainly include cooling and dehumidification, solution dehumidification, adsorption dehumidification, etc. Restricted by various factors, cooling and dehumidification is still the most commonly used method to deal with the humidity load of air conditioners.

降温除湿方法是采用较低温度的冷冻水对空气进行一次性降温除湿处理,将其处理至所需的饱和状态,然后再通过加热将空气升温至送风状态。在这种方式中,空调负荷中的显热负荷和湿负荷都是采用低温冷冻水进行处理,而为了兼顾除湿的需求,冷冻水温度必须足够低(7℃左右),导致冷水机组的蒸发温度无法提高,空调机组能效比较低,经济性较差,机组耗能量大。The method of cooling and dehumidification is to use cold water at a lower temperature to perform one-time cooling and dehumidification treatment on the air, and process it to the required saturation state, and then heat the air to the air supply state by heating. In this way, the sensible heat load and humidity load in the air-conditioning load are treated with low-temperature chilled water, and in order to meet the needs of dehumidification, the temperature of the chilled water must be low enough (about 7°C), resulting in the evaporation temperature of the chiller It cannot be improved, the energy efficiency of the air conditioning unit is relatively low, the economy is poor, and the unit consumes a lot of energy.

发明内容 Contents of the invention

技术问题:本发明的目的是为解决现有一次性降温除湿空调装置所存在的蒸发温度低、制冷机组能效比难以提升的问题,提供一种实现空调负荷分段处理,节能高效的热湿分段处理的空调机组装置及其空气处理方法。Technical problem: The purpose of the present invention is to solve the problems of low evaporation temperature and difficulty in improving the energy efficiency ratio of refrigeration units existing in the existing one-time cooling and dehumidification air-conditioning device, and to provide a heat-humidifier that realizes segmental processing of air-conditioning loads and is energy-saving and efficient. Air-conditioning unit device for stage treatment and air treatment method thereof.

技术方案:本发明热湿分段处理的空调机组装置包括空气处理部分和冷水机组部分。空气处理部分由第一表冷器、第二表冷器、加热器、加湿器、风机顺序连接而成。冷水机组部分包括第一冷水机组和第二冷水机组两部分,两个冷水机组共用一个冷凝器。第一冷水机组用于制备高温冷冻水,其设备按连接顺序依次为第一压缩机、冷凝器、第一储液罐、第一过滤器、第一电子膨胀阀、第一蒸发器,第一蒸发器又与第一压缩机相连构成回路,其中高温冷冻水部分从第一蒸发器出发,经第三电磁阀、第一表冷器、第一电磁阀、第一水泵再回到第一蒸发器。第二冷水机组用于制备高温冷冻水,其设备按连接顺序依次为第二压缩机、冷凝器、第二储液罐、第二过滤器、第二电子膨胀阀、第二蒸发器,第二蒸发器又与第二压缩机相连构成回路,其中低温冷冻水部分从第二蒸发器出发,经第二表冷器,再经第二电磁阀、第二水泵回到第二蒸发器。在第一表冷器和第二表冷器的冷冻水进出口处增设了第三电磁阀、第四电磁阀、第五电磁阀,通过调节3个电磁阀的开闭,使第一表冷器、第二表冷器可实现串联通入高温冷冻水。Technical solution: The air-conditioning unit device for heat and humidity staged treatment in the present invention includes an air treatment part and a water chiller part. The air processing part is composed of a first surface cooler, a second surface cooler, a heater, a humidifier, and a fan connected in sequence. The chiller part includes two parts, the first chiller and the second chiller, and the two chillers share a condenser. The first water chiller is used to prepare high-temperature chilled water, and its equipment is the first compressor, condenser, first liquid storage tank, first filter, first electronic expansion valve, first evaporator, first The evaporator is connected with the first compressor to form a circuit, in which the high-temperature chilled water starts from the first evaporator, passes through the third electromagnetic valve, the first surface cooler, the first electromagnetic valve, and the first water pump and then returns to the first evaporator. device. The second chiller is used to prepare high-temperature chilled water, and its equipment is the second compressor, the condenser, the second liquid storage tank, the second filter, the second electronic expansion valve, the second evaporator, and the second The evaporator is connected with the second compressor to form a circuit, wherein the low-temperature chilled water starts from the second evaporator, passes through the second surface cooler, and returns to the second evaporator through the second solenoid valve and the second water pump. A third solenoid valve, a fourth solenoid valve, and a fifth solenoid valve are added at the chilled water inlet and outlet of the first surface cooler and the second surface cooler. By adjusting the opening and closing of the three solenoid valves, the first surface cooler The device and the second surface cooler can be connected in series to high-temperature chilled water.

本发明热湿分段处理的空气处理方法是:室内回风与新风混合后首先经过第一表冷器与高温冷冻水换热,经等湿降温到接近露点温度,除去大部分显热负荷后进入第二表冷器;在第二表冷器中,空气与低温冷冻水进一步换热,降温并产生凝结水,除去湿负荷;降温除湿后的空气经加热器、加湿器处理到送风状态点,最终经风机加压后送入空调房间。The air treatment method of heat and humidity sectional treatment in the present invention is: after the indoor return air is mixed with the fresh air, it first passes through the first surface cooler to exchange heat with high-temperature refrigerated water, then cools down to a temperature close to the dew point through isohumidity, and removes most of the sensible heat load Enter the second surface cooler; in the second surface cooler, the air further exchanges heat with low-temperature chilled water, cools down and generates condensed water, and removes the humidity load; the air after cooling and dehumidification is processed by the heater and humidifier to the air supply state point, and finally sent to the air-conditioned room after being pressurized by the fan.

本发明热湿分段处理的空调机组装置所采取的方案是:第一冷水机组中制冷剂在被第一压缩机压缩排出后进入冷凝器冷凝,然后经过第一储液罐和第一过滤器,再被第一电子膨胀阀节流降压后,进入第一蒸发器与冷冻水进行换热,制冷剂吸热蒸发,同时冷冻水温度降低,制取高温冷冻水,制冷剂完全蒸发后再次被第一压缩机吸入压缩,从而实现循环。高温冷冻水在第一水泵的驱动下经第三电磁阀流入第一表冷器,与空气进行换热,吸收空气中的显热,然后经第一电磁阀、第一水泵回到第一蒸发器。第二冷水机组中制冷剂在被第二压缩机压缩排出后进入冷凝器冷凝,然后经过第二储液罐和第二过滤器,再被第二电子膨胀阀节流降压后进入第二蒸发器,制冷剂与冷冻水换热,吸热制取低温冷冻水,制冷剂完全蒸发后被第二压缩机再次吸入,从而完成循环。低温冷冻水受到第二水泵的驱动流入第二表冷器,吸收空气中的潜热,自身温度升高,然后经第二电磁阀、第二水泵回到第二蒸发器。The scheme adopted by the heat-humidity segmental treatment air conditioning unit device of the present invention is: the refrigerant in the first chiller unit enters the condenser to condense after being compressed and discharged by the first compressor, and then passes through the first liquid storage tank and the first filter , after being throttled and depressurized by the first electronic expansion valve, it enters the first evaporator to exchange heat with the chilled water. It is sucked and compressed by the first compressor, thereby realizing a cycle. Driven by the first water pump, the high-temperature chilled water flows into the first surface cooler through the third electromagnetic valve, exchanges heat with the air, absorbs sensible heat in the air, and then returns to the first evaporator through the first electromagnetic valve and the first water pump. device. In the second chiller, the refrigerant enters the condenser to condense after being compressed and discharged by the second compressor, then passes through the second liquid storage tank and the second filter, and is throttled and depressurized by the second electronic expansion valve before entering the second evaporation The refrigerant exchanges heat with the chilled water, and absorbs heat to produce low-temperature chilled water. After the refrigerant is completely evaporated, it is re-inhaled by the second compressor, thus completing the cycle. Driven by the second water pump, the low-temperature chilled water flows into the second surface cooler, absorbs latent heat in the air, raises its own temperature, and then returns to the second evaporator through the second solenoid valve and the second water pump.

针对空调机组有较多时间在部分负荷、低湿负荷下运行,本发明设计出部分负荷、低湿负荷工况下的节能运行方案:在部分、低湿负荷工况下,第二冷水机组停止工作,不制备低温冷冻水。第一冷水机组正常工作,第二电磁阀、第三电磁阀关闭,第四电磁阀、第五电磁阀开启,第一表冷器、第二表冷器形成串联。高温冷冻水从第一蒸发器出发,在第一水泵的驱动下经第五电磁阀进入第二表冷器,流出后再经第四电磁阀流入第一表冷器,出来后经第一电磁阀、第一水泵回到第一蒸发器。此时的空气处理过程为:室内回风与新风混合后经过第一表冷器、第二表冷器与高温冷冻水换热,降温除湿,然后经加热器、加湿器处理到送风状态点,最终经风机加压后送入空调房间。此时通过调节第一水泵的转速,即改变高温冷冻水的流量(流量变小,第一蒸发器的出水温度将相应降低,流量变大则相反),实现高温冷冻水承担小部分除湿负荷。In view of the fact that the air conditioning unit has more time to operate under partial load and low humidity load, the present invention designs an energy-saving operation scheme under partial load and low humidity load conditions: under partial and low humidity load conditions, the second chiller stops working and does not Prepare low temperature chilled water. The first chiller works normally, the second solenoid valve and the third solenoid valve are closed, the fourth solenoid valve and the fifth solenoid valve are opened, and the first surface cooler and the second surface cooler are connected in series. High-temperature chilled water starts from the first evaporator, driven by the first water pump, enters the second surface cooler through the fifth electromagnetic valve, flows out and then flows into the first surface cooler through the fourth electromagnetic valve, and then passes through the first electromagnetic valve, the first water pump returns to the first evaporator. The air treatment process at this time is: after the indoor return air is mixed with the fresh air, it passes through the first surface cooler and the second surface cooler to exchange heat with high-temperature chilled water, cools down and dehumidifies, and then is processed by the heater and humidifier to the air supply state. , and finally sent to the air-conditioned room after being pressurized by the fan. At this time, by adjusting the speed of the first water pump, that is, changing the flow rate of high-temperature chilled water (the flow rate becomes smaller, the outlet water temperature of the first evaporator will decrease correspondingly, and the flow rate is larger, the opposite is true), so that the high-temperature chilled water can bear a small part of the dehumidification load.

两个冷水机组中的两台压缩机采用一定一变的形式。第一冷水机组中使用变容量压缩机用于制备高温冷冻水,第二冷水机组中使用定容量压缩机用于制备低温冷冻水。当空调系统处在部分负荷运行时,变容量压缩机进行能量调节,适应负荷需要。当总负荷较小、潜热负荷不大的情况时,第二冷水机组停机,制冷负荷完全由变容量压缩机制备高温冷冻水来承担。The two compressors in the two chillers adopt a constant and variable form. The variable-capacity compressor is used in the first water chiller to prepare high-temperature chilled water, and the fixed-capacity compressor is used in the second chiller to prepare low-temperature chilled water. When the air conditioning system is in partial load operation, the variable capacity compressor performs energy adjustment to meet the load needs. When the total load is small and the latent heat load is not large, the second chiller is shut down, and the cooling load is completely borne by the high-temperature chilled water prepared by the variable-capacity compressor.

有益效果:本发明的有益效果是,在满足空调除湿负荷要求的同时,将空调负荷的显热负荷和湿负荷分段处理,实现提高冷水机组的蒸发温度,进而提高整个空调系统的能效比,提高能源利用率,整个装置结构简单,紧凑。部分负荷时也能充分利用设备资源,节能,具有良好的经济性。Beneficial effect: the beneficial effect of the present invention is that, while meeting the requirements of the dehumidification load of the air conditioner, the sensible heat load and the humidity load of the air conditioner load are processed in sections, so as to realize the improvement of the evaporation temperature of the chiller unit, thereby improving the energy efficiency ratio of the entire air conditioning system, The energy utilization rate is improved, and the structure of the whole device is simple and compact. Partial load can also make full use of equipment resources, save energy, and have good economy.

附图说明 Description of drawings

图1是本发明热湿分段处理的空调机组装置示意图。Fig. 1 is a schematic diagram of an air conditioning unit device for heat and humidity staged treatment according to the present invention.

图中有:新风口1;回风口2;第一表冷器3;第二表冷器4;加热器5;加湿器6;风机7;送风口8;第一水泵9;第一蒸发器10;第一压缩机11;冷凝器12;冷凝器第一输入端12a;冷凝器第一输出端12b;冷凝器第二输入端12c;冷凝器第二输出端12d;第一储液罐13;第一过滤器14;第一电子膨胀阀15;第二储液罐16;第二过滤器17;第二电子膨胀阀18;第二蒸发器19;第二压缩机20;第二水泵21;第一电磁阀22;第二电磁阀23;第三电磁阀24;第四电磁阀25;第五电磁阀26;冷却水进出管27。In the figure: fresh air outlet 1; return air outlet 2; first surface cooler 3; second surface cooler 4; heater 5; humidifier 6; fan 7; air supply port 8; first water pump 9; first evaporator 10; the first compressor 11; the condenser 12; the first input end 12a of the condenser; the first output end 12b of the condenser; the second input end 12c of the condenser; the second output end 12d of the condenser; the first liquid storage tank 13 The first filter 14; The first electronic expansion valve 15; The second liquid storage tank 16; The second filter 17; The second electronic expansion valve 18; The second evaporator 19; The second compressor 20; The second water pump 21 ; The first solenoid valve 22; the second solenoid valve 23; the third solenoid valve 24; the fourth solenoid valve 25; the fifth solenoid valve 26;

具体实施方式 Detailed ways

结合附图1进一步说明本发明的具体实施方式:基于热湿分段处理的空调机组装置包括空气处理部分(I)和冷水机组部分(II),其中空气处理部分由第一表冷器3、第二表冷器4、加热器5、加湿器6和风机7组成,并通过箱体依次连接而成。冷水机组部分包括第一冷水机组和第二冷水机组,具体连接方式为第一冷水机组压缩机11的输出端接冷凝器第一输入端12a,冷凝器第一输出端12b接第一储液罐13输入端,第一储液罐13输出端通过第一过滤器14接第一电子膨胀阀15输入端,第一电子膨胀阀15输出端接第一蒸发器10输入端,第一蒸发器10输出端接第一压缩机11输入端。第一蒸发器10的冷冻水输出端通过第三电磁阀24接第一表冷器3的冷冻水输入端,第一表冷器3的冷冻水输出端通过第一电磁阀22接第一水泵9的输入端,第一水泵9的输出端接第一蒸发器10的冷冻水输入端。第二冷水机组的压缩机20输出端接冷凝器第二输入端12c,冷凝器第二输出端12d接第二储液罐16输入端,第二储液罐16输出端通过第二过滤器17接第二电子膨胀阀18输入端,第二电子膨胀阀18输出端接第二蒸发器19输入端,第二蒸发器19输出端接第二压缩机20输入端。第二蒸发器19的冷冻水输出端接第二表冷器4的冷冻水输入端,同时通过第五电磁阀26与第一蒸发器10的冷冻水输出端相连,第二表冷器4的冷冻水输出端通过第二电磁阀23接第二水泵21的输入端,同时通过第四电磁阀25与第一表冷器3的冷冻水输入端相连,第二水泵21的输出端接第二蒸发器19的冷冻水输入端。Further illustrate the specific embodiment of the present invention in conjunction with accompanying drawing 1: the air-conditioning unit device based on heat and humidity subsection processing comprises air treatment part (I) and water chiller part (II), wherein air treatment part is made up of the first surface cooler 3, The second surface cooler 4, the heater 5, the humidifier 6 and the blower fan 7 are composed, and are sequentially connected through the casing. The chiller part includes a first chiller and a second chiller, and the specific connection mode is that the output end of the compressor 11 of the first chiller is connected to the first input end 12a of the condenser, and the first output end 12b of the condenser is connected to the first liquid storage tank 13 input end, the output end of the first liquid storage tank 13 is connected to the input end of the first electronic expansion valve 15 through the first filter 14, the output end of the first electronic expansion valve 15 is connected to the input end of the first evaporator 10, and the first evaporator 10 The output end is connected to the input end of the first compressor 11 . The chilled water output end of the first evaporator 10 is connected to the chilled water input end of the first surface cooler 3 through the third solenoid valve 24, and the chilled water output end of the first surface cooler 3 is connected to the first water pump through the first solenoid valve 22 9, the output of the first water pump 9 is connected to the chilled water input of the first evaporator 10. The output end of the compressor 20 of the second chiller is connected to the second input end 12c of the condenser, the second output end 12d of the condenser is connected to the input end of the second liquid storage tank 16, and the output end of the second liquid storage tank 16 passes through the second filter 17 It is connected to the input end of the second electronic expansion valve 18 , the output end of the second electronic expansion valve 18 is connected to the input end of the second evaporator 19 , and the output end of the second evaporator 19 is connected to the input end of the second compressor 20 . The chilled water output end of the second evaporator 19 is connected to the chilled water input end of the second surface cooler 4, and is connected with the chilled water output end of the first evaporator 10 through the fifth electromagnetic valve 26 simultaneously, and the second surface cooler 4 The chilled water output end is connected to the input end of the second water pump 21 through the second electromagnetic valve 23, and is connected to the chilled water input end of the first surface cooler 3 through the fourth electromagnetic valve 25 at the same time, and the output end of the second water pump 21 is connected to the second water pump 21. Chilled water input end of evaporator 19.

空气热湿分段处理过程为:新风、室内回风分别由新风口、回风口进入空调箱并混合,经第一表冷器与高温冷冻水换热,经等湿降温后,除去大部分显热负荷,进入第二表冷器,在第二表冷器中空气与低温冷冻水换热,进一步降温并产生凝结水,除去湿负荷,空气然后依次经过加热器、加湿器、风机后最终从送风口送入室内。The heat and humidity treatment process of air is as follows: the fresh air and the indoor return air enter the air conditioning box from the fresh air outlet and the return air outlet respectively and mix them. The heat load enters the second surface cooler, where the air exchanges heat with low-temperature chilled water, further cools down and generates condensed water, and removes the humidity load. The air then passes through the heater, humidifier, and fan in sequence and finally from The air supply port is sent into the room.

冷水机组的工作过程为:制冷剂在第一压缩机中被压缩排出后进入冷凝器进行冷凝,冷凝成液体后依次经过第一储液罐、第一过滤器后被第一电子膨胀阀节流降压,进入第一蒸发器蒸发,制取高温冷冻水,制冷剂完全蒸发后再次被第一压缩机吸入压缩,从而形成循环,完成制取高温冷冻水,高温冷冻水在第一蒸发器中与制冷剂换热,放出热量,温度降低后通过第三电磁阀进入第一表冷器(此时第四电磁阀、第五电磁阀关闭),冷冻水在其中与空气换热,温度降低后通过第一电磁阀、第一水泵再次进入第一蒸发器。制冷剂在第二压缩机中被压缩排出后进入冷凝器冷凝,冷凝成液体后依次经过第二储液罐、第二过滤器后,再被第二电子膨胀阀节流降压变成气液两相进入第二蒸发器,制冷剂在其中蒸发制取低温冷冻水,制冷剂完全蒸发后再次进入第二压缩机压缩,从而形成循环,低温冷冻水在第二蒸发器中与制冷剂换热,放出热量,温度降低后进入第二表冷器(此时第四电磁阀、第五电磁阀关闭),冷冻水在其中与空气换热,温度降低后通过第二电磁阀、第二水泵再次进入第二蒸发器。The working process of the chiller is: the refrigerant is compressed and discharged in the first compressor and enters the condenser for condensation. After being condensed into a liquid, it passes through the first liquid storage tank and the first filter in turn, and then is throttled by the first electronic expansion valve. Reduce the pressure, enter the first evaporator to evaporate, and produce high-temperature frozen water. After the refrigerant is completely evaporated, it is sucked and compressed by the first compressor again, thus forming a cycle to complete the production of high-temperature frozen water. The high-temperature frozen water is in the first evaporator Exchange heat with the refrigerant to release heat. After the temperature drops, it enters the first surface cooler through the third solenoid valve (at this time, the fourth solenoid valve and the fifth solenoid valve are closed), and the chilled water exchanges heat with the air in it. After the temperature drops Enter the first evaporator again through the first electromagnetic valve and the first water pump. The refrigerant is compressed and discharged in the second compressor and enters the condenser to condense. After being condensed into a liquid, it passes through the second liquid storage tank and the second filter in turn, and then is throttled and depressurized by the second electronic expansion valve to become gas-liquid. The two phases enter the second evaporator, where the refrigerant evaporates to produce low-temperature chilled water. After the refrigerant is completely evaporated, it enters the second compressor again for compression, thereby forming a cycle. The low-temperature chilled water exchanges heat with the refrigerant in the second evaporator , release heat, enter the second surface cooler after the temperature drops (the fourth solenoid valve and the fifth solenoid valve are closed at this time), the chilled water exchanges heat with the air in it, and passes through the second solenoid valve and the second water pump again after the temperature drops. into the second evaporator.

当空调在部分负荷、低湿负荷工况下时,空调机组切换到低负荷工况运行,此时第一电磁阀、第四电磁阀、第五电磁阀开启,第二电磁阀、第三电磁阀关闭,第一表冷器、第二表冷器串联接入高温冷冻水。第二压缩机、第二水泵停止运行。第一冷水机组中制冷剂流动回路不变,冷冻水部分高温冷冻水从第一蒸发器出来后经过第五电磁阀(此时第三电磁阀关闭)进入第二表冷器,从第二表冷器出来后,冷冻水通过第四电磁阀进入第一表冷器,冷冻水从第一表冷器出来经过第一电磁阀、第一水泵后再次进入第一蒸发器完成冷冻水循环。此工况下通过调节第一水泵的转速(即调节水泵的流量)和对第一压缩机进行变容量控制可实现机组制冷量和空调总负荷之间的匹配。When the air conditioner is under the condition of partial load and low humidity load, the air conditioner unit switches to the low load condition. At this time, the first solenoid valve, the fourth solenoid valve, and the fifth solenoid valve are opened, and the second solenoid valve and the third solenoid valve are turned on. Closed, the first surface cooler and the second surface cooler are connected to high-temperature chilled water in series. The second compressor and the second water pump stop running. The refrigerant flow circuit in the first chiller unit remains unchanged, and the high-temperature chilled water part of the chilled water comes out of the first evaporator and enters the second surface cooler through the fifth solenoid valve (the third solenoid valve is closed at this time). After the cooler comes out, the chilled water enters the first surface cooler through the fourth solenoid valve, and the chilled water comes out of the first surface cooler, passes through the first solenoid valve and the first water pump, and then enters the first evaporator again to complete the chilled water cycle. Under this working condition, the matching between the cooling capacity of the unit and the total load of the air conditioner can be realized by adjusting the rotational speed of the first water pump (that is, adjusting the flow rate of the water pump) and performing variable capacity control on the first compressor.

从以上过程可以看出,采用热湿分段处理的空调机组装置,在一般工况下,空气显热负荷主要通过高温冷冻水处理,该部分冷量由第一冷水机组产生。第一冷水机组制取高温冷冻水,蒸发温度较高,能效比可得到显著提升。在低负荷工况下,全部热湿负荷均通过高温冷冻水处理,冷量全部由第一冷水机组产生。由于第一制冷循环蒸发温度较高,能效比高,机组耗能减少,机组整体性能显著提升。It can be seen from the above process that, under normal working conditions, the sensible heat load of the air is mainly treated by high-temperature chilled water, and this part of the cooling capacity is generated by the first chiller. The first chiller produces high-temperature chilled water with a high evaporation temperature, and the energy efficiency ratio can be significantly improved. Under low-load conditions, all heat and humidity loads are processed by high-temperature chilled water, and all cooling capacity is generated by the first chiller. Due to the high evaporation temperature and high energy efficiency ratio of the first refrigeration cycle, the energy consumption of the unit is reduced, and the overall performance of the unit is significantly improved.

Claims (5)

1. the air-conditioning unit device of the wet segment processing of heat is characterized in that this device comprises air-treatment part (I) and handpiece Water Chilling Units part (II); Air-treatment part (I) is included in first surface cooler (3), second surface cooler (4), heater (5), humidifier (6) and the blower fan (7) that is arranged in order in the casing; Handpiece Water Chilling Units part (II) comprises first handpiece Water Chilling Units and second handpiece Water Chilling Units; In first handpiece Water Chilling Units, the condenser first input end (12a) of the output termination condenser (12) of first compressor (11), condenser first output (12b) connects the input of first fluid reservoir (13), first fluid reservoir (13) output connects the input of first electric expansion valve (15) by first filter (14), the cold-producing medium input of first electric expansion valve (15) output termination first evaporimeter (10), the input of cold-producing medium output termination first compressor (11) of first evaporimeter (10); The chilled water output of first evaporimeter (10) connects the chilled water input of first surface cooler (3) by the 3rd magnetic valve (24), the chilled water output of first surface cooler (3) connects the input of first water pump (9) by first magnetic valve (22), the chilled water input of first water pump (9) output termination first evaporimeter (10); In second handpiece Water Chilling Units, second compressor (20) output termination condenser second input (12c), condenser second output (12d) connects second fluid reservoir (16) input, second fluid reservoir (16) output connects second electric expansion valve (18) input by second filter (17), second electric expansion valve (18) output termination second evaporimeter (19) cold-producing medium input, second evaporimeter (19) cold-producing medium output termination second compressor (20) input; The chilled water input of chilled water output termination second surface cooler (4) of second evaporimeter (19), the chilled water output of second evaporimeter (19) links to each other with the chilled water output of first evaporimeter (10) by the 5th magnetic valve (26), the chilled water output of second surface cooler (4) connects the input of second water pump (21) by second magnetic valve (23), the chilled water output of second surface cooler (4) links to each other the chilled water input of output termination second evaporimeter (19) of second water pump (21) by the 4th magnetic valve (25) with the chilled water input of first surface cooler (3).
2. the air-conditioning unit device of the wet segment processing of heat according to claim 1 is characterized in that two surface coolers are arranged in the described casing: first surface cooler (3) and second surface cooler (4); Logical high temperature chilled water in first surface cooler (3), second surface cooler (4) leads to cryogenic freezing water.
3. the air-conditioning unit device of the wet segment processing of heat according to claim 1, it is characterized in that adopting two compressors to prepare high temperature chilled water and cryogenic freezing water respectively, first compressor (11) that wherein is used to prepare the high temperature chilled water is a variable displacement compressor, second compressor (20) that is used to prepare cryogenic freezing water is the constant volume compressor, and first water pump (9) is the flow-changing water pump.
4. the air-conditioning unit device of the wet segment processing of heat according to claim 1 is characterized in that the shared condenser of described first handpiece Water Chilling Units and second handpiece Water Chilling Units (12).
5. the air-treatment method of the air-conditioning unit device of the wet segment processing of a heat as claimed in claim 1 is characterized in that this method divides two parts, wherein:
The air-treatment method of the wet segment processing of heat is: indoor return air with after new wind mixes at first through first surface cooler (3) and the heat exchange of high temperature chilled water, through etc. the wet dew-point temperature that cools to, enter second surface cooler (4) after removing most of sensible heat load; In second surface cooler (4), air and the further heat exchange of cryogenic freezing water, cooling also produces condensate water, removes humidity load; Air heater via (5), humidifier (6) behind the cool-down dehumidification are handled the ventilation state point, finally send into air-conditioned room after blower fan (7) pressurization;
The method that air-conditioning unit device is taked is: cold-producing medium enters condenser (12) condensation in first handpiece Water Chilling Units after being discharged by first compressor (11) compression, then through first fluid reservoir (13) and first filter (14) by first electric expansion valve (15) throttling step-down after, enter first evaporimeter (10) and carry out heat exchange with chilled water, cold-producing medium heat absorption evaporation, chilled water temperature reduces simultaneously, produce the high temperature chilled water, sucked compression by first compressor (11) once more after cold-producing medium evaporates fully, thereby realize circulation; The high temperature chilled water flows into first surface cooler (3) through the 3rd magnetic valve (24) under the driving of first water pump (9), carry out heat exchange with air, absorbs airborne sensible heat, gets back to first evaporimeter (10) through first magnetic valve (22), first water pump (9) then; Cold-producing medium enters condenser condenses in second handpiece Water Chilling Units after being discharged by second compressor (20) compression, then through second fluid reservoir (16) and second filter (17), entered second evaporimeter (19) after second electric expansion valve (18) the throttling step-down, cold-producing medium and chilled water heat exchange, cryogenic freezing water is produced in heat absorption, cold-producing medium evaporates the back fully and is sucked once more by second compressor (20), thereby finishes circulation; The driving that cryogenic freezing water is subjected to second water pump (21) flows into second surface cooler (4), absorbs airborne latent heat, and self temperature raises, and gets back to second evaporimeter (19) through second magnetic valve (23), second water pump (21) then.
CNB2008100238832A 2008-04-18 2008-04-18 Air Conditioning Unit Device and Air Treatment Method for Heat and Humidity Sectional Treatment Expired - Fee Related CN100552312C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2008100238832A CN100552312C (en) 2008-04-18 2008-04-18 Air Conditioning Unit Device and Air Treatment Method for Heat and Humidity Sectional Treatment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2008100238832A CN100552312C (en) 2008-04-18 2008-04-18 Air Conditioning Unit Device and Air Treatment Method for Heat and Humidity Sectional Treatment

Publications (2)

Publication Number Publication Date
CN101261024A CN101261024A (en) 2008-09-10
CN100552312C true CN100552312C (en) 2009-10-21

Family

ID=39961630

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2008100238832A Expired - Fee Related CN100552312C (en) 2008-04-18 2008-04-18 Air Conditioning Unit Device and Air Treatment Method for Heat and Humidity Sectional Treatment

Country Status (1)

Country Link
CN (1) CN100552312C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101806473A (en) * 2010-03-26 2010-08-18 杭州源牌环境科技有限公司 Fresh air processor with split twin-stage surface coolers and method for processing air by same

Families Citing this family (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101782263B (en) * 2010-03-10 2012-06-27 广东吉荣空调有限公司 Multi-operating mode energy-saving controlled combined type thermostatic and humidistatic air conditioning unit with thermometal compound box body structure
CN101968243B (en) * 2010-09-21 2012-11-28 东南大学 Air source heat pump device capable of simultaneously preparing double-temperature water and driving method thereof
CN102589058B (en) * 2011-01-10 2014-01-01 广东迪奥技术有限公司 Efficient energy-saving air conditioning system with independent temperature and humidity control function and adjusting method thereof
CN102269450A (en) * 2011-08-23 2011-12-07 上海京瓷电子有限公司 Summer energy-saving air conditioner
CN102418966B (en) * 2011-12-19 2013-07-31 东南大学 Air treatment device and air treatment method
CN102878650B (en) * 2012-09-28 2015-02-18 东南大学 Household air conditioner device capable of adjusting temperature and humidity respectively
CN103591723A (en) * 2013-12-17 2014-02-19 南通明德重工有限公司 Air-conditioning water chilling unit
CN103759360B (en) * 2014-01-20 2016-10-05 新疆绿色使者干空气能源有限公司 Multi-state is combined indirect air processing means and air-conditioning method thereof
CN103940007A (en) * 2014-03-24 2014-07-23 广东石油化工学院 Direct evaporation type water-cooling fresh air unit
CN103884058A (en) * 2014-03-24 2014-06-25 雅士空调(广州)有限公司 Direct evaporation type air cooling type fresh air unit
CN103940061A (en) * 2014-05-07 2014-07-23 深圳海悟科技有限公司 Energy-saving air conditioning system
CN104406242B (en) * 2014-11-18 2017-02-22 苏州市海魄洁净环境工程有限公司 Efficient dehumidification cleaning room system
CN104390320A (en) * 2014-11-18 2015-03-04 苏州市海魄洁净环境工程有限公司 Clean room temperature and humidity automatic control device
CN104764126A (en) * 2015-03-30 2015-07-08 广东申菱空调设备有限公司 Double-cold-source variable frequency precise air conditioning unit
CN104930595B (en) * 2015-07-13 2018-02-27 尹本望 A kind of indoor air conditioning system
CN106016514A (en) * 2016-05-12 2016-10-12 上海交通大学 Temperature and humidity weak-relevance control unit type air conditioner system and use method
CN106152285B (en) * 2016-08-16 2023-07-04 珠海格力电器股份有限公司 Air conditioning system and control method thereof
CN106546028B (en) * 2016-09-29 2019-12-27 同济大学 Frostless type refrigerant dual cycle fresh air conditioning unit
CN106895530B (en) * 2017-04-18 2019-08-20 东南大学 A kind of water cold storage independent temperature-humidity control regional cold supply system
CN108592269B (en) * 2018-05-22 2023-05-30 福建工程学院 Air conditioning system for comprehensively utilizing natural cold and heat sources and control method
CN110671772B (en) * 2019-11-06 2024-08-20 璟赫系统科技(苏州)有限公司 A constant temperature and humidity water system
CN111735124A (en) * 2020-07-29 2020-10-02 有无实业(重庆)有限公司 Novel heat exchange and dehumidification structure and method
CN113847666B (en) * 2021-12-01 2022-03-11 深圳中集天达吉荣航空制冷有限公司 Air Conditioning System
DE102022117134A1 (en) * 2022-07-08 2024-01-11 Heck Kältetechnik GmbH Air preparation system for ventilating a cabin and cabin system
CN115265163B (en) * 2022-07-28 2023-11-07 哈尔滨工业大学 Heat pump drying system with pre-dehumidification and heat energy circulation functions
CN115854448B (en) * 2022-12-28 2024-09-20 北京建筑大学 Double-evaporation temperature and humidity independent control air conditioner
CN119164036B (en) * 2024-10-25 2025-11-07 珠海格力电器股份有限公司 Air conditioning unit and control method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101806473A (en) * 2010-03-26 2010-08-18 杭州源牌环境科技有限公司 Fresh air processor with split twin-stage surface coolers and method for processing air by same

Also Published As

Publication number Publication date
CN101261024A (en) 2008-09-10

Similar Documents

Publication Publication Date Title
CN101261024A (en) Air Conditioning Unit Device and Air Treatment Method for Heat and Humidity Sectional Treatment
CN100595490C (en) Chiller and its air treatment method based on heat and humidity independent treatment
CN202532629U (en) Liquid dehumidification air fan unit based on independent cold source assistance
CN202204076U (en) A heat recovery type air conditioning box suitable for animal rooms
CN100538208C (en) A dual temperature cold water/air cooler unit
CN112097356A (en) Fluorine pump type machine room air-cooled precision air conditioner
CN109945354A (en) Family formula radiation air-conditioning and the effective integrated processing unit of fresh air and operation method
CN201302243Y (en) Energy-saving full fresh air dehumidifier machine
CN100451468C (en) A heat pump-driven multi-stage solution dehumidification and regeneration fresh air unit
CN103940007A (en) Direct evaporation type water-cooling fresh air unit
CN114111101B (en) Evaporative cooling chiller and method for operating the same
CN111678198A (en) High-energy-efficiency-ratio machine room air conditioning system
CN101398234A (en) Low-temperature air-cooling heat pump unit
CN113446756A (en) Four-pipe air source heat pump unit with variable-speed compressor
CN104848497A (en) Air conditioner
CN105020807B (en) It crosses cold mould heat-pump-type solution humidifying and evaporates cooling combined air-conditioning system
CN102628626A (en) Air conditioning dehumidification evaporative type condensation three-work-condition cold and hot water unit
CN107270456B (en) An energy-saving integrated cooling, heating, and dehumidification device
CN206269310U (en) Energy recovery type double-cold-source large enthalpy difference energy storage fresh air handling unit
CN201476397U (en) Temperature-adjusting dehumidifier of water source heat pump
CN207881043U (en) The air-conditioning device of big temperature difference cold source and big temperature difference cold source
CN101334195B (en) Energy-saving household heat pump air conditioner with multiple evaporation temperatures
CN202562130U (en) Air conditioner dehumidification evaporative condensation three-working-condition cold-and-hot water unit
CN201215362Y (en) High-efficiency energy-conserving air conditioner unit
CN201203218Y (en) Heat-humidity separate treatment air-conditioning unit with multiple chilled water temperatures

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Shanghai Fengshen Environmental Equipment Engineering Co., Ltd.

Assignor: Southeast University

Contract record no.: 2010310000097

Denomination of invention: Heat moisture segmental processing air-conditioning unit device and its air-treatment method

Granted publication date: 20091021

License type: Exclusive License

Open date: 20080910

Record date: 20100702

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091021

Termination date: 20140418