CN100416010C - 预制复合承重墙结构的节点构造施工方法 - Google Patents

预制复合承重墙结构的节点构造施工方法 Download PDF

Info

Publication number
CN100416010C
CN100416010C CNB2006100123327A CN200610012332A CN100416010C CN 100416010 C CN100416010 C CN 100416010C CN B2006100123327 A CNB2006100123327 A CN B2006100123327A CN 200610012332 A CN200610012332 A CN 200610012332A CN 100416010 C CN100416010 C CN 100416010C
Authority
CN
China
Prior art keywords
prefabricated
network framework
sandwich
bearing
sandwich network
Prior art date
Application number
CNB2006100123327A
Other languages
English (en)
Other versions
CN1800531A (zh
Inventor
张晶廷
Original Assignee
张晶廷
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
Application filed by 张晶廷 filed Critical 张晶廷
Priority to CNB2006100123327A priority Critical patent/CN100416010C/zh
Publication of CN1800531A publication Critical patent/CN1800531A/zh
Application granted granted Critical
Publication of CN100416010C publication Critical patent/CN100416010C/zh
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=36810712&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN100416010(C) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.

Links

Abstract

本发明提供一种预制复合承重墙结构的节点构造施工方法,其特征在于:将承重墙所需要主要受力钢筋网与保温层和保温层外侧的钢筋网预制成夹芯保温网骨架,这和夹芯保温网骨架直接包附在梁、柱钢筋的外侧,支撑模板后承重墙、梁、柱与夹芯保温网骨架的混凝土一起浇筑,形成带保温的承重墙、梁、柱、保温层外的混凝土一起形成三维结构。节点构造包括:在预制的夹心网骨架的搭接部位设置柱筋和矩形框架箍筋,夹心网骨架的平网搭接部位设置连接锚筋、柱筋、箍筋、连接锚筋与预制夹心网骨架的钢筋连接形成整体受力结构。本发明基本构件保温夹心网骨架、高压石膏永久模板等可在工厂生产线上完成,夹心网骨架在墙的部位是二层或三层立体交叉桁架受力,在梁、柱部位与梁、柱受力钢筋结合成为一体、包括保温层外的混凝土共同受力。

Description

预制复合承重墙结构的节点构造施工方法技术领域本发明涉及到一种预制复合承重墻结构的节点保温构造施工方 法,属于建筑施工技术领域。 背景技术建筑节能工作已列为十一五廿划的重点,建筑外墙的保温技术都 是在墙体结构外面抹保溫层或粘贴、附加保温层不参与结构受力。如 社会上已有钢丝夹芯网板也只是挂在墻面的外面和墙体内的受力钢筋没有关系;另一种是整体现浇带保温的剪力墙结构如申请人的"95100283"、 "99110073"、 "03263843"专利申请文件先后公开了新 型的房屋建筑三维结构体系及整体浇注施工方法和具有网状钢筋且 填充保温材料的轻质夹芯预制墙板,首先提出了将墙体内主要受力钢 筋预制成带保温的钢网架与房屋的梁、柱、楼板整体施工的技术方案 经过严格的测试证明这种建筑结构和施工方法完全可行。 发明内容本发明的目的是在前述专利申请的基础上将单侧预制混凝土夹 心网板改为预制保温夹心网骨架,将这种由承重墙主受力钢筋形成的 保温钢筋网骨架,延伸至梁、柱的外侧,使梁、柱形成带保温层的复 合受力构件提供具体的预制复合承重墙结构的节点构造施工方法 以建立施工标准和规范,提高施工速度和质量,使其在受力性能、抗 震性能方面体现结构体系的优越性。本发明的技术方案是这样实现的这种预制复合承重墙结构的节点构造施工方法其特征在于承重墙采用预制的保温夬心网骨架 以高压石膏板作为浇铸混凝土的一侧永久模板,整体直接喷注或浇注 形成柱、梁、墻板一体的三维结构,节点构造包括在预制的夹心网 骨架的搭接部位设置柱筋和矩形框架箍筋,夹心网骨架的平网搭接都 位设置连接锚筋、柱筋、箍筋、连接锚筋与预制夹心网骨架的钢筋连 接形成整体受力结构。所述的预制复合承重墙结构的节点构造施工方法,在预制的夹心 网骨架的搭接部位,连接锚筋绑扎在夹心网骨架平网上。所述的预制复合承重嬉结构的节点构造施工方法预制夹心网骨 架在平网延伸端预留连接锚筋或锚固网片。所述的预制复合承重墙结构的节点构造施工方法.预制的夹心网 骨架是双层或三层钢丝平网中间夹聚苯乙烯泡沬板保溫层、由立体交 叉的钢丝桁条将钢丝平网连接成为桁架预制而成。所述的预制复合承重墙结构的节点构造施工方法,其特征在于, 在预制的夹心网骨架的搭接部位设置加强网片与夹心网骨架绑扎。所述的预制复合承重墙结构的节点构造施工方法,在预制的夹心 网骨架的墙角搭接部位设置加强角网与夹心网骨架绑扎。所述的预制复合承重墙结构的节点构造施工方法,在预制的夹心网骨架的洞口部位设置u形锚筋与夹心网骨架绑扎。所述的预制复合承重壞结构的节点构造施工方法,基础施工后楼 盖混凝土浇注预留柱筋、锚筋.现场吊装预制夹心网骨架.就位后将 夹心网骨架与箍筋、连接锚筋、加强网片或加强角网绑扎或焊接成力 整体结构,安装墙、柱、梁模板,现场浇注梁、柱、网板承重墙,养 护,施工下一楼盖板。所述的预制复合承重墙结构的节点构造施工方法所述夹心网骨架承重一侧浇注混凝土厚度力8-18cm,协同承重一侧预制混凝土厚度 为3-5cm.采用本发明节点构造和施工方法,基本构件保温夹心网骨架、高 压石膏永久模板等可在工厂生产线上完成,将预制夹心网板改力预制 夹心网骨架,不但减少了运输压力,还为实现本发明的节点构造和施 工方法拓展了应用空间。夹心网骨架在墻的部位是二层或三层立体交 叉桁架受力,在梁、柱都位与梁、柱受力钢筋结合成为一体、包括保 温层外的混凝土共同受力,这种协同受力经检测比同厚度的墙增加承 载力14%,既能受力又能保温。真正实现了建筑工厂化,住宅产业化, 比砖混结构减少了劳动强度,工人容易操作,施工速度提高1/3,适 用于10层以下的多层建筑,试验证明抗震性能比砖混结构提高2-3 个地震裂度,优于框架结构。 附图说明下面结合实施例和附图详细说明本发明的技术内容 图1为本发明双层夹心网骨架剪力墙结构图 图2为本发明三层夹心网骨架剪力墙结构图 一图、图2适用于多层结构所有剪力墙 图3为本发明外墻保温转角节点构造图一主要用于对热桥敏感地区多层外墙大角等扭转力比较强的位置 图4为本发明内墙保温转角节点构造图一主要用于楼(电)梯间等非外墙的连接,也可用于对热桥不敏感地区多层外墙大角位置图5为本发明外墙与室内侧扶壁柱节点构造图图6为本发明外墙与分户墙、楼梯间内墙节点构造图图7力本发明室内剪力墙相交连接的节点构造图6图8为本发明内墙、外墙墙中柱节点构造图一主要用于室内分户嬉、楼梯间嬉或对热桥不敏感地区外墙墙中柱 或梁下柱位置图9为本发明剪力墙拐角节点构造图 一主要用于剪力墙阳角位置阴角构造与此近似 图10为本发明小高层外嬉与室内复合墙节点构造图 图11为本发明小高层外墙与室内侧扶壁柱节点构造图 图12为本发明多层外墙圈梁(橫向边缘构件)节点构造图 图13为本发明室内圏梁节点构造图一主要用于室内或对热桥不敏感地区剪力墙圈梁(橫向边缘构件)图14为本发明外墙梁板节点构造图图15为本发明剪力墙端柱节点构造图图16为本发明剪力墻洞口节点构造图图中1、2、现浇混凝土 3、保温层 4、立体交叉钢丝桁条5、钢丝平网6、加强角网7、13、连接锚筋8、柱筋9、箍筋10、加强网片11、锚固网片12、楼板 14、U形锚筋15、洞口1、室内 0、室外具体实施方式按照施工流程将作为外墙和承重墙的夹心网骨架先在工厂预制 好,运至施工现场吊装就位后,将夹心网骨架与箍筋、连接锚筋、加 强网片或加强角网绑扎或焊接成为整体结构,安装墙、柱、梁石膏永 久模板和埋设管线,支撑墻的单面石膏永久模板,另一侧力钢模板, 现场浇注梁、柱、网板承重墙,由于网板不易振捣,采用自密实石子 粒径10國以内的混凝土喷射泵向模内喷注,楼面用普通平板振动器 振实为了减少楼面二次抹灰.楼面混凝土施工时加浆抹平图l、图2所示墙板力偏夹心网骨架形式,厚的一侧主承重,依靠网状钢丝协同双侧承重;网板中间夹保温材料作保温层3,保温材 料可选择发泡聚苯乙烯板。图3-图16所示预制夹心网骨架之间或骨架与梁、柱之间的节卢、 构造,骨架与骨架之间用连接锚筋7、 13或附加加强网片10、锚固 网片11绑扎连接;在实际应用中,夹心网骨架亦可预制延伸的连接 锚筋13或锚固网片ll,现浇柱与预制网板之间还要另插入连接锚筋。 上述描述仅作为本发明预制复合承重墙结构的节点构造施工方 法几种技术方案的实施例提出,不作为对其结构的卓一限制条件。

Claims (9)

1. 一种预制复合承重墙结构的节点构造施工方法,其特征在于:承重墙采用预制的保温夹心网骨架,将这种由承重墙主受力钢筋形成的保温钢筋网骨架,延伸至梁、柱的外侧,使梁、柱形成带保温层的复合受力构件;以高压石膏板作为浇铸混凝土的一侧永久模板,整体直接喷注或浇注形成柱、梁、墙板一体的三维结构,节点构造包括:在预制的夹心网骨架的搭接部位设置柱筋(8)和矩形框架箍筋(9),夹心网骨架的平网(5)搭接部位设置连接锚筋(7)、柱筋、箍筋、连接锚筋与预制夹心网骨架的钢筋连接形成整体受力结构。
2、 根据权利要求1所述的预制复合承重墙结构的节点构造施工 方法,其特征在于在预制的夹心网骨架的搭接部位,连接锚筋(7) 绑扎在夹心网骨架平网<上。
3、 根据权利要求2所述的预制复合承重墙结构的节点构造施工 方法,其特征在于预制夹心网骨架在平网延伸端预留连接锚筋(13) 或锚固网片(11)。
4、 根据权利要求1所述的预制复合承重墙结构的节点构造施工 方法,其特征在于预制的夹心网骨架是双层或三层钢丝平网(5)中 间夹聚苯乙烯泡沬板(3)保温层,由立体交叉的钢丝桁条(4)将钢 丝平网连接成为桁架预制而成。
5、 根据权利要求1所述的预制复合承重墙结构的节点构造施工 方法,其特征在于,在预制的夹心网骨架的搭接部位设置加强网片(10)与夹心网骨架绑扎。
6、 根据权利要求1所述的预制复合承重墙结构的节点构造施工 方法,其特征在于,在预制的夹心网骨架的墙角搭接都位设置加强角 网(6)与夹心网骨架绑扎。
7、 根据杈利要求1所述的预制复合承重墙结构的节点构造施工方法,其特征在于,在预制的夹心网骨架的洞口部位设置u形锚筋(14)与夹心网骨架绑扎。
8、 根据权利要求1所述的预制复合承重墙结构的节点构造施工 方法,其特征在于,基础施工后楼盖混凝土浇注预留柱筋、锚筋,现 场吊装预制夹心网骨架,就位后将夹心网骨架与箍筋、连接锚筋、加 强网片或加强角网绑扎或焊接成为整体结构,安装墙、柱、梁模板, 现场浇注梁、柱、网板承重墙,养护,施工下一楼盖板。
9、 根据权利要求8所述的预制复合承重墙结构的节点构造施工 方法,其特征在于所述夹心网骨架承重一侧浇注混凝土厚度为8-18cm,协同承重一侧预制混凝土厚度为3-5cm。
CNB2006100123327A 2006-01-17 2006-01-17 预制复合承重墙结构的节点构造施工方法 CN100416010C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100123327A CN100416010C (zh) 2006-01-17 2006-01-17 预制复合承重墙结构的节点构造施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100123327A CN100416010C (zh) 2006-01-17 2006-01-17 预制复合承重墙结构的节点构造施工方法

Publications (2)

Publication Number Publication Date
CN1800531A CN1800531A (zh) 2006-07-12
CN100416010C true CN100416010C (zh) 2008-09-03

Family

ID=36810712

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100123327A CN100416010C (zh) 2006-01-17 2006-01-17 预制复合承重墙结构的节点构造施工方法

Country Status (1)

Country Link
CN (1) CN100416010C (zh)

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101260720B (zh) * 2008-04-11 2010-06-09 山东龙新建材股份有限公司 一种预制网架夹芯墙板的连接施工方法
WO2010081278A1 (zh) * 2008-12-30 2010-07-22 哈尔滨吴淑环建设工程技术研究有限公司 建筑的复合保温构件
CN101503890B (zh) * 2009-02-04 2011-05-18 南通建筑工程总承包有限公司 钢筋混凝土全预制装配结构梁l型连接节点
EP2498963A1 (en) * 2009-11-13 2012-09-19 Plattforms, Inc. Precast composite structural floor system
CN101831965A (zh) * 2010-04-06 2010-09-15 北京华丽联合高科技有限公司 一种无机材料隔热保温墙板及其制作方法
CN101956437A (zh) * 2010-09-29 2011-01-26 刘春� 低自重仿生承重墙体
CN102535639B (zh) * 2011-12-26 2014-05-14 中国矿业大学 埋入钢筋加固预制空心板与开间梁节点的连接方法
CN102535680B (zh) * 2012-02-21 2014-03-12 北京工业大学 带暗柱t型钢板网复合砂浆轻质空心墙结构
CN102864855B (zh) * 2012-09-19 2015-02-04 初明进 T型预制混凝土墙体连接节点
CN102864854B (zh) * 2012-09-19 2015-02-04 初明进 L型预制混凝土墙体连接节点
CN103711229B (zh) * 2012-10-08 2016-04-13 中国石油化工集团公司 钢筋混凝土抗爆墙墙体钢筋配置方法
CN103266700A (zh) * 2013-04-25 2013-08-28 中天建设集团有限公司 插接式大模内置现浇外保温板拼接结构
CN103243825A (zh) * 2013-04-27 2013-08-14 陈久旺 高强复合钢丝网架保温板及其施工方法
CN103343572B (zh) * 2013-07-19 2016-04-27 四川大学 预制复合墙板抗震节能农居结构体系
CN103590509B (zh) * 2013-11-27 2016-03-02 四川华构住宅工业有限公司 基于装配式建筑的墙墙连接节点结构
CN104074312B (zh) * 2014-05-07 2016-08-03 杜景云 部品化的带有内保温板的钢筋网架结构、制造及组装方法
CN110439137A (zh) * 2015-10-14 2019-11-12 史世英 预制墙板、墙体及预制墙板生产方法、预制墙体施工方法
CN105604221A (zh) * 2016-03-08 2016-05-25 万保金 预制带钢筋墙体模壳
CN106245813A (zh) * 2016-09-30 2016-12-21 浙江宝业现代建筑工业化制造有限公司 一体化叠合剪力墙板l型水平连接节点

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2168904Y (zh) * 1993-09-23 1994-06-15 张晶廷 一种轻质承重夹芯网板
CN1399047A (zh) * 2002-08-13 2003-02-26 张晶廷 一种三维结构体系建筑及工业化施工方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2168904Y (zh) * 1993-09-23 1994-06-15 张晶廷 一种轻质承重夹芯网板
CN1399047A (zh) * 2002-08-13 2003-02-26 张晶廷 一种三维结构体系建筑及工业化施工方法

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
CL建筑体系的设计与经济分析. 于庆荣,张洪波,张晶廷.施工技术,第29卷第7期. 2000
CL建筑体系的设计与经济分析. 于庆荣,张洪波,张晶廷.施工技术,第29卷第7期. 2000 *
CL结构体系的施工技术. 王春梅,崔晓伟.建筑技术,第36卷第7期. 2005
CL结构体系的施工技术. 王春梅,崔晓伟.建筑技术,第36卷第7期. 2005 *
介绍一种新型抗震节能住宅结构体系--CL结构体系. 王忠礼,于庆荣,张同亿,吴敏哲,谢志孝.基建优化,第22卷第1期. 2001
介绍一种新型抗震节能住宅结构体系--CL结构体系. 王忠礼,于庆荣,张同亿,吴敏哲,谢志孝.基建优化,第22卷第1期. 2001 *

Also Published As

Publication number Publication date
CN1800531A (zh) 2006-07-12

Similar Documents

Publication Publication Date Title
CN105544733B (zh) 用于支撑建筑物的结构框架系统和装配其的方法
CN102561553B (zh) 预制钢管混凝土边框剪力墙及其施工方法
CN102433955B (zh) 装配式预制轻钢复合承重墙板
CN106013811B (zh) 一种装配式建筑的安装方法
US8499511B2 (en) Precast composite structural floor system
EP1123449B1 (en) Volumetric modular building system
EP1992750A1 (en) Prefabricated reinforced-concrete single-family dwelling and method for erecting said dwelling
US20090113820A1 (en) Prefabricated wall panel system
CN204386002U (zh) 一种装配式楼盖体系
WO2017206411A1 (zh) 全预制叠合装配式地下综合管廊及其连接节点
CN101260720B (zh) 一种预制网架夹芯墙板的连接施工方法
CA2888614A1 (en) Methods, systems and components for multi-storey building construction
US20080184650A1 (en) Insulated block with non-linearthermal paths for building energy efficient buildings
CN105317137B (zh) 预制墙体、墙板及其施工方法以及预制墙板生产方法
TWI632272B (zh) Three-dimensional light steel frame composed of two-way continuous double beams
CN103015565A (zh) 预制装配整体式钢筋混凝土承重墙及建筑施工方法
CN102071797A (zh) 纤维增强免抹灰免拆一体化保温模板和外墙保温施工工艺
CN101858114A (zh) 现场浇筑整体式轻体隔墙施工方法
CN101769008B (zh) 利用预制构造柱圈梁建造抗震砌体房屋的方法
CN101858119B (zh) 一种钢筋混凝土空心楼板及施工方法
US5373675A (en) Composite building system and method of manufacturing same and components therefor
Bruggeling et al. Prefabrication with concrete
CN103993679B (zh) 低层装配式复合墙体房屋螺栓连接节点结构
CN105649360A (zh) 一种整体装配式建筑系统及安装方法
CN202559569U (zh) 一种装配整体式自保温暗密肋轻质叠合楼板

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
LIC Patent licence contract for exploitation submitted for record

Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2009.3.10 TO 2017.3.10; CHANGE OF CONTRACT

Name of requester: SHIJIAZHUANG JINGDA ARCHITECTURAL SYSTEM CO., LTD.

Effective date: 20090515

EE01 Entry into force of recordation of patent licensing contract

Assignee: Shijiazhuang Jingda Building System Co., Ltd.

Assignor: Zhang Jingting

Contract fulfillment period: 2009.3.10 to 2017.3.10 contract change

Contract record no.: 2009130000068

Denomination of invention: Joint construction method of prefabricated composite bearing wall structure

Granted publication date: 20080903

License type: Exclusive license

Record date: 2009.5.15