CN100359109C - Construction process for building concrete structure and its used mould - Google Patents
Construction process for building concrete structure and its used mould Download PDFInfo
- Publication number
- CN100359109C CN100359109C CNB2005100191391A CN200510019139A CN100359109C CN 100359109 C CN100359109 C CN 100359109C CN B2005100191391 A CNB2005100191391 A CN B2005100191391A CN 200510019139 A CN200510019139 A CN 200510019139A CN 100359109 C CN100359109 C CN 100359109C
- Authority
- CN
- China
- Prior art keywords
- template
- concrete structure
- concrete
- building
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The present invention relates to construction technology for building concrete structure and used templates thereof. The present invention mainly solves the problems that lots of plate material, such as timber, etc., serves as the templates and needs to be consumed in the traditional construction for building concrete posts, beams and plates, concrete is cast in the templates which are dismantled after a curing period, and therefore, work, time, material, etc. are wasted. Concrete building moulds used by the present invention are novel moulds which are manufactured and assembled according to specific shapes of various kinds of concrete structure, the concrete is cast in the moulds which do not need to be dismantled after achieving the curing period, and the moulds which are tightly connected into integration with the concrete structure become a part of the concrete structure (replace a floated coat outside the original concrete structure). The construction technology for building the concrete structure is greatly simplified, lots of plate material is saved, construction periods are shortened, and building veneer projects can be directly carried out on the outside of the glabrous moulds at the later stage of the projects. The present invention belongs to the significant innovation of building trades.
Description
Technical field
The present invention relates to template used in the architectural construction technology.
Background technology
At present, the building construction process of concrete frame structural building or building is actually a process that repeatedly repeats a cover program.This process is: make template, make reinforcing bar, set up scaffold, assembled formwork is installed reinforcing bar, pour concrete, dismounting template.Repeat above process then.Go round and begin again and repeat same process one after another, complete until the main structure body engineering.Such construction pattern should be the construction pattern of just having used since concrete comes out.Though reform was several times arranged in history, became veneer, Engraved bamboo clappers, steel template etc. by solid wood board.Reform that can be such has also just changed mould material, and whole construction pattern and program are not had a bit change.The general this construction pattern of China exists the problem of following several aspects at present
(1), the construction stage is all bigger to the consumption of timber, steel and all kinds of sheet materials.And the number of turnover of these materials generally has only three times, the every use of material once, volume of the circular flow needs to replenish 30% new material at least.Particularly consume a large amount of timber, can cause the forest reserves further to be cut down, and then cause soil erosion, ecological disequilibrium takes a bath the country and people.
(2), the template construct engineering quantity of installing is big, and consumption is many man-hour.Not only consume man-hour during form removable, and damage template.Impaired template does not often have recycle value and becomes waste product.
(3), crude because of the concrete body structure surface, so out-of-flatness is consumption worker feed consumption, the particularly flat-top part of plastering during later stage decorations.
Summary of the invention
The objective of the invention is to provide a kind of construction formwork of uniqueness, its template and concrete structure are united two into one, exempted the pour concrete operation of palpus stripping later on, accomplished that labor and material saving saves time, improved concrete structure construction quality for the building concrete structure construction.
Purpose of the present invention is realized by following scheme:
Construction process for building concrete structure includes following operation: make template, make reinforcing bar, set up scaffold, assembled formwork, installation reinforcing bar, pour concrete.Said template is by the prefabricated cement spare template that the given shape of various concrete structures is made and assembly unit goes out, when pour concrete in it and after reaching curing time, need not stripping, and its template and concrete structure closely are connected as a single entity.
Used template in a kind of construction process for building concrete structure, it is characterized in that: it is prefabricated cement spare, the selection of material is: cement 40~60%, thin river sand 30~50%, flyash 8%, gesso 2%, adding entry in 1: 0.12~0.26 ratio in above mortar fully stirs, when reaching more than 3 minutes, ratio in 1: 0.017~0.020 in mortar adds glass fiber or other fibrous material, stir and it was evenly distributed in the slip in 5 minutes, then with slip casting to making in the template forming mould, mould is placed on to rock rocks 5~6 minutes on the machine, can quietly stop maintenance 12~16 hours then, open dovetail groove and plucking processing at template surface again, treat maintenance expiration back reprocessing post, beam, the assembly unit tongue and groove and the beam of plate, the connectivity port of intercolumniation.
Template used in the above-mentioned construction process for building concrete structure is assembled by the polylith veneer, the weight≤30kg of every veneer.
The invention has the advantages that used construction formwork is simple in structure, produce easily, it is used for the concrete structure construction makes its work simplification, need not remove this template after the completion, and template and concrete structure are connected as a single entity closely.Because prefabricated cement formwork is mechanical-moulded, its finish is very high, and the finishing stage in engineering later stage need not be carried out the plastering process of cylinder, beam face, flat-top.This has not only saved above several labor and materials losses, has also saved the labor and materials of setting up full hall scaffold simultaneously.The present invention has changed traditional construction process for building concrete structure, has simplified operation, has saved a large amount of timber, has reduced construction cost and building costs, for protection environment and ecological resources very big benefit is arranged all.
Description of drawings
Fig. 1 is the schematic diagram that the mould intracavity wall of construction formwork combines with the concrete structure.
Fig. 2 is an oat tail groove structure schematic diagram set on the template.
Fig. 3 is a concrete structural column form stop shape schematic diagram.
Fig. 4 is a concrete structural column form assembly mode schematic diagram.
Fig. 5 is the tongue and groove schematic diagram of concrete structural column template connecting portion.
Fig. 6 is a beam forms termination shape schematic diagram.
Fig. 7 is a beam forms compound mode schematic diagram.
Fig. 8 is a template die plate termination shape schematic diagram.
Fig. 9 is the connection diagram of plate and plate.
Figure 10 is the connection diagram of plate and beam.
The specific embodiment
The disclosed structure of above accompanying drawing is the structure of one embodiment of the present of invention.Among the figure, 1~4 for being combined into each veneer of template; 5 is the structure concrete; 6 is dovetail groove.
Technical essential of the present invention:
Technical essential of the present invention is: change existing construction work concrete structure construction mode, lack and use or do not use wooden template.Use prefabricated cement formwork instead and substitute construction formworks such as timber, bamboo board and steel form.
1, prefabricated cement concrete structure construction template is that inserts, glass fiber (or other mineral wool material) are that tensile materials, gesso are the cement mortar of accelerating combinations such as initial setting time material with cement as cementitious matter, thin river sand exactly, in particular manufacturing craft, pour into cement plate with this mortar, the plucking fluting is carried out on the surface that template is combined with the structure concrete then, enterprise is cut and opens at the position that template combines with template, thereby manufacture cement concrete structure construction template.
Not only production technology is simple for this template of the present invention, and is cheap for manufacturing cost, and product plasticity is strong, and bigger superiority is: the material that the production template uses material and building concrete structure to use belongs to the same material kind.Their various physical performance indexs and physical change all are identical.Compatibility between template and the structure is very good, and the stability of solid-state bond is also very good.
This template of the present invention is much simpler than traditional form of construction work on construction technology, because after in a single day prefabricated cement concrete structure construction template be assembled into the needed shape of concrete structure, just combine with the structure concrete, has become the topping of body structure surface.So template successfully just need not stripping once assembling.So not only saved material, saved artificial simultaneously again.
2, prefabricated cement concrete structure construction template does not change the section area of structure.Do not influence the load design of structure.We can be understood as it is body structure surface one deck motar, makes template the prescription of this one deck motar is improved, and adds the prefabricated one-tenth construction formwork of some fibre again.Made particular processing at template inner surface (surface that combines with the structure concrete) again, watered after the concrete in the die cavity, use the combination of dovetail groove mode between template and the structure concrete, add template when making, reserve a lot of short glass fiber stakes in swallow layer groove, all-pervasive cement paste is with regard to be bonded together with template firmly (referring to Fig. 1) when the structure concrete waters.
After structure construction is finished, need not stripping, only remove to support and get final product.Save the worker and the material of body structure surface float work in the future simultaneously, and shortened the construction period.Because template is in plant produced, its surface is very bright and clean, and the engineering later stage can directly construction building be surface-veneer engineered in the above.
3, prefabricated cement concrete structure construction template is produced with the mechanization mode in factory.Measure the quality certification system that strictness all will be arranged from selecting materials to.Only in this way could protect product standard quality unified and product good.Production technology design therefore of the present invention is based on mechanization production.
The specifications and models design of template of the present invention:
Stencil design of the present invention is three major products at present: post, beam, template die plate.Prefabricated cement concrete structure construction column template is used for the construction of the concrete structural column of all size and different shape.Prefabricated cement concrete structure construction beam forms is used for the construction of the concrete structural beams of all size and different shape.Prefabricated cement concrete structure construction template die plate is used for the construction of the concrete structural slab of all size and different shape.Because the building of concrete structure is made up of these three kinds of form of structure basically.More than the template of three types also satisfied construction requirement basically.Set forth technical essential below:
1, determining about the thickness of template: template thickness is by the monolateral size decision of structural section.If the monolateral size of structural section is not more than 600 millimeters, template basic unit is in 10 millimeters.Monolateral size is greater than 600 millimeters, and the template groundwork thickness is 13 millimeters.4 millimeters of dovetail groove thickness.The template thickness of these two kinds of specifications adds dovetail groove thickness in addition and forms template thickness (referring to Fig. 2).
2, the definite foundation about template veneer length (or claiming area) is such:
At first will obey a prerequisite: that is exactly a handled easily.The weight of every veneer should be controlled in the 30KG, if too heavyly just be inconvenient to splice installation.Can produce monoblock during plant produced, but must be cut into small pieces during product export, the scene can assembly unit.
3, the specific design scheme of template
A, at present in the Cross section Design of the building field concrete structural column of China, all select 240 * 240,300 * 300,300 * 400,400 * 400,400 * 500,400 * 600 uniform section sizes basically for use.Although it also is southern and northern in the difference of selecting for use on the grade having any different.Should this be the main flow of the present architectural design concept of China.And the main flow trend of house floor height also is to select absolute altitudes such as 2.80,3.00,3.20,3.30 basically for use.This just provides a basic standard for our deisgn product specification.So the total principle of the specifications design of product is: with construction module design production technology and product template.Needs with the user are determined product specification.Concrete structural column, beam, template die plate termination form are seen Fig. 3, Fig. 6, Fig. 8 respectively.
The tongue and groove practice of the compound mode of B, template and connecting portion:
The form assembly mode of concrete structural column is seen Fig. 4; The form assembly mode of concrete structural beams is seen Fig. 7; The form assembly mode of concrete structural slab is seen Fig. 9.The practice of each connecting portion tongue and groove can be referring to the connecting portion tongue and groove practice shown in Figure 5.
The prescription of mould of the present invention and the mode of production:
1, prescription:
This product is made up of following different materials:
32.5# cement: 40-60% (actual optional 50%);
Thin river sand: 30-50% (actual optional 40%);
Flyash: 8%;
Gesso: 2%;
Other adds entry: mortar ratio water is 1 to compare 0.12-0.26;
Also add glass fiber: the mortar ratio glass fiber is 1 to compare 0.017-0.020.
2, production technology:
At first cement, thin river sand, flyash, gesso are added water and stir fully, short glass fiber (or other fibrous material) section of adding the 10-12 millimeters long after stirring more than 3 minutes stirred 5 minutes again, and fiber is evenly distributed in the slip.Then with slip casting in mould, mould is placed on to rock rocks on the machine 5-6 minute (can not shake, vibrations can cause fiber to form the bottom skew).Then can be quiet stop maintenance,, can drive dovetail groove and plucking is handled at template surface when template maintenance to 12 during hour to 16 hours.Treat the connectivity port of the assembly unit tongue and groove of maintenance expiration back reprocessing post, beam, plate and beam, intercolumniation.
Install the job site of template of the present invention:
Concrete post, beam, template die plate in factory according to the prefabricated all size of design drawing, splice installation according to working drawing after transporting to the job site, the girth member and the support member of concrete post, beam, plate have been locked, seal the place that the total interface place might spillage and can water concrete, treat structure concrete curing expiration dismounting support and girth member, so far the concrete structure construction is finished.
Claims (2)
1, used template in a kind of construction process for building concrete structure, it is characterized in that: it is prefabricated cement spare, the selection of material is: cement 40~60%, thin river sand 30~50%, flyash 8%, gesso 2%, adding entry in 1: 0.12~0.26 ratio in above mortar fully stirs, when reaching more than 3 minutes, ratio in 1: 0.017~0.020 in mortar adds glass fiber or other fibrous material, stir and it was evenly distributed in the slip in 5 minutes, then with slip casting to making in the template forming mould, mould is placed on to rock rocks 5~6 minutes on the machine, quietly then stopped maintenance 12~16 hours, open dovetail groove and plucking processing at template surface again, treat maintenance expiration back reprocessing post, beam, the assembly unit tongue and groove and the beam of plate, the connectivity port of intercolumniation.
2, by used template in the described construction process for building concrete structure of claim 1, it is characterized in that: above-mentioned template is assembled by the polylith veneer, the weight≤30kg of each piece veneer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2005100191391A CN100359109C (en) | 2005-07-21 | 2005-07-21 | Construction process for building concrete structure and its used mould |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2005100191391A CN100359109C (en) | 2005-07-21 | 2005-07-21 | Construction process for building concrete structure and its used mould |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1715573A CN1715573A (en) | 2006-01-04 |
CN100359109C true CN100359109C (en) | 2008-01-02 |
Family
ID=35821699
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2005100191391A Expired - Fee Related CN100359109C (en) | 2005-07-21 | 2005-07-21 | Construction process for building concrete structure and its used mould |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100359109C (en) |
Families Citing this family (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102493647B (en) * | 2011-12-05 | 2014-05-28 | 中冶天工集团有限公司 | Construction method for high-rise concrete structure |
CN105014770A (en) * | 2014-04-30 | 2015-11-04 | 王建军 | Manufacturing method of fiber reinforced type composite base material plate frame |
CN104552568A (en) * | 2015-01-06 | 2015-04-29 | 余美宝 | Prefabricated enclosing wall vertical column suspension roller manufacturing process |
CN105464208A (en) * | 2015-09-16 | 2016-04-06 | 北京建筑大学 | ECC assembly integrated building structure construction method |
CN106223544B (en) * | 2016-07-29 | 2019-04-09 | 华南理工大学 | A kind of ultra-high performance concrete column permanent formwork and preparation method thereof |
CN106049759A (en) * | 2016-07-29 | 2016-10-26 | 华南理工大学 | Cylindrical ultra-high performance concrete permanent formwork and preparation method thereof |
CN106703288B (en) * | 2016-11-18 | 2020-03-17 | 湖南大学 | Method for manufacturing carbon fiber grid composite plate concrete continuous beam |
CN106760190A (en) * | 2016-11-18 | 2017-05-31 | 湖南大学 | Concrete simply supported beam and preparation method based on carbon fiber mesh composite board |
CN107152112A (en) * | 2017-07-04 | 2017-09-12 | 上海宝岳住宅工业有限公司 | A kind of modularization Prefabricated stacking floor and its construction method for being used to drop plate region |
WO2019222896A1 (en) * | 2018-05-21 | 2019-11-28 | 增城市碧桂园物业发展有限公司 | Floor panel and construction method thereof |
WO2019222891A1 (en) * | 2018-05-21 | 2019-11-28 | 增城市碧桂园物业发展有限公司 | Concrete column and construction method thereof |
CN110552508B (en) * | 2019-09-11 | 2021-05-04 | 上海市市政规划设计研究院有限公司 | Method of Orientation Alignment of Steel Fibers in Ultra High Performance Concrete |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3925090A (en) * | 1974-03-28 | 1975-12-09 | James L Head | Cellular cement composition |
CN1096072A (en) * | 1993-05-29 | 1994-12-07 | 马杰 | Energy-saving composite wall deposited in situ and forming method thereof and device |
CN1031521C (en) * | 1993-11-22 | 1996-04-10 | 王全祥 | Medium-density gypsum fiber-planted partition boards, roof panels and composite panels made of partition boards |
US5609680A (en) * | 1992-12-21 | 1997-03-11 | Maeta Concrete Industry Ltd. | Cement, cement products, molding material, a concrete member and a method of producing the same |
CN1152653A (en) * | 1996-11-08 | 1997-06-25 | 温克义 | Concrete composite pouring forming technology |
CN2305454Y (en) * | 1997-08-14 | 1999-01-27 | 柏飞 | Disassembling-free framework for concrete column and beam |
CN2386102Y (en) * | 1999-06-09 | 2000-07-05 | 沈翔鸣 | External mould type sandwich cement form board |
CN1079475C (en) * | 1997-10-17 | 2002-02-20 | 北京亿利达轻体房屋有限公司 | New technology for form-stripping free cast-in-situ thermal-insulated load-bearing wall |
-
2005
- 2005-07-21 CN CNB2005100191391A patent/CN100359109C/en not_active Expired - Fee Related
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3925090A (en) * | 1974-03-28 | 1975-12-09 | James L Head | Cellular cement composition |
US5609680A (en) * | 1992-12-21 | 1997-03-11 | Maeta Concrete Industry Ltd. | Cement, cement products, molding material, a concrete member and a method of producing the same |
CN1096072A (en) * | 1993-05-29 | 1994-12-07 | 马杰 | Energy-saving composite wall deposited in situ and forming method thereof and device |
CN1031521C (en) * | 1993-11-22 | 1996-04-10 | 王全祥 | Medium-density gypsum fiber-planted partition boards, roof panels and composite panels made of partition boards |
CN1152653A (en) * | 1996-11-08 | 1997-06-25 | 温克义 | Concrete composite pouring forming technology |
CN2305454Y (en) * | 1997-08-14 | 1999-01-27 | 柏飞 | Disassembling-free framework for concrete column and beam |
CN1079475C (en) * | 1997-10-17 | 2002-02-20 | 北京亿利达轻体房屋有限公司 | New technology for form-stripping free cast-in-situ thermal-insulated load-bearing wall |
CN2386102Y (en) * | 1999-06-09 | 2000-07-05 | 沈翔鸣 | External mould type sandwich cement form board |
Also Published As
Publication number | Publication date |
---|---|
CN1715573A (en) | 2006-01-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN200968053Y (en) | Reinforced concrete detaching-free formwork | |
CN100359109C (en) | Construction process for building concrete structure and its used mould | |
CN104005502B (en) | A kind of precast light building cover board and industrialized building house floor slab structure | |
CN105484391A (en) | Construction method for manufacturing heat-preservation waterproof wall through light heat-preservation GRC disassembling-free formworks | |
CN106930431A (en) | A kind of combined type cavity EPS modules | |
CN113500690B (en) | Manufacturing process of UHPC outer wall decorative plate | |
CN109853956A (en) | Residential building construction method | |
CN108589975A (en) | Assembling cladding and construction technology | |
CN2232953Y (en) | Permanent combination building section mould | |
CN106381999A (en) | Fair-faced concrete wall intaglio character die plate construction method | |
CN105155836A (en) | Aluminum alloy formwork for buildings and method for applying aluminum alloy formwork | |
CN115749043A (en) | Assembled building wallboard connected node structure | |
CN214402295U (en) | Prefabricated formula concrete shear wall structure | |
CN113103427A (en) | Prefabricated assembled concrete exterior wall cladding and decorative layer mixed-striking method thereof | |
CN110374241B (en) | Floor bottom module, floor and method for constructing floor | |
CN101418602B (en) | In-situ casting construction method of reinforced concrete structural system using phosphogypsum as wall material | |
CN108394004A (en) | Mixing wallboard of assembled architecture plate and preparation method thereof | |
CN205476468U (en) | Non - design, can all rotary die plate bodys be prefabricated staircase bench template | |
CN214169600U (en) | Laminated floor slab | |
CN109505352A (en) | Integrated hollow wall assembly construction technology synchronous with concrete frame structure | |
CN112622025A (en) | Method for processing wall integrating structure, electromechanics and decoration | |
CN112659354A (en) | Machining method of structural electromechanical thermal insulation integrated wall | |
CN210658659U (en) | Split level prefabricated window and steel construction connected node of wafing | |
CN208052203U (en) | The mixing wallboard of assembled architecture plate | |
CN215717725U (en) | Prefabricated double-sided coincide enclosure of exempting from to tear open mould |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20080102 Termination date: 20110721 |