CN100341766C - Technology for exchanging hoisting cable wire of floor type friction hoist - Google Patents

Technology for exchanging hoisting cable wire of floor type friction hoist Download PDF

Info

Publication number
CN100341766C
CN100341766C CNB2003101053050A CN200310105305A CN100341766C CN 100341766 C CN100341766 C CN 100341766C CN B2003101053050 A CNB2003101053050 A CN B2003101053050A CN 200310105305 A CN200310105305 A CN 200310105305A CN 100341766 C CN100341766 C CN 100341766C
Authority
CN
China
Prior art keywords
rope
old
steel rope
new
chute board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2003101053050A
Other languages
Chinese (zh)
Other versions
CN1605558A (en
Inventor
侯宇刚
季海明
都波
刘亮
徐丙华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XUCHANG COAL MINE ZIBO MINING GROUP CO Ltd
Original Assignee
XUCHANG COAL MINE ZIBO MINING GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XUCHANG COAL MINE ZIBO MINING GROUP CO Ltd filed Critical XUCHANG COAL MINE ZIBO MINING GROUP CO Ltd
Priority to CNB2003101053050A priority Critical patent/CN100341766C/en
Publication of CN1605558A publication Critical patent/CN1605558A/en
Application granted granted Critical
Publication of CN100341766C publication Critical patent/CN100341766C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B19/00Mining-hoist operation
    • B66B19/02Installing or exchanging ropes or cables

Abstract

The present invention discloses a new process of replacing elevating wire ropes of a floor type friction elevator for mines. An old rope drives a new rope, the rope are changed in a slide way, namely that a steel slide plate is firstly placed on an elevating roller, the old wire rope is wound on the steel slide plate, the new wire rope is clamped and connected with the old wire rope, the old wire rope is recovered, the old wire rope drives the new wire rope to slide on the steel slide plate, and rope exchange is carried out. Therefore, the present invention has the characteristics of less occupied manpower, simple process, convenient operation, low labor strength, high efficiency, safety, etc.

Description

The floor type friction drive hoist is changed hoisting cable technology
One, affiliated technical field
The present invention relates to a kind of mine and change the technology of hoisting cable with the floor type friction drive hoist.
Two, background technology
At present, the floor type friction drive hoist used of mine more the change steel rope method common have two kinds: change the rope method and once change the rope method for twice.And concrete grammar is new steel rope to be entangled in advance change on the rope winch, new fag end is fixed on the lifter, start friction drive hoist and transfer lifting container, new fag end is brought to down the well head place, utilize then and change the rope winch old rope is put on, and utilize old fag end that new fag end band is crossed head sheave and friction winding cylinder.This technology has the following disadvantages:
When 1, transferring new rope because return rope along with transferring, so can not relax too much, change the rope winch speed must with the friction drive hoist speed synchronization, otherwise steel rope is easy to knotting.
2, new steel wire rope head must be crossed head sheave by the manpower band, labour intensity is big, and is very dangerous.
3, complex process, holding time is long.
Three, summary of the invention
The objective of the invention is for the floor type friction drive hoist provides a kind of technology of changing hoisting cable, it is few that this technology takies manpower, and technology is simple, easy to operate, labour intensity is low, efficient height, and safety.
Technical scheme of the present invention is: " newly restricting with old rope band; sliding type changes rope " technology, promptly place earlier iron chute board on elevator drum, the old steel rope that needs are changed is wrapped on the iron chute board, and new steel rope and old steel rope clamping is firm, reclaim old steel rope again, when collecting old steel rope, drive new steel rope by old steel rope, and on iron chute board, slide and change rope, finish the whole rope process of changing, its technological process is as follows:
Step 1: rope → step 2 on the stable car: settle iron chute board → step 3: the new and old rope of clamping → step 4: block old rope → step 5: change rope and divide rope → step 6: adjust and connect new rope.
Step 1: restrict on the stable car: new steel rope is wrapped on the stable car, and stable car can be arranged between heapstead and the winch room;
Step 2: settle iron chute board: iron chute board is placed on the cylinder of gig, and below old steel rope, old steel rope is pressed on the iron chute board equably, then iron chute board is fixed on the cylinder.Iron chute board should account for cylinder garden girth 2/3 and more than.The resistance that new for reducing, old steel rope slides on iron chute board can scribble lubrication oil on iron chute board.
Step 3: the new and old rope of clamping: new steel rope is walked around track adjusting wheel on the derrick, the becket bridle upside above the upper and lower lifting container of gig is firm with new steel rope and old steel rope clamping with wire line shoe.
Step 4: block old rope: respectively hang a cucurbit and hang above the hydraulic cylinder for adjusting rope of upper and lower lifting container, cucurbit hangs hydraulic cylinder for adjusting rope, then the old steel rope between wire line shoe and the becket bridle is blocked.
Step 5: change rope and divide rope, above the becket bridle of following lifting container, the downside of old rope butt installs and divides a rope device, the old cable wire end that blocks at following lifting container place is drawn down well head through a minute rope device, and begin to receive old steel rope, simultaneously put new steel rope with old steel rope at last well head, because of new, old steel rope is connected together by wire line shoe, new steel rope by old rope belt, transfer to following lifting container place through iron chute board, and old steel rope separates with new steel rope through minute rope device, and is all replaced out by new steel rope.
Step 6: adjust and connect new rope: new steel rope is transferred to following lifting container place, firm with the becket bridle stitch of following lifter, adjust the elasticity of new steel rope by handling stable car, gig, hydraulic cylinder for adjusting rope etc. then, after making it reach requirement, again new steel rope is connected firmly with becket bridle, the hydraulic cylinder for adjusting rope of upper and lower lifting container, and take out to divide that a rope device, cucurbit hang, iron chute board etc., change the rope process and finish.
Therefore, the present invention is connected on new wire line shoe on the old steel rope, collecting old steel rope simultaneously, drive new steel rope by old steel rope, finish and change the rope operation, in addition on the cylinder of gig, place iron chute board, when change steel rope more, newly, old steel rope slides on iron chute board, reduced resistance.Therefore, the present invention has that the manpower of taking is few, and technology is simple, and is easy to operate, and labour intensity is low, efficient is high, and characteristics such as safety.
Four, specific implementation method
The present invention be " with old rope band newly restrict, sliding type changes rope " a kind of technology of changing mine floor type friction drive hoist hoisting cable, be a kind of specific implementation method of this technology below.
Step 1: restrict on the stable car: earlier stable car is installed between heapstead and the winch room, the rope of new steel rope rolls and is placed on the appropriate location, start stable car, new steel rope is wrapped on the stable car, new steel rope is answered marshalling, tight on stable car, and restrict between the layer with the iron plate interval, in case the random layer of steel rope.
Step 2: settle iron chute board: upper and lower lifting container is stopped position supreme, that descend well head, personnel to be convenient to construct, to go up lifter rising certain altitude H again, this height H is 2/3 diameter of the cylinder of gig approximately, be placed on iron chute board on the cylinder and below old steel rope, descend at a slow speed then and go up lifter, old steel rope is pressed on the iron chute board equably, again iron chute board is fixed on the cylinder.On iron chute board, scribble lubrication oil.The width A of iron chute board should account for more than 2/3 of cylinder garden girth.
Step 3: the new and old rope of clamping: the new steel rope on the stable car is walked around gig after the track adjusting wheel on the derrick, with wire line shoe firmly and handle stable car, new steel rope is dragged tightly with new steel rope and old steel rope clamping.
Step 4: block old rope: handle the hydraulic cylinder for adjusting rope of going up lifting container earlier, make old steel rope lax, hang in cucurbit of hydraulic cylinder for adjusting rope overhung, cucurbit hangs hydraulic cylinder for adjusting rope, it is not tilted, will go up becket bridle on the lifting container and the old steel rope between the wire line shoe then and block.Above the becket bridle on the following lifting container, install the branch rope device again, and hang the hydraulic cylinder for adjusting rope of lifting container down in following cucurbit of hydraulic cylinder for adjusting rope overhung of lifting container, hydraulic cylinder for adjusting rope is not tilted, handle the hydraulic cylinder for adjusting rope of lifting container down, make old steel rope loose, will descend the becket bridle top of lifting container, the old steel rope of branch rope device below to block again.
Step 5: change rope and divide rope, old steel rope is unloaded from hydraulic cylinder for adjusting rope, becket bridle on the upper and lower lifting container, and the old cable wire end that divides the rope device below is drawn down well head, be wrapped on the cheese, collect old steel rope.Handle stable car simultaneously and transfer new steel rope, new steel rope, walk around iron chute board on the elevator drum, transfer new steel rope, transfer to lifting container place down until new cable wire end by old rope belt.And old steel rope separates with new steel rope through minute rope device, and is wrapped on the cheese.
Step 6: adjust and connect new rope: new steel rope is connected with becket bridle on the following lifting container, again by handling stable car, gig, hydraulic cylinder for adjusting rope etc., after making the elasticity of new steel rope reach requirement, new steel rope is connected firmly with becket bridle following, lifting container down, hydraulic cylinder for adjusting rope etc., withdraw from cucurbit then and hang, divide rope device, iron chute board to get final product.
This shows, because the present invention utilizes old steel rope to drive new steel rope, and is provided with iron chute board on cylinder, new, old steel rope is slided when changing rope on iron chute board, reduced resistance, also just alleviated labour intensity, thus the present invention to have a manpower of taking few, technology is simple, easy to operate, intensity is low, the efficient height, and safety etc. characteristics.

Claims (1)

1, the floor type friction drive hoist of a kind of " newly restricting with old rope band " is changed hoisting cable technology, it is characterized in that on elevator drum, placing earlier iron chute board, the old steel rope that needs are changed is wrapped on the iron chute board, new steel rope and old steel rope clamping is firm, reclaim old steel rope again, when collecting old steel rope, drive new steel rope and on iron chute board, slide by old steel rope, change rope; Its technological process is as follows: step 1: rope → step 2 on the stable car: settle iron chute board → step 3: the new and old rope of clamping → step 4: block old rope → step 5: change rope and divide rope → step 6: adjust and connect new rope;
Step 1: restrict on the stable car: new steel rope is wrapped on the stable car, and stable car can be arranged between heapstead and the winch room;
Step 2: settle iron chute board: iron chute board is placed on the cylinder of gig, and below old steel rope, old steel rope is pressed on the iron chute board equably, then iron chute board is fixed on the cylinder, iron chute board should account for cylinder garden girth 2/3 and more than, can on iron chute board, scribble lubrication oil;
Step 3: the new and old rope of clamping: new steel rope is walked around track adjusting wheel on the derrick, the becket bridle upside above the upper and lower lifting container of gig is firm with new steel rope and old steel rope clamping with wire line shoe;
Step 4: block old rope: respectively hang a cucurbit and hang above the hydraulic cylinder for adjusting rope of upper and lower lifting container, cucurbit hangs hydraulic cylinder for adjusting rope, then the old steel rope between wire line shoe and the becket bridle is blocked;
Step 5: change rope and divide rope, above the becket bridle of following lifting container, the downside of old rope butt installs and divides a rope device, the old cable wire end that blocks at following lifting container place is drawn down well head through a minute rope device, and begin to receive old steel rope, simultaneously put new steel rope with old steel rope, new steel rope, transfer to following lifting container place through iron chute board by old rope belt at last well head, and old steel rope separates with new steel rope through minute rope device, and is all replaced out by new steel rope;
Step 6: adjust and connect new rope: new steel rope is transferred to following lifting container place, firm with the becket bridle stitch at following lifter place, then by handling the elasticity of stable car, gig, the new steel rope of hydraulic cylinder for adjusting rope adjustment, after making it reach requirement, again new steel rope is connected firmly with becket bridle, the hydraulic cylinder for adjusting rope of upper and lower lifter, and taking-up divides, and rope device, cucurbit hang, iron chute board.
CNB2003101053050A 2003-10-10 2003-10-10 Technology for exchanging hoisting cable wire of floor type friction hoist Expired - Fee Related CN100341766C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2003101053050A CN100341766C (en) 2003-10-10 2003-10-10 Technology for exchanging hoisting cable wire of floor type friction hoist

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2003101053050A CN100341766C (en) 2003-10-10 2003-10-10 Technology for exchanging hoisting cable wire of floor type friction hoist

Publications (2)

Publication Number Publication Date
CN1605558A CN1605558A (en) 2005-04-13
CN100341766C true CN100341766C (en) 2007-10-10

Family

ID=34757251

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2003101053050A Expired - Fee Related CN100341766C (en) 2003-10-10 2003-10-10 Technology for exchanging hoisting cable wire of floor type friction hoist

Country Status (1)

Country Link
CN (1) CN100341766C (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101417765B (en) * 2008-11-22 2010-06-02 太原理工大学 First rope synchronous continuous replacement apparatus of hoister
CN101786570B (en) * 2010-03-17 2011-07-27 山东煤安矿山提升设备安装有限公司 Process for replacing hoisting ropes
CN105016184B (en) * 2015-07-08 2016-08-24 徐州九益科技有限公司 Vertical multirope friction winder process for replacing hoisting ropes
JP6288162B2 (en) * 2016-05-25 2018-03-07 三菱電機ビルテクノサービス株式会社 Adjustable rope replacement tool
CN107324231B (en) * 2017-07-25 2019-04-19 山西晋城无烟煤矿业集团有限责任公司 Endless rope winch wire rope distributing technique
CN109110624B (en) * 2018-09-26 2021-02-02 河北峪耳崖黄金矿业有限责任公司 Friction type winch first rope replacing device and using method thereof
CN109720965A (en) * 2018-12-14 2019-05-07 中国华冶科工集团有限公司 A kind of silo coal tub way steel rope replacing method and more changing device
CN109516356A (en) * 2019-01-11 2019-03-26 淮南矿业(集团)有限责任公司 The main method for replacing lifting ropes of multi-rope of mine
CN115285821B (en) * 2022-08-23 2024-01-19 山东里能鲁西矿业有限公司 System and method for quickly separating new and old steel wire ropes from each other and replacing ropes of multi-rope friction type elevator

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85201131U (en) * 1985-04-25 1986-12-31 上海冶金矿山机械厂 Friction type hoist with direct-connection and multirope
SU1493580A1 (en) * 1987-03-16 1989-07-15 Криворожский горнорудный институт Method of replacing leading rope of mine hoist
SU1533978A1 (en) * 1987-03-25 1990-01-07 Криворожский горнорудный институт Arrangement for replacing ropes in mine hoisting gears
SU1627492A1 (en) * 1988-03-30 1991-02-15 Криворожский горнорудный институт Method of replacing ropes in friction-pulley mine winder
JP2000143122A (en) * 1998-11-12 2000-05-23 Mitsubishi Electric Building Techno Service Co Ltd Main rope replacing method for side fork elevator
JP2002029678A (en) * 2000-07-12 2002-01-29 Mitsubishi Electric Building Techno Service Co Ltd Replacement method for elevator main rope
JP2002068637A (en) * 2000-08-29 2002-03-08 Mitsubishi Electric Building Techno Service Co Ltd Replacing method of elevator control cable

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85201131U (en) * 1985-04-25 1986-12-31 上海冶金矿山机械厂 Friction type hoist with direct-connection and multirope
SU1493580A1 (en) * 1987-03-16 1989-07-15 Криворожский горнорудный институт Method of replacing leading rope of mine hoist
SU1533978A1 (en) * 1987-03-25 1990-01-07 Криворожский горнорудный институт Arrangement for replacing ropes in mine hoisting gears
SU1627492A1 (en) * 1988-03-30 1991-02-15 Криворожский горнорудный институт Method of replacing ropes in friction-pulley mine winder
JP2000143122A (en) * 1998-11-12 2000-05-23 Mitsubishi Electric Building Techno Service Co Ltd Main rope replacing method for side fork elevator
JP2002029678A (en) * 2000-07-12 2002-01-29 Mitsubishi Electric Building Techno Service Co Ltd Replacement method for elevator main rope
JP2002068637A (en) * 2000-08-29 2002-03-08 Mitsubishi Electric Building Techno Service Co Ltd Replacing method of elevator control cable

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
多绳提升机换绳新方法 赵学义等,煤矿设计 1998 *
落地式多绳摩擦轮提升机换绳工艺介绍 董志刚等,煤矿现代化 1997 *
落地式多绳摩擦轮提升机换绳工艺探讨 董志刚等,煤矿自动化 1999 *

Also Published As

Publication number Publication date
CN1605558A (en) 2005-04-13

Similar Documents

Publication Publication Date Title
EP2016015B1 (en) Method for installing the hoisting roping of an elevator
CN100341766C (en) Technology for exchanging hoisting cable wire of floor type friction hoist
CN107500170B (en) Pulley lifting system and drilling platform thereof
CN101472826A (en) Roping method and apparatus
CN104590974A (en) Multi-rope composite type mine elevator
CN100436300C (en) Wire rope reeving support system for cargo container handling gantry cranes
CN101311099A (en) Vertical shaft friction winding rope-adjusting device and method
CN115285821A (en) System and method for quickly separating and replacing new steel wire rope and old steel wire rope of multi-rope friction type elevator
CN108190742A (en) A kind of operating method for replacing lifting equipment steel wire rope
CN101391721A (en) Novel technology for changing hoist steel wire rope of tower type friction winder
CN201183725Y (en) Crane rope winding system
JP2005138917A (en) Method for changing main rope on carrier, and main rope changing device
CN106044574A (en) Method for synchronously replacing gantry beam and steel wire ropes of ladle crane
CN201183702Y (en) Novel silo hoisting device using movable pulley
CN112607568A (en) Elevator steel wire rope replacing method
CN112374399A (en) Adjustable hoisting device for mechanical equipment maintenance
CN201325830Y (en) Cabin hanging and winding-proofing mechanism of shore bridge hanger lifting steel wire ropes
CN109019306B (en) A kind of method of quick-replaceable bridge crane single hook head
CN213802533U (en) Universal bridge crane
CN201942465U (en) Steel cable threading and winding system
JP5841929B2 (en) How to change the main rope of the elevator
CN220264947U (en) Anti-falling lifting hook of winch
CN2821128Y (en) Drilling machine derrick mounted on ground
CN110713092B (en) Hoisting method and hoisting mechanism for elevator synthetic fiber rope
CN219746274U (en) Draw and rectify quick-witted sideslip device and conticaster

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20071010

Termination date: 20121010