CH519976A - Production line for the continuous production of precast reinforced concrete parts, especially panels and beams - Google Patents

Production line for the continuous production of precast reinforced concrete parts, especially panels and beams

Info

Publication number
CH519976A
CH519976A CH200971A CH200971A CH519976A CH 519976 A CH519976 A CH 519976A CH 200971 A CH200971 A CH 200971A CH 200971 A CH200971 A CH 200971A CH 519976 A CH519976 A CH 519976A
Authority
CH
Switzerland
Prior art keywords
formwork
production
dependent
devices
hoods
Prior art date
Application number
CH200971A
Other languages
German (de)
Inventor
Gunia Klaus
Original Assignee
Remy Friedr Nfg
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Remy Friedr Nfg filed Critical Remy Friedr Nfg
Publication of CH519976A publication Critical patent/CH519976A/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations

Description

  

  
 



  Fertigungsanlage für die kontinuierliche Herstellung von Stahlbetonfertigteilen, insbesondere Platten und Trägern
Die Erfindung betrifft eine Fertigungsanlage zur Herstellung von Stahlbetonfertigungsteilen, insbesondere Platten und Trägern. Solche Betonfertigteile wurden bisher in Einzelschalungen hergestellt. Diese Fertigung erfordert viel Handarbeit und damit hohe Herstellungskosten. Ausserdem ist die Qualität der Betonfertigteile von Bedienungspersonen abhängig, so dass die Gefahr von Ausschuss gegeben ist.



   Der vorliegenden Erfindung liegt die Aufgabe zugrunde, eine wirtschaftliche und qualitativ einwandfreie Fertigung mit grösserer Leistung und geringeren Herstellungskosten zu erzielen. Dies soll durch eine kontinuierliche Herstellung solcher Betonfertigteile erreicht werden.



   Die insbesondere für die kontinuierliche Herstellung von Platten und Trägern bestimmte Fertigungsanlage nach der Erfindung ist gekennzeichnet durch mindestens eine feststehende, waagrechte, beheizte Schalungsbahn grösserer Länge, die auf einem Fundament gelagert ist, beidseitig längs dieser Schalungsbahn angeordnete Schienen, einen auf diesen Schienen verfahrbaren Betonverteiler zum Aufbringen und Verteilen des Frischbetons auf die Schalungsbahn, ein auf diesen Schienen kontinuierlich bewegtes Fertigungsaggregat, bestehend aus Verdichtern (Rüttelvorrichtung), Glätter und Gleitschalungen sowie einer schrittweise bewegten Trennvorrichtung, eine Vielzahl von wärmeisolierenden Abdeckhauben für die Schalungsbahn und eine synchron oder schrittweise mit dem Fertigungsaggregat bewegte Fördereinrichtung,

   welche die vor dem Fertigungsaggregat befindlichen Abdeckhauben nacheinander abhebt und hinter diesem Aggregat wieder auf die Schalungsbahn absetzt.



   Die Einzelheiten dieser Fertigungsanlage und deren Vorteile sind im folgenden anhand eines in der Zeichnung dargestellten Ausführungsbeispiels näher erläutert. Es zeigt:
Fig. 1 die Aufsicht auf eine Fertigungsanlage für Platten und Träger, in schematischer Darstellung,
Fig. 2 die Seitenansicht in Richtung II der Fig. 1 auf eine Schalungsbahn, Fertigungsgeräte und eine fahrbare Halle, teilweise im Schnitt,
Fig. 3 die Ansicht in Richtung III der Fig. 1 auf die Fertigungsanlage,
Fig. 4a die Seitenansicht auf das Fertigungsaggregat mit Gleitschalung,
Fig. 4b eine Aufsicht auf das Fertigungsaggregat mit Gleitschalung, in schematischer Darstellung,
Fig. 5 einen Querschnitt durch eine Schalungsbahn und Gleitschalungen zur Herstellung von L-förmigen Betonplatten,
Fig. 6 der gleiche Querschnitt mit einer Gleitschalung zur Herstellung von Betonplatten mit Rechteckquerschnitt,
Fig.

   7 den gleichen Querschnitt mit Gleitschalung zur Herstellung von T-Trägern,
Fig. 8 die Seitenansicht eines Versetzgerätes für Abdeckhauben nebst Reinigungsmaschine, in schematischer Darstellung,
Fig. 9 eine Stirnansicht in Richtung IX der Fig. 8 auf das Versetzgerät,
Fig. 10 bis 19 verschiedene Arbeitsstellungen dieses Versetzgerätes nebst Reinigungsmaschine.



   Bei der in der Zeichnung dargestellten, besonders vorteilhaften Fertigungsanlage sind in geringem Abstand voneinander zwei feststehende, waagrechte, beheizte Schalungsbahnen 1 und 2 grösserer Länge vorgesehen, die auf einem Fundament 3 gelagert sind. Beidseitig dieser Schalungsbahnen 1 und 2 sind Schienen 4 angeordnet, auf denen Fertigungsgeräte verfahrbar sind, insbesondere ein Betonverteiler 5 zum Aufbringen und Verteilen des Frischbetons auf die Schalungsbahn, ferner ein kontinuierlich bewegtes Fertigungsaggregat.



  Dieses besteht aus einem Verdichter 6 (Rüttelvorrichtung), einem Nachverdichter 7, einem Glätter 8 und den Gleitschalungen 9 bis 14. Zu diesem Fertigungsaggregat gehört ferner noch eine schrittweise bewegte Trennvorrichtung 15, die vorteilhaft ein lotrecht beweg- und in Rüttelschwingung versetzbares Trennmesser 16 aufweist. Der mit Pfeil C angedeutete freie Raum der Schalungsbahn dient zum Einlegen der Bewehrungskörbe.



   Zu der vorbeschriebenen Fertigungsanlage gehört ferner eine Vielzahl von wärmeisolierenden Abdeckhauben 17 für die Schalungsbahnen 1 und 2 und eine synchron oder schrittweise mit dem Fertigungsaggregat bewegte Fördereinrichtung 18 bis 20 (Fig. 2), mit welcher die vor dem Fertigungs  aggregat 6 bis 8 befindlichen Abdeckhauben 17 nacheinander abgehoben (Pfeil B) und hinter diesem Aggregat, wie mit Pfeil A angedeutet, wieder auf die Schalungsbahn abgesetzt werden. Für jede Schalungsbahn ist eine längs dieser auf Schienen 21 verfahrbare, das Fertigungsaggregat, die Fördereinrichtung und die Bedienungspersonen schützende Halle 22, 23 vorgesehen, die zusammen mit dem Fertigungsaggregat 6 bis 8, 15 synchron oder schrittweise bewegt wird.

  Dabei ist vorteilhaft bei dem gezeigten Ausführungsbeispiel die Fördereinrichtung 18 bis 20 an der Hallenkonstruktion angeordnet und so ausgeführt, dass die Abdeckhauben, wie mit Pfeil B angedeutet, gehoben und oberhalb des Fertigungsaggregates 6 bis 8, 15 oder auch seitlich von diesem Aggregat zur Absetzstelle gefördert werden. Dabei ist zweckmässig eine mit Saugkraft arbeitende Hubvorrichtung 18 vorgesehen, welche die Abdeckhauben auf eine waagrechte Förderbahn 19 (zweckmässig ein Bandförderer) bringt, welche die Hauben 17 auf die zweckmässig auch mit Saugkraft arbeitende Hubvorrichtung 20 bringt, welche die Hauben dann in Pfeilrichtung A auf die Schalungsbahn absetzt, so dass die auf dieser Schalungsbahn befindlichen Betonfertigteile mit diesen Hauben überdeckt sind.

  Die fahrbaren Hallen 22 und 23 haben demgemäss mehrfache Funktion: Sie bilden nicht nur einen Witterungsschutz für das Fertigungsaggregat, die Arbeiter und die Frischbeton-Fertigteile, sondern dienen gleichzeitig auch mit der Fördereinrichtung 18 bis 20 zum Transport der Abdeckhauben 17. Sie dienen ferner zur Energieversorgung der Fertigungsgeräte. Dabei kann ein Stromzuführungskabel längs der Schalungsbahnen angeordnet sein, von welchem der Strom durch einen Stromabnehmer in die Hallen 22, 23 geführt wird.



   Vorteilhaft bestehen die Schalungsbahnen 1, 2 aus Beton und sind mit eingebauten Heizelementen, z. B. Heizrohren 24 für Warmwasser oder Dampf versehen. Um einen Wärmeverlust zu verhindern, ist die Unterseite jeder Schalungsbahn mit einer Isolierschicht 25 versehen. Die Schalungsbahn besteht ferner vorteilhaft aus Betonfertigteilen, die mit höhenverstellbaren Stützen, z.B. Schraubenbolzen, wie bei 26 angedeutet, versehen sind. Mit diesen verstellbaren Stützen können die einzelnen Bahnenteile waagrecht in Quer- und Längsrichtung genau ausgerichtet werden. Dabei wird vorteilhaft die gesamte Schalungsbahn in einem Abstand a über dem Fundament 3 angeordnet. Der so gebildete Zwischenraum wird nachträglich mit einer elastischen, isolierenden Masse, z.B. Polyurethanschaum, ausgegossen.

  Diese elastische, nicht nur zur Isolierung, sondern vor allem zur Schwingungsdämpfung vorgesehene Schicht ist bei 27 angedeutet. Es soll damit verhindert werden, dass die vom Rüttler 6 auf die Schalungsbahnen 1 und 2 wirkenden Schwingungen auf das Fundament und die Schienen 4 und damit auf die Gleitschalungen 9 bis 13 übertragen werden. Durch die ausserdem vorgesehene getrennte Anordnung der Gleitschalungen von der Rüttelvorrichtung 6 werden also schädliche Schwingungen dieser Gleitschalungen und damit eine Beschädigung der frischgeformten Platten oder Träger vermieden.



   Wie aus der Zeichnung hervorgeht, besteht jede Schalungsbahn aus einer ebenen Platte 28 und seitlichen, nach unten ragenden und sich, wie vorbeschrieben, auf dem Fundament 3 abstützenden Winkeln 29. An diesen ist eine äussere, lotrechte Schalungswand 30 vorgesehen, so dass, wie in Fig. 5 bis 7 veranschaulicht, mit entsprechenden Gleitschalungen auf ein und derselben Schalungsbahn Platten und Träger verschiedenen Querschnitts herstellbar sind. So ist es möglich, gemäss Fig. 6 mit Hilfe der seitlichen Gleitschalung 9 und der mittleren Gleitschalung 10 zwei Reihen von Betonplatten 31 mit Rechteckquerschnitt herzustellen. Gemäss Fig. 5 ist es anderseits möglich, mit Hilfe der Gleitschalungen 11 und 12 zwei Reihen von L-förmigen Betonplatten 32 zu fertigen.



  Ausserdem können gemäss Fig. 7 mit Hilfe der Gleitschalungen 13 und 14 auch T-Träger 33 hergestellt werden.



   Wie aus der Zeichnung, insbesondere Fig. 4, hervorgeht, sind die Gleitschalungen 9 und 10 (gemäss Fertigung nach Fig. 6) auf einem eigenen Fahrgestell 34 gelagert, im gleichen Sinne die Gleitschalungen nach Fig. 5 und 7 auf einem Fahrgestell 34a, 34b. Wie aus Fig. 4a und 4b hervorgeht, sind vorteilhaft die beiden Verdichter 6 und 7 sowie auch der Glätter 8 als gleiche austauschbare Baueinheiten ausgeführt.



  Diese sind untereinander, z.B. durch Winkeiprofilstangen 45, miteinander verbunden, also gekoppelt. Dieses aus den Einheiten 6 bis 8 bestehende Aggregat ist ferner mit dem Fahrgestell 34 der Gleitschalungen 9, 10 (bzw. 11, 12/13, 14) gekoppelt. Zu diesem Zweck können an den Stangen 45 U-Stücke 46 befestigt sein, welche die lotrechten Pfosten des Fahrgestells 34 umgreifen, so dass also bei der Vor- oder Rückwärtsbewegung des Aggregats 6 bis 8 das Fahrgestell 34 mitgenommen wird. Es sind ausserdem noch zwischen den U-Stücken 46 und den lotrechten Pfosten des Fahrgestells 34 elastische Puffer 35 (zweckmässig ebenfalls in U-Profilform) vorgesehen.

  Durch diese Anordnung wird gewährleistet, dass schädliche, insbesondere von den Rüttlern 6 und 7 erzeugte Rüttelbewegungen nicht auf die Gleitschalungen 9 bis 14 übertragen werden, so dass diese also völlig in Ruhe bleiben und eine Beschädigung der frischen Betonfertigteile nicht eintreten kann. Dank dieser Anordnung und auch der schwingungsdämpfenden Zwischenschicht 27 ist es möglich, das Fertigungsaggregat 6 bis 8 zusammen mit den Gleitschalungen mit einer sehr hohen Geschwindigkeit von etwa 1 m/min und mehr zu bewegen, also eine hohe Leistung dieser Fertigungsanlage zu erzielen.



   Die vorbeschriebene, mit einem Trennschwert 16 arbeitende Trennvorrichtung 15 wird mit dem Fertigungsaggregat 6 bis 8 synchron bewegt. Sie wird durch einen Anschlag, z. B.



  einen an den Schalungen 30 verstellbar angeordneten Haftmagneten, gestoppt, so dass dann durch Absenken des Trennschwertes 16 der Frischbetonteil auf die gewünschte Länge abgetrennt wird. Nach diesem Trennvorgang wird die Vorrichtung 15 wieder in Bewegung gesetzt, bis sie das Aggregat 6 bis 8 erreicht hat und mit diesem sich synchron weiterbewegt.



   Die wirtschaftliche Fertigung von Betonfertigteilen wird noch durch ein in Fig. 8, 9 dargestelltes, auf den Längsschienen 4 verfahrbares Haubenversetzgerät verbessert, welches Hubvorrichtungen derart aufweist, dass diese das gleichzeitige Abheben mehrerer Abdeckhauben 17 und das Verfahren derselben über die noch auf der Schalungsbahn befindlichen Hauben ermöglicht. Bei der gezeigten vorteilhaften Ausbildung weist dieses Versetzgerät mehrere gleiche, koppelbare Einzelgeräte 36 auf, deren Hubvorrichtung vorteilhaft aus mehreren Saughebern 37 besteht, die, wie aus der Zeichnung ersichtlich, die Abdeckhauben 17 in die gestrichelt gezeichnete Lage 17' heben können. Die dargestellten drei Einzelversetzgeräte 36 weisen eine Gesamtlänge auf, die der Länge des grössten zu fertigenden Betonteils (z.B. 15 m) entspricht.

 

  Hinter diesen koppelbaren Versetzgeräten 36 ist eine längs der Schalungsbahn verfahrbare Reinigungsmaschine 38 für diese Bahn angeordnet. Diese Maschine ist, wie in Fig. 6 angedeutet, mit Rollen 39 auf den äusseren Schalungswänden
30 verfahrbar, also unabhängig von den Versetzgeräten 36.



  Vorteilhaft ist ferner hinter den koppelbaren Versetzgeräten 36 ein selbständiges, kurzes Versetzgerät 40 angeordnet, unter welchem sich das Reinigungsgerät 38 in der Grundstellung befindet, in welcher das kurze Versetzgerät einen Anschlag 41 für die Versetzgeräte 36 bildet.



   Die Arbeitsweise dieser Haubenversetzgeräte und Reinigungsmaschine ist in den Fig. 10 bis 19 veranschaulicht. Von  der Schalungsbahn sind die genügend erhärteten Fertigteile 31/33 zu entfernen, die noch von den Hauben 17 abgedeckt sind. Zu diesem Zweck heben die Versetzgeräte 36 die darunter befindlichen Hauben 17 so hoch, dass sie dann mit diesen Versetzgeräten in die Stellung nach Fig. 11 gefahren werden, sich also die gehobenen Hauben über den auf der Bahn verbleibenden Hauben 17 befinden. Mit einem Kran, z.B. einem Portalkran 42, werden dann die freigelegten Fertigteile 31/33 von der Schalungsbahn abgehoben. Es wird dann die Reinigungsmaschine 38 in Bewegung gesetzt, bis sie die in Fig. 12 gezeigte Stellung erreicht und damit die Schalungsbahn gesäubert hat. Daraufhin fahren die Versetzungsgeräte 36 wieder in ihre Ausgangsstellung zurück, wie in Fig. 13 gezeigt.

  Dabei dient das kurze Versetzgerät 40 als Anschlag für die Geräte 36, womit das genaue Absetzen der Hauben 17 in ihrer richtigen Lage (Fig. 5) gewährleistet wird. Bei diesem Absetzen der Hauben mittels der Huborgane 37 wird eine Haube 17 über der Reinigungsmaschine abgesetzt. Nun fahren gemäss Fig. 15 die Versetzgeräte 36 und das kurze Gerät 40 so weit vor, bis das kurze Gerät 40 wieder über der Reinigungsmaschine 38 steht. Die Versetzgeräte 36 nehmen nun wieder gleichzeitig mehrere (bei diesem Beispiel sechs) Hauben 17 auf und fahren in die Stellung nach Fig. 16. Der Kran hebt wiederum die freigelegten Fertigteile 31/33 ab, und es wird vom Gerät 40 die auf der Reinigungsmaschine stehende Abdeckhaube 17 angehoben. Nach Fig. 8 beginnt nun die Reinigungsmaschine wieder ihre Arbeit, während das Gerät 40 die Haube 17 auf die gesäuberte Betonbahn absetzt.

  Nach Fig. 9 ist die Reinigungsmaschine an den noch abgedeckten Fertigteilen angekommen. Gemäss Fig. 19 bringen die Versetzgeräte 16 die Hauben 17 wieder in ihre Ausgangsstellung und setzen diese wieder auf die Schalungsbahn ab, so dass damit wieder die Lage nach Fig. 13 erreicht ist.



   Bei der in der Zeichnung (insbesondere Fig. 1) dargestellten vorteilhaften Ausführung kann bei Anordnung von zwei (event. auch mehr) Schalungsbahnen 1 und 2 nebeneinander mit nur einem Satz von Fertigungsgeräten ausgekommen werden. Dabei beginnen z. B. die Fertigungsgeräte auf der Bahn 1 und bewegen sich mit der zugehörigen Halle 22 von links nach rechts. Die Fertigungsgeräte 5, 6 bis 8, 15 werden dann, z.B. mittels Portalkran 42, von der Bahn 1 auf die Schalungsbahn 2 gesetzt, so dass dann hier diese Fertigungsgeräte zusammen mit der Halle 23 von rechts nach links auf der Bahn 2 arbeiten. Bei einer Länge der Schalungsbahn von beispielsweise 240 m und einer Geschwindigkeit des Fertigungsaggregates von etwa 1 m/min nimmt diese Fertigung auf zwei Bahnen etwa 8 Stunden in Anspruch.

  Durch die Heizung der Schalungsbahn sind dann die Betonfertigteile so erhärtet, dass sie von den Bahnen abgehoben werden können. Zu diesem Zweck beginnt (siehe Fig. 1) das Haubenversetzgerät 36, 40 nebst Reinigungsmaschine in der angegebenen Pfeilrichtung seine Arbeit. Es können dann die Fertigungsgeräte von der Bahn 2 wieder auf die Bahn 1 versetzt werden, so dass dann diese Fertigungsgeräte zusammen mit der Halle 22 den Versetzgeräten 36, 40 nachlaufen. Auf diese Weise kann im Kreislauf sehr wirtschaftlich gefertigt und eine hohe Leistung erzielt werden.



   Mit der Fertigungsanlage können nicht nur Platten und Träger aus Stahlbeton, sondern gegebenenfalls auch aus Spannbeton hergestellt werden, wobei das vorerwähnte Trennmesser 15 dann kammartig ausgebildet ist, um den zwischen den gespannten Drähten liegenden Frischbeton zu trennen. Mit der erfindungsgemässen Fertigungsanlage können Fertigteile sowohl aus Schwerbeton als auch Leichtbeton   (z. B.    Bimsbeton) hergestellt werden.



   Die neue Fertigungsanlage erfordert nur verhältnismässig geringe Investitionen, da alle Geräte voll ausgenutzt werden können. Da für lange Schalungsbahnen nur fahrbare, verhältnismässig kurze Hallen erforderlich sind, so sind auch deren Kosten sowie auch die Schalungskosten niedrig. Die Schalungsbahnen aus Beton stellen mit ihrer grossen Masse einen guten Wärmespeicher dar und ergeben also optimale Härtungsbedingungen für die Fertigteile. Für die gesamten vorerwähnten Transportarbeiten genügt ein einziger Kran, der als Portalkran ausgebildet sein kann und gegebenenfalls auch, wie in Fig. 2 und 3 angedeutet, zum Antransport des in einer Mischanlage 43 erzeugten Frischbetons dienen, der in einem Betonkübel 44 befördert wird, um dann den Frischbeton in den Betonverteiler 5 zu entladen.

 

   Die erfindungsgemässe Fertigungsanlage hat ferner den grossen Vorzug, dass die Fertigung von Stahlbetonbauelementen auch im Winter möglich ist. Um eine Schnee- und Eisbildung auf den in Fig. 3 bei 3a angedeuteten Gehbahnen für die Bedienungspersonen zu verhindern, können diese Gehbahnen ebenfalls wie die Schalungsbahnen beheizt werden. 



  
 



  Production line for the continuous production of precast reinforced concrete parts, especially panels and beams
The invention relates to a production plant for the production of reinforced concrete production parts, in particular panels and beams. Such precast concrete parts were previously produced in individual formwork. This production requires a lot of manual labor and thus high manufacturing costs. In addition, the quality of the precast concrete parts depends on the operators, so that there is a risk of rejects.



   The present invention is based on the object of achieving economical and qualitatively flawless production with greater performance and lower production costs. This is to be achieved through a continuous production of such precast concrete parts.



   The production plant according to the invention, which is intended in particular for the continuous production of panels and supports, is characterized by at least one fixed, horizontal, heated formwork track of greater length, which is mounted on a foundation, rails arranged on both sides along this formwork track, a concrete distributor that can be moved on these rails Application and distribution of the fresh concrete on the formwork sheet, a production unit that moves continuously on these rails, consisting of compressors (vibrator), smoothers and sliding formwork as well as a step-by-step separating device, a large number of heat-insulating covers for the formwork sheet and one that is moved synchronously or step-by-step with the production unit Conveyor,

   which lifts the hoods located in front of the production unit one after the other and sets it down again on the formwork sheet behind this unit.



   The details of this manufacturing plant and its advantages are explained in more detail below with reference to an exemplary embodiment shown in the drawing. It shows:
Fig. 1 is a plan view of a production plant for plates and carriers, in a schematic representation,
FIG. 2 shows the side view in direction II of FIG. 1 of a formwork sheet, manufacturing equipment and a mobile hall, partly in section.
FIG. 3 shows the view in the direction III of FIG. 1 of the manufacturing plant,
4a shows the side view of the production unit with sliding formwork,
4b shows a plan view of the production unit with sliding formwork, in a schematic representation,
5 shows a cross section through a formwork sheet and sliding formwork for the production of L-shaped concrete slabs,
6 shows the same cross-section with sliding formwork for the production of concrete slabs with a rectangular cross-section,
Fig.

   7 the same cross-section with sliding formwork for the production of T-beams,
8 shows the side view of a displacing device for cover hoods together with a cleaning machine, in a schematic representation,
FIG. 9 shows an end view in the direction IX of FIG. 8 onto the displacement device,
10 to 19 different working positions of this relocating device together with the cleaning machine.



   In the particularly advantageous production plant shown in the drawing, two stationary, horizontal, heated formwork sheets 1 and 2 of greater length are provided at a short distance from one another and are mounted on a foundation 3. Rails 4 are arranged on both sides of these formwork sheets 1 and 2, on which production equipment can be moved, in particular a concrete distributor 5 for applying and distributing the fresh concrete onto the formwork sheet, and also a continuously moving production unit.



  This consists of a compressor 6 (vibrator), a secondary compressor 7, a smoothing machine 8 and the sliding formworks 9 to 14. This manufacturing unit also includes a step-by-step separating device 15, which advantageously has a vertically movable separating knife 16 that can be vibrated. The free space of the formwork membrane indicated by arrow C is used to insert the reinforcement cages.



   The above-described production plant also includes a large number of heat-insulating covers 17 for the formwork sheets 1 and 2 and a conveying device 18 to 20 (FIG. 2) that is moved synchronously or step-by-step with the production unit, with which the cover units 17 located in front of the production unit 6 to 8 lifted off one after the other (arrow B) and placed behind this unit, as indicated by arrow A, back onto the formwork membrane. A hall 22, 23, which can be moved along it on rails 21 and which protects the production unit, the conveyor and the operators, is provided for each formwork path and is moved synchronously or stepwise with the production unit 6 to 8, 15.

  In the embodiment shown, the conveying device 18 to 20 is advantageously arranged on the hall structure and designed so that the cover hoods, as indicated by arrow B, are lifted and conveyed above the production unit 6 to 8, 15 or to the side of this unit to the depositing point . A lifting device 18 working with suction is expediently provided, which brings the hoods onto a horizontal conveyor track 19 (suitably a belt conveyor), which brings the hoods 17 to the lifting device 20, which also works expediently with suction, which then moves the hoods in the direction of arrow A onto the Formwork sheet settles so that the precast concrete parts located on this formwork sheet are covered with these hoods.

  The mobile halls 22 and 23 accordingly have multiple functions: They not only provide weather protection for the production unit, the workers and the fresh concrete prefabricated parts, but also serve, together with the conveyors 18 to 20, to transport the covers 17. They also serve to supply energy of manufacturing equipment. A power supply cable can be arranged along the formwork tracks, from which the power is led through a current collector into the halls 22, 23.



   The formwork sheets 1, 2 are advantageously made of concrete and are equipped with built-in heating elements, e.g. B. provided heating pipes 24 for hot water or steam. In order to prevent heat loss, the underside of each form sheet is provided with an insulating layer 25. The formwork sheet also advantageously consists of precast concrete parts which are provided with height-adjustable supports, e.g. Screw bolts, as indicated at 26, are provided. With these adjustable supports, the individual track parts can be precisely aligned horizontally in the transverse and longitudinal directions. The entire formwork sheet is advantageously arranged at a distance a above the foundation 3. The space thus formed is subsequently covered with an elastic, insulating compound, e.g. Polyurethane foam, poured out.

  This elastic layer, which is provided not only for insulation, but above all for vibration damping, is indicated at 27. This is intended to prevent the vibrations acting on the formwork tracks 1 and 2 by the vibrator 6 from being transmitted to the foundation and the rails 4 and thus to the sliding formworks 9 to 13. Due to the separate arrangement of the sliding formwork from the vibrating device 6, which is also provided, harmful vibrations of these sliding formworks and thus damage to the freshly formed panels or carriers are avoided.



   As can be seen from the drawing, each shuttering sheet consists of a flat plate 28 and lateral, downwardly protruding and, as described above, brackets 29 supported on the foundation 3. An outer, vertical shuttering wall 30 is provided on this, so that, as in Fig. 5 to 7 illustrates, with corresponding sliding formwork panels and beams of different cross-sections can be produced on one and the same formwork sheet. It is thus possible, according to FIG. 6, to produce two rows of concrete slabs 31 with a rectangular cross section with the aid of the lateral sliding formwork 9 and the central sliding formwork 10. According to FIG. 5, on the other hand, it is possible to manufacture two rows of L-shaped concrete slabs 32 with the aid of the sliding formwork 11 and 12.



  In addition, according to FIG. 7, T-beams 33 can also be produced with the aid of the sliding formworks 13 and 14.



   As can be seen from the drawing, in particular FIG. 4, the sliding formworks 9 and 10 (according to production according to FIG. 6) are mounted on their own chassis 34, in the same way the sliding formworks according to FIGS. 5 and 7 are mounted on a chassis 34a, 34b . As can be seen from FIGS. 4a and 4b, the two compressors 6 and 7 and also the smoother 8 are advantageously designed as the same exchangeable structural units.



  These are among themselves, e.g. by angle profile rods 45, connected to one another, that is, coupled. This unit consisting of the units 6 to 8 is also coupled to the chassis 34 of the sliding formwork 9, 10 (or 11, 12/13, 14). For this purpose, U-pieces 46 can be attached to the rods 45, which encompass the vertical posts of the chassis 34, so that the chassis 34 is carried along when the unit 6 to 8 moves forwards or backwards. There are also provided between the U-pieces 46 and the vertical posts of the chassis 34 elastic buffers 35 (also expediently in a U-profile shape).

  This arrangement ensures that harmful shaking movements, in particular generated by the vibrators 6 and 7, are not transferred to the sliding formworks 9 to 14, so that they remain completely at rest and the fresh precast concrete parts cannot be damaged. Thanks to this arrangement and also the vibration-damping intermediate layer 27, it is possible to move the production unit 6 to 8 together with the sliding formwork at a very high speed of about 1 m / min and more, i.e. to achieve a high performance of this production system.



   The previously described cutting device 15, which operates with a cutting blade 16, is moved synchronously with the production unit 6 to 8. It is through a stop, z. B.



  a holding magnet adjustably arranged on the formwork 30, so that the fresh concrete part is then separated to the desired length by lowering the cutting blade 16. After this separation process, the device 15 is set in motion again until it has reached the unit 6 to 8 and continues to move synchronously therewith.



   The economical production of precast concrete parts is further improved by a hood relocating device, shown in FIGS. 8, 9, which can be moved on the longitudinal rails 4 and which has lifting devices such that they simultaneously lift off several hoods 17 and move them over the hoods that are still on the formwork track enables. In the advantageous embodiment shown, this relocating device has several identical, connectable individual devices 36, the lifting device of which advantageously consists of several suction lifters 37 which, as can be seen from the drawing, can lift the covers 17 into the position 17 'shown in dashed lines. The three individual moving devices 36 shown have a total length which corresponds to the length of the largest concrete part to be produced (e.g. 15 m).

 

  A cleaning machine 38 for this path, which can be moved along the formwork path, is arranged behind these couplable displacement devices 36. As indicated in FIG. 6, this machine is provided with rollers 39 on the outer formwork walls
30 can be moved, that is to say independently of the relocating devices 36.



  An independent, short displacement device 40 is also advantageously arranged behind the connectable displacement devices 36, under which the cleaning device 38 is in the basic position, in which the short displacement device forms a stop 41 for the displacement devices 36.



   The operation of these hood relocators and cleaning machines is illustrated in FIGS. 10-19. The sufficiently hardened prefabricated parts 31/33 that are still covered by the hoods 17 must be removed from the formwork membrane. For this purpose, the relocating devices 36 lift the hoods 17 located below them so high that they are then moved with these relocating devices into the position according to FIG. 11, that is to say the raised hoods are located above the hoods 17 remaining on the track. With a crane, e.g. a portal crane 42, the exposed prefabricated parts 31/33 are then lifted from the formwork sheet. The cleaning machine 38 is then set in motion until it has reached the position shown in FIG. 12 and has thus cleaned the formwork sheet. The relocation devices 36 then move back into their starting position, as shown in FIG.

  The short displacing device 40 serves as a stop for the devices 36, which ensures that the hoods 17 are precisely set down in their correct position (FIG. 5). When the hoods are lowered by means of the lifting members 37, a hood 17 is lowered over the cleaning machine. Now, according to FIG. 15, the displacement devices 36 and the short device 40 advance so far that the short device 40 is again above the cleaning machine 38. The relocating devices 36 now take on several (in this example six) hoods 17 again at the same time and move into the position according to FIG. 16. The crane in turn lifts the exposed prefabricated parts 31/33, and the device 40 becomes the one standing on the cleaning machine Cover 17 raised. According to FIG. 8, the cleaning machine begins its work again, while the device 40 places the hood 17 on the cleaned concrete track.

  According to FIG. 9, the cleaning machine has arrived at the finished parts that are still covered. According to FIG. 19, the relocating devices 16 bring the hoods 17 back into their starting position and place them back on the formwork sheet, so that the position according to FIG. 13 is again reached.



   In the advantageous embodiment shown in the drawing (in particular FIG. 1), when two (possibly even more) formwork sheets 1 and 2 are arranged next to one another, only one set of manufacturing devices can be used. Start z. B. the manufacturing equipment on the track 1 and move with the associated hall 22 from left to right. The manufacturing devices 5, 6 to 8, 15 are then, e.g. by means of a gantry crane 42, placed from track 1 onto formwork track 2, so that these production devices work here together with hall 23 from right to left on track 2. With a length of the formwork web of, for example, 240 m and a speed of the production unit of around 1 m / min, this production on two webs takes around 8 hours.

  By heating the formwork membrane, the precast concrete parts are then hardened in such a way that they can be lifted off the membranes. For this purpose (see FIG. 1) the hood relocating device 36, 40 together with the cleaning machine begins its work in the indicated arrow direction. The manufacturing devices can then be relocated from track 2 to track 1, so that these manufacturing devices follow the relocating devices 36, 40 together with hall 22. In this way, it is possible to manufacture very economically in the cycle and achieve high performance.



   With the production plant, not only plates and girders can be made of reinforced concrete, but also, if necessary, of prestressed concrete, the above-mentioned cutting knife 15 then being designed like a comb in order to separate the fresh concrete lying between the tensioned wires. With the production plant according to the invention, prefabricated parts can be produced from both heavy and lightweight concrete (e.g. pumice concrete).



   The new production plant requires only a relatively small investment, since all devices can be fully utilized. Since only mobile, relatively short halls are required for long formwork tracks, their costs as well as the formwork costs are low. With their large mass, the formwork sheets made of concrete represent a good heat store and therefore result in optimal curing conditions for the precast elements. A single crane is sufficient for all of the aforementioned transport work, which can be designed as a gantry crane and, if necessary, as indicated in FIGS unload the fresh concrete into the concrete distributor 5.

 

   The production plant according to the invention also has the great advantage that the production of reinforced concrete structural elements is also possible in winter. In order to prevent the formation of snow and ice on the walkways indicated at 3a in FIG. 3 for the operators, these walkways can also be heated like the formwork sheets.

 

Claims (1)

PATENTANSPRUCH PATENT CLAIM Fertigungsanlage für die kontinuierliche Herstellung von Stahlbetonfertigteilen, insbesondere Platten und Trägern, gekennzeichnet durch mindestens eine feststehende, waagrechte, beheizte Schalungsbahn (1, 2) grösserer Länge, die auf einem Fundament (3) gelagert ist, beidseitig längs dieser Schalungsbahn angeordnete Schienen (4), einen auf diesen Schienen verfahrbaren Betonverteiler (5) zum Aufbringen und Verteilen des Frischbetons auf die Schalungsbahn, ein auf diesen Schienen kontinuierlich bewegtes Fertigungsaggregat, bestehend aus Verdichtern (6, 7), Glätter (8) und Gleitschalungen (9 bis 14) sowie einer schrittweise bewegten Trennvorrichtung (15), eine Vielzahl von wärmeisolierenden Abdeckhauben (17) für die Schalungsbahn und eine synchron oder schrittweise mit dem Fertigungsaggregat bewegte Fördereinrichtung (18 bis 20), Production plant for the continuous production of precast reinforced concrete parts, in particular panels and girders, characterized by at least one fixed, horizontal, heated formwork track (1, 2) of greater length, which is supported on a foundation (3), rails (4) arranged on both sides along this formwork track , a concrete spreader (5) that can be moved on these rails for applying and distributing the fresh concrete onto the formwork track, a production unit that moves continuously on these rails and consists of compactors (6, 7), smoothers (8) and sliding formworks (9 to 14) and one stepwise moving separating device (15), a plurality of heat-insulating cover hoods (17) for the formwork sheet and a conveyor device (18 to 20) moved synchronously or step-by-step with the production unit, welche die vor dem Ferti gungsaggregat befindlichen Abdeckhauben nacheinander abhebt und hinter diesem Aggregat wieder auf die Schalungsbahn absetzt. which lifts the hoods located in front of the production unit one after the other and sets it back on the formwork sheet behind this unit. UNTERANSPRÜCHE 1. Fertigungsanlage nach Patentanspruch, dadurch gekennzeichnet, dass für jede Schalungsbahn (1, 2) eine längs dieser verfahrbare, das Fertigungsaggregat (6 bis 8,15), die Fördereinrichtung und die Bedienungspersonen schützende Halle (22, 23) angeordnet ist, die zusammen mit dem Fertigungsaggregat bewegt wird. SUBCLAIMS 1. Production system according to claim, characterized in that for each formwork sheet (1, 2) a movable along this, the production unit (6 to 8.15), the conveyor and the operators protecting hall (22, 23) is arranged, which together is moved with the production unit. 2. Fertigungsanlage nach Unteranspruch 1, dadurch gekennzeichnet, dass die Fördereinrichtung (18 bis 20) an der Hallenkonstruktion (22, 23) angeordnet und so ausgeführt ist, dass die Abdeckhauben (17) gehoben und oberhalb des Fertigungsaggregates (6 bis 8,15) zur Absetzstelle (A) gefördert werden. 2. Production system according to dependent claim 1, characterized in that the conveyor device (18 to 20) is arranged on the hall structure (22, 23) and is designed so that the cover hoods (17) are lifted and above the production unit (6 to 8.15) to the deposition point (A). 3. Fertigungsanlage nach Patentanspruch, dadurch gekennzeichnet, dass die Schalungsbahn (1, 2) aus Beton mit eingebauten Heizelementen (24) besteht und die Unterseite der Schalungsbahn mit einer Isolierschicht (25) versehen ist. 3. Production system according to claim, characterized in that the formwork sheet (1, 2) consists of concrete with built-in heating elements (24) and the underside of the formwork sheet is provided with an insulating layer (25). 4. Fertigungsanlage nach Unteranspruch 3, dadurch gekennzeichnet, dass die Schalungsbahn aus Betonfertigteilen besteht und diese höhenverstellbare Stützen (26) zum Aus echten aufweisen. 4. Manufacturing plant according to dependent claim 3, characterized in that the formwork sheet consists of precast concrete parts and these have height-adjustable supports (26) for real. 5. Fertigungsanlage nach Unteranspruch 3 oder 4, dadurch gekennzeichnet, dass zwischen der Schalungsbahn (1, 2) und dem Fundament (3) eine elastische, isolierende Schicht (27) angeordnet ist. 5. Manufacturing plant according to dependent claim 3 or 4, characterized in that an elastic, insulating layer (27) is arranged between the formwork sheet (1, 2) and the foundation (3). 6. Fertigungsanlage nach Unteranspruch 3, dadurch gekennzeichnet, dass die Schalungsbahn (1, 2) aus einer ebenen Platte (28) und seitlichen, nach unten ragenden und sich auf dem Fundament (3) abstützenden Winkeln (29) besteht, die je eine äussere lotrechte Schalungswand (30) aufweisen, so dass mit entsprechenden Gleitschalungen (9 bis 14) sowohl im Querschnitt rechteckige als auch L-förmige Platten (31, 32) bzw. auch T-förmige Träger (33) herstellbar sind. 6. Manufacturing plant according to dependent claim 3, characterized in that the formwork sheet (1, 2) consists of a flat plate (28) and lateral, downwardly protruding and on the foundation (3) brackets (29) supported, each one outer have vertical formwork wall (30), so that with corresponding sliding formwork (9 to 14) both rectangular and L-shaped plates (31, 32) and also T-shaped beams (33) can be produced. 7. Fertigungsanlage nach Patentanspruch, dadurch gekennzeichnet, dass die Gleitschalungen (9 bis 14) auf einem eigenen Fahrgestell (34, 34a, 34b) gelagert sind. 7. Manufacturing plant according to claim, characterized in that the sliding formwork (9 to 14) are mounted on their own chassis (34, 34a, 34b). 8. Fertigungsanlage nach Unteranspruch 7, dadurch gekennzeichnet, dass Verdichter (6, 7) und Glätter (8) - vorteilhaft als gleiche, austauschbare Baueinheiten ausgeführt untereinander (45) und ausserdem unter Zwischenschaltung von elastischen Puffern (35) mit dem Fahrgestell (34) der Gleitschalungen (9 bis 14) gekoppelt sind. 8. Production system according to dependent claim 7, characterized in that the compressor (6, 7) and smoother (8) - advantageously designed as the same, interchangeable units with one another (45) and also with the interposition of elastic buffers (35) with the chassis (34) the sliding formworks (9 to 14) are coupled. 9. Fertigungsanlage nach Patentanspruch, gekennzeichnet durch ein auf den Längsschienen (4) verfahrbares, Hubvorrichtungen (37) aufweisendes Haubenversetzgerät (36), welches das gleichzeitige Abheben mehrerer Abdeckhauben (17) und das Verfahren derselben über die noch auf der Schalungsbahn (1, 2) befindlichen Hauben (17) ermöglicht. 9. Production system according to claim, characterized by a hood relocating device (36) which can be moved on the longitudinal rails (4) and has lifting devices (37), which enables the simultaneous lifting of several hoods (17) and the movement of the same over the still on the formwork sheet (1, 2 ) located hoods (17) allows. 10. Fertigungsanlage nach Unteranspruch 9, dadurch gekennzeichnet, dass das Versetzgerät mehrere koppelbare gleiche Einzelgeräte (36) aufweist. 10. Production system according to dependent claim 9, characterized in that the displacement device has a plurality of connectable identical individual devices (36). 11. Fertigungsanlage nach Unteranspruch 9, dadurch gekennzeichnet, dass hinter den koppelbaren Versetzgeräten (36) eine längs der Schalungsbahn (1, 2) verfahrbare Reinigungsmaschine (38) für diese Bahn angeordnet ist. 11. Production system according to dependent claim 9, characterized in that a cleaning machine (38) which can be moved along the formwork path (1, 2) is arranged for this path behind the couplable displacement devices (36). 12. Fertigungsanlage nach Unteranspruch 11, dadurch gekennzeichnet, dass hinter den koppelbaren Versetzgeräten (36) ein selbständiges, kurzes Versetzgerät (40) angeordnet ist, unter welchem sich das Reinigungsgerät (38) in der Grundstellung befindet, in welcher das kurze Versetzgerät einen Anschlag (41) für die koppelbaren Versetzgeräte (36) bildet. 12. Manufacturing system according to dependent claim 11, characterized in that behind the couplable relocating devices (36) an independent, short relocating device (40) is arranged, under which the cleaning device (38) is in the basic position, in which the short relocating device has a stop ( 41) for the couplable relocating devices (36). 13. Fertigungsanlage nach Patentanspruch, dadurch gekennzeichnet, dass zwei oder mehr Schalungsbahnen (1, 2) in geringem Abstand nebeneinander und für diese nur ein Satz Fertigungsgeräte (5 bis 8, 15) - von einer Bahn auf die andere Bahn versetzbar - so angeordnet sind, dass die Fertigung im Kreislauf erfolgen kann. 13. Manufacturing plant according to claim, characterized in that two or more formwork webs (1, 2) at a small distance next to each other and for this only one set of production devices (5 to 8, 15) - can be moved from one web to the other web - are so arranged that production can take place in a closed loop. 14. Fertigungsanlage nach Patentanspruch, dadurch gekennzeichnet, dass die Trennvorrichtung (15) ein lotrecht beweg- und in Rüttelschwingung versetzbares Trennmesser (16) aufweist. 14. Production system according to claim, characterized in that the separating device (15) has a vertically movable cutting knife (16) which can be set in shaking vibration.
CH200971A 1970-02-24 1971-02-10 Production line for the continuous production of precast reinforced concrete parts, especially panels and beams CH519976A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE2008457A DE2008457B2 (en) 1970-02-24 1970-02-24 Production line for the production of panels, beams, etc. from reinforced concrete

Publications (1)

Publication Number Publication Date
CH519976A true CH519976A (en) 1972-03-15

Family

ID=5763174

Family Applications (1)

Application Number Title Priority Date Filing Date
CH200971A CH519976A (en) 1970-02-24 1971-02-10 Production line for the continuous production of precast reinforced concrete parts, especially panels and beams

Country Status (6)

Country Link
US (1) US3732052A (en)
BE (1) BE763100A (en)
CH (1) CH519976A (en)
DE (1) DE2008457B2 (en)
FR (1) FR2078954A5 (en)
NL (1) NL7102339A (en)

Families Citing this family (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4864113A (en) * 1971-12-09 1973-09-05
JPS52484B2 (en) * 1972-01-13 1977-01-08
JPS50110415A (en) * 1974-02-12 1975-08-30
DE2614036C3 (en) * 1976-04-01 1979-05-23 Dyckerhoff & Widmann Ag, 8000 Muenchen Device for the production of prefabricated parts from prestressed concrete with immediate bonding, in particular prestressed concrete sleepers
IT1077838B (en) * 1977-03-25 1985-05-04 Italiana Prefabbricazione Edil PLANT FOR THE SERIAL PRODUCTION OF PREFABRICATED REINFORCED CONCRETE BUILDINGS
US4181485A (en) * 1977-11-14 1980-01-01 Horst Schramm Tiltable mold and shed means
US4165215A (en) * 1978-02-22 1979-08-21 Price Brothers Company Slab preparation apparatus
FR2431360A1 (en) * 1978-07-17 1980-02-15 Borcoman Mircea FLOAT PROCESS AND CHAINS FOR THE MANUFACTURE OF CONCRETE PRODUCTS
FR2439653A1 (en) * 1978-10-24 1980-05-23 Demler Sa Ets PROCESS FOR MANUFACTURING CEMENT PRODUCTS AND MEANS FOR CARRYING OUT SAID METHOD
DE3272000D1 (en) * 1981-05-01 1986-08-21 Fuji Ps Concrete Apparatus for the slide forming of prestressed concrete
US4472919A (en) * 1982-05-19 1984-09-25 Con-Tex Elements, Inc. Prefabricated building panel
FR2579512B1 (en) * 1985-04-01 1987-06-19 Rech Etudes Tech PROCESS INSTALLATION FOR THE MANUFACTURE OF REINFORCED CONCRETE ELEMENTS, PARTICULARLY PRE-STRESSED CONCRETE SLABS OR PRELABS
IT1213070B (en) * 1986-05-02 1989-12-07 Afros Spa POLYURETHANE MOLDING PLANT WITH AUTOMOTIVE AND MOBILE MOLD-HOLDING TROLLEYS ALONG A SUSPENDED SINGLE RAIL.
US6086349A (en) * 1992-05-26 2000-07-11 Del Monte; Ernest J. Variable wall concrete molding machine
US5332191A (en) * 1992-10-26 1994-07-26 Nolan Terry L Apparatus for making concrete slabs
US6082059A (en) * 1997-06-11 2000-07-04 Loomans; David C. Pour and set concrete construction system
US20060180736A1 (en) * 1998-04-30 2006-08-17 Kandiah & Associates Sdn. Bhd. Pre-cast concrete panels for construction of a building
US8413744B2 (en) * 2008-07-31 2013-04-09 Baker Hughes Incorporated System and method for controlling the integrity of a drilling system
GB201503159D0 (en) * 2015-02-25 2015-04-08 Fosbel Inc Methods and apparatus for constructing glass furnace structures
CN106965309A (en) * 2017-03-22 2017-07-21 仇心金 Warming plate formwork erection flat-die dual-purpose integral production line and its circulation producing method
CN107127880B (en) * 2017-06-27 2019-01-08 浙江金鑫管桩有限公司 A kind of three-dimensional circular production process for tubular pile
CN111604444B (en) * 2020-06-02 2021-10-15 中交二航局第四工程有限公司安徽混凝土装配化构件分公司 Be used for prefabricated reinforcement production line of segmental beam
CN113319997A (en) * 2021-05-28 2021-08-31 湖南三一快而居住宅工业有限公司 Concrete prefabricated part production line with lifting function

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US734124A (en) * 1903-03-26 1903-07-21 William Frey Brick-cut-off table.
CA763876A (en) * 1962-07-06 1967-07-25 Span-Deck Apparatus and method for forming concrete planks or slabs
US3600773A (en) * 1969-03-26 1971-08-24 Leland J Davis Concrete-forming device

Also Published As

Publication number Publication date
US3732052A (en) 1973-05-08
NL7102339A (en) 1971-08-26
BE763100A (en) 1971-08-17
DE2008457B2 (en) 1974-05-02
FR2078954A5 (en) 1971-11-05
DE2008457A1 (en) 1971-11-11

Similar Documents

Publication Publication Date Title
CH519976A (en) Production line for the continuous production of precast reinforced concrete parts, especially panels and beams
DE102008050955A1 (en) Forming device for finished concrete floor slabs, has plate-shaped forming cavity which forms forming table with side walls, where core tubes are arranged in forming cavity in extendable manner, and vibration unit is provided for core tubes
DE2803629A1 (en) PREFABRICATED COMPONENTS WITH REINFORCEMENT OR REINFORCEMENT ELEMENTS AS A BOX OR CAISSON, EQUIPMENT FOR MANUFACTURING SUCH COMPONENTS AND PROCESSES FOR MANUFACTURING AND ASSEMBLING ON CONSTRUCTION
EP0225893A1 (en) Process and device for constructing wall sections from building blocks.
DE102006051045A1 (en) Device for manufacturing elements from hardenable casting mass, preferably at building site places, has transportable container that is designed inside for regulation and withdrawal of movable equipment relevant for manufacturing of element
AT253200B (en) Method and device for producing masonry from building blocks
DE1953963A1 (en) Method and device for the production of prefabricated structural elements for buildings
DE60114375T2 (en) METHOD AND APPARATUS FOR PREPARING PRE-LOADED CONCRETE PRODUCTS
DE2032793C3 (en) System and method for shuttering, demoulding, cleaning and emptying of mold trolleys
DE3540962C2 (en)
AT263597B (en) Method and device for manufacturing large components
DE1907165A1 (en) Method and device for casting components or units for building purposes
EP0536600B1 (en) Device for producing reinforcements
DE3724641A1 (en) Process and device for producing, by machines, a heat-insulating lightweight concrete building brick
DE2446768A1 (en) Concrete-road-surface vibrating plug-driving machine - with chute-type reservoir storing plugs individually superimposed and transverse forwarding guideway
WO2006128638A1 (en) Device for the vacuum treatment of concrete
DE1036743B (en) Device for the continuous production of prestressed concrete slabs with the help of automatic slab pavers
DE3027046C2 (en) Method and device for the production of prefabricated parts from prestressed concrete with an immediate bond, in particular prestressed concrete sleepers
DE2812145A1 (en) Automatic prodn. of concrete building blocks - contg. thermally insulating polystyrene foam cores, by synchronised supply of cores to mould which is then packed with concrete mix
EP0812252A1 (en) Process and device for producing longitudinal mouldings of a pourable material, especially foundation mats
DE2338445C3 (en) Process and plant for the production of precast concrete parts
DE2005899A1 (en) Device for the production of plates from pourable, hardening material
AT387930B (en) SYSTEM FOR THE PRODUCTION OF LARGE-FORMAT REINFORCED CONCRETE CONCRETE PARTS
AT227136B (en) Device for making blocks from lightweight concrete
DE3344034A1 (en) Installation for assembly-line production of precast concrete parts, in particular of large panels

Legal Events

Date Code Title Description
PL Patent ceased