BR112016000677B1 - Método de reparo de alto-forno - Google Patents
Método de reparo de alto-forno Download PDFInfo
- Publication number
- BR112016000677B1 BR112016000677B1 BR112016000677-1A BR112016000677A BR112016000677B1 BR 112016000677 B1 BR112016000677 B1 BR 112016000677B1 BR 112016000677 A BR112016000677 A BR 112016000677A BR 112016000677 B1 BR112016000677 B1 BR 112016000677B1
- Authority
- BR
- Brazil
- Prior art keywords
- foundation
- new
- sliding
- furnace
- level
- Prior art date
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B7/00—Blast furnaces
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Furnace Charging Or Discharging (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
Applications Claiming Priority (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013158324 | 2013-07-30 | ||
JP2013-158324 | 2013-07-30 | ||
JP2013-272269 | 2013-12-27 | ||
JP2013272269A JP5577450B1 (ja) | 2013-07-30 | 2013-12-27 | 高炉の改修方法 |
PCT/JP2014/069944 WO2015016220A1 (ja) | 2013-07-30 | 2014-07-29 | 高炉の改修方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
BR112016000677B1 true BR112016000677B1 (pt) | 2020-03-31 |
Family
ID=51579076
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BR112016000677-1A BR112016000677B1 (pt) | 2013-07-30 | 2014-07-29 | Método de reparo de alto-forno |
Country Status (7)
Country | Link |
---|---|
EP (1) | EP3029159B1 (de) |
JP (1) | JP5577450B1 (de) |
KR (1) | KR101665990B1 (de) |
CN (1) | CN105408499B (de) |
BR (1) | BR112016000677B1 (de) |
RU (1) | RU2618978C1 (de) |
WO (1) | WO2015016220A1 (de) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109097516A (zh) * | 2018-09-29 | 2018-12-28 | 中国冶集团有限公司 | 高炉大修工程更换高炉炉壳的施工方法 |
CN110592300A (zh) * | 2019-08-29 | 2019-12-20 | 上海宝冶冶金工程有限公司 | 高炉炉壳的运输系统及方法 |
CN111422643B (zh) * | 2020-03-31 | 2021-08-10 | 神华天津煤炭码头有限责任公司 | 装船机齿圈轴承的维护方法 |
CN114058750B (zh) * | 2021-11-30 | 2022-10-14 | 中国十九冶集团有限公司 | 高炉整体水平推移的新旧基础搭接方法 |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5213406A (en) * | 1975-07-23 | 1977-02-01 | Kawasaki Steel Corp | Method of exchanging old furnace body with new one at relining of blas t furnaces |
JPS5243709A (en) * | 1975-10-02 | 1977-04-06 | Sankiyuu Kk | Building method of blast furnace |
SU1028822A1 (ru) * | 1981-11-04 | 1983-07-15 | Украинский Государственный Институт По Проектированию Металлургических Заводов "Укргипромез" | Способ реконструкции доменной печи и устройство дл его осуществлени |
JPS58106036A (ja) * | 1981-12-21 | 1983-06-24 | 山九株式会社 | 高層構造物の建設方法 |
SU1032149A1 (ru) * | 1982-03-09 | 1983-07-30 | Ордена Трудового Красного Знамени Центральный Научно-Исследовательский И Проектный Институт Строительных Металлоконструкций "Цниипроектстальконструкция" | Способ реконструкции и ремонта доменной печи |
SU1262015A1 (ru) * | 1985-03-27 | 1986-10-07 | Государственный Проектный Институт "Днепропроектстальконструкция" | Способ реконструкции доменной печи |
JP2006183105A (ja) * | 2004-12-28 | 2006-07-13 | Nippon Steel Corp | 高炉炉体の撤去方法 |
JP2006283183A (ja) | 2005-04-05 | 2006-10-19 | Nippon Steel Engineering Co Ltd | 高炉炉体の撤去方法 |
KR101322251B1 (ko) | 2006-05-18 | 2013-10-28 | 신닛떼쯔 수미킨 엔지니어링 가부시끼가이샤 | 고로 노 저부의 해체 방법 |
JP4351288B2 (ja) * | 2007-08-09 | 2009-10-28 | 新日鉄エンジニアリング株式会社 | リングブロックの搬送装置および高炉炉体の改修方法 |
JP5213406B2 (ja) * | 2007-10-05 | 2013-06-19 | キヤノン株式会社 | 調整方法、露光装置、およびデバイス製造方法 |
JP4351290B2 (ja) * | 2007-10-26 | 2009-10-28 | 新日鉄エンジニアリング株式会社 | 高炉の炉底構造 |
CN102146488B (zh) * | 2010-02-09 | 2012-07-25 | 上海宝冶建设有限公司 | 用于高炉的模块化且一体化的拆卸和安装方法 |
-
2013
- 2013-12-27 JP JP2013272269A patent/JP5577450B1/ja active Active
-
2014
- 2014-07-29 EP EP14832291.0A patent/EP3029159B1/de not_active Not-in-force
- 2014-07-29 WO PCT/JP2014/069944 patent/WO2015016220A1/ja active Application Filing
- 2014-07-29 CN CN201480042669.5A patent/CN105408499B/zh active Active
- 2014-07-29 KR KR1020167003646A patent/KR101665990B1/ko active IP Right Grant
- 2014-07-29 RU RU2016106921A patent/RU2618978C1/ru active
- 2014-07-29 BR BR112016000677-1A patent/BR112016000677B1/pt active IP Right Grant
Also Published As
Publication number | Publication date |
---|---|
JP5577450B1 (ja) | 2014-08-20 |
CN105408499B (zh) | 2017-08-15 |
EP3029159A4 (de) | 2017-04-05 |
RU2618978C1 (ru) | 2017-05-11 |
KR101665990B1 (ko) | 2016-10-13 |
CN105408499A (zh) | 2016-03-16 |
EP3029159A1 (de) | 2016-06-08 |
WO2015016220A1 (ja) | 2015-02-05 |
EP3029159B1 (de) | 2018-05-09 |
KR20160022941A (ko) | 2016-03-02 |
JP2015045081A (ja) | 2015-03-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BR112016000677B1 (pt) | Método de reparo de alto-forno | |
WO2017121044A1 (zh) | 一种预制板式减振轨道结构系统及配套施工方法 | |
CN106480823B (zh) | 拱脚定位装置及其定位方法 | |
CN104109999A (zh) | 桥塔横梁的施工方法 | |
JP6316101B2 (ja) | 鉄道車両用軌道とその施工方法 | |
BRPI0811412B1 (pt) | equipamento para o transporte de bloco de anel e método para a reparação de carcaça de alto-forno | |
CN109989330B (zh) | 连续式轨道及其架设方法 | |
CN105507154A (zh) | 预制梁吊装定位装置及其预制梁吊装施工方法 | |
CN205876339U (zh) | 箱型主梁中承式自行液压仰拱栈桥 | |
CN104176139A (zh) | 起重机及起重机上履带架与车架之间的间隙调整方法 | |
CN103437301A (zh) | 一种单索面斜拉桥悬浇段施工挂篮的安装方法 | |
JP5867451B2 (ja) | 仮設橋の施工方法及び該施工方法に用いるプレキャスト床版 | |
JP2014189182A (ja) | 水中構造物組立用台船、水中構造物の施工方法 | |
JP5113786B2 (ja) | プレキャストカルバート運搬装置と運搬方法。 | |
JP2002089195A (ja) | トンネルにおける床版の構築方法 | |
CN104653222A (zh) | 一种盾构区间隧道预制疏散平台 | |
JP2008202217A (ja) | 側壁の構築方法、支持構造およびセグメント | |
JP5854000B2 (ja) | 装炭車軌条受台の更新方法 | |
CN105417396B (zh) | 造船龙门起重机横向位移方法 | |
CN111733874A (zh) | 装配式地铁车站顶层组件的拼装设备 | |
JP2005213826A (ja) | 床版の設置方法 | |
JP5970305B2 (ja) | 管渠の布設方法 | |
JP2013194369A (ja) | 芯材要素の傾き修正確認装置 | |
KR20150066295A (ko) | 분절형 블록 조립체를 이용한 횡단 구조물의 지지보강 방법 | |
KR20140053372A (ko) | 연안 기초 구조물 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B06A | Notification to applicant to reply to the report for non-patentability or inadequacy of the application according art. 36 industrial patent law | ||
B09A | Decision: intention to grant | ||
B25D | Requested change of name of applicant approved |
Owner name: NIPPON STEEL ENGINEERING CO., LTD. (JP) |
|
B16A | Patent or certificate of addition of invention granted |
Free format text: PRAZO DE VALIDADE: 20 (VINTE) ANOS CONTADOS A PARTIR DE 29/07/2014, OBSERVADAS AS CONDICOES LEGAIS. |