BE903871A - Antivibration rail track system - has continuous elastic rail support with head and core inserted in grooves in concrete - Google Patents

Antivibration rail track system - has continuous elastic rail support with head and core inserted in grooves in concrete Download PDF

Info

Publication number
BE903871A
BE903871A BE0/216019A BE216019A BE903871A BE 903871 A BE903871 A BE 903871A BE 0/216019 A BE0/216019 A BE 0/216019A BE 216019 A BE216019 A BE 216019A BE 903871 A BE903871 A BE 903871A
Authority
BE
Belgium
Prior art keywords
rail
core
rails
concrete
grooves
Prior art date
Application number
BE0/216019A
Other languages
French (fr)
Inventor
P Le Clercq
G Rigot
J C Delheusy
R Mertens
Original Assignee
Dynamit Du Batiment En Abrege
Ronveaux E Ets Sprl
Entpr S Louis De Waele S A
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dynamit Du Batiment En Abrege, Ronveaux E Ets Sprl, Entpr S Louis De Waele S A filed Critical Dynamit Du Batiment En Abrege
Priority to BE0/216019A priority Critical patent/BE903871A/en
Publication of BE903871A publication Critical patent/BE903871A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/002Ballastless track, e.g. concrete slab trackway, or with asphalt layers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B19/00Protection of permanent way against development of dust or against the effect of wind, sun, frost, or corrosion; Means to reduce development of noise
    • E01B19/003Means for reducing the development or propagation of noise
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B3/00Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails
    • E01B3/28Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails made from concrete or from natural or artificial stone
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B9/00Fastening rails on sleepers, or the like
    • E01B9/60Rail fastenings making use of clamps or braces supporting the side of the rail
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B9/00Fastening rails on sleepers, or the like
    • E01B9/62Rail fastenings incorporating resilient supports
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/11Embedded tracks, using prefab elements or injecting or pouring a curable material
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/12Floating rails or sleepers

Abstract

The anti-vibration rail track incorporates a continuous elastic rail support laid in a continuous concrete foundation. Two rails, each comprising a head and a core can be inserted in continuous grooves in the concrete. - Intermediate elastic components lay between the head and core and are on both sides of the cores and bearing against the faces on the underside of the heads. A lining can also be inserted between each rail and the elastic component.

Description

       

  "Système de voie ferrée antivibratoire" La présente invention concerne la réalisation de voies ferrées en pose continue comportant un dispositif original antivibratoire.

  
Le but poursuivi est de réduire fortement les vibrations transmises dans le sol lors du passage de convois ferroviaires et en particulier de véhicules urbains tels que métros et tramways.

  
Dans l'état actuel de la technique, on connaît différents systèmes de pose antivibratoire de voies ferrées utilisant des appuis locaux élastiques posés sous les rails à intervalles réguliers.

  
Ces systèmes présentent notamment l'inconvénient d'être la source d'une vibration engendrée, lors du passage du véhicule, par la variation de la déformation due à la discontinuité des appuis.

  
Pour éviter cet inconvénient, le système, objet de la présente invention, est caractérisé par un appui élastique continu du rail dans une fondation continue en béton.

  
Ce système permet de réduire la section et l'inertie du rail, engendrant une économie de coût.

  
Cette réduction de section du rail permet également de réduire la hauteur du niveau de roulement du rail par rapport

  
au niveau d'assise du rail.

  
Cette réduction de hauteur permet un gain sur la hauteur des tunnels de métro par exemple, engendrant également une économie de coût.

  
Le système de rail suivant l'invention est caractérisé également par une disposition du matériau élastique.à proximité immédiate de la source même de vibrations que constitue le contact de la roue sur le rail, ce qui permet un amortissement beaucoup plus efficace des vibrations engendrées.

  
Ci-après, on décrira en détails les caractéristiques de ce procédé en se référant aux dessins annexés.

  
La figure 1 représente une demi-coupe transversale d'un premier mode d'exécution de la voie comportant deux rails indépendants. La figure 2 montre un détail du rail suivant la fig.l. La figure 3 représente une demi-coupe transversale d'un deuxième mode d'exécution de la voie comportant deux rails reliés entre eux par des traverses. La figure 4 montre une vue en plan d'une traverse en béton. La figure 5 représente une vue en plan de la mise en oeuvre de traverses en alignement droit et en courbes. La figure 6 représente un détail d'un mode de liaison par boulons du rail à la traverse. La figure 7 représente un détail d'un autre mode de fixation par clipsage du rail à la traverse.

  
Nous décrivons en premier lieu le système antivibratoire de voies à rails indépendants suivant les figures 1 et 2.

  
Le rail 1 comporte un champignon 2 dont le profil de la surface de roulement est conf orme aux normes de roulement imposées sur le réseau ferroviaire considéré.

  
Ce rail 1 comporte également une âme 3 solidaire du champignon 2, comportant à sa partie inférieure des chanfreins 4.

  
La section de ce rail 1 est avantageusement symétrique par rapport à son axe vertical ce qui permet un cintrage aisé dans les courbes.

  
Ce rail 1 est disposé dans une gorge 5 réalisée dans un béton 9 dont les parois latérales sont constituées par deux bandes 6 généralement en acier.

  
Un élément intercalaire élastique antivibratoire 7

  
et une fourrure 8 éventuelle sont interposés entre le rail 1 et la gorge 5 en réservant un espace libre 36 de manière à éviter tout contact direct entre le rail 1 et le béton 9.

  
Cet élément intercalaire élastique 7-muni de sa fourrure éventuelle 8 est disposé de part et d'autre de l'âme 3 et s'appuie simultanément sur les deux faces verticales de l'âme 3 et des bandes 6 ainsi que sur les faces inférieures 38 du champignon 2 et sur les faces supérieures 39 des bandes 6.

  
Cet élément intercalaire 7 est réalisé en matériau élastique, par exemple en caoutchouc naturel ou synthétique ou tout autre type d'élastomère présentant les propriétés requises. La fourrure éventuelle 8 est réalisée en métal ou en matière plastique appropriée présentant une dureté suffisante et un pouvoir autolubrifiant éventuel.

  
La mise en oeuvre de cette voie peut s'opérer de

  
la manière décrite ci-après.

  
Des traverses en acier 10 comportent des butées 11 dont l'écartement et la position correspondent à la géométrie des deux gorges 5 de la voie.

  
Ces traverses 10 comportent deux supports d'extrémité 12 munis chacun d'un trou circulaire ou ovale.

  
Ces traverses 10 sont posées à intervalles réguliers sur des vérins à vis 13 dont la base 14 est fixée sur la face. supérieure 37 d'une fondation primaire en béton par des moyens de fixation 15 tels que douilles d'ancrage, clous au pistolet, collage, etc...

  
La position des traverses, latéralement et verticalement, est ajustée avec précision par l'intermédiaire des vérins à vis 13.

  
Les bandes 6 sont alors engagées entre les butées 11 et solidarisées à celles-ci par soudage par exemple.

  
Le béton 9 est alors mis en oeuvre sur le béton primaire 37 de fondation. Après durcissement du béton 9, l'élément intercalaire élastique 7 et sa fourrure 8 éventuelle sont engagés dans les deux gorges 5 de la voie. Le rail 1 est alors emboité dans la rainure présentée par le matériau élasti-que 7

  
et sa fourrure éventuelle 8 en exerçant l'effort vertical nécessaire. 

  
Nous décrivons en deuxième lieu le système antivibratoire de voies à rails reliés par des traverses suivant

  
les figures 3 à 7.

  
Ce système présente l'avantage de maintenir rigoureusement constant l'écartement entre les deux rails de la voie.

  
Ce système permet également d'augmenter la masse flottante de la voie ce qui en réduit la fréquence propre. 

  
L'atténuation de la transmission des vibrations engendrées par le passage du véhicule sur la voie ferrée

  
sera augmentée par la réduction de la fréquence propre de la voie ferrée dans son ensemble.

  
Le rail 1 comporte un champignon 2, une âme verticale 3 et au moins une rainure 16 dans l'âme 3.

  
Les deux rails 1 sont reliés par des traverses 17 au moyen de systèmesde fixation tels que décrits ci-après suivant les figures 6 et 7.

  
La figure 4 montre la géométrie de principe de ces traverses 17. Elles comportent des crochets métalliques 18 à chaque extrémité. Ces crochets seront réalisés en acier rigide ou en acier à ressort.  La figure 6 montre un exemple d'assemblage' avec des crochets en acier rigide 21 solidaires de la traverse 17.

  
L'âme 3 du rail 1 est serrée entre un ou plusieurs crochets rigides 21 et une clavette 22 à l'aide d'une vis 24 engagée dans une entretoise 26 comportant un trou fileté 27.

  
La clavette comporte au moins un bossage 23 qui vient s'insérer dans au moins une rainure correspondante 16 dans l'âme 3. Une rondelle fendue 25 évite le déserrage.

  
La figure 7 montre un deuxième exemple d'assemblage avec des crochets en acier à ressort 34 également solidaires de la traverse.

  
 <EMI ID=1.1> 

  
crochets 34. Ces crochets 34 comportent au moins un bossage 35 qui vient s'insérer dans au moins une rainure 16 dans l'âme 3

  
du rail 1.

  
La mise en oeuvre de cette voie antivibratoire avec traverses peut s'opérer de la manière décrite ci-après(fig.3) .

  
Des traverses en acier 10 comportent des butées 11 dont l'écartement et la position correspondent à la géométrie

  
de la voie. Ces traverses 10 comportent deux supports d'extrémité
12 munis chacun d'un trou circulaire ou ovale.

  
Ces traverses sont posées à intervalles réguliers sur des vérins à vis 13 dont la base 14 est fixée sur la face supérieure 37 d'une fondation primaire en béton par des moyens

  
de fixation 15 tels que douilles d'ancrage, clous au pistolet, collage, etc...

  
La position des traverses, latéralement et verticalement, est ajustée avec précision par l'intermédiaire des vérins à vis 13.

  
Les bandes 6 sont alors posées contre les butées 11

  
à chaque extrémité de chaque traverse 17. Ces bandes 6 sont solidarisées aux traverses 17 par soudage par exemple.

  
Le béton 9 est alors mis en oeuvre sur le béton primaire 37 de fondation.

  
Après durcissement du béton 9, les traverses 17

  
sont disposées sur le niveau supérieur 37 du béton primaire conformément à la figure 5. Elles comportent des butées parallèles 19 sur une faible longueur de part et d'autre de chaque traverse. Elles sont réalisées substantiellement en double trapèze ce qui permet de les accoler les unes aux autres dans les alignements droits et dans les courbes de la voie à installer.

  
Toujours après durcissement du béton 9, un élément intercalaire élastique 7 avec sa fourrure éventuelle 8 sont mis en place de chaque côté de la voie à installer.

  
Un gabarit rigide de pose 29 est posé sur les deux rails 1 perpendiculairement à ceux-ci. Ce gabarit comporte deux vis 30 qui viennent se visser dans des écrous ou douilles filetées
31 noyées et ancrées dans la traverse 17.

  
En serrant ces vis 30, on fait remonter chaque traverse 17 du niveau 33 supérieur du béton de fondation primaire jusqu'au niveau définitif 32 de manière à ce que les traverses 17 ne soient plus en contact avec le béton 33 de fondation primaire.

  
Le jeu compris entre les niveaux 32 et 33 est

  
choisi de manière telle qu'aucun contact direct ne soit possible lors de la déformation élastique du rail sous le passage des roues du convoi ferroviaire. 

REVENDICATIONS

  
1. Système de voie ferrée antivibratoire, caractérisé

  
 <EMI ID=2.1> 

  
continue en béton (9).

  
2. Système de voie ferrée antivibratoire caractérisé en ce que deux rails (1) constitués d'un champignon (2) et d'une âme

  
(3) sont insérés d'une manière continue dans une gorge (5) réalisée dans du béton (9) avec interposition d'un élément intercalaire élastique (7).

  
3. Système de voie ferrée antivibratoire suivant la



  "Anti-vibration track system" The present invention relates to the production of continuous laying rail tracks comprising an original anti-vibration device.

  
The aim is to greatly reduce the vibrations transmitted into the ground when passing railway convoys and in particular urban vehicles such as metros and trams.

  
In the current state of the art, various anti-vibration laying systems of railways are known using elastic local supports placed under the rails at regular intervals.

  
These systems have the particular disadvantage of being the source of a vibration generated, during the passage of the vehicle, by the variation in the deformation due to the discontinuity of the supports.

  
To avoid this drawback, the system, object of the present invention, is characterized by a continuous elastic support of the rail in a continuous concrete foundation.

  
This system makes it possible to reduce the section and the inertia of the rail, generating a cost saving.

  
This reduction in section of the rail also makes it possible to reduce the height of the level of rolling of the rail relative to

  
at the seat level of the rail.

  
This reduction in height allows a gain in the height of metro tunnels for example, also generating cost savings.

  
The rail system according to the invention is also characterized by an arrangement of the elastic material. In the immediate vicinity of the very source of vibrations that constitutes the contact of the wheel on the rail, which allows a much more effective damping of the vibrations generated.

  
The characteristics of this process will be described in detail below with reference to the accompanying drawings.

  
Figure 1 shows a half cross section of a first embodiment of the track comprising two independent rails. Figure 2 shows a detail of the rail according to fig.l. Figure 3 shows a half cross-section of a second embodiment of the track comprising two rails connected together by crosspieces. Figure 4 shows a plan view of a concrete sleeper. FIG. 5 represents a plan view of the implementation of crosspieces in straight alignment and in curves. FIG. 6 shows a detail of a method of connection by bolts of the rail to the cross-member. Figure 7 shows a detail of another method of fixing by clipping the rail to the crosspiece.

  
We first describe the anti-vibration system of independent rail tracks according to Figures 1 and 2.

  
Rail 1 comprises a mushroom 2, the profile of the running surface of which conforms to the rolling standards imposed on the rail network in question.

  
This rail 1 also comprises a core 3 integral with the mushroom 2, comprising at its lower part chamfers 4.

  
The section of this rail 1 is advantageously symmetrical relative to its vertical axis which allows easy bending in the curves.

  
This rail 1 is arranged in a groove 5 made of concrete 9, the side walls of which consist of two strips 6 generally made of steel.

  
An elastic antivibration insert 7

  
and a possible fur 8 are interposed between the rail 1 and the groove 5, reserving a free space 36 so as to avoid any direct contact between the rail 1 and the concrete 9.

  
This elastic intermediate element 7-provided with its optional fur 8 is disposed on either side of the core 3 and is supported simultaneously on the two vertical faces of the core 3 and of the bands 6 as well as on the lower faces. 38 of the mushroom 2 and on the upper faces 39 of the bands 6.

  
This intermediate element 7 is made of elastic material, for example natural or synthetic rubber or any other type of elastomer having the required properties. The optional fur 8 is made of metal or of an appropriate plastic material having sufficient hardness and possible self-lubricating power.

  
The implementation of this path can take place from

  
as described below.

  
Steel sleepers 10 have stops 11 whose spacing and position correspond to the geometry of the two grooves 5 of the track.

  
These crosspieces 10 comprise two end supports 12 each provided with a circular or oval hole.

  
These crosspieces 10 are placed at regular intervals on screw jacks 13 whose base 14 is fixed on the face. upper 37 of a primary concrete foundation by fixing means 15 such as anchor sleeves, gun nails, gluing, etc.

  
The position of the cross members, laterally and vertically, is precisely adjusted by means of the screw jacks 13.

  
The strips 6 are then engaged between the stops 11 and secured to them by welding, for example.

  
The concrete 9 is then used on the primary concrete 37 of the foundation. After the concrete 9 has hardened, the elastic intermediate element 7 and its possible fur 8 are engaged in the two grooves 5 of the track. The rail 1 is then fitted into the groove presented by the elastic material 7

  
and its possible fur 8 by exerting the necessary vertical force.

  
Secondly, we describe the anti-vibration system of rail tracks connected by sleepers according to

  
Figures 3 to 7.

  
This system has the advantage of keeping the spacing between the two rails of the track strictly constant.

  
This system also makes it possible to increase the floating mass of the track, which reduces its natural frequency.

  
Attenuation of the transmission of vibrations generated by the passage of the vehicle on the railway

  
will be increased by reducing the natural frequency of the railway as a whole.

  
The rail 1 comprises a mushroom 2, a vertical core 3 and at least one groove 16 in the core 3.

  
The two rails 1 are connected by crosspieces 17 by means of fixing systems as described below according to FIGS. 6 and 7.

  
Figure 4 shows the basic geometry of these crosspieces 17. They have metal hooks 18 at each end. These hooks will be made of rigid steel or spring steel. FIG. 6 shows an example of assembly 'with rigid steel hooks 21 integral with the cross-member 17.

  
The core 3 of the rail 1 is clamped between one or more rigid hooks 21 and a key 22 using a screw 24 engaged in a spacer 26 having a threaded hole 27.

  
The key has at least one boss 23 which is inserted into at least one corresponding groove 16 in the core 3. A split washer 25 prevents loosening.

  
Figure 7 shows a second example of assembly with spring steel hooks 34 also integral with the crosspiece.

  
 <EMI ID = 1.1>

  
hooks 34. These hooks 34 comprise at least one boss 35 which is inserted into at least one groove 16 in the core 3

  
of rail 1.

  
The implementation of this antivibration track with crosspieces can be done as described below (fig.3).

  
Steel sleepers 10 have stops 11 whose spacing and position correspond to the geometry

  
of the way. These sleepers 10 have two end supports
12 each provided with a circular or oval hole.

  
These crosspieces are placed at regular intervals on screw jacks 13, the base 14 of which is fixed to the upper face 37 of a primary concrete foundation by means

  
fixing 15 such as anchor sleeves, gun nails, gluing, etc.

  
The position of the cross members, laterally and vertically, is precisely adjusted by means of the screw jacks 13.

  
The strips 6 are then placed against the stops 11

  
at each end of each cross member 17. These bands 6 are joined to the cross members 17 by welding, for example.

  
The concrete 9 is then used on the primary concrete 37 of the foundation.

  
After hardening of the concrete 9, the sleepers 17

  
are arranged on the upper level 37 of the primary concrete in accordance with FIG. 5. They comprise parallel stops 19 over a short length on either side of each cross-member. They are made substantially in double trapezium which allows them to be joined to each other in straight alignments and in the curves of the track to be installed.

  
Still after the concrete 9 has hardened, an elastic intermediate element 7 with its possible fur 8 is placed on each side of the track to be installed.

  
A rigid installation template 29 is placed on the two rails 1 perpendicular to them. This template has two screws 30 which are screwed into threaded nuts or bushings
31 submerged and anchored in the crosspiece 17.

  
By tightening these screws 30, each cross member 17 is raised from the upper level 33 of the primary foundation concrete to the final level 32 so that the cross members 17 are no longer in contact with the concrete 33 of the primary foundation.

  
The game between levels 32 and 33 is

  
chosen in such a way that no direct contact is possible during the elastic deformation of the rail under the passage of the wheels of the railway convoy.

CLAIMS

  
1. Anti-vibration track system, characterized

  
 <EMI ID = 2.1>

  
continuous concrete (9).

  
2. Antivibration track system characterized in that two rails (1) consisting of a mushroom (2) and a core

  
(3) are inserted continuously into a groove (5) made in concrete (9) with the interposition of an elastic intermediate element (7).

  
3. Anti-vibration track system according to


    

Claims (1)

revendication 2 caractérisé en ce que l'élément intercalaire élastique (7) est disposé de part et d'autre de l'âme (3) et s'appuie simultanément sur les deux faces inférieures (38) du champignon (2). claim 2 characterized in that the elastic intermediate element (7) is disposed on either side of the core (3) and is supported simultaneously on the two lower faces (38) of the mushroom (2). 4. Système de voie ferrée antivibratoire suivant la revendication 2 caractérisé en ce que l'élément intercalaire (7) prend appui sur des bandes (6) limitant la gorge (5) de part et d'autre. 4. anti-vibration rail system according to claim 2 characterized in that the intermediate element (7) is supported on bands (6) limiting the groove (5) on either side. 5. Système de voie ferrée antivibratoire suivant la revendication 2 caractérisé par le fait qu'une fourrure (8) est interposée entre l'élément intercalaire élastique (7) et le rail 5. anti-vibration track system according to claim 2 characterized in that a fur (8) is interposed between the elastic intermediate element (7) and the rail (1). (1). 6. Système de voie ferrée antivibratoire suivant la revendication 2 caractérisé en ce que deux rails (1) constitués d'un champignon (2) et d'une âme (3) sont assemblés et reliés entre eux par des traverses (17). 6. anti-vibration track system according to claim 2 characterized in that two rails (1) consisting of a mushroom (2) and a core (3) are assembled and connected together by crosspieces (17). 7. Système de voie ferrée antivibratoire suivant la revendication 6 caractérisé en ce que l'âme (3) du rail (1) comporte une ou plusieurs rainures (16) et que les traverses (17) sont fixées aux rails (1) par des crochets (21) et des clavettes (22) solidaires des traverses (17) à leurs deux extrémités, qui enserrent l'âme (3) du rail (1) par serrage des vis (24). 7. anti-vibration track system according to claim 6 characterized in that the core (3) of the rail (1) has one or more grooves (16) and that the sleepers (17) are fixed to the rails (1) by hooks (21) and keys (22) integral with the crosspieces (17) at their two ends, which grip the core (3) of the rail (1) by tightening the screws (24). 8. Système de voie ferrée antivibratoire suivant la revendication 6 caractérisé en ce que l'âme (3) du rail (1) comporte une ou plusieurs rainures (16)et que les traverses (17) sont fixées aux rails (1) par des clips (34) en acier à ressort solidaires de la traverse (17) à chacune de ses extrémités et qui comportent au moins un bossage (35) qui vient s'insérer dans au moins une rainure 8. anti-vibration track system according to claim 6 characterized in that the core (3) of the rail (1) has one or more grooves (16) and that the sleepers (17) are fixed to the rails (1) by clips (34) made of spring steel secured to the crosspiece (17) at each of its ends and which comprise at least one boss (35) which is inserted in at least one groove (16) . (16). 9. Rail pour voie ferrée antivibratoire caractérisé en ce qu'il comporte un champignon (2)-et une âme (3) mais pas la semelle d'assise des rails utilisés actuellement. 9. Rail for an antivibration track characterized in that it comprises a mushroom (2) -and a core (3) but not the sole of the rails currently used. 10. Rail pour voie ferrée antivibratoire suivant la revendication 9 caractérisé en ce qu'il comporte une ou plusieurs rainures (16) dans l'âme (3). 10. Rail for anti-vibration track according to claim 9 characterized in that it comprises one or more grooves (16) in the core (3). 11. Système de voie ferrée antivibratoire suivant les revendications 1 à 5 caractérisé par le fait que la pose et le réglage des rails s'effectuent en plaçant à espace régulier des traverses (10) qui prennent appui sur des vérins à vis (13) qui permettent de les régler verticalement et latéralement, que des bandes (6) sont mises en oeuvre et solidarisées aux traverses (10), que du béton (9) est ensuite coulé, que les éléments intercalaires élastiques (7) munis de leur fourrure éventuelle (8) sont ensuite placés et que finalement les rails (1) sont insérés dans les gorges 11. anti-vibration track system according to claims 1 to 5 characterized in that the installation and adjustment of the rails are carried out by placing at regular space sleepers (10) which bear on screw jacks (13) which allow them to be adjusted vertically and laterally, that bands (6) are used and secured to the crosspieces (10), that concrete (9) is then poured, that the elastic intermediate elements (7) provided with their possible fur ( 8) are then placed and finally the rails (1) are inserted into the grooves (5) en appliquant l'effort vertical nécessaire. (5) by applying the necessary vertical force. 12. Système de pose de voie ferrée antivibratoire avec traverses suivant les revendications 6 à 11 caractérisé par le fait que des traverses (17) comportant des crochets d'extrémité (18) sont posées sur le niveau supérieur (33) du béton (9), qu'un gabarit rigide (29) est posé sur les deux rails (1) de la voie, que des vis 12. An anti-vibration track laying system with sleepers according to claims 6 to 11 characterized in that sleepers (17) having end hooks (18) are placed on the upper level (33) of the concrete (9) , that a rigid gauge (29) is placed on the two rails (1) of the track, that screws (30) viennent se visser dans des écrous ou douilles d'ancrage (31) solidaires des traverses (17) permettant ainsi de relever la traverse (17) du niveau (33) jusqu'au niveau (32) définitif. (30) are screwed into nuts or anchor sockets (31) integral with the crosspieces (17) thus making it possible to raise the crosspiece (17) from the level (33) to the final level (32).
BE0/216019A 1985-12-17 1985-12-17 Antivibration rail track system - has continuous elastic rail support with head and core inserted in grooves in concrete BE903871A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
BE0/216019A BE903871A (en) 1985-12-17 1985-12-17 Antivibration rail track system - has continuous elastic rail support with head and core inserted in grooves in concrete

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
BE0/216019A BE903871A (en) 1985-12-17 1985-12-17 Antivibration rail track system - has continuous elastic rail support with head and core inserted in grooves in concrete
BE903871 1985-12-17

Publications (1)

Publication Number Publication Date
BE903871A true BE903871A (en) 1986-04-16

Family

ID=25654805

Family Applications (1)

Application Number Title Priority Date Filing Date
BE0/216019A BE903871A (en) 1985-12-17 1985-12-17 Antivibration rail track system - has continuous elastic rail support with head and core inserted in grooves in concrete

Country Status (1)

Country Link
BE (1) BE903871A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1989012140A1 (en) * 1988-06-01 1989-12-14 Ortwein, Hermann Rail for vehicles
FR2691484A1 (en) * 1992-05-22 1993-11-26 Vanotti Gerard Method of constructing a railway in concrete
EP0703318A1 (en) * 1994-07-27 1996-03-27 WEGU Gummi- und Kunststoffwerke Walter Dräbing KG Damping element for a rail
WO1996021063A1 (en) * 1994-12-30 1996-07-11 Gmundner Fertigteile Gesellschaft Mbh & Co. Kg Railway track

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1989012140A1 (en) * 1988-06-01 1989-12-14 Ortwein, Hermann Rail for vehicles
FR2691484A1 (en) * 1992-05-22 1993-11-26 Vanotti Gerard Method of constructing a railway in concrete
EP0576392A1 (en) * 1992-05-22 1993-12-29 Vape Rail International S.A. Method for the construction of a track in concrete
US5285964A (en) * 1992-05-22 1994-02-15 Etablissements Vape Method for constructing a railroad in concrete having vertical and lateral adjustment steps prior to concrete pouring
EP0703318A1 (en) * 1994-07-27 1996-03-27 WEGU Gummi- und Kunststoffwerke Walter Dräbing KG Damping element for a rail
WO1996021063A1 (en) * 1994-12-30 1996-07-11 Gmundner Fertigteile Gesellschaft Mbh & Co. Kg Railway track
US5806764A (en) * 1994-12-30 1998-09-15 Gmundner Fertigteile Gesellschaft M.B.H. & Co. Kg Track

Similar Documents

Publication Publication Date Title
EP1905896B1 (en) Railway sleeper
US9010655B2 (en) System for securing a rail on level solid ground
EP0758418B2 (en) Rail-fastening assembly
US5788153A (en) Infrastructure for railway tracks
US6079630A (en) Railway grade crossing apparatus and method of installation
MXPA00011902A (en) Railway or tramway rail and rail fastening system.
EP2184402B1 (en) Ballastless fixed track superstructure and construction method
BE903871A (en) Antivibration rail track system - has continuous elastic rail support with head and core inserted in grooves in concrete
KR20080103664A (en) Fill up type rail structure having good vibration isolation efficiency
JP6486728B2 (en) Crossing angle sleepers
BE1014311A5 (en) Rail support system for railway in highways and analysis system for such a rail.
KR100844965B1 (en) Structure for supporting rail
FR3002555A1 (en) Support device for supporting rail of railway track relative to ground during movement of train on rail, has screws for adjusting upper plate relative to lower base, so as to adapt height of support of rail
FR2764316A1 (en) Adjustable fastener for fixing rail to sleepers without ballast
EP0587517A1 (en) Installation of the movable point in a crossing piece incorporated in long welded railway rails and method to this purpose
FR2982622A1 (en) Concrete slab for supporting two rail lines of tracks used for tram, has bands made of elastomeric material and detachably fixed in rabbets bordering reglet such that bands seal set of ruts defined by reglet on sides of rails
FR2865225A1 (en) Track crossing unit support assembly for railway network, has fixation unit with elastic fastener mounted on brace so that insulator is fixed with concrete support using screw and fastener, in position for fixing base on support
US20080099571A1 (en) Tie for a Ballasted Track
FR3025813A1 (en) RAILWAY RAIL SUPPORT SADDLE
BE1015814A5 (en) Track railway system installation and traverse to such a system.
KR101611014B1 (en) Rail fastening structure
KR102433171B1 (en) Device for fixing railway sleepers
KR101219391B1 (en) vibration protecting structure for rail
US6343747B1 (en) Fork and wedge-type rail connector
FR2737511A1 (en) Installation of rail on concrete foundation - comprises two vibration damping stages, first placing resilient bed plate under rail foot, secondly placing single saddle supporting rail and resilient truncated blocks either side rail axis

Legal Events

Date Code Title Description
RE Patent lapsed

Owner name: S.A. LES ENTREPRISES LOUIS DE WAELE

Effective date: 19961231

Owner name: S.P.R.L. ETS E. RONVEAUX S.P.R.L.

Effective date: 19961231

Owner name: DYNAMIT DU BATIMENT EN ABREGE S.A. DYNABAT

Effective date: 19961231