BE1024138B1 - Device and method for offshore execution of well bore interventions - Google Patents

Device and method for offshore execution of well bore interventions Download PDF

Info

Publication number
BE1024138B1
BE1024138B1 BE2013/0768A BE201300768A BE1024138B1 BE 1024138 B1 BE1024138 B1 BE 1024138B1 BE 2013/0768 A BE2013/0768 A BE 2013/0768A BE 201300768 A BE201300768 A BE 201300768A BE 1024138 B1 BE1024138 B1 BE 1024138B1
Authority
BE
Belgium
Prior art keywords
frame
working deck
horizontal
platform
foregoing
Prior art date
Application number
BE2013/0768A
Other languages
Dutch (nl)
Inventor
Dieter Wim Jan Rabaut
Wouter Everaerts
Original Assignee
GeoSea N.V.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GeoSea N.V. filed Critical GeoSea N.V.
Priority to BE2013/0768A priority Critical patent/BE1024138B1/en
Priority to EP14192038.9A priority patent/EP2871285B1/en
Priority to DK14192038.9T priority patent/DK2871285T3/en
Application granted granted Critical
Publication of BE1024138B1 publication Critical patent/BE1024138B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/02Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
    • E02B17/021Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto with relative movement between supporting construction and platform
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/22Handling reeled pipe or rod units, e.g. flexible drilling pipes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/0034Maintenance, repair or inspection of offshore constructions

Abstract

De uitvinding betreft een inrichting voor het offshore uitvoeren van boorputinterventies. De inrichting omvat een jack-up platform dat een in hoogte verstelbaar horizontaal werkdek omvat dat door op een onderwaterbodem steunende verticale poten wordt ondersteund; een frame van onderling stijf verbonden framedelen, dat tenminste twee horizontale framevloeren omvat van onderling verbonden framevloerdelen, welk frame met een werkdekgedeelte in horizontale richtingen over het werkdek verrijdbaar met het werkdek is verbonden, en welk frame met een werkzaam gedeelte uitsteekt voorbij een zijrand van het werkdek. De uitvinding betreft eveneens een werkwijze voor het offshore uitvoeren van boorputinterventies onder gebruikmaking van de uitgevonden inrichting.The invention relates to a device for offshore well intervention. The device comprises a jack-up platform which comprises a height-adjustable horizontal working deck that is supported by vertical legs supported on an underwater bottom; a frame of mutually rigidly connected frame parts, which comprises at least two horizontal frame floors of mutually connected frame floor parts, which frame is connected to the working deck in a horizontal direction over the working deck and which frame with an active part extends beyond a side edge of the working deck. The invention also relates to a method for carrying out offshore borehole interventions using the invented device.

Description

Inrichting en werkwijze voor het offshore uitvoeren van boorputinterventiesDevice and method for offshore execution of well bore interventions

De uitvinding betreft een inrichting en werkwijze voor het offshore uitvoeren van boorputinterventies.The invention relates to a device and method for offshore well intervention.

Offshore olie-en gas platforms worden voor tientallen jaren gebruik ontworpen. Olie- en gasbronnen beginnen op te raken wat een behoefte creëert om enerzijds de levensduur van deze bronnen te verlengen en anderzijds de bronnen uit bedrijf te nemen en te ontmantelen (well plug and abandonment). Deze operaties kunnen uitgevoerd worden door middel van boorputinterventies.Offshore oil and gas platforms have been designed for decades of use. Oil and gas wells are starting to run out, creating a need to extend the lifespan of these wells on the one hand and to decommission and dismantle the wells on the other (well plug and abandonment). These operations can be performed through well bore interventions.

Boorputinterventies worden momenteel uitgevoerd door relatief grote jack-up platforms, ondersteund door een drietal vakwerkpoten met diameters van 6-8 m en meer. Deze zijn oorspronkelijk ontworpen om te boren naar olie- en gasbronnen maar worden in toenemende mate ook toegepast om boorputinterventies uit te voeren. De bestaande platforms zijn niet eenvoudig verplaatsbaar en ontberen vaak een voor boorputinterventies geëigend ontwerp.Well well interventions are currently being carried out by relatively large jack-up platforms, supported by three lattice legs with diameters of 6-8 m and more. These were originally designed to drill for oil and gas wells but are increasingly being used to carry out well bore interventions. The existing platforms are not easily movable and often lack a design that is appropriate for well-bore interventions.

Door bovengenoemde trend is er een behoefte ontstaan op een efficiënte en flexibele wijze boorputinterventies uit te kunnen voeren. Boorputinterventies kunnen bijvoorbeeld het sluiten van een boorput omvatten, waarbij een boorput wordt gereinigd en gevuld met een geëigend materiaal zoals cement, waarna de hoorbuis wordt afgezaagd. Andere boorputinterventies omvatten onderhoud aan een boorput, zoals het nemen van monsters uit de wand van de boorput, het inmeten en loggen om de restcapaciteit van de bron te kunnen bepalen, het aanbrengen van kleine explosieve ladingen teneinde nieuwe olie te laten toevloeien aan de boorput, en dergelijke meer.The above trend has created a need to be able to carry out well bore interventions in an efficient and flexible manner. Borehole interventions may, for example, include closing a borehole, wherein a borehole is cleaned and filled with an appropriate material such as cement, after which the hearing tube is sawn off. Other well intervention interventions include maintenance of a well, such as taking samples from the wall of the well, measuring and logging to determine the residual capacity of the well, applying small explosive charges to allow new oil to flow into the well, and the like.

Hiertoe verschaft de uitvinding een inrichting omvattende een jack-up platform dat een in hoogte verstelbaar horizontaal werkdek omvat dat door op een onderwaterbodem steunende verticale poten wordt ondersteund; en verder een frame van onderling stijf verbonden framedelen, dat is ingericht om boorputinterventie apparatuur te dragen en daartoe tenminste twee horizontale ffamevloeren omvat van onderling verbonden framevloerdelen; waarbij het frame met een werkdekgedeelte in horizontale richtingen over het werkdek verrijdbaar met het werkdek is verbonden, en het frame met een werkzaam gedeelte uitsteekt voorbij een zijrand van het werkdek.To this end, the invention provides a device comprising a jack-up platform that comprises a height-adjustable horizontal working deck that is supported by vertical legs supported on an underwater bottom; and further a frame of mutually rigidly connected frame parts, which is adapted to carry well intervention equipment and for this purpose comprises at least two horizontal frame floors of mutually connected frame floor parts; wherein the frame with a working deck portion is movably connected to the working deck in horizontal directions over the working deck, and the frame with an operating portion projects beyond a side edge of the working deck.

De inrichting volgens de uitvinding laat onder andere een veilige opbouw toe van boorputinterventie apparatuur op een positie die ver verwijderd kan zijn van de te interveniëren boorput. Verder wordt het door gebruik te maken van een relatief licht en snel te transporteren jack-up platform, bij voorkeur voorzien van vier of meer poten met een diameter van ten hoogste 4 m, mogelijk op een snelle en efficiënte wijze een boorput interventie uit te voeren. Door het platform van ten minste vier poten te voorzien wordt een stabiel steunvlak verkregen voor het frame. Door bovendien gebruik te maken van een frame dat met een werkdekgedeelte in horizontale richtingen over het werkdek verrijdbaar met het werkdek is verbonden, en dat met een werkzaam gedeelte uitsteekt voorbij een zijrand van het werkdek kan boorputinterventie apparatuur nauwkeurig boven een te interveniëren bron worden geplaatst.The device according to the invention allows, among other things, a safe construction of well-intervention equipment at a position that can be far away from the well to be intervened. Furthermore, by making use of a relatively light and quickly transportable jack-up platform, preferably provided with four or more legs with a diameter of at most 4 m, it becomes possible to carry out a borehole intervention in a quick and efficient manner. . By providing the platform with at least four legs, a stable support surface for the frame is obtained. In addition, by using a frame that is movably connected to the working deck with a working deck portion in horizontal directions across the working deck, and which protrudes beyond a side edge of the working deck with a working portion, well-bore intervention equipment can be accurately placed above a source to be intervened.

Om de nauwkeurigheid van het positioneren verder te verhogen en het risico op schade aan bijvoorbeeld de oliebron zelf te verminderen wordt in een uitvoeringsvorm een inrichting verschaft, waarbij het jack-up platform een Dynamic Positioning platform omvat dat is ingericht om zich zelfstandig te positioneren door middel van roteerbare stuwlichamen.In order to further increase the accuracy of the positioning and to reduce the risk of damage to, for example, the oil well itself, a device is provided in which the jack-up platform comprises a Dynamic Positioning platform which is arranged to position itself independently by means of of rotatable weirs.

In een uitvoeringsvorm van de uitvinding wordt een inrichting verschaft waarbij het werkdek van het jack-up platform een hijsmiddel omvat dat is ingericht voor het heffen van een last tussen 200 en 1000 ton op een afstand begrepen tussen 5 en 50 m, bij voorkeur voor het heffen van een last tussen 500 en 900 ton op een afstand begrepen tussen 10 en 40 m, en met de meeste voorkeur voor het heffen van een last tussen 600 en 800 ton op een afstand begrepen tussen 20 en 30 m. Met een dergelijk hijsmiddel kunnen niet alleen onderdelen van bron interventiemiddelen worden opgenomen en in het frame geplaatst, maar kunnen ook onderdelen van een boorput met grote lengte naar boven het wateroppervlak worden getrokken. Een geschikt hefmiddel omvat een rond een verticale as zwenkbaar met het werkdek verbonden hijskraan. Deze kan een opgerichte steunarm omvatten waaraan een hoofdboom scharnierend is verbonden. De hoofdboom is aan het vrije uiteinde ervan voorzien van een hijstakel en kan middels trekkabels worden op- en afgetopt.In an embodiment of the invention, a device is provided in which the working deck of the jack-up platform comprises a hoisting means which is adapted to lift a load between 200 and 1000 tons at a distance comprised between 5 and 50 m, preferably for lifting lifting a load between 500 and 900 tons at a distance included between 10 and 40 m, and most preferably for lifting a load between 600 and 800 tons at a distance included between 20 and 30 m. not only parts of source intervention means are received and placed in the frame, but parts of a wellbore with a large length can also be pulled upwards over the water surface. A suitable lifting means comprises a crane connected pivotally to the working deck about a vertical axis. This can comprise an erected support arm to which a main boom is hingedly connected. The main boom is provided with a hoist link at its free end and can be tucked up and tipped off using pull cables.

In een uitvoeringsvorm van de uitvinding wordt een inrichting verschaft, waarbij het werkdek een dikte heeft en het uitkragend gedeelte van het frame zich vertikaal langs het werkdek in de dikterichting ervan uitstrekt. In deze uitvoeringsvorm bevindt een horizontale framevloer van het uitkragend gedeelte zich op een niveau onder het bovenoppervlak van het werkdek wat de bereikbaarheid van de bron voor duikers bijvoorbeeld vergroot.In an embodiment of the invention, a device is provided wherein the working deck has a thickness and the projecting portion of the frame extends vertically along the working deck in its thickness direction. In this embodiment, a horizontal frame floor of the projecting portion is located at a level below the upper surface of the working deck which, for example, increases the accessibility of the source for divers.

Deze bereikbaarheid wordt verder vergroot door een uitvoeringsvorm van de inrichting, waarbij het uitkragend gedeelte van het frame meer horizontale framevloeren van onderling verbonden framevloerdelen heeft dan het werkdekgedeelte, en door een andere uitvoeringsvorm waarbij het frame een breedte heeft en het uitkragend gedeelte van het frame een horizontale framevloer omvat die zich verder uitstrekt dan de breedte.This accessibility is further enhanced by an embodiment of the device, wherein the projecting part of the frame has more horizontal frame floors of interconnected frame floor parts than the working deck part, and by another embodiment where the frame has a width and the projecting part of the frame has a horizontal frame floor that extends beyond the width.

Een praktische uitvoeringsvorm van de uitvinding wordt gekenmerkt doordat het werkdekgedeelte van het frame twee horizontale vloeren, en het uitkragend gedeelte van het frame drie horizontale vloeren omvat.A practical embodiment of the invention is characterized in that the working deck portion of the frame comprises two horizontal floors, and the projecting portion of the frame comprises three horizontal floors.

De framevloeren zijn ingericht om bron interventie apparatuur te kunnen dragen. Een uitvoeringsvorm van de uitvinding stelt een inrichting voor waarbij een bovenste horizontale vloer van het frame een coiled tubing injector omvat die aan framedelen wordt verbonden. In nog een uitvoeringsvorm van de uitvinding wordt een inrichting verschaft, waarbij een middelste vloer zich uitstrekt in het vlak van het werkdek van het platform en een riseropbouw uitrusting omvat die aan framedelen wordt verbonden. Volgens een verdere uitvoeringsvorm van de uitvinding wordt een inrichting verschaft waarbij een laagste vloer van het uitkragend gedeelte van het frame een riser ring tensioner omvat die aan framedelen wordt verbonden. Met een ring tensioner wordt het mogelijk pijpdelen vast te houden.The frame floors are designed to support source intervention equipment. An embodiment of the invention proposes a device wherein an upper horizontal floor of the frame comprises a coiled tubing injector which is connected to frame parts. In yet another embodiment of the invention, a device is provided in which a middle floor extends in the plane of the working deck of the platform and comprises a riser build-up equipment which is connected to frame parts. According to a further embodiment of the invention, a device is provided in which a lowest floor of the projecting part of the frame comprises a riser ring tensioner which is connected to frame parts. With a ring tensioner it becomes possible to hold pipe parts.

Een frame dat bovengenoemde bovenste, middelste en onderste framevloeren in combinatie omvat geeft veel praktische voordelen, waarbij voor elke vloer specifieke apparatuur wordt aangebracht en die specifieke handelingen vereist. Hierdoor kunnen de werkzaamheden overzichtelijk en met weinig risico op fouten en dergelijke worden uitgevoerd.A frame comprising the above upper, middle and lower frame floors in combination gives many practical advantages, with specific equipment being installed for each floor and requiring specific actions. This allows the work to be carried out in a well-organized manner and with little risk of errors and suchlike.

Een andere uitvoeringsvorm van de uitvinding is gericht op een inrichting waarbij een horizontale vloer van het frame kan worden geopend. Een dergelijke vloer laat eenvoudig toe om apparatuur in het frame op te nemen. Ook is het mogelijk horizontale vloeren te voorzien van kleinere luiken en doorgangen waardoorheen bijvoorbeeld pijpen en buizen kunnen worden ingebracht en gefixeerd.Another embodiment of the invention is directed to a device in which a horizontal floor of the frame can be opened. Such a floor makes it easy to accommodate equipment in the frame. It is also possible to provide horizontal floors with smaller shutters and passages through which, for example, pipes and tubes can be inserted and fixed.

De op het frame inwerkende belastingen worden bij voorkeur via de over het werkdek verrijdbare verbinding aan het werkdek doorgeleid. In een uitvoeringsvorm van de uitvinding wordt een inrichting verschaft waarbij de zijrand van het werkdek een steunrail omvat. De steunrail levert een randversterking van het werkdek en strekt zich bij voorkeur over nagenoeg de gehele randlengte uit.The loads acting on the frame are preferably routed to the working deck via the connection movable over the working deck. In an embodiment of the invention, a device is provided wherein the side edge of the working deck comprises a support rail. The support rail provides edge reinforcement of the working deck and preferably extends over substantially the entire edge length.

Het werkdek van het platform kan in een alternatieve uitvoeringsvorm zijn voorzien van een (cirkelvormige) opening of zogenaamde moonpool, die toegang verschaft tot het water dat zich onder het werkdek 11 bevindt. In een dergelijke uitvoeringsvorm kan het frame ook over en in de moonpool zijn aangebracht, en is de omtreksrand van de moonpool voorzien van een steunrail in de vorm van een dikwandige plaat.In an alternative embodiment, the working deck of the platform can be provided with a (circular) opening or so-called moonpool, which provides access to the water that is underneath the working deck 11. In such an embodiment, the frame can also be arranged over and in the moon pole, and the peripheral edge of the moon pole is provided with a support rail in the form of a thick-walled plate.

De verrijdbare verbinding met het werkdek van het platform kan op velerlei wijzen worde uitgevoerd. In een geschikte uitvoeringsvorm omvat het werkdek een op afstand van, en in hoofdzaak evenwijdig aan, de steunrail verlopende glijdbalk (skidding beam) waarmee het werkdekgedeelte van het frame in een in hoofdzaak evenwijdig aan de zijrand verlopende richting over het werkdek verrijdbaar is verbonden. De glijdbalk is stevig met het werkdek verbonden om de relatief grote krachten op te kunnen vangen. De onderling evenwijdig verlopende steunrail en glijdbalk zijn ingericht om een krachtmoment op te nemen van tenminste 800 ton.m, met meer voorkeur tenminste 1000 ton.m en met de meeste voorkeur tenminste 1200 ton.m.The mobile connection with the working deck of the platform can be made in many ways. In a suitable embodiment the working deck comprises a sliding beam (skidding beam) running at a distance from, and substantially parallel to, the support rail, to which the working deck part of the frame is movably connected over the working deck in a direction which runs substantially parallel to the side edge. The sliding beam is firmly connected to the working deck in order to be able to absorb the relatively large forces. The mutually parallel supporting rail and sliding beam are adapted to receive a moment of force of at least 800 ton.m, more preferably at least 1000 ton.m and most preferably at least 1200 ton.m.

In een andere uitvoeringsvorm van de uitvinding wordt een inrichting verschaft waarbij het werkdek is voorzien van in hoofdzaak loodrecht op de steunrail verlopende horizontale glijdbalken, waarmee het werkdekgedeelte van het frame in een in hoofdzaak loodrecht op de zijrand verlopende richting over het werkdek verrijdbaar is verbonden.In another embodiment of the invention, a device is provided in which the working deck is provided with horizontal sliding beams running substantially perpendicular to the support rail, to which the working deck part of the frame is movably connected over the working deck in a direction substantially perpendicular to the side edge.

In beide bovengenoemde uitvoeringsvormen kan het frame bijvoorbeeld ten opzichte van het werkdek worden verplaatst door middel van tussen de glijdbalk(en) en framedelen van het frame opgestelde hydraulische cilinders.In both of the above-mentioned embodiments, the frame can for instance be displaced relative to the working deck by means of hydraulic cylinders arranged between the sliding beam (s) and frame parts of the frame.

Om de aanzienlijke krachten nog beter op te kunnen vangen wordt een uitvoeringsvorm verschaft waarbij het jack-up platform onder het werkdek bulkheads omvat, die bij voorkeur langs de onderzijde van de glijdbalk(en) verlopen. Verder is het werkdek in een uitvoeringsvorm voorzien van opslaghouders voor vloeistoffen, bijvoorbeeld vloeistoffen die bij het reinigen van een boorput worde toegepast en die vanaf de bron naar het werkdek worden verpompt. De opslaghouders worden bij voorkeur als inwendige holtes in het werkdek uitgevoerd.In order to be able to absorb the considerable forces even better, an embodiment is provided in which the jack-up platform underneath the working deck comprises bulk heads, which preferably run along the underside of the sliding beam (s). Furthermore, in one embodiment the working deck is provided with storage holders for liquids, for example liquids which are used in the cleaning of a borehole and which are pumped from the source to the working deck. The storage holders are preferably designed as internal cavities in the working deck.

In een uitvoeringsvorm van de uitvinding wordt een werkwijze voor het offshore uitvoeren van boorputinterventies verschaft onder gebruikmaking van een inrichting volgens de uitvinding.In an embodiment of the invention, a method for performing offshore borehole interventions is provided using a device according to the invention.

Een andere uitvoeringsvorm van de uitvinding is gericht op een werkwijze waarbij de inrichting wordt ingezet voor het boven een bestaand productieplatform uitvoeren van werkzaamheden, zogenaamde “Workover”. Bestaande productieplatforms omvatten bij voorkeur meerdere boorputten die op het platform worden samengebracht. De inrichting wordt met voordeel ingezet voor het uitvoeren van boorputinterventies boven een dergelijk bestaand productieplatform. Door de geboden mogelijkheid het frame in horizontale richtingen te bewegen kunnen de verschillende op het productieplatform samengebrachte boorputten goed bereikt worden vanaf één positie van het jack-up platform.Another embodiment of the invention is directed to a method in which the device is used for performing work, so-called "workover", over an existing production platform. Existing production platforms preferably comprise a plurality of wells that are brought together on the platform. The device is advantageously used for carrying out well bore interventions above such an existing production platform. Due to the possibility offered to move the frame in horizontal directions, the various wells assembled on the production platform can be easily reached from one position of the jack-up platform.

De uitvinding zal nu verder worden verduidelijkt aan de hand van de beschrijving van de toegevoegde figuren, zonder hiertoe overigens te worden beperkt. In de figuren toont:The invention will now be further elucidated on the basis of the description of the attached figures, without being otherwise limited thereto. In the figures:

Figuur 1 een schematisch vooraanzicht van een inrichting volgens een uitvoeringsvorm volgens de uitvinding;Figure 1 shows a schematic front view of a device according to an embodiment according to the invention;

Figuur 2 een schematisch zijaanzicht van een uitvoeringsvorm van de inrichting volgens de uitvinding;Figure 2 is a schematic side view of an embodiment of the device according to the invention;

Figuur 3 een schematisch aanzicht in perspectief van het frame van de in figuur 1 getoonde inrichting volgens een uitvoeringsvorm volgens de uitvinding;Figure 3 shows a schematic perspective view of the frame of the device shown in Figure 1 according to an embodiment according to the invention;

Figuur 4 een schematisch zijaanzicht van de in figuur 3 getoonde uitvoeringsvorm van het frame volgens de uitvinding;Figure 4 is a schematic side view of the embodiment of the frame according to the invention shown in Figure 3;

Figuur 5 een schematisch vooraanzicht van het in figuren 3 en 4 getoonde frame volgens de uitvinding; enFigure 5 is a schematic front view of the frame according to the invention shown in Figures 3 and 4; and

Figuur 6 een schematisch zijaanzicht van een andere uitvoeringsvorm van de inrichting volgens de uitvinding die toepasbaar is voor workover werkzaamheden.Figure 6 is a schematic side view of another embodiment of the device according to the invention that can be used for workover work.

Onder verwijzing naar de figuren 1 en 2 wordt een uitvoeringsvorm van een inrichting 20 volgens de uitvinding getoond. De inrichting 20 omvat een jack-up platform 1 waaraan een uitkragend frame 3 is verbonden. Het jack-up platform 1 omvat in hoofdzaak een horizontaal werkdek 21 dat door vier (waarvan slechts twee zichtbaar zijn) op of in een onderwaterbodem 15 steunende verticale poten 22 wordt ondersteund. Omdat het jack-up platform 1 eenvoudig moet kunnen worden verplaatst zijn de poten 22 relatief licht uitgevoerd als holle buizen met een diameter van ten hoogste 4 m. Dit wordt mogelijk omdat het frame 3 niet is voorzien van een boortoren, zoals dat gebruikelijk is bij meer permanente boorplatforms. Dergelijke boorplatforms zijn doorgaans voorzien van 3 poten in de vorm van vakwerken met een diameter van 8 m en meer.With reference to figures 1 and 2, an embodiment of a device 20 according to the invention is shown. The device 20 comprises a jack-up platform 1 to which a projecting frame 3 is connected. The jack-up platform 1 essentially comprises a horizontal working deck 21 that is supported by four (only two of which are visible) vertical legs 22 supported on or in an underwater bottom 15. Because the jack-up platform 1 must be easy to move, the legs 22 are of relatively light design as hollow tubes with a diameter of at most 4 m. This is possible because the frame 3 is not provided with a derrick, as is customary with more permanent drilling platforms. Such drilling platforms are generally provided with 3 legs in the form of trusses with a diameter of 8 m and more.

Het werkdek 21 is in een hoogterichting 16 in hoogte verstelbaar door middel van vier tandradvijzels 23 die zich op de hoekpunten van het werkdek 11 bevinden en die elk een overeenkomstige poot 22 bedienen. Het werkdek 21 van het platform 1 kan in een (niet getoonde) uitvoeringsvorm eveneens zijn voorzien van een (cirkelvormige) opening of zogenaamde moonpool, die toegang verschaft tot het water 17 dat zich onder het werkdek 11. In een dergelijke uitvoeringsvorm kan het frame 3 ook over en in de moonpool zijn aangebracht. | Het werkdek 21 heeft een dikte 24 om het de benodigde buigstijfheid te geven, waartoe zich over de dikte een inwendige (niet zichtbare) steunconstructie van steunbalken en -schotten uitstrekt. Zoals zichtbaar is in figuur 1 is een zijrand van het werkdek 21 versterkt met een steunrail 2. In een uitvoeringsvorm waarin het frame 3 over en in de moonpool is aangebracht omvat de omtreksrand van de moonpool een steunrail. Λ.The working deck 21 is height-adjustable in a height direction 16 by means of four gear jacks 23 which are located at the corner points of the working deck 11 and which each operate a corresponding leg 22. In a (not shown) embodiment, the working deck 21 of the platform 1 can also be provided with a (circular) opening or so-called moonpool, which provides access to the water 17 that is located below the working deck 11. In such an embodiment, the frame 3 can are also arranged over and in the moonpool. | The working deck 21 has a thickness 24 to give it the required bending stiffness, for which purpose an internal (non-visible) support structure of support beams and baffles extends over the thickness. As can be seen in figure 1, a side edge of the working deck 21 is reinforced with a support rail 2. In an embodiment in which the frame 3 is arranged over and in the moon pole, the peripheral edge of the moon pole comprises a support rail. Λ.

Het jack-up platform 1 is verder voorzien van een Dynamic Positioning (DP) systeem.The jack-up platform 1 is further provided with a Dynamic Positioning (DP) system.

Een dergelijk DP systeem is ingericht om het platform 1 zelfstandig te kunnen positioneren en omvat een aantal onder het werkdek 21 voorziene stuwlichamen 25 (of thrusters) van rond een horizontale as roterende propellerbladen. In de getoonde uitvoeringsvorm zijn een viertal stuwlichamen 25 langs een onderrand van het werkdek 21 aangebracht. Met de stuwlichamen 25 kan een in het water 17 drijvend werkdek 21 nauwkeurig worden gepositioneerd ten opzichte van een oliebron bijvoorbeeld, in het bijzonder doordat zij eveneens roteerbaar zijn rond een verticale as 26. Het gebruik van stuwlichamen 25 heeft als voordeel dat het niet nodig is ankerkabels toe te passen bij het positioneren van het platform 1. Hierdoor wordt het risico dat bijvoorbeeld oliebronnen worden beschadigd verminderd.Such a DP system is adapted to be able to position the platform 1 independently and comprises a number of propulsion bodies 25 (or thrusters) provided under the working deck 21 of propeller blades rotating about a horizontal axis. In the embodiment shown, four weir bodies 25 are arranged along a lower edge of the working deck 21. With the dam bodies 25, a working deck 21 floating in the water 17 can be accurately positioned with respect to an oil well, for example, in particular because they are also rotatable about a vertical axis 26. The use of dam bodies 25 has the advantage that it is not necessary to use anchor cables when positioning the platform 1. This reduces the risk that, for example, oil wells are damaged.

Het werkdek 21 is verder voorzien van een hijsmiddel in de vorm van een hijskraan 27.The working deck 21 is further provided with a hoisting means in the form of a hoisting crane 27.

De hijskraan is rond een verticale as 270 zwenkbaar verbonden met het werkdek 21 door middel van de basis 271. Zij omvat verder een opgerichte steunarm 272 waaraan een hoofdboom 273 scharnierend is verbonden. De hoofdboom 273 is aan het vrije uiteinde ervan voorzien van een hijstakel 274 waarmee de onderdelen die worden gebruikt voor het uitvoeren van boorputinterventies kunnen worden opgenomen en verplaatst. De hoofdboom 273 kan middels trekkabels 275 worden op- en afgetopt. Desgewenst zijn op het werkdek 21 nog kleinere hulpkranen aanwezig.The crane is pivotally connected about a vertical axis 270 to the working deck 21 by means of the base 271. It also comprises an erected support arm 272 to which a main boom 273 is hingedly connected. The main boom 273 is provided at its free end with a hoist bar 274 with which the parts used for carrying out well bore operations can be picked up and moved. The main boom 273 can be topped up and tipped off by means of pull cables 275. If desired, even smaller auxiliary cranes are present on the working deck 21.

Volgens de uitvinding is het frame 3 met een werkdekgedeelte 31 in horizontale richtingen (18, 19) over het werkdek 21 verrijdbaar met het werkdek 21 verbonden. Verwijzend naar figuren 3 en 4 omvat het werkdekgedeelte 31 van het frame het gedeelte dat zich over het werkdek 21 uitstrekt en derhalve niet uitkraagt. Het frame 3 steekt met een werkzaam gedeelte 32 uit voorbij een zijrand 28 van het werkdek 21.According to the invention, the frame 3 is movably connected to the working deck 21 in horizontal directions (18, 19) over the working deck 21 in horizontal directions (18, 19). Referring to Figures 3 and 4, the working deck portion 31 of the frame comprises the portion that extends over the working deck 21 and therefore does not protrude. With an active portion 32, the frame 3 projects beyond a side edge 28 of the working deck 21.

Het frame 3 is opgebouwd uit onderling stijf verbonden framedelen (33, 34).The frame 3 is made up of mutually rigidly connected frame parts (33, 34).

Framedelen 33 strekken zich in een lengterichting 35 van het frame 3 uit, terwijl 1 framedelen 34 zich in een dwarse richting 36 van het frame 3 uitstrekken. De lengterichting 35 van het frame 3 strekt zich evenwijdig uit aan de horizontale richting 18 van het werkdek 21, daar waar de dwarse richting 36 van het frame 3 zich evenwijdig aan de horizontale richting 19 van het werkdek 21 uitstrekt. Zoals aangegeven in figuren 1 en 2 strekt het uitkragend gedeelte 32 van het frame 3 zich in verticale richting 16 langs het werkdek 21 in de dikterichting ervan uit over een lengte die kan variëren.Frame parts 33 extend in a longitudinal direction 35 of the frame 3, while 1 frame parts 34 extend in a transverse direction 36 of the frame 3. The longitudinal direction 35 of the frame 3 extends parallel to the horizontal direction 18 of the working deck 21, where the transverse direction 36 of the frame 3 extends parallel to the horizontal direction 19 of the working deck 21. As shown in Figures 1 and 2, the projecting portion 32 of the frame 3 extends in vertical direction 16 along the working deck 21 in its thickness direction over a length that can vary.

Om het frame 3 te kunnen verplaatsen ten opzichte van het werkdek 21 is op het werkdek 21 een glijdbalk 11 (skidding beam) aangebracht. De glijdbalk 11 verloopt op een afstand 111 van en in hoofdzaak evenwijdig aan de steunrail 2. De afstand 111 kan vrij worden gekozen, afhankelijk van het over te brengen moment en krachten op de steunrail 2 en glijdbalk 11. Tussen de glijdbalk 11 en een bevestiging op een framedeel 34 verlopen hydraulische cilinders 110 waarmee het frame 3 in de langsrichting 35 ervan kan worden verplaatst ten opzichte van de glijdbalk 11. Hiermee kan de afstand van het uitkragend gedeelte 32 van het frame 3 tot de zijrand 28 worden vergroot of verkleind zodat het uitkragend gedeelte 32 nauwkeurig boven een oliebron kan worden geplaatst. Op dezelfde wijze kan het frame 3 in de dwarse richting 36 ervan worden veiplaatst ten opzichte van de glijdbalk 11. Hiermee kan de onderlinge positie van het uitkragend gedeelte 32 van het frame 3 en het platform 1 in de horizontale richting 19 worden aangepast zodat het uitkragend gedeelte 32 nauwkeurig boven een oliebron kan worden geplaatst.In order to be able to move the frame 3 relative to the working deck 21, a sliding beam 11 (skidding beam) is arranged on the working deck 21. The slide bar 11 extends at a distance 111 from and substantially parallel to the support rail 2. The distance 111 can be freely selected, depending on the moment to be transmitted and forces on the support rail 2 and slide bar 11. Between the slide bar 11 and a mounting hydraulic cylinders 110 running on a frame part 34 with which the frame 3 can be moved in the longitudinal direction 35 thereof with respect to the sliding beam 11. Hereby the distance from the projecting part 32 of the frame 3 to the side edge 28 can be increased or decreased so that the projecting portion 32 can be accurately placed above an oil well. In the same way the frame 3 can be placed in the transverse direction 36 thereof with respect to the sliding beam 11. Hereby the mutual position of the projecting part 32 of the frame 3 and the platform 1 in the horizontal direction 19 can be adjusted so that the projecting portion 32 can be accurately positioned above an oil well.

Om de grote krachten op de glijdbalk 11 op te kunnen vangen heeft het voordelen het werkdek 21 te voorzien van in de dikterichting 16 verlopende scheidingswanden of bulkheads, die bij voorkeur langs de onderzijde van de glijdbalk(en) 11 verlopen.In order to be able to absorb the large forces on the sliding beam 11, it is advantageous to provide the working deck 21 with dividing walls or bulk heads extending in the thickness direction 16, which preferably run along the underside of the sliding beam (s) 11.

De zich in dwarse richting 36 uitstrekkende framedelen 34 vormen in de getoonde uitvoeringsvorm de framevloerdelen van drie horizontale framevloeren (12,13,14) van het uitkragend gedeelte 32 van het frame 3. Het werkdekgedeelte 31 van het frame 3 heeft twee framevloeren ((12, 13). Op elke framevloer (12,13 14) bevindt zich specifieke bij de uitvoering van boorputinterventie werkzaamheden benodigde apparatuur, zoals verder hieronder zal worden toegelicht.In the embodiment shown, the frame parts 34 extending in the transverse direction 36 form the frame floor parts of three horizontal frame floors (12, 13, 14) of the projecting part 32 of the frame 3. The working deck part 31 of the frame 3 has two frame floors ((12 On each frame floor (12, 13, 14) there is specific equipment required for performing well intervention activities, as will be explained further below.

Om de apparatuur te kunnen begrijpen is het handig de opbouw van een boorput kort te illustreren. Hierbij wordt verwezen naar figuren 1 en 2. Een boorput wordt verkregen door een met een boortoren boorstangen (drill strings) rechtstandig in een ondergrond te drijven en casings te plaatsen die het boorgat afsluiten van het omringende gesteente. Nadat het aan te boren doel, meestal een koolwaterstofhoudende formatie of "reservoir" is bereikt, kan de toren worden weggehaald. Aan de onderzijde van de boorstang bevindt zich een bronhoofd (Well Head) waaraan de boorstang wordt bevestigd. Een zogenaamde kerstboom (Christmas Tree of kortweg Tree) 9 wordt over de Well Head geplaatst. De Tree 9 omvat een aantal afsluiters waarmee het debiet van het uit de bron stromende product (gas, olie, enz.) kan worden geregeld. Ook kan de Tree 9 andere functies vervullen zoals bijvoorbeeld het verschaffen van injectiepunten voor chemicaliën, het verschaffen van middelen om boorputinterventie werkzaamheden uit te voeren, en van drukventielen, meetapparatuur, enzovoorts.To understand the equipment, it is useful to briefly illustrate the construction of a well. Reference is made here to figures 1 and 2. A borehole is obtained by driving drill rods (drill strings) vertically into a subsurface with a derrick and placing casings that close the borehole of the surrounding rock. After the target to be drilled, usually a hydrocarbon-containing formation or "reservoir", the tower can be removed. At the bottom of the drill rod there is a well head (Well Head) to which the drill rod is attached. A so-called Christmas tree (Christmas Tree or simply Tree) 9 is placed over the Well Head. The Tree 9 comprises a number of valves with which the flow of the product flowing from the source (gas, oil, etc.) can be regulated. The Tree 9 can also perform other functions such as, for example, providing injection points for chemicals, providing means for carrying out well bore intervention operations, and pressure valves, measuring equipment, and so on.

Bij het uitvoeren van boorputinterventie werkzaamheden wordt de aanwezige Tree 9 gebruikt als verbindingsorgaan voor een Riser 6. Een dergelijke Riser 6 verbindt het jack-up platform 1 en meer bepaald de in het frame 3 aanwezige boorputinterventie apparatuur met de Christmas Tree 9 of met een Well Head. De Riser 6 wordt vanaf het werkdek 21 van het platform 1 opgebouwd uit een aantal op elkaar aansluitende stalen pijpdelen met een diameter van de ordegrootte van 15-20 cm bijvoorbeeld. Om de Riser 6 met de Tree 9 te kunnen verbinden is de Tree 9 voorzien van een Tree Running Tool (TRT) 8, die de interface vormt tussen de Christmas Tree 9 en boorputinterventie operateurs. Met de TRT 8 kunnen bijvoorbeeld de instellingen van de Tree 9 worden bepaald om de veiligheid van de boorputinterventie werkzaamheden te kunnen garanderen. De Riser 6 wordt aan de bovenzijde voorzien van een Flowhead 4 die onder andere het debiet van boorputinterventie vloeistoffen regelt.When carrying out well bore intervention activities, the present Tree 9 is used as a connecting member for a Riser 6. Such a Riser 6 connects the jack-up platform 1 and more specifically the well-bore intervention equipment present in the frame 3 with the Christmas Tree 9 or with a Well Head. The Riser 6 is built up from the working deck 21 of the platform 1 from a number of mutually connecting steel pipe parts with a diameter of the order of magnitude of 15-20 cm, for example. To connect the Riser 6 to the Tree 9, the Tree 9 is provided with a Tree Running Tool (TRT) 8, which forms the interface between the Christmas Tree 9 and well bore intervention operators. With the TRT 8, for example, the settings of the Tree 9 can be determined in order to guarantee the safety of the well intervention activities. The Riser 6 is provided with a Flowhead 4 at the top which, among other things, controls the flow of well bore intervention fluids.

Apparatuur die kan worden ingezet voor well plug and abandonment omvat bijvoorbeeld: - pompen en opslagtanks voor het opvullen van een boorput met beton/grout/C02. Deze kunnen op het dek van het jack-up platform worden geplaatst of bevinden zich op een horizontale vloer 12 of 13 van het frame 3; - een kraan 27 voor het hijsen van de boorputonderdelen; - klemmen voor het vastnemen van de hoorbuizen. Deze klemmen bevinden zich doorgaans op een horizontale vloer 12 of 13 van het frame 3; - Snijdgereedschap om de hoorbuizen door te snijden. Dit gereedschap wordt bij voorkeur net boven de klemmen geplaatst.Equipment that can be used for well plug and abandonment includes, for example: - pumps and storage tanks for filling a well with concrete / grout / CO2. These can be placed on the deck of the jack-up platform or are located on a horizontal floor 12 or 13 of the frame 3; - a crane 27 for hoisting the well parts; - clamps for holding the hearing tubes. These clamps are usually located on a horizontal floor 12 or 13 of the frame 3; - Cutting tool to cut through the hearing tubes. This tool is preferably placed just above the clamps.

Geschikte apparatuur voor levensduur verlenging omvat bijvoorbeeld: - tenminste één Wire line and slick line reel en geleiders om deze wires in een Riser te geleiden; en - een Coiled Tubing reel en injector.Suitable equipment for lifetime extension includes, for example: - at least one Wire line and slick line reel and conductors to guide these wires in a Riser; and - a Coiled Tubing reel and injector.

Ten titel van voorbeeld omvat een bovenste horizontale vloer 12 van het frame 3 een coiled tubing injector eenheid 5 die aan framedelen 34 is vastgemaakt. Op de bovenste vloer 12 van het werkdekgedeelte 31 bevindt zich een coiled tubing reel 10 van waaraf een flexibele doorgaans metalen buis 50 (coiled tubing) kan worden afgerold, die via een steunconstructie 51 met de coiled tubing injector eenheid 5 in een riser 6 worden geschoten tot dieptes van 4000-5000 m en meer. De bovenste vloer kan verder zijn voorzien van (niet getoonde) pompmiddelen waarmee vloeistoffen via de buis 50 naar een bron kunnen worden gepompt. Het verpompen van aanslagverminderende vloeistoffen en methanol bijvoorbeeld voorkomt aanslagvorming in de hoorbuis. Ook kunnen zouthoudende vloeistoffen (brine) of stoom worden geïnjecteerd om een boorput te onderhouden. Ook kan een flexibele buis 50 gebruikt worden als productiehuis in bijna uitgeputte bronnen.By way of example, an upper horizontal floor 12 of the frame 3 comprises a coiled tubing injector unit 5 fixed to frame parts 34. On the upper floor 12 of the working deck portion 31 there is a coiled tubing reel 10 from which a flexible, usually metal tube 50 (coiled tubing) can be unrolled, which is shot through a support structure 51 with the coiled tubing injector unit 5 into a riser 6 up to depths of 4000-5000 m and more. The upper floor can further be provided with pump means (not shown) with which liquids can be pumped via a tube 50 to a source. For example, pumping deposit-reducing liquids and methanol prevents deposit formation in the hearing tube. Salt-containing liquids (brine) or steam can also be injected to maintain a wellbore. A flexible tube 50 can also be used as a production house in almost depleted sources.

De coiled tubing 50 is ter onderzijde doorgaans voorzien van een (niet getoond) boorputsamenstel of bottom hole assembly (BHA). Geschikte BHA omvatten bijvoorbeeld een spuitkop voor het pompen van chemicaliën of cement door de buis 50, maar kunnen ook een aantal in serie geplaatste logging instrumenten omvatten, afhankelijk van de bedoeling. Coiled tubing kan ook worden gebruikt als een goedkopere uitvoering van work-over operaties. Een BHA kan ook worden gebruikt om een oliebron open te breken, waarbij een vloeistof onder hoge druk in de buis 50 wordt gepompt om rotsbodem te breken en product (olie of gas) te laten vloeien.The coiled tubing 50 is usually provided on the underside with a (not shown) well assembly or bottom hole assembly (BHA). Suitable BHA include, for example, a nozzle for pumping chemicals or cement through the tube 50, but may also include a number of serially arranged logging instruments, depending on the intention. Coiled tubing can also be used as a cheaper implementation of work-over operations. A BHA can also be used to break open an oil well, wherein a liquid is pumped under high pressure into the tube 50 to break rock bottom and allow product (oil or gas) to flow.

Aan de bovenste framevloer 12 kunnen ook middelen zijn bevestigd voor het ondersteunen van draden of Wire Lines (wire line tools). Met Wire Lines kan allerlei (meet)apparatuur vanaf het frame 3 in de bron worden neergelaten. Wire Lines omvatten elektrische bekabeling waarmee allerlei gegevens betreffende de toestand van de bron kunnen worden doorgegeven, bijvoorbeeld ten behoeve van logging van de bron. Ook kan andere apparatuur, bijvoorbeeld bestemd om boorputpluggen te verwijderen, vanaf het frame 3 worden neergelaten met behulp van (niet getoonde) slick lines. De wire (en slick) lines zijn via lieren met het frame 3 verbonden en kunnen met de lieren worden verlengd of verkort. Geleidingsdraden 7 kunnen worden voorzien om apparatuur mee naar de onderwaterbodem te begeleiden.Means for supporting wires or wire lines (wire line tools) may also be attached to the upper frame floor 12. With Wire Lines all kinds of (measuring) equipment can be lowered from the frame 3 into the source. Wire Lines comprise electrical cabling with which all kinds of data concerning the condition of the source can be passed on, for example for logging of the source. Other equipment, for example intended for removing well bore plugs, can also be lowered from the frame 3 with the aid of (not shown) slick lines. The wire (and slick) lines are connected to the frame 3 via winches and can be extended or shortened with the winches. Guide wires 7 can be provided to guide equipment to the underwater bottom.

Verder draagt de bovenste framevloer 12 bij voorkeur ook een (niet getoonde) Blow Out Preventer (BOP). Een BOP omvat een klep die reageert op bovenmatige drukken en stroming in een boorstreng tijdens het boren in een bron reservoir. Hierdoor voorkomt een BOP dat boorstreng onderdelen maar ook boorputinterventie vloeistoffen bijvoorbeeld met grote kracht uit de boorschacht worden geblazen.Furthermore, the upper frame floor 12 preferably also carries a Blow Out Preventer (BOP) (not shown). A BOP includes a valve that responds to excessive pressures and flow in a drill string while drilling in a well reservoir. As a result, a BOP prevents drill string components, but also well bore intervention fluids from being blown out of the drill shaft with great force.

Een middelste vloer 13 strekt zich in hoofdzaak uit in het vlak van het werkdek 21 van het platform 1 en omvat een riseropbouw uitrusting die aan framedelen 34 wordt verbonden. De riseropbouw uitrusting omvat bijvoorbeeld de flowhead 4. Ter hoogte van de middelste vloer kan desgewenst een duiker worden gelanceerd, bijvoorbeeld met behulp van een (niet getoond) lanceerframe. Een dergelijk lanceerffame omvat bijvoorbeeld een A-frame dat scharnierend is verbonden met een vloer, en dat is voorzien van een toptakel waaraan een kooi voor een duiker kan worden bevestigd en neergelaten. Ook is het bijvoorbeeld mogelijk een op afstand bestuurbare robot of Remote Operated vehicle (ROV) aan de toptakel te bevestigen en neer te laten.A middle floor 13 extends substantially in the plane of the working deck 21 of the platform 1 and comprises a riser building equipment which is connected to frame parts 34. The riser building equipment comprises, for example, the flowhead 4. At the level of the middle floor, a diver can be launched if desired, for example with the aid of a launch frame (not shown). Such a launching effect comprises, for example, an A-frame which is hingedly connected to a floor and which is provided with a top hoist to which a cage for a diver can be attached and lowered. It is also possible, for example, to attach a remote controlled robot or Remote Operated vehicle (ROV) to the top hoist and lower it.

Een laagste vloer 14 van het uitkragend gedeelte 32 van het frame 3 omvat bij voorkeur een Riser Ring Tensioner 60 die aan framedelen 34 wordt verbonden. De Ring Tensioner 60 zorgt ervoor dat de Riser 6 op spanning wordt gebracht ter hoogte van het werkdek 21. Hierdoor worden bewegingen van de Riser 6 ten gevolge van windbelasting en golfbewegingen grotendeels voorkomen.A lowest floor 14 of the projecting portion 32 of the frame 3 preferably comprises a Riser Ring Tensioner 60 which is connected to frame parts 34. The Ring Tensioner 60 ensures that the Riser 6 is energized at the height of the working deck 21. As a result, movements of the Riser 6 due to wind load and wave movements are largely prevented.

Het frame 3 volgens de uitvinding heeft als groot voordeel dat het meerdere vloeren (12, 13, 14) verschaft en door de opbouw middels framedelen (33, 34) toch goed toegankelijk is voor in het (uitkragend gedeelte 32 van het) frame 3 aan te brengen uitrusting. In dit verband heeft een uitvoeringsvorm waarbij een horizontale vloer (12, 13, 14) van het frame 3 kan worden geopend verdere voordelen. Dit kan bijvoorbeeld gebeuren door een betreffende vloer scharnierend met de rest van het frame 3 uit te voeren zodat deze kan worden weg geklapt.The frame 3 according to the invention has the great advantage that it provides a plurality of floors (12, 13, 14) and is nevertheless easily accessible because of the construction by means of frame parts (33, 34) for in the (projecting part 32 of the) frame 3 on equipment to be brought. In this regard, an embodiment in which a horizontal floor (12, 13, 14) of the frame 3 can be opened has further advantages. This can be done, for example, by hinging a floor in question with the rest of the frame 3 so that it can be folded away.

Met de inrichting volgens de uitvinding kan op efficiënte wijze een werkwijze voor het offshore uitvoeren van boorputinterventies worden uitgevoerd.With the device according to the invention, a method for offshore borehole interventions can be carried out efficiently.

Hiertoe wordt het jack-up platform 1 van de inrichting in de onmiddellijke nabijheid van een te interveniëren boorput gepositioneerd en het frame 3 ten opzichte van het werkdek in een horizontaal vlak verreden totdat het werkzame deel 32 van het frame 3 is uitgelijnd met de boorput. Vervolgens kan een duiker vanaf het frame 3 worden gelanceerd om verbindingen tot stand te brengen tussen het frame 3 en een Christmas Tree 9 van de boorput. Hierbij kan voor de boorputinterventie benodigde apparatuur via geleidingsdraden 7 naar beneden worden gebracht. Vervolgens kunnen vanaf het frame 3 doorheen de in de opgebouwde Riser 6 naar beneden geschoten coiled tubing 50 allerlei voor de interventie geëigende vloeistoffen worden geïnjecteerd of 9andersom) naar boven gebracht. Na de interventie kan het platform 1 eenvoudig worden losgekoppeld van de boorput en naar een andere boorput worden gevaren.To this end, the jack-up platform 1 of the device is positioned in the immediate vicinity of a well to be intervened and the frame 3 is moved in a horizontal plane relative to the working deck until the active part 32 of the frame 3 is aligned with the wellbore. Subsequently, a diver can be launched from the frame 3 to establish connections between the frame 3 and a Christmas Tree 9 of the wellbore. The equipment required for the well bore intervention can be brought down via guide wires 7. Subsequently, all kinds of fluids suitable for the intervention can be injected from the frame 3 through the coiled tubing 50 shot down into the built-up Riser 6 or vice versa. After the intervention, the platform 1 can easily be disconnected from the well and sailed to another well.

Zoals getoond in figuur 6 wordt de de inrichting volgens de uitvinding ook met voordeel toegepast in een werkwijze voor het offshore uitvoeren van boorputinterventies boven een bestaand productieplatform. Het bestaande productieplatform omvat een jacket fundering 61 die zich gedeeltelijk onder water uitstrekt en waarop een verwerkingsplatform 60 is geplaatst dat zich boven de waterspiegel 17 bevindt. Boorputbuizen 62 strekken zich vanaf een bron onder het bodemoppervlak 15 uit tot boven het verwerkingsplatform 60, en kunnen met het frame 3 eenvoudig worden bereikt door dit frame 3 in een horizontaal vlak te verschuiven.As shown in Figure 6, the device according to the invention is also advantageously used in a method for carrying out offshore borehole interventions above an existing production platform. The existing production platform comprises a jacket foundation 61 which partially extends under water and on which a processing platform 60 is placed which is located above the water level 17. Borehole tubes 62 extend from a source below the bottom surface 15 to above the processing platform 60, and can be easily achieved with the frame 3 by sliding this frame 3 in a horizontal plane.

De uitvinding is niet beperkt tot de hierboven beschreven uitvoeringsvormen en wijzigingen hieraan zouden kunnen worden aangebracht voor zover deze op voor de hand liggende wijze voortvloeien uit de toegevoegde conclusies.The invention is not limited to the embodiments described above and modifications thereof could be made to the extent that they result in the obvious way from the appended claims.

Claims (17)

ConclusiesConclusions 1. Inrichting voor het offshore uitvoeren van boorputinterventies omvattende een jack-up platform dat een in hoogte verstelbaar horizontaal werkdek omvat dat door op een onderwaterbodem steunende verticale poten wordt ondersteund; een frame van onderling stijf verbonden framedelen, dat is ingericht om boorputinterventie apparatuur te dragen en daartoe tenminste twee horizontale framevloeren omvat van onderling verbonden ffamevloerdelen; waarbij het frame met een werkdekgedeelte in horizontale richtingen over het werkdek verrijdbaar met het werkdek is verbonden, en waarbij het frame met een werkzaam gedeelte uitsteekt voorbij een zijrand van het werkdek.An apparatus for performing offshore well operations comprising a jack-up platform comprising a height-adjustable horizontal working deck supported by vertical legs supported on an underwater bottom; a frame of mutually rigidly connected frame parts, which is adapted to carry well-bore intervention equipment and for this purpose comprises at least two horizontal frame floors of mutually connected frame floor parts; wherein the frame with a working deck portion is movably connected to the working deck in horizontal directions over the working deck, and wherein the frame with an operating portion projects beyond a side edge of the working deck. 2. Inrichting volgens conclusie 1, waarbij het werkdek een dikte heeft en het uitkragend gedeelte van het frame zich vertikaal langs het werkdek in de dikterichting ervan uitstrekt.Device as claimed in claim 1, wherein the working deck has a thickness and the projecting part of the frame extends vertically along the working deck in the thickness direction thereof. 3. Inrichting volgens conclusie 1 of 2, waarbij het uitkragend gedeelte van het frame meer horizontale framevloeren van onder verbonden framevloerdelen heeft dan het werkdekgedeelte.Device as claimed in claim 1 or 2, wherein the projecting part of the frame has more horizontal frame floors from lower connected frame floor parts than the working deck part. 4. Inrichting volgens één der voorgaande conclusies, waarbij het frame een breedte heeft en het uitkragend gedeelte van het frame een horizontale ffamevloer omvat die zich verder uitstrekt dan de breedte.Device as claimed in any of the foregoing claims, wherein the frame has a width and the projecting part of the frame comprises a horizontal frame floor that extends further than the width. 5. Inrichting volgens één der voorgaande conclusies, waarbij het werkdekgedeelte van het frame twee horizontale vloeren omvat, en het uitkragend gedeelte van het frame drie horizontale vloeren omvat.Device as claimed in any of the foregoing claims, wherein the working deck part of the frame comprises two horizontal floors, and the projecting part of the frame comprises three horizontal floors. 6. Inrichting volgens één der voorgaande conclusies, waarbij een bovenste horizontale vloer van het frame een coiled tubing injector omvat die aan framedelen wordt verbonden.Device as claimed in any of the foregoing claims, wherein an upper horizontal floor of the frame comprises a coiled tubing injector which is connected to frame parts. 7. Inrichting volgens één der voorgaande conclusies, waarbij een middelste vloer zich uitstrekt in het vlak van het werkdek van het platform en een riseropbouw uitrusting omvat die aan framedelen wordt verbonden.7. Device as claimed in any of the foregoing claims, wherein a middle floor extends in the plane of the working deck of the platform and comprises riser building equipment which is connected to frame parts. 8. Inrichting volgens één der voorgaande conclusies, waarbij een laagste vloer van het uitkragend gedeelte van het frame een riser ring tensioner omvat die aan framedelen wordt verbonden.Device as claimed in any of the foregoing claims, wherein a lowest floor of the projecting part of the frame comprises a riser ring tensioner which is connected to frame parts. 9. Inrichting volgens één der voorgaande conclusies, waarbij een horizontale vloer van het frame kan worden geopend.Device as claimed in any of the foregoing claims, wherein a horizontal floor of the frame can be opened. 10. Inrichting volgens één der voorgaande conclusies, waarbij de zijrand van het werkdek een steunrail omvat.Device as claimed in any of the foregoing claims, wherein the side edge of the working deck comprises a support rail. 11. Inrichting volgens één der voorgaande conclusies, waarbij het werkdek op afstand van en in hoofdzaak evenwijdig aan de steunrail een glijdbalk (skidding beam) omvat waarmee het werkdekgedeelte van het frame in een in hoofdzaak evenwijdig aan de zijrand verlopende richting over het werkdek verrijdbaar is verbonden.Device as claimed in any of the foregoing claims, wherein the working deck comprises a sliding beam (skidding beam) at a distance from and substantially parallel to the support rail, with which the working deck part of the frame can be moved over the working deck in a direction substantially parallel to the side edge. connected. 12. Inrichting volgens één der voorgaande conclusies, waarbij het werkdek in hoofdzaak loodrecht op de steunrail verlopende horizontale glijdbalken omvat waarmee het werkdekgedeelte van het frame in een in hoofdzaak loodrecht op de zijrand verlopende richting over het werkdek verrijdbaar is verbonden.12. Device as claimed in any of the foregoing claims, wherein the working deck comprises horizontal sliding beams which run substantially perpendicular to the support rail, to which the working deck part of the frame is movably connected over the working deck in a direction substantially perpendicular to the side edge. 13. Inrichting volgens één der voorgaande conclusies, waarbij het jack-up platform onder het werkdek bulkheads omvat, die bij voorkeur langs de onderzijde van de glijdbalken verlopen.Device as claimed in any of the foregoing claims, wherein the jack-up platform below the working deck comprises bulk heads, which preferably run along the underside of the sliding beams. 15. Inrichting volgens één der voorgaande conclusies, waarbij het jack-up platform vier of meer poten omvat met een diameter van ten hoogste 4 m.Device as claimed in any of the foregoing claims, wherein the jack-up platform comprises four or more legs with a diameter of at most 4 m. 16. Werkwijze voor het offshore uitvoeren van boorputinterventies onder gebruikmaking van een inrichting volgens één der voorgaande conclusies.A method for conducting offshore borehole interventions using a device according to any one of the preceding claims. 17. Werkwijze volgens conclusie 16, waarbij het jack-up platform in de onmiddellijke nabijheid van een te interveniëren boorput wordt gepositioneerd en het frame ten opzichte van het werkdek wordt verreden totdat het werkzame deel van het frame is uitgelijnd met de boorput.The method of claim 16, wherein the jack-up platform is positioned in the immediate vicinity of a well to be intervened and the frame is moved relative to the working deck until the operative part of the frame is aligned with the wellbore. 18. Werkwijze volgens conclusie 16 of 17, waarbij het jack-up platform in de onmiddellijke nabijheid van meerdere te interveniëren boorputten van een bestaand productieplatform wordt gepositioneerd en het frame ten opzichte van het werkdek wordt verreden totdat het werkzame deel van het frame is uitgelijnd met één van de boorputten.A method according to claim 16 or 17, wherein the jack-up platform is positioned in the immediate vicinity of a plurality of boreholes of an existing production platform to be intervened and the frame is moved relative to the working deck until the active part of the frame is aligned with one of the wells.
BE2013/0768A 2013-11-08 2013-11-08 Device and method for offshore execution of well bore interventions BE1024138B1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
BE2013/0768A BE1024138B1 (en) 2013-11-08 2013-11-08 Device and method for offshore execution of well bore interventions
EP14192038.9A EP2871285B1 (en) 2013-11-08 2014-11-06 Device and method for performing well interventions offshore
DK14192038.9T DK2871285T3 (en) 2013-11-08 2014-11-06 Apparatus and method for performing operations in offshore boreholes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
BE2013/0768A BE1024138B1 (en) 2013-11-08 2013-11-08 Device and method for offshore execution of well bore interventions

Publications (1)

Publication Number Publication Date
BE1024138B1 true BE1024138B1 (en) 2017-11-17

Family

ID=50272192

Family Applications (1)

Application Number Title Priority Date Filing Date
BE2013/0768A BE1024138B1 (en) 2013-11-08 2013-11-08 Device and method for offshore execution of well bore interventions

Country Status (3)

Country Link
EP (1) EP2871285B1 (en)
BE (1) BE1024138B1 (en)
DK (1) DK2871285T3 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108438177B (en) * 2018-05-17 2023-10-27 铁道战备舟桥处 Diving cage for underwater detection operation
CN112850380B (en) * 2021-01-05 2023-08-04 周巧慧 Petroleum conveying system for offshore petroleum platform and use method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004035985A1 (en) * 2002-10-17 2004-04-29 Itrec B.V. An offshore drilling system
US6932553B1 (en) * 2003-03-17 2005-08-23 Itrec, B.V. Multipurpose unit for drilling and well intervention
US20080243365A1 (en) * 2007-03-30 2008-10-02 Remedial (Cyprus) Pcl Methods of holding station and mooring and elevating support vessel

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004035985A1 (en) * 2002-10-17 2004-04-29 Itrec B.V. An offshore drilling system
US6932553B1 (en) * 2003-03-17 2005-08-23 Itrec, B.V. Multipurpose unit for drilling and well intervention
US20080243365A1 (en) * 2007-03-30 2008-10-02 Remedial (Cyprus) Pcl Methods of holding station and mooring and elevating support vessel

Also Published As

Publication number Publication date
DK2871285T3 (en) 2017-01-02
EP2871285A1 (en) 2015-05-13
EP2871285B1 (en) 2016-09-07

Similar Documents

Publication Publication Date Title
BE1020071A5 (en) METHOD FOR PROVIDING A FOUNDATION FOR A MASS FIXED AT HEIGHT AND A POSITIONING FRAME FOR CARRYING OUT THE METHOD.
US6601649B2 (en) Multipurpose unit with multipurpose tower and method for tendering with a semisubmersible
US7021402B2 (en) Method for using a multipurpose unit with multipurpose tower and a surface blow out preventer
US8191636B2 (en) Method and apparatus for motion compensation during active intervention operations
CA2866346A1 (en) Modular drilling rig system
BRPI0616351A2 (en) tubular storage device and tubular handling devices
WO2012144952A1 (en) A multi-functional jack up system for decommissioning an offshore platform
EP4219883A2 (en) Drilling installation, handling system, method for independent operations
US20120318530A1 (en) Device for a Tower for Well Operations and Use of Same
GB2555152A (en) Conductor pipe support system for an off-shore platform
NO325441B1 (en) Mobile equipment for riserless drilling, well intervention, subsea construction from a vessel
US11299939B2 (en) System and method for supporting a riser
DK178718B1 (en) A mobile offshore drilling unit, a method of using such a unit and a system comprising such a unit
BE1024138B1 (en) Device and method for offshore execution of well bore interventions
US3221817A (en) Marine conductor pipe assembly
US20130075102A1 (en) Mobile offshore drilling unit
US20150075803A1 (en) Compensating well intervention method and apparatus
US10086917B2 (en) Drilling vessel and method for operating a drilling vessel adapted to run large diameter casing strings
KR20180076920A (en) Derrick Load Test System and Method
US20160076311A1 (en) Method and apparatus for compensated well intervention operations
EP3450676A1 (en) Crane, marine vessel or rig, and method
US20150176346A1 (en) Method and system for wireline intervention in a subsea well from a floating vessel
US11499379B2 (en) System and method for subsea well operation
US3387459A (en) Self-adjusting tripod structure for supporting an underwater well conductor pipe
KR20020021683A (en) Floating support comprising a central cavity including a plurality of sections