AU2016204976A1 - Precast Concrete Panels used as Surface Lining of Perimeter Surfaces of Excavations - Google Patents

Precast Concrete Panels used as Surface Lining of Perimeter Surfaces of Excavations Download PDF

Info

Publication number
AU2016204976A1
AU2016204976A1 AU2016204976A AU2016204976A AU2016204976A1 AU 2016204976 A1 AU2016204976 A1 AU 2016204976A1 AU 2016204976 A AU2016204976 A AU 2016204976A AU 2016204976 A AU2016204976 A AU 2016204976A AU 2016204976 A1 AU2016204976 A1 AU 2016204976A1
Authority
AU
Australia
Prior art keywords
precast concrete
concrete panels
piles
panels
affixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
AU2016204976A
Inventor
Mark Robert Edmund Curtis
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to AU2016204976A priority Critical patent/AU2016204976A1/en
Priority to US16/317,717 priority patent/US20190309497A1/en
Priority to EP17826669.8A priority patent/EP3485143A4/en
Priority to PCT/AU2017/000148 priority patent/WO2018009958A1/en
Publication of AU2016204976A1 publication Critical patent/AU2016204976A1/en
Priority to AU2023203639A priority patent/AU2023203639A1/en
Abandoned legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • E21D11/083Methods or devices for joining adjacent concrete segments
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/385Sealing means positioned between adjacent lining members
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/04Driving tunnels or galleries through loose materials; Apparatus therefor not otherwise provided for
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Abstract

A system for lining a perimeter surface of an excavation; the perimeter surface defined by a solid structure; the perimeter surface lined by means of precast concrete panels which are affixed to the solid structure. C> (NO Y I >~ro

Description

Precast Concrete Panels used as surface lining of perimeter surfaces of excavations
TECHNICAL FIELD
[0001] The present invention relates to a system for the construction of excavations such as underground structures, including but not limited to car parks, train stations or containment cells for contaminated materials. More particularly, although not exclusively, the system comprises lining (and in some instances further including waterproofing) a perimeter surface (which may include horizontal and vertical surfaces) of an excavation with precast (in some instances prestressed and/or post tensioned) concrete panels affixed to solid structures to form a lining in the form of a wall or floor structure.
BACKGROUND
[0002] Shoring systems are constructed to retain earth and the adjacent structures when a bulk excavation is required. Traditionally, a shoring system comprises piles inserted vertically into the ground at the design spacing around the exterior of the perimeter of a new structure. The area in front and between the piles is excavated in increments (maximum 2.00 meters), which is a time consuming and difficult task. As excavation progresses the piles can be reinforced by bracing with temporary anchors and installing steel dowels between the piles before creating a shotcrete wall interface (see figure 1).
[0003] Ensuring that permanent underground wall structures and floors remain watertight is not a trivial task. Several methods have been used including; constructing a concrete block wall in front of the piles from the basement up to the ground level, to “hide from view” the water leakages and the uneven surface of the piles and the shotcrete walls. In addition, a vertical geosynthetic drainage strip material can be attached to the rear side of the reinforcing steel dowels prior to shotcreting to provide a direct flow of passage of seepage to the basement prior to pumping it out. In the case where the ground has a particularly high water table, a secant piles wall may be used to provide the tanking of the underground structure.
[0004] WO 2011/009219 A1 to Alfonso Gonzalez, SFS Structures Ltd. discloses the use of precast concrete panels to build a wall in a shoring-free excavation and basement construction apparatus and method. The concrete panels in WO 2011/009219 A1 are moulded with a parabolic cross section and lateral faces of the panels are attached between the piles-columns using a bolt system. The bolt system comprises a bolt through the metal post to a steel plate bonded to the backside of the concrete panel. The bolt mechanism acts to prevent the panel from any downward movement during the excavation process. This system does not allow any tolerance on the installation of the columns / soldier piles and requires the soil/earth between the piles-columns to be excavated.
[0005] US 6,220,789 B1 to Richard White discloses a method of constructing an underground building structure without the use of a conventional shoring system. The shoring method requires inserting columns into the ground and vertically arranging concrete or shoring panels against the exterior wall columns. Thus the panels vertically exert force on the ground whilst being reinforced with temporary braces. In this technique the panels are not permanently bolted in place.
[0006] Some of the main disadvantages of the traditional shoring method using piles and shotcrete walls are time consuming steps including excavating the earth between the piles and the additional supply and installation of dowel bars. Furthermore, shotcreting is not only time-consuming but also extremely sensitive to inclement weather. The traditional shoring method cannot provide waterproofed walls and strip drains are difficult to install and most of the time inefficient. Generally, the construction of an additional concrete block wall in front of the piles is required to overcome these problems. Overall, the construction of underground structures is a long and complex activity, that is expensive and requires the expertise of tradesmen in areas such as: diggers, steel fixers, shotcreters and brick layers [0007] It would be advantageous if a system and method could be provided which did not require the participation of multiple trades and yet provided for a means of shoring, even in unstable or water laden ground. It would be further advantageous in at least some forms to provide a waterproofing seal at the soldier pile interface. It would be further advantageous if a system and method could be provided which did not require the construction of additional facades in order to provide a finished, functional lining for the perimeter surface of an excavation.
[0008] It is an object of the present invention to address or at least ameliorate some of the above disadvantages.
Notes [0009] The term “comprising” (and grammatical variations thereof) is used in this specification in the inclusive sense of “having” or “including”, and not in the exclusive sense of “consisting only of’. The above discussion of the prior art in the Background of the invention, is not an admission that any information discussed therein is citable prior art or part of the common general knowledge of persons skilled in the art in any country.
SUMMARY OF INVENTION
[00010] Accordingly, in one broad form of the invention there is provided a system for lining a perimeter surface of an excavation; the perimeter surface defined by a solid structure; the perimeter surface lined by means of precast concrete panels which are affixed to the solid structure.
[00011] Accordingly, in a further broad form of the invention there is provided a system for lining a perimeter vertical and horizontal surface of an excavation for the purpose of waterproof tanking including the base floor area; the perimeter surface defined by a solid structure; the perimeter surface lined by means of precast concrete panels which are affixed to the solid structure.
[00012] Accordingly, in a further broad form of the invention there is provided a method for lining a perimeter surface of an excavation; the perimeter surface defined by a solid structure; the perimeter surface lined by means of precast concrete panels which are affixed to the solid structure.
[00013] Preferably the perimeter surface is a vertical surface.
[00014] Preferably the perimeter surface is a horizontal surface.
[00015] Accordingly, in yet a further broad form of the invention there is provided a top-down method of affixing precast concrete panels to piles; said method including the steps of: (a) inserting piles to design depth around the exterior of a design perimeter of an underground structure with a predetermined horizontal pile spacing. (b) Excavate in increments. (c) Affix precast concrete panels to the piles. (d) Install temporary anchors progressively, with the advancement of the excavation and the installation of precast concrete panels. (e) Stress the temporary anchors.
[00016] Accordingly, in yet a further broad form of the invention there is provided a bottom-up method for the construction of an underground structure can be used subsequent to the completion of the formation level of the precast concrete panel system affixed to piles; said method including the steps of: (a) Constructing internal footings, drainage and sewer systems. (b) Constructing lift shafts. (c) Constructing additional underground structure including basement slabs and wall. (d) Progressively destress the relevant temporary anchors and remove the anchor plates and protruding portions of the temporary anchors.
[00017] Accordingly, in yet a further broad form of the invention there is provided a top-down method of affixing precast concrete panels to a rock face; said method including the steps of: (a) Excavate in increments. (b) Affix precast concrete panels to the rock face thereby to line the rock face with the precast concrete panels preparatory to commencing the next increment of excavation.
[00018] Accordingly, in yet a further broad form of the invention there is provided a bottom-up method for the construction of the underground structure can be used subsequent to the completion of the formation level of the precast concrete panel system affixed to rock a face; said method including the steps of: (a) Constructing internal footings, drainage and sewer systems, (b) Constructing lift shafts. (c) Constructing underground structure: basement slabs and wall [00019] Accordingly, in yet a further broad form of the invention there is provided a top-down method of affixing precast concrete panels to canopy tubes; said method including the steps of: (a) Inserting hollow canopy tubes into soil/earth in an arched formation slightly above the intended arched formation, (b) Fill canopy tubes with grout. (c) Excavate in increments below the tubes to commence tunnelling. (d) Affix precast concrete panels to grout filled canopy tubes [00020] Preferably the solid structure is a rock face.
[00021] Preferably the solid structure comprises a plurality of columns.
[00022] Preferably the precast concrete panels are affixed to a front portion of the columns.
[00023] Preferably the material in the volume between the columns is not excavated.
[00024] Preferably the precast concrete panels are arranged with their edges in a juxtaposed relationship.
[00025] Preferably an expansion seal, gasket or wall seal system (as described further in this patent application) can be utilized to seal between the adjacent precast concrete panels.
[00026] Preferably the precast concrete panels adjoin at a location between the columns.
[00027] Preferably the precast concrete panels adjoin vertically.
[00028] Preferably the precast concrete panels adjoin horizontally.
[00029] Preferably the columns are substantially parallel to each other.
[00030] Preferably the columns comprise piles.
[00031] Preferably the piles comprise soldier piles.
[00032] Preferably the piles comprise of contiguous piles [00033] Preferably the piles comprise of secant piles.
[00034] Preferably the piles are comprised of reinforced concrete.
[00035] Preferably each pile of the piles is formed by the step of drilling so as to define a tubular cavity followed by the step of inserting reinforcement material into the tubular cavity followed by the step of pouring concrete into the tubular cavity and allowing it to set thereby to construct the pile.
[00036] Preferably the columns comprise canopy tubes.
[00037] Preferably the canopy tubes are filled with grout.
[00038] Preferably the perimeter surface is substantially planar.
[00039] Preferably the perimeter surface is substantially curved.
[00040] Preferably the precast concrete panels are comprised of steel and/or fibre reinforced concrete.
[00041 ] Preferably the precast concrete panels are cast in a mould.
[00042] Preferably the precast concrete panels are cast with a fully covering vertical drainage structure void HDPE mesh.
[00043] In a preferred form the mesh is covered both sides with a geotextile being a composite material that is adhered to the reverse side of the precast concrete panels.
[00044] Preferably the reverse side of the precast concrete panels comprising said fully covering vertical drainage structure void HDPE mesh.
[00045] In a preferred form the mesh is covered both sides with a geotextile being a composite material that is positioned against the solid structure to which the precast concrete panels are affixed.
[00046] Preferably the precast concrete panels are cast with an encapsulated flexible seal member extending from at least one edge of the precast concrete panels.
[00047] Preferably the precast concrete panels are affixed to the solid structure by means of rock bolts.
[00048] Preferably the precast concrete panels are affixed to the solid structure by means of chemical bolts.
[00049] Preferably the precast concrete panels are affixed to the solid structure by means of mechanical bolts.
[00050] Preferably the precast concrete panels are affixed in a first step by means of anchors extending beyond the perimeter surface into material located behind the perimeter surface.
[00051] Preferably the anchors are deactivated after alternative support structures are implemented.
[00052] Preferably the anchors are deactivated after the basement floors are built.
[00053] Preferably excavation occurs at a maximum of 2 metre increments.
[00054] Preferably if tanking of the underground structure is required, install the precast concrete panels horizontally on the lowest basement and vertically on the perimeter of the structure.
[00055] Preferably there is a further step of sealing all joints between adjacent panels.
[00056] Preferably sealing is performed utilising overlapping seals, expansion seal, gasket or the wall seal system as described further in this application.
BRIEF DESCRIPTION OF DRAWINGS
[00057] Embodiments of the present invention will now be described with reference to the accompanying drawings wherein: [00058] Figure 1, is a prior art illustration of a conventional pile and shotcrete wall shoring system used for lining excavations. The inset figure IB illustrates detail of the piles and intervening shotcrete fill construction.
[00059] Figures 2 A, B and C, illustrate respectively a plan, side and front view a precast concrete panel system applied to piles for the construction of walls lining the perimeter surface of an excavation, in accordance with a first preferred embodiment of the present invention.
[00060] Figure 3 illustrates, in a first preferred embodiment, a detailed side section view of the piles and precast concrete panel system of figure 2 incorporating a drainage system in accordance with a further embodiment.
[00061] Figure 4 A, B and C illustrate respectively the plan, front and side views of the system of figure 2 or figure 3 with a joint sealing system in accordance with a further preferred embodiment.
[00062] Figure 5 shows a side section view of the joint sealing system of figure 4.
[00063] Figures 6 A, B and C, illustrate respectively a plan, side and front view of the system of precast concrete panels affixed directly to a rock face for the construction of walls lining the perimeter surface of an excavation, in accordance with a further preferred embodiment.
[00064] Figure 7 illustrates an end cross section view of a precast concrete panels system in accordance with a further embodiment affixed to canopy tubes installed in an arch formation for the construction of a tunnel.
[00065] Figure 8 comprises views as illustrated of a flexible seal system in accordance with a first preferred embodiment applied to adjacent concrete panels; [00066] Figure 9A comprises a side section detail view of a welded portion of the flexible seal of members of Fig8; [00067] Figures 9B and 9C comprise a further plan and sectioned end view with enlargements of the flexible seal members of Fig 8; [00068] Figure 10 comprises views as illustrated of a flexible seal system in accordance with a second preferred embodiment applied to adjacent concrete panels; [00069] Figures 10A and 10B comprise view of variations of the flexible seal system of Figure 10; [00070] Figure 11 comprises views as illustrated of a flexible seal system in accordance with a third preferred embodiment applied to adjacent concrete panels; [00071] Figure 11A comprises a side section detail view of a welded portion of the flexible seal of members of Fig 11 [00072] Figure 12 illustrates a wall panel arrangement constructed from the embodiments of any one of Figures 8 to 11; [00073] Figure 13 is a diagrammatic arrangement of a methodology for defining a landfill volume; [00074] Figure 14 illustrates a methodology for defining a landfill volume which can advantageously utilise the wall seal system of any one of Figures 8 to 11; [00075] Figure 15 comprises views as illustrated of a flexible seal system in accordance with a fourth preferred embodiment, applicable to any of the above-described methodologies [00076] figure 16 is a perspective view of an alternative embodiment for sealing adjoined precast concrete panels, [00077] figure 17 is a perspective view of a further embodiment of a precast concrete panel incorporating surface cavities.
DETAILED DESCRIPTION OF PREFERED EMBODIMENTS
[00078] Embodiments of the present invention are concerned with the use of precast concrete panels affixed to solid structures to form the interior walls or linings of excavations such as tunnels or underground structures which may be in the form of car parks, train stations and containment cells for contaminated materials. In one form components of the system may be used to form a shoring system to facilitate formation of the excavations.
First Embodiment [00079] With reference to figure 2A, there is illustrated a plan view of a first embodiment of the present invention where the solid structures in this instance comprise vertical piles 121.
[00080] In this preferred embodiment, the excavation is built utilizing a precast concrete panel system 100 in this instance by way of a top-down construction method. Once the formation of the excavation has been achieved, the construction of the underground structure can start using a bottom-up method.
[00081 ] In the first embodiment of the precast concrete panels system 100 piles 121 are inserted into the ground at a horizontal spacing 145 around the exterior perimeter 144 of the underground structure 146 to be formed. In preferred forms the horizontal spacing 145 between the piles is calculated preferably using the vertical loads and the side loads exerted on the piles. A typical, nonlimiting spacing is approximately 2-2.5 metres.
[00082] With reference to figure 2C, in the first preferred embodiment, the material directly in front of the piles 121 may be excavated in vertical increments 147 (preferably maximum 2 metres) to avoid ground collapse. At each excavated vertical increment 147, the rectangular precast concrete panels 122 are affixed, in this instance, to the front portion of two or more piles 121. In a preferred form the precast concrete panels 122 are oriented with their longest dimension parallel to the ground. In another form the precast concrete panels 122 may include decorative features. In one form these features may include relief patterns.
[00083] With reference to figure 2C, the preferred juxtaposed relationship between precast concrete panels 121 ensures that they vertically adjoin at a region 149 located intermediate the piles. In a preferred form there may be a gap, for example of up to 20 mm, between adjacent precast concrete panels. In this embodiment the region 149 at no stage is located flush with the front 148 of the piles 121.
[00084] In this instance the preferred method of affixing the precast concrete panels to the piles 21 is by means of bolts 26 passing through the precast concrete panels 122 and into the piles 121. In a particular preferred form, a minimum of 4 bolts 126 is utilised to affix each precast concrete panel 122 to piles 121.
[00085] In a preferred embodiment, a temporary anchor 120 is inserted through a steel plate 123 and driven at an angle into a precast concrete panel 122. In a preferred form the temporary anchor 120 passes through the precast concrete panel 122 and then through the soldier pile 121 to which the precast concrete panel is abutted. The temporary anchor 120 then extends into the material 151 located behind the perimeter surface 144 (see figure 2B) thereby to anchor the precast concrete panels 122 into the material 151. There remains a portion of the temporary anchor 120 which protrudes at an angle from the surface of the wall 150. This arrangement provides at least temporary bracing or shoring of the precast concrete panels 122 pending utilisation of alternative forms of bracing or shoring.
[00086] In a preferred embodiment, the basement slabs 127 may form the floor of each respective level. The slabs 127 are installed sequentially from the lowest level up. The floors provide the required bracing or shoring for the precast concrete panel system 100. As each floor is installed the relevant temporary anchor 120 may be destressed and the anchor plates 123 and protruding section of the temporary anchor 150 removed.
[00087] In a preferred embodiment, the precast concrete panels 122 are cast with a fully covering vertical drainage structure 125 on the reverse side. The vertical drainage structure 125 includes either a bi-dimensional or tri-dimensional HDPE mesh void structure, encapsulated by a geotextile fabric. The vertical drainage structure 125 may function as a conveyance passage for water and/or gas emissions. In addition, or in the alternative it may be used as a thermal and/or noise insulator.
Second Preferred Embodiment
With reference to figure 4A, B and C and figure 5 there is illustrated a second preferred embodiment of the present precast concrete panel system 200 wherein the gaps between the affixed precast concrete panels 122 are sealed using a flexible seal system for provision of a substantially watertight seal between adjacent concrete panels.
[00088] In a preferred embodiment the precast concrete panels are cast with an encapsulated flexible seal member extending from at least one edge of the precast concrete panels.
In this second preferred embodiment the precast concrete panels are constructed from a method comprising pouring concrete into formers moulds; suspending flexible seal members into the concrete prior to its setting such that at least the anchor portion of the flexible seal member is encased within the concrete; The concrete then sets to form a solid concrete panel having one or more flexible seal members anchored therein.
[00089] The concrete panels are arranged in juxtaposed relationship such that an overlap component of a flexible seal member of a first type overlaps at least a portion of a surface component of a flexible seal member of a second type so as to form an elongated weld zone along edges of the juxtaposed concrete panels. A welding operation is performed along the length of the elongated weld zone whereby the overlap component of the flexible seal member of the first type is welded to the flexible seal member of the second type substantially along the elongated weld zone thereby to form a substantially water tight flexible seal between the juxtaposed concrete panels. The overlap component of the overlap components of the flexible seal members proximate the vertical edge of first and second vertical concrete panels are welded. Panels may be stacked on the longitudinal alignment of panels [00090] With reference to inset figure 5 one particular form of the wall seal system comprises an F shaped membrane 130 having an overlap component 130A is anchored into precast concrete panel 122 by means of anchor component 130B. The overlap component 130A is dimensioned so as to, in use, overlay an external portion of C shaped membrane 131 and to which it is subsequently welded by double weld 132. The C shaped membrane is anchored into the adjacent panel 122 by means of anchor components 13 IB.
[00091] In this instance a tongue in groove or male/female joint 128 is utilised to position and retain adjacent precast concrete panels 122 in juxtaposed relationship.
[00092] In one form the precast concrete panels 122 are fixed in a manner to suit the construction sequence of the underground structure and seek to avoid the male-female interlocking joints 128 from interfering with basement slabs 127 and walls.
[00093] In an instance where the ground water table is very high partial or full tanicing of the underground structure may be required. In this case the lowest basement is built using the precast concrete panels 122 placed horizontally. The joints 128 between the precast concrete panels may be waterproofed using the Wall Seal System 124.
[00094] Further examples of the wall seal system 124 which may be applied to any of the described above embodiments, are described later in this specification.
[00095] In the precast concrete panels system 200 shown in figure 4A the solid structure illustrated comprises piles 121 arranged in soldier pile format. In a further preferred embodiment the horizontal spacing between the piles 145 becomes negligible and the solid structure takes the form of contiguous piles 171. A plan view of such an arrangement is shown in Figure 1D. The precast concrete panels 121 may then be affixed directly to the front region 148 of the contiguous piles in a juxtaposed relationship. In preferred forms the gaps between the affixed precast concrete panels 122 are sealed using sealing material. In a particular preferred form, a flexible seal system (as described elsewhere in the specification) for provision of a substantially watertight seal between adjacent concrete panels may be adopted. In this instance the fully covering vertical drainage structure void HDPE mesh adhered to the reverse side of the precast concrete panels acts as a drainage system between the contiguous piles and the inner wall.
[00096] In the precast concrete panels system 200 shown in figure 4A the solid structure illustrated is piles 121. In a further preferred embodiment, where the material 151 has a high water table, the piles 121 may be cast such that they are interlocked and the solid structure takes the form of secant piles (see figure ID). The construction of secant piles involves casting primary (female) piles 172 first with secondary (male) piles 173, cutting into the primary piles forming a continuous wall. In one form the primary and secondary piles may be cast from different concrete. In this instance the fully covering vertical drainage structure void HDPE mesh adhered to the reverse side of the precast concrete panels acts as the drainage system between the piles and the inner wall.
Third Preferred Embodiment [00097] With reference to figure 6Λ, B and C there is illustrated a third preferred embodiment of the present precast concrete panel system 300 wherein precast concrete panels 122 are affixed directly to a rock face 133 to line the perimeter surface 144 of an excavation 146 in this instance defined substantially by the rock face 133.
[00098] In this embodiment, particularly where the perimeter surface 144 of an excavation is too dense to insert any additional solid fixtures, the precast concrete panels 122 may be directly affixed to the rock face 133 or rocky ground. In this instance, the preferred method of affixing the precast concrete panels to the rock face 133 is by means of rock bolts 134 passing through the precast concrete panel 122 and into the rock face 133. In this instance, no temporary anchor bolts are required. In a preferred form, the rock bolts 134 are used to support the panels 122 in place on a permanent basis.
Fourth Preferred Embodiment [00099] With reference to figure 7, there is illustrated a fourth embodiment of the present precast concrete panel system 400 wherein curved precast concrete panels 135 are affixed to canopy tubes 142, to line the perimeter surface 144 of an arch formation 152.
[000100] In the fourth preferred embodiment hollow canopy tubes 142 are driven into material 151 at a distance slightly higher than the perimeter surface 144 of the intended arch formation 152. The canopy tubes 142 are filled with grout 153 and the material 151 directly below is excavated in increments. The curved precast concrete panels 135 are affixed to the grout filled canopy tubes, in this instance using stainless steel bolts 136, as the excavation progresses.
[000101] In a preferred embodiment, the curved precast concrete panels 13 5 may include on the reverse side a fully covered drainage structure which in a preferred form comprises of a bi-planar or tri-planar HDPE mesh void structure encapsulated by a geotextile fabric 125. Adjacent curved precast panels 135 may be joined using the flexible seal system 124 described earlier. In preferred forms the flexible seal system 124 acts to form a waterproof joint between adjacent panels 135.
[000102] With reference to figure 16, there is illustrated a perspective view of an alternative embodiment for sealing the reverse side of adjacent precast concrete panels. The precast concrete panel 122 is defined by surface edges 154. In this instance the perimeter of the precast concrete panel 122 near the surface edge 163 is rimmed with a conductor, preferably copper wire positioned beneath a layer of the flexible seal system 124. A through channel 161 is formed communicating from the front side 122A to the reverse side of the precast concrete panel 122. The edges 154 of two adjacent precast concrete panels 122 may be sealed by electrofusion welding by means of heating the copper wire 165 using the through channel 161 to establish an electrical connection with the copper wire on the reverse side of the precast concrete panel 122. In a particular preferred form electro conductive welding is utilised to weld both the front layers of the flexible seal system and the reverse side layers of the panels 122 thereby providing a double seal.
[000103] With reference to figure 17, there is illustrated a perspective view of a further embodiment of a precast concrete panel 122 incorporating cavities 160. The cavities 160 in this instance comprise hollowed out passages through the precast concrete panel from one surface edge 154 to another. These cavities 160 can be used to house services such as electrical and communication cables thereby to facilitate the enclosed transportation of services around the perimeter of the underground structure 146.
Flexible seal system [000104] The flexible seal system 124 described above may take a number of forms when used to assist in sealing any of the above described embodiments. Further examples of the flexible seal system are described below and with reference to figures 8 to 15.
[000105] The flexible seal system is for sealing the joints between abutting concrete (or other settable material) panels. In each of the below described embodiments, each panel is prepared when cast with flexible seal members of two distinct configurations; a first flexible seal member and a second flexible seal member. Both the flexible seal members include at least one anchor component embedded within the concrete and a surface portion which extends over, or overlays, a portion of the outer surface of the panel. The first flexible seal member is distinguished from the second flexible seal member in that an overlap portion extends from its surface portion in such a way that the overlap portion extends beyond the edge of the panel.
[000106] With reference to Figure 8, there is illustrated a first embodiment of a flexible seal system 10 used to create a substantially watertight seal between, in this instance, a first concrete panel 11 and a second concrete panel 12. As shown in the plan view there is a first flexible seal member 13 proximate a first end of concrete panel 12. First flexible seal member 13 includes a surface component 24 extending over, and anchored into, a surface region 14 first concrete panel 11. In this instance the first flexible seal member 13 further includes at least an anchor component formed as legs or elongate flanges 15A,15B which, in this instance project substantially normal from and are cast into the surface region 14 of the first concrete panel 11, leaving the surface component 24 exposed above surface region 14. Each of the legs 15 A, 15B ends in an enlarged portion for securely embedding the anchor components in the concrete of the panel. The first flexible seal member 13 further includes an overlap component 16 mechanically supported by and extending from the surface component 24 to extend past the end of the concrete panel 11. The first flexible seal member 13 thus described is shown in profile 1 of Figure 8.
[000107] The flexible seal system 10 further comprises a second flexible seal member 17, disposed proximate a second end of an abutting concrete panel 12, comprising, in this instance, a surface component 18 extending over a portion of the surface region 20. Second flexible seal member further includes an anchor component 19 in this instance in the form of a first leg 19 A and a second leg 19 B projecting preferably substantially at right angles from surface component 18,
The legs 19 A and 19 B are cast into the surface region 20 of second concrete panel 12 in such a way as to anchor surface component 18 reliably into the second concrete panel 12 whilst leaving surface component 18 exposed above surface region 20.
[000108] The flexible seal members are arranged so that each concrete panel is provided with a first flexible seal member along each of a first pair of contiguous edges and with a second flexible seal member along each of a second pair of contiguous edges. Thus the differences between the first and second flexible seal members provides, in this embodiment, for sealing around both the vertical and horizontal edges of the panel.
[000109] As shown in the plan view of a concrete panel 11 prepared with the flexible seal system of the invention in Figures 9B, the ends of the first flexible seal members 13 at their intersection 42 are mitrered and welded to form a watertight continuous seal surface. Similarly, the second flexible seal members 17 at their intersection 44 are mitrered and welded. The junctions 46 between first and second flexible seal members are also mitrered and welded so that there is formed a continuous seal surface at the perimeter of the concrete panel. The cross sectioned view and enlargements of Figure 9C show the disposition of each of the first and second flexible seal members and their anchor portions relative the opposite edges of the concrete panel.
[000110] The concrete panels of this preferred embodiment may be formed as follows. The flexible seal members are prepared in lengths to suit the dimensions of the panel to which they are to be applied and the ends mitrered as described above. The first and second flexible seal members are then welded at their intersections to form the continuous seal surface and positioned over formwork for the pouring of the concrete, with the anchor members suspended relative the formwork so as to become embedded within the concrete, and leaving the surface components extending over the surface. One the concrete has set; pressure testing of the flexible seal members completes the process.
[000111] Each of the first and second flexible seal members comprises an integral polymer structure. In use the first concrete panel 11 and the second concrete panel 12 are juxtaposed in sufficiently close relationship that overlap component 16 or at least a portion of it overlaps a longitudinal length of at least a portion of the surface component 18 as shown in the plan view of Figure 1 thereby to define a weld zone 21.
[000112] It should be noted that the surface component extending along an outer surface of the concrete panel with the overlap portion disposed as shown in Figures 8 and 9A, affords considerable flexibility to the seal of the invention, allowing some movement between two adjacent panels in at least two directions. Moreover, the relatively short distance the anchor components of the two flexible seal members intrude into the concrete allows the flexible seal system of the invention to be used with relatively thin concrete panels. This may be contrasted for example with the arrangement of FR2415693 to Bachy discussed above, in which the arrangement of the flexible seal members require a much greater thickness of panel. It is noted also that the Bachy system creates an inherent weakness in the concrete by the long intrusion likely to lead to cracking.
[000113] The overlap component 16 and surface component 18 are made from a weldable plastics material whereby, following the juxtaposition of the adjacent panels the overlap component 16 is welded along its length to the surface component 18 by means not shown. Preferably, the overlap component of the first flexible seal member is of thinner or more pliable than the anchor components.
[000114] Preferred materials for the flexible seal members 13,17 include plastics materials, in particular, plastic materials which have the capacity to stretch and flex and preferably to be welded one to the other.
[000115] Suitable materials include polymers; HDPE; PVC; Teflon and polymer blends. Preferably these materials may be particularly selected and optimized for properties such as elongation, resistance to chemicals, and resistance to heat. Polyethylene and polypropylene are particularly suited for petrochemical applications. PVC or PET may be suited to water applications.
[000116] Preferably the same material is used for both the first flexible seal member 13 and the second flexible seal member 17 thereby to assist in homogeneity of the weld (see below).
[000117] A preferred process of welding is thermal fusion welding utilising a modified plastics extruder machine (not shown) that can be hand operated and which extrudes a molten bead of High Elongation resin through a “stepped” die head over an overlapping weld zone 21.
Preferably the weld zone 21 is prepared via abrasion prior to extrusion welding to remove surface grit and contamination.
[000118] In preferred forms the weld consumable comprises the same material composition as that of the first flexible seal member 13 and second flexible seal member 17. At figure 9A is a side section view of a preferred form of weld showing the consumable 40 enveloping a beveled edge portion of the overlap component 16 and at least a portion of the surface component 18.
[000119] Preferably, each weld is tested for water tightness at the completion of the weld. In a preferred method, after preparing the seal to be tested with a suitable liquid, a plexiglass dome, provided with a seal around its periphery, is placed over the weld area to be tested and a partial vacuum created under the dome to show up any imperfections. This testing is facilitated by the ready access available to the overlap component of the first flexible seal member and the bead of welding along the overlap edge.
[000120] With reference to the wall panel plan view of fig 8 a preferred arrangement for the first concrete panel 11 is to have a flexible seal member of the first flexible seal member 13 aligned along a first edge 22 thereof and to have a second flexible seal member 17 aligned along an opposite parallel second edge 23 thereof as illustrated. Panels of like types and flexible seal member arrangements can then be juxtaposed side-by-side in the manner illustrated in the adjacent wall panels plan view of Figure 8. In this embodiment a preferred distance between edges of adjacent panels is approximately 20 mm and with the opposed anchor component inset approximately 50 mm from an edge of an opposed panel edge with the overlap component extending approximately 130 mm from an edge of the panel into which it is anchored so as to thereby provide a weld zone of around 60 mm and where the face of the surface region of the second flexible seal member over which it extends is of the order of 90 mm in width.
[000121] Typical precast concrete panel or cast in situ panel dimensions can be of the order of 4000mm mm x 2000mm or as large as 2000mm x 6000mm mm or as required by the application.
The panels themselves may be square, rectangular, cruciform, arched or other suitable shapes preferably adapted for adjacent abutting of long edges thereof.
[000122] In preferred forms the flexible seal members are applied on the “inside” of the resulting bander structure. That is to say on the side abutting the material or liquid which is being retained by the structure.
[000123] With reference to Figure 10 there is illustrated a further embodiment of a flexible seal system 210 wherein like components are numbered as for the first embodiment described with reference to Figure 8 except in the 200s series. In this instance first flexible seal member 213 includes a single anchor component 215 subtending from a surface component 24 which, in this instance, then extends integrally to the overlap component 216.
[000124] The overlaps of the arrangement of Figure 10 are approximately the same as for the arrangement of Figure 8.
[000125] With reference to Figure 11 there is illustrated a further embodiment of a flexible seal system 310 where like components are numbered as for the embodiment described with reference to Figure 8 except in the 300s series. The construction of the flexible seal members 313, 317 is substantially the same as that for the first embodiment. In this instance the second flexible seal member is placed as close to an edge of the concrete panel as possible rather than inset 50 mm as was the case with the arrangement of Figure 8. Correspondingly the extension of the overlap component 316 may be reduced to 75 mm as a result.
[000126] As shown in Figure 12 further panels can then be stacked on the initial longitudinal alignment of panels and joined by welds along all four edges to create a wall structure of substantially any length and any height. In this instance a wall structure 29 is comprised of lower juxtaposed panels 25, 26 joined at weld zone 30 above which are placed further panels 27, 28 which are themselves joined at weld zone 31. Upper panel 27 is joined at weld zone 32 to lower panel 25 whilst upper panel 28 is joined to lower panel 26 at weld zone 33 thereby to form a wall structure comprised of four concrete panels.
[000127] The wall panel arrangement of Figure 12 can be used by way on non-limiting example of a dam wall, tunnel arch, tank farm vertical bund wall, sea wall.
[000128] In addition, in respect of any one of the above described embodiments, a fire-resistant/heat-resistant/chemical-resistant/UV-resistant expandable and/or flexible sealant or mastic may be inserted in the gap region between adjacent panels. In some forms this will be for the purpose of providing UV resistance. In other forms it will be for the purpose of providing heat resistance. In some forms this will be particularly for protecting the welded flexible seal.
Reclamation System [000129] The above described system of any previous embodiments including those of figures 1 to 7 can be utilised as part of a methodology to reclaim landfill volume.
[000130] With reference to Figure 13 there is illustrated a berm 50 traditionally used to define a boundary for a landfill volume.
[000131] An alternative arrangement which permits use of substantially the volume of the berm involves use of a substantially vertical wall structure 51 thereby permitting use of volume 52 that otherwise would be occupied by the berm itself.
[000132] Advantageously, the vertical wall structure 51 is constructed utilising the arrangements described with reference to the earlier embodiments of Figures 8 to 12.
[000133] With reference to Figure 14, a preferred system which can be used as part of a landfill system includes: (a) defining a substantially flat filling area 60 defined in part by at least a far edge region 61 separated from a near edge region 62 (b) constructing a first substantially vertical wall structure 63 from concrete panels to a first panel height hi substantially along the far edge region 61 (c) placing landfill 64 up to the level of the first panel height hi (d) constructing a substantially vertical second wall structure 65 along top edges of the first substantially vertical wall structure 63 to a second panel height h2 (e) placing landfill 66 to the level of the second panel height h2. The process may be continued as necessary until a desired maximum wall height hn is achieved.
[000134] In some applications a liner may be applied to the filling area 60. In some applications a contiguous liner may be applied over the inside face of the wall structure 63, 65...
[000135] Applications for embodiments of the invention described above include, but not are limited to: (a) Water retained structures (b) Hydraulic barrier structures such as sea walls or cut off walls (c) Chemical spill barrier structures in tanlcfarm bundwall storages (d) Retaining wall banders (e) Waterproofing of the low grade concrete structures (f) Waterproofing of tunnel arch structures (g) Volume capacity reclaiming structures for landfills [000136] In a preferred arrangement in which the concrete panels with the flexible seal system of the invention are used for the sequential erection of a wall defining the boundary of refuse land fill, the concrete panels are erected with the flexible seal members on the rear surface of the panels, that is away from refuse land fill. In this arrangement, the flexible seal member along the lower horizontal edge of the lowermost or first row of panels of the wall, is the second flexible seal member described above and designated 17 in Figures 8 and 9A. A liquid proof seal between the wall and ground cover sheet of the land fill area can then be made by extending the polymer ground sheet of the land fill surface to lie under the foundation or toe of the wall to curve upward and, after the concrete panels are erected, welding the edge of the ground cover sheet to the flexible seal member of the panel.
[000137] With reference to Figure 15, there is illustrated a wall seal system 410, in accordance with a further preferred embodiment of the invention, wherein like components are numbered as for earlier embodiments, except in the 400 series.
[000138] In this instance, the overlap component 416 comprises a separate component Rom the first flexible seal member 413 and the second flexible seal member 417. Accordingly, in use, the adjacent wall panels 411, 412 are juxtaposed and then the overlap component 416 is applied so as to overlap at least a portion of both the first flexible seal member 413 and the second flexible seal member 417, and substantially along the entire length thereof. The overlap component 416 is then welded to both flexible seal members 413, 417.
[000139] This embodiment is suited for use in most situations where the previously-described embodiments are applicable.

Claims (69)

1. A system for lining a perimeter surface of an excavation; the perimeter surface defined by a solid structure; the perimeter surface lined by means of precast concrete panels which are affixed to the solid structure.
2. The system of claim 1 wherein the solid structure is a rock face.
3. The system of claim 1 wherein the solid structure comprises a plurality of columns.
4. The system of claim 3 wherein the precast concrete panels are affixed to a front portion of the columns.
5. The system of claim 3 or 4 wherein material in the volume between the columns is not excavated.
6. The system of any one of claims 1 to 5 wherein the precast concrete panels are arranged with their edges in a juxtaposed relationship.
7. The system of any one of claims 3,4 or 5 wherein the precast concrete panels adjoin at a location between the columns.
8. The system of any one of claims 1 to 7 wherein the precast concrete panels adjoin vertically.
9. The system of any one of claims 1 to 7 where the precast concrete panels adjoin horizontally.
10. The system of claim 3 wherein the columns are substantially parallel to each other.
11. The system of claim 3 or claim 4 wherein the columns comprise piles.
12. The system of claim 11 wherein the piles comprise soldier piles.
13. The system of claim 11 wherein the piles comprise of contiguous piles 14. the system of claim 11 wherein the piles comprise of secant piles.
15. The system of claim 11 to 14 wherein the piles are comprised of reinforced concrete.
16. The system of claim 11 wherein each pile of the piles is formed by the step of drilling so as to define a tubular cavity followed by the step of inserting reinforcement material into the tubular cavity followed by the step of pouring concrete into the tubular cavity and allowing it to set thereby to construct the pile.
17. The system of claim 11 or claim 16 wherein the columns comprise canopy tubes.
18. The system of claim 17 wherein the canopy tubes are filled with grout.
19. The system of any one of claims 1 to 18wherein the perimeter surface is substantially planar.
20. The system of any one of claims 1 to 18 wherein the perimeter surface is substantially curved.
21. The system of any one of claims 1 to 20 wherein the precast concrete panels are comprised of steel and/or fibre reinforced concrete.
22. The system of any one of claims 1 to 21 wherein the precast concrete panels are cast in a mould.
23. The system of claim 22 wherein the precast concrete panels are cast with a fully covering vertical drainage structure void HDPE mesh adhered to the reverse side of the precast concrete panels.
24. The system of claim 23 wherein the reverse side of the precast concrete panels comprising said fully covering vertical drainage structure void HDPE mesh covered both sides with a geotextile being a composite material is positioned against the solid structure to which the precast concrete panels are affixed.
25. The system of any one of claims 22, 23 or 24 wherein the precast concrete panels are cast with an encapsulated flexible seal member extending from at least one edge of the precast concrete panels.
26. The system of any one of claims 1 to 25 wherein the precast concrete panels are affixed to the solid structure by means of rock bolts.
27. The system of any one of claims 1 to 25 wherein the precast concrete panels are affixed to the solid structure by means of chemical bolts.
28. The system of any one of claims 1 to 25 wherein the precast concrete panels are affixed to the solid structure by means of mechanical bolts.
29. The system of any one of claims 1 to 28 wherein the precast concrete panels are affixed in a first step by means of anchors extending beyond the perimeter surface into material located behind the perimeter surface.
30. The system of claim 29 wherein the anchors are deactivated after the basement floor are built..
31. A method for lining a perimeter surface of an excavation; the perimeter surface defined by a solid structure; the perimeter surface lined by means of precast concrete panels which are affixed to the solid structure.
32. The method of claim 31 wherein the solid structure is a rock face.
33. The method of claim 32 wherein the solid structure comprises a plurality of columns.
34. The method of claim 33 wherein the precast concrete panels are affixed to a front portion of the columns.
35. The method of claim 33 or 34wherein material in the volume between the columns is not excavated.
36. The method of any one of claims 31 to 35 wherein the precast concrete panels are arranged with their edges in a juxtaposed relationship.
37. The method of any one of claims 33, 34 or 35 wherein the precast concrete panels adjoin at a location between the columns.
38. The method of any one of claims 31 to 37 wherein the precast concrete panels adjoin vertically.
39. The method of any one of claims 31 to 37 where the precast concrete panels adjoin horizontally.
40. The method of claim 33 wherein the columns are substantially parallel to each other.
41. The method of claim 33 or claim 34 wherein the columns comprise piles.
42. The method of claim 41 wherein the piles comprise soldier piles.
43. The method of claim 41 or 42 wherein the piles are comprised of reinforced concrete.
44. The method of claim 41 wherein each pile of the piles is formed by the step of drilling so as to define a tubular cavity followed by the step of inserting reinforcement material into the tubular cavity followed by the step of pouring concrete into the tubular cavity and allowing it to set thereby to construct the pile.
45. The method of claim 41 or claim 44 wherein the columns comprise canopy tubes.
46. The method of claim 45 wherein the canopy tubes are filled with grout.
47. The method of any one of claims 31 to 46 wherein the perimeter surface is substantially planar.
48. The method of any one of claims 31 to 46 wherein the perimeter surface is substantially curved.
49. The method of any one of claims 31 to 48 wherein the precast concrete panels are comprised of steel and/or fibre reinforced concrete.
50. The method of any one of claims 31 to 49 wherein the precast concrete panels are cast in a mould.
51. The method of claim 50 wherein the precast concrete panels are cast with a fully covering vertical drainage structure void HDPE mesh covered both sides with a geotextile being a composite material adhered to the reverse side of the precast concrete panels.
52. The method of claim 51 wherein the reverse side of the precast concrete panels comprising said fully covering vertical drainage structure void HDPE mesh covered both sides with a geotextile being a composite material is positioned against the solid structure to which the precast concrete panels are affixed.
53. The method of any one of claims 50, 51 or 52 wherein the precast concrete panels are cast with an encapsulated flexible seal member extending from at least one edge of the precast concrete panels.
54. The method of any one of claims 31 to 50 wherein the precast concrete panels are affixed to the solid structure by means of rock bolts.
55. The method of any one of claims 31 to 50 wherein the precast concrete panels are affixed to the solid structure by means of chemical bolts.
56. The method of any one of claims 31 to 54 wherein the precast concrete panels are affixed to the solid structure by means of mechanical bolts.
57. The method of any one of claims 31 to 56 wherein the precast concrete panels are affixed in a first step by means of anchors extending beyond the perimeter surface into material located behind the perimeter surface.
58. The method of claim 57 wherein the anchors are deactivated after the basement floors are built.
59. A top-down method of affixing precast concrete panels to piles; said method including the steps of: a) Inserting piles to design depth around the exterior of a design perimeter of an underground structure with a predetermined horizontal pile spacing. b) Excavate in increments c) Permanently affix precast concrete panels to the piles d) Install temporary anchors progressively, with the advancement of the excavation and the installation of precast concrete panels. e) Stress the temporary anchors.
60. The method of claim 59 wherein excavation occurs at a maximum of 2 metre increments.
61. The method of claim 59 or 60 wherein if tanking of the underground structure is required, install the precast concrete panels horizontally on the lowest basement and vertically on the perimeter of the structure.
62. The method of any one of claims 59, 60 or 61 including the further step of sealing all joints between adjacent panels.
63. The method of claim 62 wherein sealing is performed utilising overlapping seals.
64. A bottom-up method for the construction of an underground structure can be used subsequent to the completion of the formation level of the system as claimed in any one of claims 31 to 58; said method including the steps of: a) Constructing internal footings, drainage and sewer systems. b) Constructing lift shafts. c) Constructing additional underground structure including basement slabs and walls. d) Progressively destress the relevant temporary anchors and remove the anchor plates and protruding portions of the temporary anchors.
65. A top-down method of affixing precast concrete panels to a rock face; said method including the steps of: a) Excavate in increments b) Affix precast concrete panels to the rock face thereby to line the rock face with the precast concrete panels preparatory to commencing the next increment of excavation.
66. The method of claim 65 wherein excavation occurs at a maximum of 2 metre increments.
67. The method of claim 65 or 66 wherein if tanking of the underground structure is required, performing the additional step of installing the precast concrete panels horizontally on the lowest basement and vertically on the perimeter of the structure.
68. The method of any one of claims 65, 66 or 67 including the further step of sealing all joints between adjacent panels.
69. A bottom-up method for the construction of the underground structure can be used subsequent to the completion of the formation level of the precast concrete panel system affixed to rock a face; said method including the steps of: a) Constructing internal footings, drainage and sewer systems. b) Constructing lift shafts. c) Constructing underground structure: basement slabs and wall
70. A top-down method of affixing precast concrete panels to canopy tubes; said method including the steps of: a) Inserting hollow canopy tubes into soil/earth in an arched formation slightly above the intended arched formation. b) Fill canopy tubes with grout c) Excavate in increments below the tubes to commence tunnelling. d) Permanently affix precast concrete panels to grout filled canopy tubes
AU2016204976A 2016-07-15 2016-07-15 Precast Concrete Panels used as Surface Lining of Perimeter Surfaces of Excavations Abandoned AU2016204976A1 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
AU2016204976A AU2016204976A1 (en) 2016-07-15 2016-07-15 Precast Concrete Panels used as Surface Lining of Perimeter Surfaces of Excavations
US16/317,717 US20190309497A1 (en) 2016-07-15 2017-07-13 Precast Concrete Panels Used as Surface Lining of Perimeter Surfaces of Excavations
EP17826669.8A EP3485143A4 (en) 2016-07-15 2017-07-13 Precast concrete panels used as surface lining of perimeter surfaces of excavations
PCT/AU2017/000148 WO2018009958A1 (en) 2016-07-15 2017-07-13 Precast concrete panels used as surface lining of perimeter surfaces of excavations
AU2023203639A AU2023203639A1 (en) 2016-07-15 2023-06-09 Precast Concrete Panels used as Surface Lining of Perimeter Surfaces of Excavations

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AU2016204976A AU2016204976A1 (en) 2016-07-15 2016-07-15 Precast Concrete Panels used as Surface Lining of Perimeter Surfaces of Excavations

Related Child Applications (1)

Application Number Title Priority Date Filing Date
AU2023203639A Division AU2023203639A1 (en) 2016-07-15 2023-06-09 Precast Concrete Panels used as Surface Lining of Perimeter Surfaces of Excavations

Publications (1)

Publication Number Publication Date
AU2016204976A1 true AU2016204976A1 (en) 2018-02-01

Family

ID=60951576

Family Applications (2)

Application Number Title Priority Date Filing Date
AU2016204976A Abandoned AU2016204976A1 (en) 2016-07-15 2016-07-15 Precast Concrete Panels used as Surface Lining of Perimeter Surfaces of Excavations
AU2023203639A Pending AU2023203639A1 (en) 2016-07-15 2023-06-09 Precast Concrete Panels used as Surface Lining of Perimeter Surfaces of Excavations

Family Applications After (1)

Application Number Title Priority Date Filing Date
AU2023203639A Pending AU2023203639A1 (en) 2016-07-15 2023-06-09 Precast Concrete Panels used as Surface Lining of Perimeter Surfaces of Excavations

Country Status (4)

Country Link
US (1) US20190309497A1 (en)
EP (1) EP3485143A4 (en)
AU (2) AU2016204976A1 (en)
WO (1) WO2018009958A1 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110670598A (en) * 2019-07-24 2020-01-10 青岛理工大学 Cold joint treatment structure and method for secant pile construction
CN110835917A (en) * 2019-10-23 2020-02-25 江苏兴厦建设工程集团有限公司 Multidirectional rotary-spraying stirring straight-inclined alternating supporting structure and supporting method
CN111255462B (en) * 2020-01-15 2021-05-18 中铁七局集团有限公司 Pipe curtain cover excavation top-down construction method for subway station construction
CN111636441A (en) * 2020-07-02 2020-09-08 福建省永泰建筑工程公司 Deep foundation pit supporting structure and construction method thereof
CN112922028A (en) * 2021-02-02 2021-06-08 中铁四局集团有限公司 Construction method suitable for oversized circular subway station
CN113174964A (en) * 2021-05-06 2021-07-27 哈尔滨工业大学 Frame-suspension pile supporting structure system for protecting subway tunnel and construction method thereof
CN113338305B (en) * 2021-06-30 2022-06-10 广东省构建工程建设有限公司 Internal support structure for underground structure and construction method thereof

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2415693A1 (en) 1978-01-30 1979-08-24 Sif Entreprise Bachy Seals for panels forming support walls against earth - are embedded thermoplastic edging strips welding together or to cover
US4653962A (en) * 1985-10-17 1987-03-31 The Reinforced Earth Company Retaining wall construction and method of manufacture
US4913594A (en) * 1986-10-27 1990-04-03 Schnabel Foundation Company Adjustable connection system for precast facing panel and soldier pile
US4836718A (en) * 1988-03-21 1989-06-06 Schnabel Foundation Company Earth retaining method and structure with improved corrosion protection and drainage
US5558470A (en) * 1992-10-09 1996-09-24 Jte, Inc. System and method for adjustably anchoring traffic barriers and wall facing panels to the soldier beams of a wall
DE19723554C2 (en) * 1997-06-05 2002-11-21 Franz Kerner Phd Entwicklungen Sealing for drip pans and method for producing such a seal
JP2006322222A (en) * 2005-05-19 2006-11-30 Metropolitan Expressway Public Corp Construction method of large-sectional tunnel
JP5308116B2 (en) * 2008-10-08 2013-10-09 大成建設株式会社 How to build a tunnel
CA2673876A1 (en) * 2009-07-24 2011-01-24 Alfonso Gonzalez Shoring free excavation and basement construction apparatus and method
AU2013206618B1 (en) * 2013-06-28 2014-10-09 Mark Robert Edmund Curtis Wall Seal System
WO2015048175A1 (en) * 2013-09-25 2015-04-02 Post Tensioning Solutions LLC Systems and methods to reinforce excavation walls

Also Published As

Publication number Publication date
US20190309497A1 (en) 2019-10-10
EP3485143A4 (en) 2020-09-30
AU2023203639A1 (en) 2023-07-06
WO2018009958A1 (en) 2018-01-18
EP3485143A1 (en) 2019-05-22

Similar Documents

Publication Publication Date Title
AU2023203639A1 (en) Precast Concrete Panels used as Surface Lining of Perimeter Surfaces of Excavations
US10435883B2 (en) Wall seal system
US7500807B2 (en) Method of construction using sheet piling sections
CN107542108B (en) A kind of reverse construction method of building basement structure
HRP20010434A2 (en) Embankment dam and waterproofing method
KR101331261B1 (en) Underground prefabricated precast concrete rainwater recycling facility using precast concrete continuous wall in strut structure or earth anchor and construction method of the same
ITMI950063A1 (en) SYSTEM TO FORM UNDER WATER PROTECTIVE WATERPROOF COATINGS OF HYDRAULIC WORKS
US11560686B2 (en) Membrane-lined wall
US4015379A (en) In-ground swimming pool and apparatus and method for constructing same
US7029204B1 (en) Wall lining method and system
CN111535328A (en) Pit shaft type underground garage foundation pit supporting system in water-rich stratum and construction method
CN109024668B (en) Construction method of multilayer subway station
CN110735641A (en) Construction method of transfer passage of underpass pipeline
CN213448506U (en) Plugging structure arranged between foundation pit fender posts
CN108104158A (en) A kind of assembled underground pipe gallery and assembled in situ method
RU2465401C1 (en) Method to erect underground structures by "wall in soil" method and wall in soil erected by this method
KR101778206B1 (en) New water-proofing method for large diameter propelling tunner
JPH09242089A (en) Underground outer wall using earth retaining wall
JPH0813495A (en) Earth retaining wall and method thereof
CN117513363A (en) Fluid-state solidified soil backfilling system for pit-in-pit narrow fertilizer slot and construction method
JP2022118913A (en) Leachate water-collection pit, waste disposal facility, and method of constructing leachate water-collection pit
CN116877128A (en) Construction method for controlling buckling deformation of subway station by hole pile method
CN114319164A (en) Open-cut tunnel upper-span existing culvert structure and construction method thereof
TR201807421T4 (en) Method and system for clamping the waterproofing primer of a hydraulic structure to concrete curb stones.
CN117685018A (en) Waterproof structure of underground tunnel and construction method thereof

Legal Events

Date Code Title Description
MK5 Application lapsed section 142(2)(e) - patent request and compl. specification not accepted